Laserfiche WebLink
DESIGN LOADS: <br />BUILDING CODE: THE FLORIDA BUILDING CODE 6TH ED. (2017) <br />SPECIAL INSPECTION REQUIREMENTS: NO- NOT CLASSIFIED AS A THRESHOLD BUILDING <br />DESIGN WIND LOADING CRITERIA: <br />CODE: ASCE 7-10 <br />DESIGN BASE WIND SPEED = 138 MPH (3 SEC. GUST) <br />RISK CATEGORY 11 <br />EXPOSURE CATEGORY B <br />INTERNAL PRESS. COEFFICIENT, GCpj = 0.0, +/�-0.18 <br />BUILDING ENCLOSURE CATEGORY = OPEN, ENCLOSED <br />WINDBORNE DEBRIS REGION - COMPONENT AND CLADDING DESIGN: <br />REFER TO COMPONENT AND CLADDING TABLES FOR DESIGN PRESSURES. <br />GRAVITY DESIGN LOADS: <br />DEAD LOADS: <br />SECOND FLOOR: <br />STRUCTURE (2ND FL.) = 15 PSF <br />ROOF: <br />STRUCTURE:= 20 PSF <br />LIVE LOADS: <br />BALCONY: <br />RESIDENTIAL = 40 PSF <br />ROOF MIN. = 20 PSF <br />EXTENT OF STRUCTURAL ANALYSIS: <br />THE STRUCTURAL ANALYSIS AND DESIGN PERFORMED ON THIS PROJECT WAS LIMITED TO THAT <br />AREA AND SPECIFICALLY INCLUDED ONLY THOSE ELEMENTS WHICH WERE DIRECTLY EFFECTED <br />BY THE MODIFICATIONS REQUIRED TO ADAPT THE EXISTING BUILDING TO SUIT THE OWNER'S <br />REQUIREMENTS AND CHANGES. NO OTHER STRUCTURAL ANALYSIS OF THE EXISTING <br />BUILDING STRUCTURE(S) WAS PERFORMED AND NONE IS EXPRESSED OR IMPLIED. <br />EXISTING CONDITIONS REPRESENTED BY THESE DOCUMENTS: <br />SHOULD THE GENERAL CONTRACTOR, OR ANY OF HIS SUB, -CONTRACTORS OBSERVE OR <br />BECOME AWARE OF ANY EXISTING CONDITION(S) WHICH VARY OR APPEAR TO BE CONTRARY <br />TO THOSE REPRESENTED BY THESE DOCUMENTS, HE SHALL IMMEDIATELY BRING <br />SUCH TO THE ATTENTION OF THE ARCHITECT. DUE CARE WAS EXERCISED IN THE RESEARCH <br />AND PREPARATION OF THESE DOCUMENTS, BUTAS IS OFTEN THE CASE IN RENOVAT10N AND <br />RETROFIT PROJECTS, SOME EXISTING CONDITIONS REPRESENTED BY THE AVAILABLE <br />ORIGINAL DESIGN AND CONSTRUCTION DOCUMENTS MAY VARY FROM WHAT WAS ACTUALLY <br />CONSTRUCTED. IMMEDIATE NOTIFICATION OF THE DESIGN TEAM OF SUCH CONDITIONS WILL <br />LESSEN THE IMPACT OF ANY NECESSARY CHANGES OR MODIFICATIONS. ADDITIONALLY, <br />SHOULD THE GENERAL CONTRACTOR, OR ANY OF HIS SUB -CONTRACTORS OBSERVE OR <br />BECOME AWARE OF ANY EXISTING CONDITION(S) WHICH WOULD SUGGEST THE POTENTIAL FOR <br />EXISTING STRUCTURAL DISTRESS OR OVERSTRESS, HE SHALL IMMEDIATELY BRING SUCH TO <br />THE ATTENTION OF THE ARCHITECT. <br />GENERAL CONSTRUCTION NOTES: <br />1 . THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT <br />DOCUMENTS.THEY SHALL BE RESPONSIBLE FOR THE FIELD COORDINATION OF <br />ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL AND ELECTRICAL TRADES, INCLUDING <br />DETAIL AND DIMENSIONS. ANY DISCREPANCIES BETWEEN DRAWINGS, DETAJLS, <br />DIMENSIONS, ETC., SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT <br />IMMEDIATELY UPON DISCOVERY AND PRIOR TO COMMENCING CONSTRUCTION OF THE <br />AFFECTED AREA. DO NOT SCALE DRAWINGS FOR DIMENSIONS NOT PROVIDED. REFER TO <br />THE ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT PROVIDED ON THE STRUCTURAL <br />DRAWINGS. <br />2. THE INFORMATION CONTAINED IN THE STRUCTURAL DRAWINGS IS, IN ITSELF, INCOMPLETE <br />AND SHALL BE USED IN CONJUNCTION WITH ALL CONTRACT DOCUMENTS, INCLUDING THE <br />WRITTEN SPECIFICATION, ISSUED IN CONJUNCTION WITH THE DRAWINGS AND ALL <br />REFERENCED CONSTRUCTION MATERIALS INSTITUTE OR ASSOCIATION SPECIFICATIONS, <br />STANDARD PRACTICES, CODES, ETC. <br />3. SPECIFICATIONS INDICATED IN THE STRUCTURAL CONTRACT DOCUMENTS ARE TO BE <br />CONSIDERED MINIMUM ACCEPTABLE CRITERIA AND MAY BE SUPERSEDED BY MORE <br />STRINGENT CRITERIA REQUIRED AS A PART OF THE ARCHITECTURAL CONTRACT <br />DOCUMENTS. <br />4. SECTIONS AND DETAILS ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL <br />APPLY AT ALL SIMILAR LOCATIONS, UNLESS OTHER SECTIONS AND DETAILS ARE <br />SPECIFICALLY REFERENCED. <br />5. WHERE, IN THE OPINION OF THE CONTRACTOR: <br />A INFORMATION IS UNCLEAR <br />B. INFORMATION IS NOT PROVIDED <br />C. THERE IS A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION <br />D. THERE IS A CONFLICT WITHIN THE DRAWINGS <br />E. THERE IS A CONFLICT WITHIN THE SPECIFICATIONS <br />THE HIGHER QUALITY AND/OR GREATER QUANTITY OF THE CONFLICTING OPTIONS SHALL <br />GOVERN. IMMEDIATELY AFTER THE DISCOVERY OF SUCH SITUATIONS, THE <br />CONTRACTOR SHALL CONTACT THE ARCHITECT(ENGINEER FOR GUIDANCE. THE <br />ARCHITECTIENGINEER IS AND SHALL REMAIN THE FINAL AUTHORITY FOR INTERPRETATION <br />OF THE DOCUMENTS IN SITUATIONS OF CONFLICT- <br />6. REFER TO THE ARCHITECTURAL DRAWINGS FOR FINISHED FLOOR ELEVATIONS, SLOPES <br />AND LOCATION OF DEPRESSED AREAS.COMPARE WITH STRUCTURAL PLANS AND DETAILS <br />AND REPORT ANY DISCREPANCIES TO THE ARCHITECT PRIOR TO FABRICATION OR <br />INSTALLATION OF STRUCTURAL WORK. <br />7. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE FLORIDA <br />BUILDING CODE e ED. (2017) AND THE WRITTEN SPECIFICATION BOOKLET ISSUED WITH <br />THE DRAWINGS. <br />8. THE SAFETY OF THE WORKERS AND THE CONSTRUCTION SITE IS THE SOLE <br />RESPONSIBILITY OF THE CONTRACTOR NEITHER THE ARCHITECT NOR THE STRUCTURAL <br />ENGINEER SHALL BE HELD LIABLE FOR ACCIDENTS DURING CONSTRUCTION OF THE <br />PROJECT. THESE DOCUMENTS DO NOT INCLUDE PROVISIONS TO SATISFY SAFETY <br />REQUIREMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING <br />CONFORMANCE WITH ALL OSHA STANDARDS. JOB SITE VISITS BY THE ENGINEER SHALL <br />NOT CONSTITUTE APPROVAL, AWARENESS OR LIABILITY FOR ANY HAZARDOUS <br />CONDITIONS. <br />9. