My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
583310th St
Zephyrhills
>
Building Department
>
Building Plans
>
583310th St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 2:34:58 PM
Creation date
2/18/2025 4:26:02 PM
Metadata
Fields
Template:
Building Plans
Street #
5833
Location
10th St
Contractor
VIP Construction
Building Plans - Permit #
21333
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OO GROUT CELLS SOLID @ <br />NEW MASONRY <br />Oj SAW -CUT MORTAR <br />JOINT ON ONE SIDE 8" <br />BEYOND DESIRED <br />OPENING <br />O <br />RADIUS THE TOP OF <br />SAW CUT TO ALLOW <br />ANGLE TO INSERT <br />FULLY FLUSH TO CMU <br />3U <br />INSERT EPDXY COATED <br />ANGLE, L 8x80/4", <br />WHERE LESS THAN 48" <br />OF BLOCK ABOVE USE: <br />L 5X3X3/8" <br />— <br />SIMPSON EPDXY ET <br />EPDXY <br />® REPEAT 1 AND 2 FOR <br />OTHER SIDE <br />O SAW -CUT AND REMOVE <br />OPENING <br />© INSTALL TAPCON 1/4"x2" <br />@ ENDS AND MIDDLE <br />OF LINTEL <br />SECTION <br />, , ELEV (+/-) 1 V-9" <br />FRC <br />SAW CUT DETAIL <br />SCALE: 3/4" = l'-0" <br />DEMOLITION ELEVATION <br />SCALE: 1/4" = l'-0" <br />DEMOLITION PLAN GENERAL NOTES <br />A. CONTRACTOR SHALL INSPECT AND VERIFY THE SCOPE OF WORK. <br />ANY ADDITIONAL WORK NOT SPECIFICALLY NOTED ON THE <br />DRAWINGS BUT WHICH BECOMES APPARENT UPON CAREFUL FIELD <br />INSPECTION SHALL BE CONSIDERED AS PART OF THIS CONTRACT. <br />B. PROVIDE SMOOTH, UNDETECTABLE TRANSITION FROM EXISTING TO <br />h ELEV (+/-)1 l'-9" <br />NEW CONSTRUCTION. <br />it <br />r <br />u <br />d <br />cl <br />u <br />DEMOLITION ELEVATION <br />SCALE: 1/4" = l'-0" <br />C. OWNER HAS FIRST SALVAGE RIGHTS TO ANY ELEMENT OF EXISTING <br />CONSTRUCTION TO BE REMOVED DURING DEMOLITION <br />OPERATIONS. <br />D. PATCH AND REPAIR ALL CONSTRUCTION TO REMAIN WHERE <br />AFFECTED BY DEMOLITION OPERATIONS. <br />E. PROTECT CONSTRUCTION TO REMAIN FROM WEATHER INTRUSION, <br />VANDALISM, AND ALL OTHER RISKS CREATED BY DEMOLITION <br />OPERATIONS. <br />F. FIELD VERIFY ALL DIMENSIONS ASSOCIATED WITH EXISTING <br />CONSTRUCTION. <br />G. WHERE DEMOLITION OPERATIONS AFFECT EXISTING STRUCTURAL <br />SYSTEM COMPONENTS TO REMAIN, SHORE THESE COMPONENTS AS <br />REQUIRED UNTIL NEW CONSTRUCTION IS IN PLACE. <br />H. REMOVE OR CAP AND ABANDON ALL ELECTRICAL WIRING IN WALLS <br />TO BE REMOVED. <br />I. PATCH ANY EXISTING CONSTRUCTION AS REQUIRED WHICH IS <br />DAMAGED DUE TO THE INSTALLATION OF NEW FIXTURES, <br />ELECTRICAL DEVICES, EQUIPMENT, OR ANY OTHER NEW <br />COMPONENT. <br />J. ALL EXISTING STRUCTURAL SUPPORT COMPONENTS SHALL REMAIN <br />INTACT. <br />2/D-1.0 K. ALL EXISTING STRUCTURAL SUPPORT COMPONENTS SHALL REMAIN <br />INTACT. <br />DEMOLITION PLAN <br />SCALE: 1/4" = V-0" <br />L. PROTECT ALL EXISTING FINISHES TO REMAIN FROM DAMAGE FOR <br />DURATION OF NEW CONSTRUCTION. <br />M. PROVIDE MINOR ALTERATIONS TO EXISTING H.V.A.C. SYSTEM AS <br />REQUIRED TO ACCOMMODATE NEW WORK, SUCH AS RELOCATION <br />OF DIFFUSERS AND RELATED ALTERATION OF ATTACHED <br />DUCTWORK. <br />N. PATCH AND REPAIR ALL EXISTING CEILINGS WHERE ELECTRICAL <br />AND MECHANICAL DEVICES ARE TO BE REMOVED, RELOCATED, <br />AND/OR ADDED. <br />O. PERFORM ADDITIONAL DEMOLITION THAT MIGHT REASONABLY BE <br />REQUIRED IN PREPARATION FOR NEW CONSTRUCTION OR SPECIFIED <br />FINISHES. INCLUDE CUTTING AND PATCHING OF EXISTING WALLS <br />AND FLOORS FOR REMOVAL OR INSTALLATION OF SERVICES, <br />EQUIPMENT OR ACCESSORIES, DEMOLITION SHALL BE PERFORMED <br />IN A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES TO <br />REMAIN. <br />P. PROTECTION - EXERCISE CARE DURING WORK