I I I ■ I I � � I.
<br />2x8 P.T. BUCK -CONNECT TO BLOCK
<br />W/ 1/4" x 3 1/4" TAPCON ( 1 1/4" MIN.
<br />EMBEDMENT INTO BLK.)
<br />1 X 4 FURRING
<br />BLOCK HEADER
<br />1/2" DRYWALL
<br />2 x 8 45^ DIAGONAL
<br />BRACE(S)
<br />BUILT UP PLWD. BUCK
<br />SCRIBE (NOTCH)
<br />BACKSIDE TO FIT ARCH
<br />CONNECT W/ 8d NAILS
<br />INSTALL WDW. SCREW ANCHOR
<br />INTO ARCH BLKG. PER
<br />INSTALLATION DETAILS
<br />1x4 1/2" DRYWALL
<br />DOOR JAMB (REFER
<br />DOOR JAMB (REFE;to
<br />2" DRYWALL
<br />DOOR JAMB (REFER
<br />TO PRODUCT
<br />1x4
<br />1/2" DRYWALL
<br />TO PRODUCT
<br />P.T.
<br />TO PRODUCT
<br />APPROVAL FOR C
<br />APPROVAL FOR CONN.
<br />APPROVAL FOR CONN.
<br />1x4
<br />X 4
<br />1,
<br />3-1/4" LONG X 3/16"0
<br />P.T."0
<br />FURRING
<br />3/16lx4 X 3" LONG FURRING
<br />TAPCONS
<br />(2) ROWS 3/16" x 3-1/2"
<br />URRING
<br />TAPCON. INTO
<br />STAGGERED @ 16"x..
<br />TAPCON @ 16" O.C. & 4"
<br />2X8
<br />ElX8
<br />BLOCK@ SPACING „
<br />1
<br />DETAIL
<br />O.C. 2-ROWS INTO
<br />FROM EACH END w/ MIN.
<br />2" EDGE DIST. ATTACH
<br />PER MANUFACTURE
<br />MASONRY THROUGH 1-1 /211 DETAIL
<br />1x8 w/ (2) ROWS 8d NALS
<br />"
<br />3 DETAIL
<br />1x4 P.T. & 1x8 P.T.
<br />STAGGERED @ 12" O.C.
<br />3/16" x 3 -1/2"
<br />1x4 P.T.
<br />DOOR JAMB (REFER
<br />TAPCON 16"
<br />�°
<br />TO PRODUCT
<br />O.C. & 4" FROM
<br />DOOR JAMB (REFER
<br />APPROVAL FOR CONN.
<br />lx4
<br />1/2" DRYWALL
<br />DOOR JAMB (REFER
<br />EACH END W/ MIN,
<br />TO PRODUCT
<br />TO PRODUCT
<br />2" EDGE DIST.
<br />APPROVAL FOR CONN.
<br />2x8 P.T. w/ (2) ROWS 3/16"
<br />APPROVAL FOR CONN.
<br />(2) ROWS 3/16" x 3-1/2"
<br />x O.C.& TAPCON @ H
<br />& 4" FROM EACH
<br />1x4
<br />TAPCON @ 16" O.C. &
<br />.C.
<br />END w/ MIN. 2" EDGE DIST.
<br />FURRING
<br />4" FROM EACH END w/
<br />2x8 P.T.
<br />ATTACH SECOND PLY wl
<br />2x P.T. AS REQ'D
<br />MIN. 2" EDGE DIST.
<br />(2) ROWS 10dx3"
<br />2x8
<br />2x DETAIL
<br />2 1/4" DETAIL
<br />STAGGERED @ 12" O.C.
<br />3-1/4" DETAIL
<br />BUILDOUT @ OVER SIZE DOOR -WINDOW ROUGH OPENINGS
<br />CC
<br />SCALE: N.T.S.
<br />SS
<br />1/4" MAX 2'-0"
<br />SOLID BLKG. AT TOP BTWN.
<br />ARCH BLKG. & BUCK
<br />8d NAILS AT 8" O.C. AT BUCK
<br />(a) 10d NAILS INTO
<br />7/16" OSB 2 x 8 BRACE/ BLKG.
<br />ARCH PANEL CUT HOLE IN O.S.B. FOR
<br />POLY -CELL IN THIS AREA
<br />(4) 10d NAILS INTO 2 x 8
<br />BRACE/ BLKG.