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE ERECTION <br />PROCEDURE, MEANS, METHODS AND SEQUENCE OF CONSTRUCTION. IT IS THE SOLE <br />RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THE STRUCTURAL STABILITY OF THE <br />BUILDING AND IT'S COMPONENT PARTS DURING ALL PHASES OF CONSTRUCTION THIS <br />INCLUDES, BUT IS NOT LIMITED TO THE ADDITION OF ANY NECESSARY TEMPORARY <br />BRACING, GUYING, SHORING, TIE DOWNS, ETC., THAT MAY BE REQUIRED TO RESIST <br />FORCES APPLIED DURING CONSTRUCTION, INCLUDING WIND. <br />10. THE CONTRACTOR SHALL EXERCISE SUCH MEASURES AS ARE REQUIRED TO PROTECT <br />ADJOINING PROPERTY, STRUCTURES, FACILITIES AND UTILITIES FROM DAMAGE <br />DURING CONSTRUCTION. <br />11. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO BEGINNING <br />CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE ALL DIMENSIONS AND <br />ELEVATIONS WITH THE ARCHITECTURAL DRAWINGS. <br />12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER DESIGN AND CONSTRUCTION <br />OF ALL NECESSARY FORMWORK, SHORING, RESHORING AND UNDERPINNING, WHICH IS <br />REQUIRED TO SAFELY CONSTRUCT THE STRUCTURE. THE CONTRACTOR IS RESPONSIBLE <br />FOR ANY DAMAGE CAUSED BY THE INSTALLATION OF ANY TEMPORARY SHORING AND/OR <br />UNDERPINNING. THE DESIGN OF ANY REQUIRED FORMWORK, SHORING, RESHORING, <br />UNDERPINNING, ETC., SHALL BE PROVIDED BY A PROFESSIONAL ENGINEER CURRENTLY <br />REGISTERED IN THE STATE OF FLORIDA (WHOSE TRAINING AND PRACTICE EXPERIENCE IS <br />STRUCTURAL ENGINEERING). DESIGN CALCULATIONS AND ERECTION DRAWING (WHICH <br />SHALL BEAR HIS SEAL, SIGNATURE AND THE DATE, SHALL BE SUBMITTED TO THE <br />ARCHITECTAND RESPONSIBLE BUILDING AUTHORITY. <br />13. THE CONTRACTOR HAS THE FULL RESPONSIBILITY FOR PROVIDING ANY AND ALL BRACING <br />NECESSARY TO MAJNTAJN STABILITY AND STRUCTURAL INTEGRITY OF WALLS DURING <br />CONSTRUCTION. RETAINING WALLS (IF ANY) SHALL BE BRACED PRIOR TO AND DURING ALL <br />COMPACTING AND BACKFILLING OPERATIONS. <br />14. NO MODIFICATION OF ANY STRUCTURAL MEMBER SHALL BE PERMITTED WITHOUT FIRST <br />OBTAJNING NOTIFICATION IN WRITING FROM THE STRUCTURAL ENGINEER THAT SUCH <br />MODIFICATION IS PERMISSIBLE. THIS INCLUDES ANY MODIFICATION WHICH MAY <br />ADVERSELY AFFECT THE STRENGTH OF THE MEMBER. <br />SHOP DRAVANG SUBMITTALS: <br />SHOP DRAWINGS ARE AN AID FOR FIELD PLACEMENT AND ARE SUPERSEDED BY THE <br />STRUCTURAL DRAWINGS. ITSHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE <br />CERTAIN THATALL CONSTRUCTION IS IN FULL AGREEMENTWITH THE LATEST STRUCTURAL <br />DRAWINGS- REVIEW OF SHOP FABRICATION AND ERECTION DRAWINGS BY THE ARCHITECT AND <br />IS FOR COORDINATION OF REVISIONS, INTERPRETATION REQUESTS <br />AND FOR VERIFICATION OF THE FABRICATORS UNDERSTANDING OF MAJOR DESIGN <br />REQUIREMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO APPROVE FOR SAME AS <br />ABOVE AND, IN ADDITION, TO REVIEW FOR DETAIL DESIGN REQUIREMENTS AND DIMENSIONS. <br />A/E REVIEWWILL NOT COVER DIMENSIONS OR DETAIL DESIGN REQUIREMENTS, SUCH AS <br />LENGTHS, QUANTITIES, ETC. THIS REVIEW NEITHER GUARANTEES THAT THE SHOP DRAWINGS <br />ARE CORRECT NOR INFERS THAT THE SHOP DRAWINGS SUPERSEDE THE STRUCTURAL <br />DRAWINGS. A/E REVIEW WILL NOT COMMENCE UNTIL ALL OF THE FOLLOWING REQUIREMENTS <br />ARE SATISFIED! <br />I . PAPER SUBMITTALS: SUBMITTALS SHALL INCLUDE ONE SET OF REPRODUCIBLES & <br />TWO SETS OF PRINTS FOR REVIEWAND FILE IN AlE OFFICE. THE REPRODUCIBLES WILL BE <br />MARKED TO INDICATE ANY NOTED DISCREPANCIES AND/OR ERRORS. THE REPRODUCIBLES <br />WILL THEN BE RETURNED TO THE CONTRACTOR FOR PRINTING OF DISTRIBUTION SETS FOR <br />THE OWNER, CONTRACTOR, SUB -CONTRACTORS, ETC. <br />ELECTRONIC SUBMITTALS: ELECTRONIC SUBMITTALS SHALL INCLUDE ONE COMPLETE SET <br />OF PRINTS FOR PHYSICAL REVIEW AND FILE IN ENGINEER'S OFFICE. IT IS NOT THE <br />RESPONSIBILITY OF THE ENGINEER TO BARE THE COST OF PRINTING COPIES OF SHOP <br />DRAWINGS FOR PHYSICAL REVIEW. ELECTRONIC SUBMITTALS WILL BE RED -LINED <br />ELECTRONICALLY WITH REVIEW COMMENTS AND WILL BE RETURNED ELECTRONICALLY TO <br />THE CONTRACTOR FOR DISTRIBUTION TO THE OWNER, CONTRACTOR, SUB -CONTRACTORS, <br />ETC. <br />NOTE: SUBMITTALS MADE IN ANY FORM OTHER THAN THAT REQUESTED ABOVE WILL BE <br />REJECTED AND WILL BE RETURNED TO CONTRACTOR WITHOUT ANY REVIEW. A <br />COMPLIANT SUBMITTAL WILL BE REQUESTED AND NO FURTHER ACTION WILL BE <br />TAKEN UNTIL A PROPER SUBMITTAL IS RECEIVED. <br />NOTE: ANY DELAYS CAUSED BY IMPROPER SUBMITTALS WILL BE THE SOLE <br />RESPONSIBILITY OF THE CONTRACTOR. <br />2. SHOP DRAWINGS SHALL NOT BE PREPARED UTILIZING REPRODUCTIONS OF THE <br />CONTRACT DOCUMENTS. SUCH SUBMITTALS WILL BE RETURNED WITHOUT ANY <br />REVIEW AND WILL REQUIRE RESUBMITTAL. <br />3. SUBMITTED DRAWINGS MUST BE COMPLETE, NOT PROGRESS PRINTS! SUBMITTED <br />DRAWINGS MUST HAVE BEEN CHECKED, APPROVED, DATED, AND INITIALED BY BOTH <br />THE DETAILER AND THE PERSON IN RESPONSIBLE CHARGE OF FINAL REVIEW AND <br />APPROVAL OF THE SHOP DRAWINGS IN THE FABRICATORS OFFICE. <br />4. THE CONTRACTOR SHALL HAVE REVIEWED AND APPROVED THE SHOP DRAWINGS <br />PRIOR TO SUBMITTING FOR AlE REVIEW! THE PROJECT MANAGER SHALL INDICATE <br />(EITHER BY COVER LETTER OR BY WRITTEN STATEMENT ON EACH SHEET OF <br />DRAWINGS SUBMITTED) FOLLOWING NOTE: <br />. <br />"THESE SHOP DRAWINGS AND ALL WORK TO BE PERFORMED MEET OR EXCEED <br />THE REQUIREMENTS OF THE CONTRACT DOCUMENTS IN ALL RESPECTS". THIS <br />STATEMENT SHALL BE SIGNED AND DATED BY THE PROJECT MANAGER. <br />5. SUBMITTALS SHALL PROVIDE FOR