Laserfiche WebLink
2 <br />6. Electrical services shall be installed in accordance to NFPA 70, Article 513 (513.1 through <br />513.16). This shall be noted on the plans. Building Official, who is the designated electrical <br />inspector for the City, will be inspecting the electrical work. <br />7. The plans do not reflect any insulation packages typical for large metal buildings such as this <br />one. As there are certain requirements concerning flammability issues for insulation none <br />shall be attached without further review from the City. <br />8. No heating, ventilation or A/C was shown in the plans, therefore shall not be installed without <br />additional review from the City. <br />Following submission of the requested information or revisions, plan approval will be made. We <br />await the information from you and should further information be needed by yourself please do <br />not hesitate to contact us. <br />***Please be advised this review of plans submitted is a cursory review to assist the contractor in <br />compliance with applicable fire safety codes. This review is not intended to be a final approval of the <br />submitted plans. It is the contractor's sole responsibility to ensure that the plans are in complete compliance <br />with all applicable NFPA codes and local ordinances. In the event that further examination or site <br />inspection reveals areas of non-compliance, it shall be the contractor's sole responsibility, at their sole <br />expense to bring those areas in compliance. The City assumes no responsibility for the contractor's failure <br />to be in compliance with all applicable NFPA codes and local ordinances. <br />