<br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB
<br />ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8
<br />A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU —�
<br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH
<br />ARCH DETAIL rT�_
<br />SCALE: N.T.S. Qs")
<br />— SECTION
<br />A -A
<br />8"
<br />,1/4" x 3 1/4" TAPCONS
<br />—LEAVE A CUT OUT IN O.S.B. ON THE
<br />INSIDE TO ALLOW FOR INSULATION
<br />TO BE INSTALLED
<br />2 x 8 45 DIAGONAL BRACE AT EA.
<br />FACE OF ARCH W/ (3) 10d NAILS
<br />AT EA. END
<br />PROVIDE TAPCON WITHIN
<br />4" MIN. OF BRACE
<br />START OF ARC
<br />4' MAX. RAD.
<br />2
<br />x 8 BUCK - CONNECT TO BLOCK SECTION
<br />WITH
<br />1/4" x 3 1/4" TAPCON (1 1/4" MIN. B-B
<br />1/4" MAX EMBEDMENT INTO K.) Z-0" 8"
<br />BLOCK HEADER
<br />SOLID BLKG. AT TOP BTWN. ARCH
<br />1 X 4 FURRING
<br />BLKG. & BUCK
<br />8d NAILS @ 8" O.C. AT BUCK
<br />2 x 8 VERT. W/ (2) 10d
<br />PROVIDE 2 x 8 DIAG. BRACE BTWN,_,
<br />NAILS AT EA. END
<br />2 MIN.
<br />( )
<br />VERT. BRACES WHEN HGT. OFPROVIDE
<br />TAPCON AT EA. SIDE
<br />BRACE EXCEEDS 24"
<br />BUCK - (1) WITHIN 4"
<br />LEAVE A CUT OUT IN O.S.B. ON T
<br />MIN. OF START OF
<br />2 x 8 VERT. BRACE(S)
<br />INSIDE TO ALLOW FOR INSULATION
<br />ARCH
<br />TO BE INSTALLED
<br />BUILT UP PLWD. BUCK -
<br />SCRIBE (NOTCH) BACKSIDE
<br />7/16" OSB ARCH PANEL
<br />TO FIT ARCH CONNECT W/
<br />8d NAILS
<br />INSTALL WDW, SCREW
<br />ANCHOR INTO ARCH BLKG.
<br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS)
<br />BTWN. OSB ARCH FACES W/ (4) 10d NAILS EQUAL EQUAL
<br />THRU OSB INTO 2 x 8
<br />START OF ARC
<br />4' MAX. RAD.
<br />PER INSTALLATION DETAILS
<br />B-B
<br />ARCH DETAIL K
<br />SCALE: N.T.S. SS
<br />PROPER INSTALLATION
<br />MAX. 8"
<br />FILL SOLID
<br />BOTH CELLS
<br />#5 REB,
<br />(TYP,)
<br />STD. 90'
<br />HOOK (1
<br />FIE".
<br />I
<br />L//9
<br />+5A
<br />NOTCH WEB AT
<br />FIRST 2 COURSI
<br />UPLIFT CAPACITY = 805 # FOR 1 STRAP
<br />= 1610 # FOR 2 STRAPS
<br />1 PLY PRE-ENGINEERED TRUSS
<br />SIMPSON HM9KT w/ (4) 1/4"xl 1/2" SDS
<br />IS 2 PLY INSTALL SIMPSON LGT2 wl (16) 16d
<br />SINKERS AND (7) 1/4"x2 1/4" TITEN = 2150 #)
<br />BOND BEAM OR CAST IN PLACE BEAM
<br />RETROFIT TRUSS DETAIL
<br />N.T.S.
<br />2X6 SYP #2 CONT. ( MATCH TRUSS DEPTH
<br />IF TRUSSES USED) W/ (3) #6 X 4Y2" WOOD
<br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL
<br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/
<br />MIN. 4" EMBEDMENT AT 16" O.C.
<br />12
<br />JACK TRUSS PROVIDED BY SEE
<br />TRUSS COMPANY OR PLAN
<br />2x6 #2 SYP @ 24" O.C.
<br />ROOF SHEATHING ATTACHED
<br />PER NAILING SCHEDULE
<br />(5) 12d NAILS SIMPSON
<br />2X6 TO 2X4 H2.5A w/ (10)
<br />8d NAILS
<br />PROVIDE 2x
<br />CONT. W/ (3)
<br />12d NAILS
<br />JACK TRUSS PROVIDED BY
<br />TRUSS COMPANY OR 2x4
<br />#2 SYP @ 24" O.C.