AT LEAST FOURTEEN (14) WORKING DAYS IN THE <br />ENGINEERS OFFICE FOR REVIEW. FOURTEEN DAY CLOCK WILL NOT START UNTIL <br />RECEIPT OF PROPER SUBMITTAL. PHASED SUBMITTALS AND SMALLER PACKAGES ARE <br />MORE EASILY AND QUICKLY RETURNED. <br />6. NOTE THAT THE CONTRACTOR'S (OR SUB-CONTRACTOR-S) FAILURE TO SUBMIT SHOP <br />DRAWINGS IN ATIMELY MANNER (PROVIDING FOR THE REQUIRED REVIEW TIME IN THE <br />ENGINEERS OFFICE) WILL NOT CONSTITUTE AN EMERGENCY AND AN IMMEDIATE <br />REVIEW BY THE ENGINEER! <br />THE CONTRACTOR AND SUB -CONTRACTORS SHALL ASSUME FULL RESPONSIBILITY, <br />VI OF SHOP DRAW NGS AND DOCUMENTS, FOR: DIMENSIONS; <br />COORDINATION W/ OTHER TRADES; FABRICATION PROCESSES; CONSTRUCTION <br />TECHNIQUES; SAFETY CONDITIONS; AND FULFILLING DETAIL REQUIREMENTS OFTHEIR <br />CONTRACT. <br />ING FOUNDATION NOTES: <br />1 � THE DESIGN SOILIFOUNDATION CONTACT PRESSURE = 2000 PSF_ PRIOR TO CONSTRUCTION, <br />THIS SHALL BE VERIFIED BY AT LEAST ONE 25 FEET DEEP STANDARD PENETRATION TEST <br />BORING AND A GEOTECHNICAL REPORT PERFORMED/PREPARED BY A GEOTECHNICAL <br />ENGINEER HOLDING CURRENT REGISTRATION IN THE STATE OF FLORIDA AS A <br />PROFESSIONAL ENGINEER- THE REPORT SHALL BE SIGNED AND SEALED BY THE <br />GEOTECHNICAL P.E. THE REPORT SHALL CONTAIN SPECIFIC DETAILED SITEWORK <br />INSTRUCTIONS AND PROCEDURES WHICH ARE REQUIRED AS A PART OF THE FOUNDATION <br />CONSTRUCTION AND SHALL BE FOLLOWED BY THE GENERAL CONTRACTOR. <br />2. ALL FILL MATERIAL SHALL BE PLACED AND COMPACTED IN STRICT CONFORMANCE WITH <br />THE GEOTECHNICAL REPORT PREPARED FOR THE PROJECT. IN NO INSTANCE SHALL FILL <br />MATERIAL BE PLACED AND COMPACTED IN INDIVIDUAL LIFT DEPTHS EXCEEDING 12 INCHES <br />UNLESS SPECIFICALLY DIRECTED TO DO SO IN WRITING BY THE PROJECT GEOTECHNICAL <br />ENGINEER. IN NO INSTANCE SHALL FILL MATERIAL AND NATURAL SUBGRADE MATERIAL <br />(UPON WHICH FOUNDATIONS AND/OR SLABS ON GRADE ARE TO BE SUPPORTED) BE <br />COMPACTED TO A CRITERIA LESS THAT 98% OF MODIFIED PROCTOR MAXIMUM DRY <br />DENSITY UNLESS SPECIFICALLY DIRECTED TO DO SO IN WRITING BY THE PROJECT <br />GEOTECHNICAL ENGINEER. <br />3. ALL POURED IN PLACE CONCRETE SHALL HAVE THE FOLLOWING MINIMUM 28 DAY ULTIMATE <br />COMPRESSIVE STRENGTH: <br />A. FOUNDATIONS-fc=3000 PSI. <br />B. COLUMNS AND (OR) PEDESTALS - fe = 4000 PSI. <br />C. BEAMS -fc=4000 PSL <br />4. THE OWNER SHALL RETAIN AN INDEPENDENT TESTING LABORATORY TO PERFORM THE <br />FOLLOWING TESTS: <br />A- ONE DENSITY TEST FOR EACH 1500 SQUARE FEET OF COMPACTED SUBGRADE OR <br />COMPACTED FILL. <br />B. ONE DENSITY TEST AT EACH COLUMN FOOTING. <br />C. ONE DENSITY TEST FOR EACH 25 FEET OF WALL FOOTING. <br />D. SEE CAST IN PLACE CONCRETE NOTES FOR CONCRETE TESTING REQUIREMENTS. <br />ONE COPY OF ALL TEST REPORT RESULTS SHALL BE SENT DIRECTLY TO THE ARCHITECT, <br />STRUCTURAL ENGINEER, GEOTECHNICAL ENGINEER AND GENERAL CONTRACTOR. <br />5. ALL REINFORCING BAR SHALL BE GRADE fy � 60 KSI AND SHALL MEET ASTM SPECIFICATION <br />A-615 (SI). <br />6. ALL FOUNDAT10N REBAR LAPS SHALL BE AS SCHEDULED ON THE DRAW NGS FOR THE <br />SPECIFIC STRUCTURAL ELEMENT AND STRENGTH OF CONCRETE TO BE POURED. <br />7. PROVIDE CORNER BARS TO MATCH SIZE AND COUNT OF FOUNDATION LONGITUDINAL BARS. <br />8. BUILDING DESIGN PURSUANT TO THE 2017 EDITION OF THE FLORIDA BUILDING CODE. <br />9. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO BEGINNING <br />FOUNDATION CONSTRUCTION. <br />10. UNLESS SPECIFICALLY DETAILED OTHERWISE, FOUNDATIONS SHALL BE LOCATED AT THE <br />CENTER OF WALLS AND/OR COLUMNS WHICH THEY SUPPORT. TOLERANCE FOR THE <br />ACCEPTABILITY OF PLACEMENT OF FOUNDATIONS, ANCHOR BOLTS, COLUMN DOWELS, <br />WALL DOWELS, ETC., SHALL BE GOVERNED BY THE APPROPRIATE AISC, ACI AND/OR <br />BUILDING CODES PROVISIONS. <br />11. WHEN LAYING OUT UNIFORMLY SPACED REINFORCING DOWELS, FIRST LOCATE DOWELS <br />SPECIFIED ATWINDOW OPENINGS, DOOR OPENINGS, ENDS OF WALLS, COLUMNS, <br />PILASTERS, ETC., THEN LOCATE THE DOWELS IN BETWEEN AT THE SPECIFIED MAXIMUM <br />UNIFORM SPACING. <br />12. THE FOUNDATION CONTRACTOR SHALL EXERCISE SUCH MEASURES AS ARE REQUIRED TO <br />PROTECT ALL ADJOINING BUILDINGS, STRUCTURES, FOUNDATIONS, FACILITIES AND <br />UTIL111ES FROM SUSTAINING DAMAGE WHICH GOULD RESULT FROM WORK DONE UNDER <br />THIS CONTRACT. <br />13. THE CONTRACTOR SHALL PROVIDE SUCH FOUNDATION STEPS AS ARE NECESSARY TO <br />PERMIT ALL BELOW GRADE PIPING TO PASS THROUGH THE BOTTOM OF THE SLAB ON <br />GRADE AND THE TOP OF THE FOUNDATION. PREFERABLY, THERE SHOULD BE A MINIMUM <br />OF FOUR INCHES OF SOIL BETWEEN THE PIPE AND BOTH THE BOTTOM OF THE SLAB ABOVE <br />AND THE TOP OF THE FOUNDATION BELOW. SEE TYPICAL STEPPED FOOTING DETAIL. <br />INDIVIDUAL COLUMN FOUNDATIONS SHOULD BE LOWERED TO ACCOMMODATE PLUMBING. <br />THE CONTRACTOR SHALL REVIEW SUCH SITUATIONS WITH THE STRUCTURAL ENGINEER <br />AND COORDINATE WITH SUBS AND <br />MATERIAL SUPPLIERS. <br />14. DURING THE CONSTRUCTION PHASES OF EXCAVATION, BACKFILLING AND FOUNDATION <br />CONSTRUCTION, A SOILS TESTING LABORATORY SHALL BE RETAINED BY THE OWNER TO <br />PROVIDE CONSTRUCTION REVIEW TO INSURE COMPLIANCE WITH THE CONSTRUCTION <br />DOCUMENTS. THE ARCHITECT SHALL BE IMMEDIATELY NOTIFIED OF ANY OBSERVED <br />CONDITIONS WHICH ARE AT VARIANCE WITH THE FIELD CONDITIONS INDICATED WITHIN THE <br />PROJECT GEOTECHNICAL REPORT. <br />15. UNLESS THE OWNER SPECIFICALLY PROHIBITS THE USE OF EARTH FORMS, THE VERTICAL <br />FACES OF FOUNDATIONS MAY BE EARTH FORMED IF THE EXCAVATION CAN BE KEPT <br />VERTICAL, CLEAN AND STABLE AND IF OVERALL FOOTING WIDTH IS INCREASED BY 2 INCHES <br />ON EACH SIDE (4 INCHES TOTAL), OTHERWISE VERTICAL SIDE FORMWORK MUST BE <br />PROVIDED. <br />16. THE CONTRACTOR IS CAUTIONED THAT EXCAVATIONS ADJACENT TO OR UNDER EXISTING <br />OR NEWLY CONSTRUCTED FOUNDATIONS SHALL NOT BE PERMITTED AND THAT THE COST <br />OF REPAIRING ANY DAMAGE ANDIOR SETTLEMENT RESULTING FROM SUCH EXCAVATIONS <br />WILL BE HIS/HER RESPONSIBILITY. <br />CAST IN PLACE CONCRETE NOTES: <br />I . CAST IN PLACE CONCRETE WORK INCLUDES REINFORCING STEEL AND RELATED WORK <br />SHOWN INCLUDING FORMWORK, SETTING ANCHOR BOLTS, PLATES, FRAMES, DOWELS FOR <br />MASONRY OR OTHER ITEMS EMBEDDED IN CONCRETE. <br />2. ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF THE FOLLOWING <br />CODES AND STANDARDS (LATEST EDITIONS): <br />A. ACI 117 "STANDARD TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS" <br />B. ACI 232AR "USE OF ROW OR PROCESSED NATURAL POZZOLANS IN CONCRETE" <br />OR <br />ACI 232.2R "USE OF FLY ASH IN CONCRETE" <br />OR <br />ACI 233R"GROUND GRANULATED BLAST FURNACE SLAG"CEMENT IN CONCRETE AND <br />MORTAR <br />C. ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS* <br />D. ACI 302 "GUIDE FOR CONCRETE FLOOR AND SLAB CONSTRUCTION" <br />E. ACI 304"RECOMMENDED PRACTICE FOR MEASURING, MIXING, TRANSPORTING AND <br />PLACING CONCRETE" <br />F. ACI 304.2R PLACING CONCRETE BY PUMPING METHODS <br />G. ACI 305R "RECOMMENDED PRACTICE FOR HOTWEATHER CONCRETING' <br />H. ACI 306R "RECOMMENDED PRACTICE FOR COLD WEATHER CONCRETING" <br />1. ACI 308 "STANDARD PRACTICE FOR CURING CONCRETE" <br />J. ACI 309R"GUIDE FOR CONSOLIDATION OF CONCRETE" <br />K. ACI 311 "RECOMMENDED PRACTICE FOR CONCRETE INSPECTION" <br />L. ACI 315 DETAILS AND DETAILING OF CONCRETE REINFORCEMENr <br />M. ACI 318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE' <br />N. ACI 347"RECOMMENDED PRACTICE FOR CONCRETE FORMWORK" <br />0. ACI MANUAL OF CONCRETE PRACTICE - PARTS 1 THRU 5 (AS APPROPRIATE TO TYPE OF <br />CONSTRUCTION). <br />3. CONCRETE SHALL BE NORMAL WEIGHT (U.N.O.) AND SHALL BE BATCHED, MIXED AND <br />TRANSPORTED IN ACCORDANCE WITH ASTM C94, -THE SPECIFICATIONS FOR READY MIX <br />CONCRETE". <br />NOTE: THE CONCRETE SHALL BE PLACED WITHIN 90 MINUTES OF BATCH TIME. <br />CONCRETE MIX DESIGN SHALL BE PROPORTIONED IN ACCORDANCE WITH ACI <br />301 TO PROVIDE CONCRETE CAPABLE OF BEING PLACED WITHOUT EXCESSIVE <br />SEGREGATION AND WITH ACCEPTABLE FINISHING PROPOERTIES, DURABILITY, <br />SURFACE HARDENERS, APPEARANCE, AND STRENGTH REQUIREMENTS <br />REQUIRED BY THESE SPECIFICATIONS. <br />MATERIALS USED IN THE CONCRETE MIX: <br />A. PORTLAND CEMENT: ASTM C 150, TYPE 1 OR TYPE 11 <br />B. AGGREGATES: NORMAL WEIGHT CONCRETE, COARSE AND FINE, ASTM C33 IMAXIMUM <br />AGGREGATE SIZE: FOUNDATIONS - #57, ALL OTHER CONCRETE STRUCTURAL ELEMENTS <br />- #67. <br />C. AIR ENTRAINING AGENT SHALL MEET ASTIM. C-260 <br />D. WATER REDUCING: ASTM C494. TYPE A <br />E. WATER: FRESH, CLEAN AND POTABLE. <br />F. NO ACCELERATORS, RETARDERS OR ADMIXTURES CONTAINING CHLORIDES WI LL BE <br />PERMITTED. <br />G. CALCIUM CHLORIDE SHALL NOT BE USED IN THE MIX <br />NOTE: ADDING OF WATER TO MIX IN FIELD: <br />THE READYMIX DRIVER SHALL HAVE IN HIS POSSESSION AT TIME OF DELIVERY, <br />WRITTEN INSTRUCTIONS FROM THE READYMIX SUPPLIER DETAJLING THE <br />MAXIMUM AMOUNT OF WATER WHICH CAN BE ADDED TO THE MIX BY THE <br />DRIVER IN THE FIELD (GALLONS PER YARD)- OTHERWISE WATER SHALL NOT BE <br />ADDED TO THE MIX AFTER LEAVING THE BATCH PLANT. <br />H. FLY-ASH:ASTM C618, CLASS F, 20% MAXIMUM BYWEIGHT. 00 NOT USE FOR EXPOSED <br />SLABS FOR ARCHITECTURAL CONCRETE. <br />1. SUPER PLASTICIZER: ASTM C494. TYPE F OR G, WHERE AUTHORIZED BY THE ENGINEER <br />J. SLAG CEMENT IN CONCRETE: ASTM C989,30% BY WEIGHT <br />4. CONCRETE SHALL HAVE THE MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS, <br />(U.N-O.), FOR THE STRUCTURAL ELEMENT INDICATED BELOW: <br />FOUNDATION: 3000 PSI . <br />SLAB ON GRADE: 3000 PSI <br />COLUMNS/PEDESTALS: 4000 PSI <br />TIE BEAMS: 4000 PSI <br />BEAMS: 4000 PSI <br />WALLS: 4000 PSI <br />CONCRETE MIX DESIGN SUBMITTAL DATA REQUIRED: <br />A- INTENDED USAGE AND LOCATION FOR EACH MIX TYPE <br />B. MIX DESIGN FOR EACH TYPE <br />C. CEMENT CONTENT IN POUNDS -PER -CUBIC YARD <br />D. COURSE AND FINE AGGREGATE IN POUNDSICUBIC YARD <br />E. WATER CEMENT RATIO BY WEIGHT (NOT TO EXCEED 0.60 EVERYWHERE EXCEPT SLAB <br />ON GRADE WIC = 0.5) <br />F. CEMENT TYPE OF MANUFACTURER <br />G. SLUMP RANGE <br />H. AIR CONTENT <br />1. ADMIXTURE TYPE AND MANUFACTURER <br />J. PERCENT ADMIXTURE BY WEIGHT <br />K. HISTORICAL PERFORMANCE STRENGTH TEST DATA REQUIRED TO ESTABLISH MIX <br />DESIGN. <br />5. THE OWNER SHALL RETAIN THE SERVICES OF A QUALIFIED ACCREDITED TESTING <br />LABORATORY TO PERFORM THE FOLLOWING TESTING SERVICES: <br />A. SAMPLING PER ASTM. C-1 72 <br />NOTE: SAMPLING SHALL BE TAKEN FROM THE POINT OF DELIVERY OF THE CONCRETE. <br />IN OTHER WORDS IF A CONCRETE PUMP IS USED, SAMPLES SHALL BE TAKEN FROM THE <br />DISCHARGE END OF THE HOSE. <br />B_ SLUMP PER ASTM. G-143 <br />C. COMPRESSIVE STRENGTH PER ASTM. C-31 & C-39. FOR EACH CLASS OF CONCRETE <br />POURED, PROVIDE FOUR SETS OF TWO CYLINDERS FOR EACH 50 CUBIC YARDS OF <br />CONCRETE OR FRACTION THEREOF. BREAK ONE SET AT (7) DAYS, TWO AT (28) <br />DAYS AND HOLD THE REMAINING IN RESERVE IN CASE A 56 DAY TEST IS REQUIRED. A <br />TEST RESULT IS CONSIDERED TO BE THE AVERAGE