TO PROTECT <br />INTERIOR AND EXTERIOR EXISTING CONSTRUCTION. REPAIRS TO <br />EXISTING CONSTRUCTION DUE TO DAMAGE SHALL BE DONE AT NO <br />COST TO THE OWNER. <br />Q. FINISHES - WHERE NEW FINISHES ARE SCHEDULED FOR EXISTING OR <br />RENOVATED SPACES, THE CONTRACTOR SHALL REMOVE EXISTING <br />FINISHES AND PREPARE SUBSTRATES TO RECEIVE NEW FINISHES AS <br />SCHEDULED. PREPARATION OF SUBSTRATES SHALL INCLUDE BUT <br />NOT BE LIMITED TO THE FOLLOWING: <br />0 <br />1. PATCHING AND/OR LEVELING OF FLOOR SLABS. <br />0 2. SKIM COATING OF GYPSUM WALLBOARD SURFACES <br />3. SANDING OF METAL FRAMES. <br />R. WHERE EXISTING SERVICES SUCH AS PLUMBING, ELECTRICAL, ETC. <br />ARE AFFECTED BY DEMOLITION WORK, SUCH AS REMOVAL OF AN <br />EXISTING PARTITION, THE SERVICES SHALL BE REMOVED TO A POINT <br />WHERE THEY CAN BE CAPPED AND TERMINATED UNLESS <br />OTHERWISE SHOWN ON THE DRAWINGS OF THE SPECIFIC <br />DISCIPLINE AFFECTED. <br />S. SMOKE DETECTOR HEADS MUST REMAIN ACTIVE THRU DEMOLITION. <br />DEMOLITION LEGEND <br />PARTITION TYPE ASSEMBLY <br />0 DEMO EXISTING PARTITION WALL IN IT'S ENTIRETY - <br />NON -RATED FLOOR TO CEILING <br />EXISTING WALL SYSTEM TO REMAIN, TYPICAL <br />DEMOLITION PLAN KEY NOTES <br />DOl REMOVE EXISTING WALLS, BAR SYSTEM, SHELVING AND FINISH <br />SYSTEMS SHOWN DASHED OVER AFFECTED AREAS TO RECEIVE <br />NEW WORK. CONTRACTOR TO FIELD VERIFY ALL LIMITS OF <br />DEMOLITION AND PROVIDE PROTECTION TO AREAS EXPOSED TO <br />THE ELEMENTS WHILE UNDER ALL PHASES OF CONSTRUCTION. <br />D02 REMOVE EXISTING DOOR AND FRAME SYSTEMS SHOWN DASHED <br />OVER AFFECTED AREAS TO RECEIVE NEW WORK. CONTRACTOR TO <br />FIELD VERIFY ALL LIMITS OF DEMOLITION AND PROVIDE <br />PROTECTION TO AREAS EXPOSED TO THE ELEMENTS WHILE UNDER <br />ALL PHASES OF CONSTRUCTION. <br />OREMOVE EXISTING WINDOW AND FRAME SYSTEMS SHOWN <br />D03 DASHED OVER AFFECTED AREAS TO RECEIVE NEW WORK. <br />CONTRACTOR TO FIELD VERIFY ALL LIMITS OF DEMOLITION AND <br />PROVIDE PROTECTION TO AREAS EXPOSED TO THE ELEMENTS <br />WHILE UNDER ALL PHASES OF CONSTRUCTION. <br />CLEAN WALLS OF ALL UN -NECESSARY ELECTRICAL EQUIPMENT. <br />D04 REMOVE ALL EXTRANEOUS WIRING, AND WALL TEXTURE THAT IS IN <br />DISREPAIR. <br />D05 PATCH AND REPAIR EXISTING WALL SYSTEMS TO REMAIN AROUND <br />AFFECTED AREAS SHOWN DASHED. PREPARE AREAS TO RECEIVE <br />NEW FINISHES. PAINT AS PER OWNER'S SPECIFICATIONS AND <br />FINISH SCHEDULE. <br />DEMOLITION ELEVATION KEY NOTES <br />D06 SAW CUT WALLS SHOWN DASHED OVER AFFECTED AREAS TO <br />RECEIVE NEW WORK. CONTRACTOR TO FIELD VERIFY ALL LIMITS OF <br />DEMOLITION AND PROVIDE PROTECTION TO AREAS EXPOSED TO <br />THE ELEMENTS WHILE UNDER ALL PHASES OF CONSTRUCTION. <br />V Lo <br />z� <br />CD <br />L u c-I <br />I <br />■ <br />I- T <br />F— (l) <br />W V) <br />co <br />Q <br />Ll <br />UJ� cv) <br />ca <br />z <br />T" <br />uz 0 <br />w Lu <br />Q > U-) <br />Q <br />+� <br />N <br />F-- =1-0D <br />z l— m M <br />Q n p <br />ca <br />U Vj LL NO <br />Q Q 0 <br />co <br />J uj f1 (D <br />uj <br />N N <br />c <br />Q <br />N <br />z <br />W <br />d- <br />V ) <br />O <br />M <br />M <br />� <br />U <br />ILL <br />wzU) <br />VJ <br />Q c— <br />i <br />— O <br />�_ <br />W <br />W cMl <br />�— <br />W <br />LID <br />W <br />N <br />ISSUE RECORD <br />REVISION NO./DATE: <br />DESCRIPTION: <br />DEMOLITION <br />PLAN <br />JOB No.: 19-023 <br />DWN BY: MA <br />CHK BY: JLM <br />DATE ISSUED: 05.07.19 <br />SHEET NO: <br />D= 1 <br />.0 <br />H Il llil _T_rr_ <br />TTTTT r-i- <br />
The URL can be used to link to this page
Your browser does not support the video tag.