<br />4'-0" MAX SEE PLAN
<br />2X4 SYP #2 CONT (MATCH TRUSS DEPTH
<br />NOTE:
<br />SHED ROOF ENDS TO BE
<br />GABLE ONLY, CORNERS
<br />SHALL NOT BE FRAMED AS
<br />HIP.
<br />DESIGNED ONLY FOR THE
<br />INSTALLATION OF SHINGLE
<br />AND METAL ROOF FINISH
<br />GLASS BLOCK INSTALLATION NOTES
<br />A)
<br />COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DR)
<br />AT LEAST 2 HOURS BEFORE PLACING MORTAR.
<br />B)
<br />ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP
<br />EXTENDS TO SILL.
<br />C)
<br />SET A FULL MORTAR BED JOINT, APPLIED TO SILL.
<br />D)
<br />SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS
<br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE
<br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE
<br />EXPANSION STRIP
<br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT
<br />20 ga. PANEL
<br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS
<br />ANCHOR
<br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER
<br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT.
<br />1/4" EXPANSION BOLT (2
<br />E)
<br />INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS
<br />9 ga. PANEL
<br />PER ANCHOR)
<br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING
<br />REINFORCING
<br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL
<br />(EVERY OTHER
<br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS.
<br />COURSE)
<br />EXPANSION STRIP
<br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE
<br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL
<br />REINFORCING AS FOLLOWS:
<br />" PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW.
<br />-
<br />SEALANT
<br />" PRESS PANEL REINFORCING INTO PLACE.
<br />„
<br />6 MIN. LAP SPLICE W/
<br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL
<br />REINFORCING PANEL
<br />SMOOTH. DO NO FURROW.
<br />F)
<br />PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT
<br />FURROW. MAINTAIN UNIFORM JOINT WIDTH.
<br />6" MIN. LAP
<br />G)
<br />SET SUCCEEDING COURSE OF BLOCKS, SPACE AT HEAD OF PANEL AND JAMBS MUST
<br />SPLICE
<br />REMAIN FREE OF MORTAR.
<br />NOTE:
<br />H)
<br />STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS
<br />SEE GLASS BLOCK INSTALLATION NOTES.
<br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE
<br />SEALANT
<br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY.
<br />GLASS BLOCK DETAIL
<br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE
<br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.)
<br />GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160
<br />I)
<br />AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN
<br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING.
<br />J)
<br />APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE
<br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS.
<br />K)
<br />A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING.
<br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR
<br />INSTALLATION OF GLASS BLOCK.
<br />IF TRUSSES USED) W/ (2) #6 X 4'/2' WOOD
<br />SCREWS @ 16" O.C. MAX. OR IF MASONRY
<br />WALL USE (2) 1/4" X 3 1/2" TAPCONS AT 16"
<br />O.C.
<br />SECTION @ ENTRY L
<br />SCALE: 3/4" = 1'-0" SS
<br />MASONRY WALL. SEE PLAN FOR
<br />REINFORCING. PROVIDE LOWER
<br />HOOKED DOWEL
<br />W.W.M. AT PERIMETER
<br />(1) #5 BARS CONT. WHERE THIS CONDITION
<br />TOP WITH MIN. 3" OCCURS
<br />COVER 6-0"
<br />F.F.
<br />° D .-►—�T
<br />D D
<br />° I—III-1 I I —III ;, I I f-1 I
<br />I_1T-1 I I—_T-
<br />I-11 511 I
<br />—III—I I I—
<br />°
<br />° I—III-1 IT
<br />GRADE o ,1111111-
<br />N p
<br />M z
<br />r �D
<br />(2) #5 REBAR. MIN. 3"
<br />16" MIN. Of COVER EA. WAY
<br />SECTION AT DEEP MONO FOUNDATION
<br />SCALE: 3/4" = V-0"
<br />`— FILLED CELL PER
<br />FOUNDATION PLAN
<br />kR
<br />YP.)
<br />THE
<br />:S
<br />■1\LriTil�7ltr�l•713I�Cylr.�iililri .
<br />FILLED CELL INSTALLATION
<br />SCALE: N.T.S.
<br />EE AP -H ='LAN AND
<br />PFF-F; 7R3 DF iIGN
<br />j ;.yFr IN I F HILL(_''.''!
<br />tx SUB FASCIA
<br />ALUM DRIP EDGC
<br />E :'a V;ALL T, FIE I ALLIM FASCIA
<br />PF k. Pt AN7
<br />I I 1-. Rltul FAINTED
<br />ENED PC I -
<br />`v. iTE FFI r 1 ' J -� NT VENTEC= �_=;uJLIC� �F,"IT
<br />IJT 2y: t ".nILEC € � . E_ _ar-h,lh _i NAILED TO DP
<br />°I K[N1 N,,ll 1 F .'=;U F''IFFY a'1THFF.