OF THE TWO CYLINDER BREAKS <br />COMPRISING A SET. ONE COPY OF ALL TEST RESULTS SHALL BE SENT DIRECTLY TO <br />THE OWNER, ARCHITECT, STRUCTURAL ENGINEER AND GENERAL CONTRACTOR <br />IMMEDIATELY UPON DETERMINATION OF RESULTS. FREQUENCY OF TESTING SHALL <br />NOT BE LESS THAN ONCE A DAY WHEN CONCRETE IS POURED NOR LESS THAN ONCE <br />FOR EACH 5000 SQUARE FEET OF SURFACE AREA FOR SLABS OR WALLS. <br />6. REINFORCEMENT USED IN CONCRETE STRUCTURAL ELEMENTS: <br />A. DEFORMED BARS: ALL MILD REINFORCING BAR USED IN CONCRETE SHALL BE GRADE 60 <br />KSI DEFORMED BAR CONFORMING TO ASTM SPECIFICATION A-615 (Sl). <br />B_ SMOOTH DOWELS: ASTM A615, PLAIN BARS, MINIMUM YIELD STRENGTH OF 60 KSI. <br />C. WELDED WIRE FABRIC: CONFORM TO ASTM. A-185 AND SUPPLIED IN FLAT SHEETS <br />(RATHER THAN IN ROLLS). FABRIC SHALL BE PLACED ON CONTINUOUS NO. 4 REBAR <br />CHAIRS SPACED AT 3 FT. O.C. TO MAINTAIN THE PROPER LOCATION WITHIN THE <br />CONCRETE. <br />D. ACCESSORIES TO CONFORM TO ACI 315. <br />E. WHERE CONCRETE SURFACES ARE EXPOSED, MAKE THOSE PORTIONS OF ALL <br />ACCESSORIES IN CONTACT WITH THE CONCRETE SURFACE OR WHININ Y2 INCHES <br />THEREOF, OF PLASTIC. <br />F. ALL REINFORCING DETAILS SHALL CONFORM TO ACI 315, LATEST EDITION,'MANUAL OF <br />STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES- (U.N.O.) <br />G. SUBMIT COMPLETE DETAIL AND PLACING SHOP DRAWINGS FOR ALL REINFORCING <br />7. CONCRETE COVER OVER REINFORCING IN CONCRETE STRUCTURAL ELEMENTS SHALL BE <br />AS FOLLOWS: <br />A- FOUNDATIONS: 3" <br />B. COLUMNS: 1 1/2" (7- FOR NO- 6 AND LARGER BARS) <br />C. BEAMS: 1 112" (2" FOR NO. 6 AND LARGER BARS) <br />D. WALLS: 1 1/2" (2" FOR NO. 6 AND LARGER BARS) <br />E_ SLABS: 1 "(INTERIOR), 1 112- (EXTERIOR) <br />NOTE: EXPOSED HORIZONTAL SURFACES OF STRUCTURAL SLABS SHALL BE COATED WITH <br />A HIGH QUALITY COMMERCIAL GRADE WATER PROOFING AND SEALING AGENT. <br />8. LAP SPLICE LENGTHS SHALL BE AS SCHEDULED FOR THE STRENGTH OF CONCRETE AND <br />SPECIFIC STRUCTURAL ELEMENT IN QUESTION. <br />9. PROVIDE PROPERLY TIED SPACERS, CHAIRS, BOLSTERS, ETC., AS ARE REQUIRED AND <br />NECESSARY TO ASSEMBLE, PLACE AND SUPPORT ALL REINFORCING IN THE PROPER <br />REQUIRED LOCATION WITHIN THE FORMWORK (AND MAINTAIN REINFORCING IN THE <br />PROPER POSITION DURING CONCRETE PLACEMENT OPERATIONS AND UNDER THE <br />APPLICATION OF CONSTRUCTION LOADS AND OPERATIONS). WHERE WIRE TYPE SUPPORTS <br />ARE USED, COMPLYING WITH CRSI RECOMMENDATIONS, PLASTIC TIP LEGS SHALL BE <br />USED WHEN CONCRETE IS TO BE EXPOSED TO EXTERIOR CONDITIONS. <br />10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER DESIGN AND <br />CONSTRUCTION OF ALL NECESSARY FORMWORK, SHORING AND RESHORING IN <br />ACCORDANCE WITH ACI 347. THE DESIGN SHALL BE PREPARED BY A DELEGATED <br />SPECIALTY STRUCTURAL ENGINEER CURRENTLY REGISTERED IN THE STATE OF INTENDED <br />CONSTRUCTION OF THE PROJECT WHERE LIFE SAFETY ISSUES ARE CRITICAL AND <br />ERECTION DRAWING SHALL BEAR HIS SEAL AND SIGNATURE AND THE DATE. ERECTION <br />DRAWINGS SHALL BE SUBMITTED TO THE RESPONSIBLE BUILDING AUTHORITY. <br />NOTE: EARTH MAYBE USED AS VERTICAL SURFACE FORMS FOR FOOTINGS PROVIDED <br />THAT THE FOOTING OVERALL WIDTH IS INCREASED IN SIZE BY FOUR INCHES. <br />11- POUR BREAKS IN BEAMS AND SLABS SHALL OCCUR AT MID SPAN BETWEEN SUPPORTS <br />(POINTS OF MINIMUM SHEAR) BY USE OF VERTICAL BULKHEADS. COLD JOINTS LOCATIONS <br />MUST BE LOCATED TO PROVIDE THE LEAST IMPACT ON THE STRENGTH OF THE <br />STRUCTURAL MEMBER. <br />NOTE: HORIZONTAL CONSTRUCTION JOINTS WILL NOT BE PERMITTED IN ANY <br />HORIZONTAL SPAN CONCRETE MEMBER! <br />12. PROVIDE MINIMUM 14 GAGE GALVANIZED CORRUGATED DOVETAIL ANCHORS AT 16"O.C. TO <br />CONNECT ADJACENT MASONRY TO CONCRETE STRUCTURAL ELEMENTS. PROVIDE <br />DOVETAIL ANCHOR HARDWARE WITH HOT DIP GALVANIZED FINISH, (ASTM A 153, <br />CLASS B2,(1.5 OZ. PER SQ. FT.)). <br />13, PROVIDE NEOPRENE WATER STOPS AT ALL CONSTRUCTION JOINTS IN CAST IN PLACE <br />CONCRETE WHERE ONE SIDE IS DIRECTLY EXPOSED TO EITHER THE WEATHER OR I N <br />DIRECT CONTACT WITH SOIL AND THE OTHER SIDE OCCURS WITHIN ENCLOSED SPACE- <br />14. PROVIDE COMMERCIAL FORM COATING COMPOUNDS (RELEASE AGENTS) THAT WILL NOT <br />BOND, STAIN OR ADVERSELY AFFECT THE FINISHED CONCRETE SURFACE. <br />15. PLACE CORNER BARS AT CORNERS AND ENDS OF ALL FOOTINGS, WALLS AND BEAMS. BAR <br />SIZE AND COUNT SHALL MATCH THE LONGITUDINAL REINFORCING IN THE MORE HEAVILY <br />REINFORCED INTERSECTING ELEMENT (U.N.O.). <br />16. DOWEL INTERSECTING WALLS, BEAMS, ETC. WITH DOWELS OF THE SAME SIZE, COUNT AND <br />SPACING AS THE LONGITUDINAL REINFORCING IN THE MORE HEAVILY REINFORCED <br />MEMBER FRAMING INTO THE JOINT. <br />17. PLACE AMINIMUM OF TWO (2) NO. 5 BARS (U.N.O.) AROUND ALL FOUR SIDES OF OPENINGS <br />IN CONCRETE STRUCTURAL ELEMENTS. BARS SHALL EXTEND AT LEAST 36 IN. BEYOND <br />THE FACE OF THE OPENING. <br />18. TYPICAL SPACING OF TIES AND STIRRUPS AS INDICATED ON THE PLANS SHALL BE <br />REDUCED BY 50% FOR THE SPACE BETWEEN THE FACE OF THE SUPPORT AND THE FIRST <br />S11RRUP OR TIE (U-N-0.). <br />19. VERTICAL AND HORIZONTAL REINFORCING INDICATED ON THE DRAWINGS SHALL BE <br />DOWELED OUT OF THE FOUNDATION (OR THE ELEMENTWHERE THE REINFORCING <br />ORIGINATES, (SLAB, BEAM, TIE BEAM, WALL, ETC-) UTILIZING AN ACI STANDARD <br />HOOK EMBEDDED TO DEVELOP THE FULL ULTIMATE TENSILE STRENGTH OF THE BAR <br />(U.N.O.). <br />20. VERTICAL WALL REINFORCING INDICATED ON THE DRAWINGS SHALL EXTEND FROM THE <br />FOUNDATION, (OR PER NOTE NO. 1 9 ABOVE), TO THE TIE BEAM AT THE TOP OF THE WALL <br />PROVIDE A STANDARD ACI 90 DEGREE HOOK (EMBEDDED TO DEVELOP THE FULL ULTIMATE <br />STRENGTH OF THE BAR) OUT OF THE ELEMENT WHERE THE REINFORCING ORIGI MATES AND <br />INTO THE TOP OF THE TIE BEAM. HOOK SIZE AND COUNT SHALL MATCH THE VERTICAL <br />REINFORCING. LAP SPLICE LENGTHS SHALL BE AS SCHEDULED ON THE PLANS. <br />NOTE: WHEN LAYING CUT FOUNDATION DOWELS FOR "UNIFORMLY'SPACED VERTICAL <br />WALL REINFORCING, FIRST LOCATE THE DOWELS SPECIFIED AT WINDOW, DOOR & <br />OTHER MASONRY OPENINGS, ENDS OF WALLS, COLUMNS, TIE COLUMNS, <br />PILASTERS, ETC-, THEN LOCATE DOWELS IN BETWEEN AT THE SPECIFIED MAXIMUM <br />UNIFORM SPACING. <br />21. THE MINIMUM BEARING OF CONCRETE BEAMS ON SUPPORT SHALL BE 8- (UNLESS NOTED <br />OR DETAILED OTHERWISE). WHERE BEAM BEARS ON A MASONRY SUPPORT, EXTEND BEAM <br />A DISTANCE OVER THE SUPPORT AT LEAST EQUAL TO THE LENGTH OF ALL REINFORCED <br />AND GROUTED CELLS ADJACENT TO THE MASONRY OPENING. WHERE THE BEAM BEARS ON <br />A REINFORCED CONCRETE SUPPORT, EXTEND THE BEAM ACROSS THE FULL LENGTH OF <br />THE SUPPORT (FULL BEARING OF BEAM ON SUPPORT). NOTE: ALL CONTINUOUS <br />LONGITUDINAL BEAM REINFORCING SHALL EXTEND FULL LENGTH ACROSS SUPPORT. <br />LENGTH OF BEARING OF BEAM ON SUPPORT SHALL NOT BE LESS THAN DEPTH OF BEAM. <br />22. SEE ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR LOCATIONS OF <br />EMBEDDED ITEMS, CONDUITS, PIPES, SLEEVES, SLAB DEPRESSIONS, ANCHORS, INSERTS, <br />ETC., IN AND THRU CONCRETE ELEMENTS, REQUIRED BY OTHER TRADES. NO CONDUITS, <br />PIPES, SLEEVES, PENETRATIONS OR INSERTS OF ANY TYPE WILL BE PERMITTED IN BEAMS, <br />JOISTS, SLABS, COLUMNS OR WALLS UNLESS APPROVED BY THE ENGINEER, SHOWN ON <br />THE SHOP DRAWINGS, AND CONSTRUCTED TO COMPLY WITH THE REQUIREMENTS OF <br />SECTION 6.3 OF ACI 318. AFTER APPROVAL BY THE ENGINEER, THE CONTRACTOR SHALL <br />FURNISH AND COORDINATE THE INSTALLATION OF EMBEDDED ITEMS PRIOR TO PLACING <br />THE CONCRETE. <br />23. GENERALLY, REINFORCING SHALL NOT BE CUT TO ACCOMMODATE THE INSTALLATION OF <br />EMBEDS, ANCHORS, SLEEVES ANDIOR OTHER ITEMS. WHERE SUCH IS ABSOLUTELY <br />NECESSARY, NOTIFY THE STRUCTURAL ENGINEER OF THE INTENTION TO DO SO AND FOR <br />EACH BAR CUT, PROVIDE ONE ADDITIONAL BAR EACH SIDE OF THE BAR WHICH WAS CUT. <br />SIZE OF ADD BARS SHALL MATCH SIZE OF ORIGINAL BAR AND LENGTH SHALL BE <br />ADEQUATE TO AT LEAST PROVIDE A CLASS -B!' TENSION LAP (OR EMBEDMENT) EACH SIDE <br />OF THE BAR WHICH WAS CUT <br />24. REMOVE TRASH AND DEBRIS FROM FORMWORK AND THOROUGHLY WET FORMS <br />IMMEDIATELY PRIOR TO PLACING CONCRETE. <br />25. THE CONCRETE SHALL BE PLACED IN ONE CONTINUOUS OPERATION BETWEEN <br />BULKHEADED CONSTRUCTION JOINTS. <br />26. THE CONCRETE SHALL BE POURED BY PUMP OR BUCKET AND SHALL BE CONSOLIDATED IN <br />PLACE USING INTERNAL VIBRATORS. <br />27. THE CONTRACTOR SHALL BEGIN CONCRETE CURING IMMEDIATELY AFTER FINISHING <br />OPERATIONS ARE COMPLETED. CURING AGENT SHALL BEA 300/0 SOLIDS LIQUID MEMBRANE <br />FORMING CHEMICAL COMPOUND AND SHALL MEET ASTM. C-309. THE GENERAL <br />CONTRACTOR IS TO VERIFY THAT ANY CURING COMPOUNDS THAT ARE USED ARE <br />COMPATIBLE WITH FINISH MATERIALS TO BE INSTALLED ON THE SURFACE OF THE <br />CONCRETE. <br />NOTE: WET CURING IS AN ACCEPTABLE AND PREFERRED METHOD OF CURING FOR SLABS. <br />THIS REQUIRES THAT THE SURFACE OF THE SLAB REMAIN SATURATED FOR AT <br />LEAST 4 DAYS WITH WET BURLAP OR POLYETHYLENE SHEETS. THIS <br />METHOD WILL GREATLY REDUCE VOLUME CHANGE AND SHRINKAGE CRACKS. <br />28. IMMEDIATELY AFTER REMOVAL OF FORMS, REPAIR ANY HONEYCOMB OR DEFECTIVE AREAS <br />WITH HIGH STRENGTH CEMENT GROUT. GROUT SHALL BE APPROVED BY THE ENGINEER. <br />WHEN REINFORCING IS VISIBLE IN DEFECTIVE AREA, CONTACT THE ENGINEER <br />IMMEDIATELY. <br />29. IT IS RECOMMENDED THAT CONCRETE TIE BEAM POUR LENGTH NOT TO EXCEED 50'-G" <br />BETWEEN COLD JOINTS AND IN NO EVENT EXCEED 10OFT IN LENGTH. <br />REQUIREMENTS FOR LIGHT DUTY SLABS ON GRADE: <br />1 . SLAB ON GRADE SHALL BE 4 INCHES THICK <br />2. SLUMP (AT POINT OF DELIVERY) = 3 TO 5 INCHES <br />3. MAXIMUM AGGREGATE SIZE = 1 INCH <br />4. ENTRAINED AIR CONTENT = 0 % <br />5. REINFORCEMENT SHALL BE 6 x 6 W2.1 I W2.1 WELDED WIRE MESH, CHAIRED 1 1/2 INCH <br />FROM TOP OF SLAB ON CONTINUOUS HORIZONTAL RODS AT A C/C SPACING NOT IN <br />EXCESS OF 3!-W. PULLING UP MESH DURING OR AFTER THE CONCRETE POUR IS NOT <br />AN ACCEPTABLE PRACTICE. PROVIDE WWM IN FLAT SHEETS. ROLLS OF WWM WILL <br />NOT BE ACCEPTABLE <br />6. PROVIDE MINIMUM 15 MIL VAPOR BARRIER (INTERIOR SLABS ONLY) <br />7. PROVIDE 30 POUND FELT BOND BREAKER WHERE SLABS ABUT VERTICAL SURFACES <br />SUCH AS WALLS AND COLUMNS. <br />a. SUPPORTING SOIL SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM <br />DRY DENSITY. PROVIDE VAPOR BARRIER BETWEEN BOTTOM OF CONCRETE AND TOP <br />OF COMPACTED SUBGRADE. <br />9. PROVIDE EITHER KEYED COLD JOINTS OR SAW CUT CONTROL JOINTS AT IT-01 O.C. <br />OM) IN EACH DIRECTION. SAW CUTJOINTS SHALL BE 1- DEEP AND SAWN AS SOON AS <br />THE SLAB WILL SUPPORT THE WEIGHT OF THE SAW AND OPERATOR AND THE BLADE <br />WILL PRODUCE CLEAN CUTS WITHOUT DISLODGING AGGREGATE. (4 HOURS MAX.) <br />10. FILL SAWCUTS WITH ELASTOMERIC SEALANT AFTER REMOVAL OF DUST WITH <br />COMPRESSED AIR. <br />ii. WET CURING IS THE PREFERRED METHOD OF CURING. THIS REQUIRES THAT THE <br />SURFACE OF THE SLAB REMAIN SATURATED FOR AT LEAST 4 DAYS WITH WET BURLAP <br />OR POLYETHYLENE