<br />v . 12,.,NALS 7'rF.
<br />,i,: ! 5U: DER = ii?F77 N.1,4TERIAL SPAN i:_:APACITIES BASED
<br />S ..
<br />a.aN TI�E DI.. �.,9+al+l 4'kE SI �,1= PE+�IF�EL.� Fi R .�>P.1Pc_�NENT'_+ AM[) CLADDING ,
<br />L +�.TED IN THE 7ESI N .f2 TERIA C'N SHEET SN
<br />F )L F I IA','11=N I A I ALL iNtk Al_ HA AL11`'.1 INa_ FL# if ,"4 k5
<br />G aC 1 T APPRC',,'4 i F C-HAN`JEL F;A ;TENEC' a �_':
<br />s=IlLiv,, T NAIL .Ll4? =a!IA Y, 2,:4' rt , K r' h.IIN EI.15EDWENT
<br />Ira _ T x 1 4' ttiT,t_ ;�dCJ ST LE d) 24 h1AX. +:j"[_,. IN DIAL l:*4�
<br />Fill TTEF,N
<br />I =B FA IA 'A', 1 ; �: i A. ;, 1 k .4 +_.R0 %I I APL d'. r=A:;F.-11400`.`F
<br />SF01 STRUCTURAL SOFFIT
<br />C'AN
<br />""'N" I d I :+ 1J'' 1 N; I ALL I11U :- AN BLt )CKIN� PFIk
<br />THE '-.c iFF IT F!_ PA 'INSTA_-LAT� . aN CRITFRIA
<br />REFER TO THE PRODUCT APPROVAL FOR INSTALLATION DETAILS.'
<br />2 X 4 #2 SYP SCAB TO SIDE OF
<br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6"
<br />* DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H.
<br />X (2) 10d NAILS @ 8" O.C.
<br />O�FRygN TO TRUSS TOP CHORD
<br />+ + IFNG�y PLYWOOD SHEATHING
<br />+ + BLOCKING AS
<br />+ REQUIRED
<br />TO SUPPORT
<br />TRUSS +
<br />+ SOFFIT
<br />+
<br />2X4 SYP d a +
<br />EACH TRUSS
<br />CONNECTOR
<br />SEE LINTEL
<br />SCHED.
<br />ENTER SO IT
<br />PRECAST LINTEL
<br />SEE ELEVATION
<br />2X2 #2 P.T. MIN. FOR OVER HANG
<br />W/J-CHANNEL SECURED (MAX. 4'-0")
<br />@24" O.C. FASTENED TO
<br />CMU W/ 3" LONG T-NAILS @
<br />24" O.C.
<br />SECTION @ ROOF EXTENSION K"M_�
<br />SCALE: 3/4" = 1'-0" SS
<br />SIMPSON HTT4 w/ (18) 1Od x 1 SEE SHEET D2 AND
<br />1/2" NAILS TO STUDS & (1) - FLOOR PLAN FOR
<br />5/8" DIA. ALL THREAD ROD MORE INFO
<br />EPDXIED w/ SIMPSON "SET"
<br />EPDXY MIN. 6" EMBEDMENT &
<br />3" MIN. EDGE DISTANCE _
<br />RETROFIT FOR MIc
<br />MSTAM STRAP
<br />4r:AI P. �/d
<br />H
<br />SS
<br />2"x BOT. PLATE W/ (2) 10d @ 6" O.C.
<br />3/4" PLYWOOD DECKING GLUED
<br />ATTACHED WALL SHEATHING TO
<br />AND NAILED W/ 8d COMMON @
<br />2X BOTTOM PLATE W/ 8d @ 4"
<br />6" O.C. EDGES AND 12" O.C. FIELD
<br />O.C., 2 ROWS STAGGERED
<br />2x BAND JOIST W/ FACE NAIL 1 Od
<br />@ TOP & BTTM CHORD, AND (8)
<br />FACE NAILS 10d @ TRUSS VERT.
<br />WEB
<br />METAL SEAT PLATE
<br />NOTE:
<br />LAP SHEATHING TO
<br />BOTTOM OF BAND
<br />JOIST TYPICAL
<br />SIMPSON HGAM10KTA @ 12" O.C.
<br />w/ (4) 1/4x1 1/2" SDS SCREWS
<br />INTO BAND JOIST & (4) 1/4"x2 3/4"
<br />TITEN INTO K.O. BLOCK
<br />RETROFIT FOR MISSING
<br />EMBEDDED STRAP
<br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S.