SHEETS. THIS METHOD WILL GREATLY REDUCE VOLUME CHANGE <br />AND SHRINKAGE CRACKS. ALTERNATIVELY, APPLY CURING COMPOUND TO SLAB <br />WITHIN TWO HOURS OF COMPLE-11ON OF FINISHING OPERATIONS. USE LIQUID <br />MEMBRANE FORMING COMPOUND COMPLYING WITH ASTM C309, TYPE 1, CLASS A. <br />FOLLOW MANUFACTURER'S INSTRUCTIONS- ACCEPTABLE PRODUCTS INCLUDE: <br />A. MASTERBUILDERS "MASTERSEAL" <br />B. BURKE "SPARTAN COTE" <br />C. SONNBORN-CONTECH"KURE-N-SEAL <br />NOTE: CONFIRM THAT CURING COMPOUND WILL NOT INTERFERE WITH THE BONDING <br />OF ANY APPLIED FLOOR SURFACES. <br />12. IT IS RECOMMENDED THAT SLABS BE POURED IN CHECKERBOARD PATTERNS OR LONG <br />STRIPS WITH TRANSVERSE CUTS TO MINIMIZE HYDRATION/SHRINKAGE CRACKING. <br />STRUCTURAL WOOD FRAMING NOTES: <br />I . ALL STRUCTURAL WOOD FRAMING SHALL CONFORM TO "THE NATIONAL DESIGN <br />SPECIFICATION FOR WOOD CONSTRUCTION-, (LATEST EDITION), BY THE NATIONAL FOREST <br />PRODUCTS ASSOCIATION. <br />2. ALL STRUCTURAL LUMBER SHALL BE (AS A MINIMUM) "SOUTHERN PINE-, NO. 2 (OR BETTER), <br />(EXCEPT FOR 2X10's &12s, WHICH SHALL BE NO. 1), COMMERCIAL GRADE, SURFACED DRY <br />AND USED AT 19% MOISTURE CONTENT. (UNLESS OTHERWISE NOTED.) <br />3. THE FOLLOWING SHALL BE THE MINIMUM DESIGN VALUES FOR STRUCTURAL LUMBER USED <br />IN THIS PROJECT. USE NO. 1 (OR BETTER) WHERE REQUIRED FOR SPECIFIC MEMBER SIZES <br />TO PROVIDE THE SPECIFIED MINIMUM DESIGN VALUES INDICATED BELOW. CLUMBER- IS <br />INTENDED TO MEAN "DIMENSION" SAWN LUMBER AND "BEAMS AND STRINGERS-.) <br />A. Fb = 1200 P.Sl (EXTREME FIBER BENDING STRESS) <br />B_ Fv = 175 P.S.I. (HORIZONTAL SHEAR STRESS) <br />C. Fc = 1000 P.S.I. (COMP. STRESS PARALLEL TO GRAIN) <br />D. E = 1600 K.S.I. (MODULUS OF ELASTICITY) <br />4. ALL STRUCTURAL WOOD IN CONTACTWITH CONCRETE OR MASONRY AND (OR) HAVING <br />EXTERIOR EXPOSURE, SHALL BE PRESSURE TREATED TO ELIMINATE THE POSSIBILITY OF <br />DETERIORATION. <br />5. ALL METAL HARDWARE AND FASTENERS USED IN MAKING LUMBER CONNECTIONS SHALL <br />BE HOT DIP GALVANIZED AFTER FABRICATION. <br />NOTE: CONNECTION HARDWARE USED FOR WOOD WHICH IS CHEMICALLY TREATED FOR <br />FIRE RETARDATION SHALL BE FABRICATED FROM STAINLESS STEEL. CARE MUST <br />BE TAKEN WITH ANY OTHER MATERIAL WHICH MAY COME INTO CONTACT WITH <br />CHEMICALLY TREATED WOOD. <br />6. ALL PRE-ENGINEERED, PRE -FABRICATED TIMBER CONNECTORS SHALL BE HOT DIP <br />GALVANIZED AFTER FABRICATION. <br />(REFER TO NOTE (5.), ABOVE REGARDING CONNECTORS USED FOR CHEMICALLY TREATED <br />FIRE RETARDANTWOOD.) <br />7. UNLESS NOTED OTHERWISE, PROVIDE SOLID BRIDGING (SIZE TO MATCH MEMBER) OR I X 3 <br />'X"BRIDGING AT INTERVALS NOT TO EXCEED (THE DEPTH OF THE MEMBER X 12) OR 8--o.. <br />WHICHEVER IS THE LESSER INTERVAL. <br />8. PROVIDE SOLID BLOCKING (SIZE TO MATCH MEMBERS) BETWEEN MEMBERS AT ALL <br />SUPPORT POINTS. <br />9. UNLESS OTHERWISE NOTED ON THE DRAWINGS, THE MINIMUM FASTENING REQUIREMENTS <br />SHALL BE AS SET FORTH BY TABLE 2304.10.1, -FASTENING SCHEDULE-, OF THE FLORIDA <br />BUILDING CODE 67' ED. (2017). <br />10. SHEATHING SHALL BE AS SPECIFIED ON THE PLANS (15132 MIN) AND SHALL BE AS FOLLOWS <br />A. THE SHEATHING SPECIFIED ON PLAN IS THE MINIMUM THICKNESS REQUIRED TO MEET <br />THE SPECIFIED DESIGN LOADS. ARCHITECTURAL SPECIFICATION$ OR HIGHER <br />PERFORMANCE DESIRES MAY REQUIRE THICKER SHEATHING. <br />B. NOMINAL PANEL THICKNESSES ON PLAN AE TO BE AS FOLLOWS <br />a. 15/32 (.469"MIN THICKNESS) -32/16 SPAN RATING <br />b. 19/32 (.594 MIN THICKNESS) -40120 SPAN RATING <br />c. 23/32 (.719 MIN THICKNESS) -48124 SPAN RATING <br />C. ALL SHEATHING IS TO BE APA RATED <br />I 1. TYPICAL ROOF DECK SHEATHING (DIAPHRAGM) FASTENING REQUIREMENTS SHALL BE AS <br />FOLLOWS: <br />A. ALL FASTENERS SHALL BE 10d GALVANIZED COMMON WIRE MAILS. <br />B. SPACING OF NAILS AT ALL DIAPHRAGM BOUNDARIES SHALL NOT EXCEED 4 INCHES ON <br />CENTER (PROVIDE CON11NUOIJS BLOCKING ALONG PERIMETER OF ROOF DECK). <br />C. SPACING OF NAILS ALONG ALL SUPPORTING MEMBERS OF INDIVIDUAL SHEETS OF ROOF <br />DECK WITHIN 8 FEET OF CORNERS OF ROOF AND WITHIN 8 FEET OF CORNERS OF RIDGE <br />SHALL NOT EXCEED 4 INCHES ON CENTER. <br />D. SPACING OF NAILS AT SUPPORTED EDGES ALONG THE PERIMETER OF EACH SHEET OF <br />ROOF DECK SHALL NOT EXCEED 6 INCHES ON CENTER. <br />E. SPACING OF NAILS AT INTERIOR OF SHEETS AT ALL INTERMEDIATED SUPPORTING <br />MEMBERS SHALL NOT EXCEED 6 INCHES ON CENTER. <br />F. PLACE INDIVIDUAL PLYWOOD SHEATHING SHEETS SO AS TO STAGGER JOINTS BETWEEN <br />ADJACENTSHEETS IN ONE DIRECTION. (SIMILAR TO -RUNNING BOND- PATTERN IN <br />MASONRY). <br />12. ALL MUL11 MEMBER"BUILT UP"WOOD ELEMENTS SHALL BE FASTENED TOGETHER WITH <br />FULL GLUE AND NAILING TO FORM A SINGLE SOLID COMPOSITE STRUCTURAL ELEMENT. <br />THIS INCLUDES; (BUT IS NOT LIMITED TO), BEAMS, COLUMNS, HEADERS, MULTIPLE STUD <br />ELEMENTS, PLATES AT TOP AND BOTTOM OF STUD WALLS, ETC. <br />13. ALL ROOF JOISTS, RAFTERS AND TRUSSES SHALL BE SECURELY FASTENED TO THEIR <br />SUPPORTING MEMBERS WITH HURRICANE STRAPS. PROPOSED STRAP SHALL BE <br />SUBMITTED TO AND APPROVED BY THE ENGINEER OF RECORD. SUBMITTAL DATA SHALL <br />INCLUDE THE MANUFACTURER'S CATALOG SHEET AND INDICATED ALLOWABLE WORKING <br />LOAD WITH PROPOSED FASTENERS. WORKING LOADS SHALL BE SUPPLIED FOR UPLIFT AS <br />WELL AS FOR TRANSVERSE LOADS BOTH PARALLEL TO AND PERPENDICULAR TO THE <br />WIDTH OF THE STRAP. "DEEMED TO COMPLY ANCHOR" BY HUGHES MANUFACTURING INC. <br />OR HETAL 20, -EMBEDDED TRUSS ANCHOR" BY SIMPSON STRONGTIE CO. INC., ARE RATED <br />ACCORDINGLY. THE MINIMUM SHALL BE 1 INCH WIDE X 14 GAGE THICK GALVANIZED STRAP. <br />LENGTH SHALL BE SUFFICIENT TO WRAP ACROSS TOP OF MEMBER (TOP CHORD OF TRUSS) <br />AND DOWN FULL LENGTH OF OPPOSITE SIDE, <br />NOTE: HURRICANE STRAPS SHALL BE PLACED SO AS TO HAVE NO KINKS OR BENDS <br />(WHICH WILL PERMIT UPLIFT OF TRUSS, JOIST OR RAFTER PRIOR TO STRAP <br />RESISTING SUCH UPLIFT) BETWEEN ANCHORAGE AT TRUSS AND ANCHORAGE AT <br />SUPPORT - <br />NOTE: UNLESS OTHERWISE NOTED, PROVIDE ONE HURRICANE STRAP AT EACH SUPPORT <br />POINT FOR EACH PLY OF ALL GIRDER TRUSSES. <br />14. PRE-ENGINEERED, PRE -FABRICATED WOOD TRUSSES SHALL BE DESIGNED BY A <br />STRUCTURAL ENGINEER OF FLORIDA. DESIGN CALCULATIONS AND ALL SHOP DRAWINGS <br />SHALL BEAR HIS SIGNATURE AND SEAL. SEE"TRUSS SHOP DRAWING NOTES"FOR <br />ADDITIONAL INFORMATION. <br />WOOD ROOF TRUSS BRACING AND ERECTION NOTES: <br />1 . ALL BRACING SHOWN OR DESCRIBED SHALL BE ,(AS A MINIMUM), A NOMINAL 2X4 <br />CONTINUOUS, HAVING A MINIMUM CONNECTION OF (2) 16d GALVANIZED COMMON NAILS <br />INTO EACH TRUSS WITH WHICH IT MAKES CONTACT. <br />2. ALL LATERAL BRACING, AS MAY BE REQUIRED BY DESIGN TO REDUCE BUCKLING LENGTH <br />OF INDIVIDUAL TRUSS MEMBERS, SHALL BE A PART OF THE WOOD TRUSS DESIGN. ALL <br />REQUIRED TRUSS MEMBER BRACING, INCLUDING; BRACING MEMBER SIZE, EXACT <br />LOCATION AND CONNECTION REQUIREMENTS, SHALL BE CLEARLY INDICATED ON THE <br />SHOP FABRICATION AND ERECTION DRAWINGS PREPARED BY THE FABRICATOR'S <br />ENGINEERING DEPARTMENT. <br />3. ALL TRUSS TOP CHORDS SHALL BE CONTINUOUSLY BRACED BY THE ROOF DECKING. <br />4. ROOF TRUSSES SHALL BE DESIGNED FOR ALL UPLIFT FORCES REQUIRED BY THE 2017 <br />EDITION OF THE FLORIDA BUILDING CODE, INCLUDING LATESTADOPTED REVISIONS. <br />BOTTOM CHORDS SHALL BE DESIGNED WITH DUE CONSIDERATION FOR THE POSSIBILITY <br />OF BECOMING COMPRESSION MEMBERS UNDER MAXIMUM DESIGN WIND VELOCITY <br />CONDITIONS. ALL TRUSS BOTTOM CHORDS SHALL BE BRACED AT INTERVALS NOT <br />EXCEEDING 4'-O"O.C. THE CALCULATIONS PERFORMED BY THE TRUSS FABRICATORS <br />STRUCTURAL ENGINEER MAY INDICATE THE NECESSITY OF MORE CLOSELY SPACED <br />BOTTOM CHORD BRIDGING, WHICH SHALL BE INCLUDED IN THE BASE BID. ALL REQUIRED <br />BOTTOM CHORD MEMBER BRACING REQUIREMENTS SHALL BE CLEARLY INDICATED ON THE <br />SHOP FABRICATION AND ERECTION DRAWINGS PREPARED BY THE FABRICATOR'S <br />ENGINEERING DEPARTMENT. <br />5. SUCH TEMPORARY ERECTION BRACING, AS IS REQUIRED TO MAINTAIN LATERAL STABILITY <br />& STRUCTURAL INTEGRITY OF THE WOOD TRUSS SYSTEM AND SITE SAFETY DURING <br />ERECTION IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND HIS <br />SUBCONTRACTORS. <br />6. ALL HORIZONTAL BRACING SHALL BE STIFFENED AT 2T-D"O.C. WITH EITHER: <br />A. DIAGONAL BRACING EXTENDED TOA SHEARWALL PARALLEL TO THE ORIGINAL <br />BRACING� <br />B. A 1/2" SHEET OF PLYWOOD EXTENDED TO THE ROOF DECK OR A SHEARWALL. <br />7. BRACI NG OF WOOD TRUSS ES SHALL BE ACCOMPLISHED I N STRICT ACCORDANCE WITH THE <br />DOCUMENT, "BRACING WOOD TRUSSES", LATEST EDITION, AS PREPARED BY THE TRUSS <br />PLATE INSTITUTE. <br />8. HANDLING AND ERECTION OF WOOD TRUSSES SHALL BE ACCOMPLISHED IN STRICT <br />ACCORDANCE WITH THE DOCUMENT, "HANDLING AND ERECTING WOOD TRUSSES", LATEST <br />EDITION, AS PREPARED BY THE TRUSS PLATE INSTITUTE. <br />.FuRR <br />PT <br />(� <br />S, V, <br />WEGMAN <br />ARCHITECTS, P.A. <br />625 EAST ORANGE ST. <br />LAKELAND, FL 33801 <br />E-MAIL: FWARCHIP <br />FURRANDWEGMAN.COM <br />TEL 863 688 1 21 1 <br />FAX 863 688 1473 <br />@ COPYRIGHT 20`19 FURR & WEGMAN ARCHITECTS, RA <br />THE DESIGN AND CONCEPTS DEPICTED HEREWITH ARE THE <br />SOLE PROPERTY OF FURR & MGMAN ARCHITECTS, PA <br />NO REPRODUCTION , REVISION, OR REUSE OF THIS <br />DRAWING IS AUTHORIZED VWTHOUT SPECIFIC ARITTEN <br />PERMISSION, ALL RIGHTS RESERVED. <br />Ln <br />U) tD <br />�z M <br />z W <br />< 13% <br />133 44z <br />z - <br />0 Uj <br />lz w <br />< Ix <br />< <br />t-: <br />Z L3 <br />w <br />F <br />a: !: <br />< T_ <br />2 E I <br />w <br /><� <br />- <br />>_ <br />_j <br />z <br />0 <br />I`_ <br />Ill <br />Ill <br />T_ <br />cl) <br />(j) <br />i <br />17- <br />;� <br />0 <br />�_ <br />a_ <br />FE <br />0 <br />C/) <br />w <br />0 <br />z <br />0 <br />U) <br />5; <br />Ill <br />w <br />. <br />I <br />I <br />0 <br />Ill <br />I-_ <br />< <br />0 <br />1 <br /><1 . <br />. <br />. <br />0 <br />I- <br />11- <br />I <br />0 <br />N <br />1 <br />CD <br />N <br />0 <br />V_ <br />� <br />co <br />0 <br />L]Ij <br />F- <br />< <br />0 <br />z <br />(1) <br />F_ <br />0 <br />z <br />w <br />�_ <br />� <br />�_ <br />:) <br />w <br />0 <br />U) <br />C) <br />0 <br />w <br />_j 0 <br />0 <br />:r <br />_j < <br />z <br />U) <br />- <br />r w <br />0 <br />w <br />W w <br />F_ <br />0 <br />z <br />>_ Z) <br />Z) <br />0 <br />1: 0 <br />w <br />F_ <br />- <br />F_ <br />0- T_ C14 <br />lqt <br />U) <br />z <br />< <br />U-) <br />w I I I ct) <br />0 <br />0 <br />N 6d" w cl) <br />(D Z)-j <br />0 <br />LL <br />Z LL <br />LL < Ill ui <br />11-10 <br />. <br />0 <br />�> _j <br />0 < <br />C) <br />,r- <br />C) <br />w <br />_j <br />w m: -1 <br />I- It <br />>_ W 105- <br />L�j <br />CL <br />�_ r-- m: <br />< cl) <br />co <br />< <br />u) <br />Lo a- <br />co W <br />0 L) m N <br />I <br />3: <br />a - <br />PROJ MGR-. <br />- <br />CKD BY: <br />DH7 <br />SF <br />JOB <br />NUMBER: <br />2020-13- <br />SHEET <br />NUMBER: <br />"___.SN-1__j <br />