<br />FILL 1 st 4 COURSES
<br />SOLID W/GROUT
<br />a
<br />°
<br />a:
<br />FOR OVERHANGS BETWEEN OVER 1 1/2"
<br />CONTACT ENGINEER OF RECORD FOR
<br />FURTHER INSTRUCTIONS.
<br />OVERHAN �' :y . •
<br />e t'
<br />RETROFIT WALL OVERHANG DETAIL (NTS
<br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2"
<br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D.
<br />1'-0" 5'-0"
<br />I _$fINISH FLO
<br />°
<br />>� p
<br />#5 BAR
<br />CENTERED W/ g
<br />s H o IN TOP o
<br />_ , Ig KNOCKOUT / c�
<br />ElCHAIR BLOCK
<br />MONO FOOTING — D
<br />SIZE AND REINF. PER PLAN I =
<br />°
<br />AND SECTION DETAILS —I
<br />CLEAN FILL
<br />DIRT 6 z
<br />STANDARD o
<br />#5 BAR IN ' 90' HOOK N
<br />FILLED CELL -
<br />®a
<br />- �. 0 �. u.• 0 0 a' a• 7 7 a- n• R e- �•
<br />STEMWALL FOOTING SIZE AND
<br />MONO TO STEMWALL FOOTING REINF. AND STEMWALL
<br />SECTIONN DDETAETAILS
<br />SCALE: 3/4" = V-0"
<br />)TE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJEC
<br />)NTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION.
<br />EXISTING BOND BEAM.
<br />DRILL 3/4"x5" MIN. HOLE SET BAR IN
<br />EPDXY CAP TO PREVENT LEAKAGE
<br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT
<br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY t 2")
<br />#5x6' EMBEDDED INTO EXISTING BOND BEAM
<br />FILL CELL FULL HEIGHT W/
<br />NON SHRINK GROUT.
<br />#5x6' EMBEDDED INTO
<br />EXISTING FOOTING (2) #5x6' IN CONC.
<br />DRILL 3/4"x5" MIN. HOLE FILLED CELL
<br />SET BAR IN EPDXY
<br />I I EXISTING FOOTING
<br />RETROFIT FILLED CELL DETAIL
<br />-i"_i O
<br />4" SAW CUT
<br />A SECTION
<br />1 SCALE: N.T.S.
<br />SCALE: N.T.S.
<br />APR 0 8 2021"
<br />virtLrat Revievi Assist, Ir:c
<br />=.ar,s RL_:aicl?/ colnwteted and approved
<br />anc0 7th Ltlition
<br />- "
<br />co
<br />CV
<br />�,
<br />4
<br />N
<br />04
<br />N
<br />N M
<br />L01,
<br />00
<br />A. L '%t35
<br />41
<br />o
<br />0
<br />z
<br />�E
<br />0
<br />00
<br />N M Il
<br />Ln V :) u m ai m
<br />�
<br />�A1,, E � r o
<br />W ::) 0 2 o
<br />mimm —O �S o Q
<br />U�� �Q
<br />(^n` V W Q N
<br />W L CD �co
<br />w
<br />o - �
<br />w� w wm�0
<br />� z�
<br />Xs2J<03x,)WUQ.J0
<br />OfW
<br />0 ~ ~
<br />Z
<br />au) w0fw4zOLL w00mZ=¢U
<br />d F5 W W x¢ _0
<br />Q<<0LL¢-oZwWO62opCL
<br />LL
<br />00[C �Qzg
<br />0
<br />LL¢ w
<br />i�
<br />O
<br />Z 04
<br />OW
<br />�—
<br />U ti
<br />0 F— M O
<br /><U)CMILL
<br />Lu Lid
<br />F— � 0- M
<br />Ofa'2T
<br />ZUF-
<br />Wz�
<br />J
<br />J
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />ON
<br />N
<br />N
<br />N
<br />o
<br />N
<br />0
<br />(`{
<br />0
<br />N
<br />0
<br />N
<br />O
<br />o
<br />O
<br />�
<br />N
<br />o
<br />I
<br />I
<br />N
<br />o
<br />I
<br />I
<br />;
<br />'
<br />z
<br />O
<br />N
<br />W
<br />z
<br />Qz
<br />O
<br />zw
<br />6""'
<br />0
<br />U
<br />_
<br />UUm
<br />L
<br />0
<br />:Dzj
<br />0��
<br />O
<br />Z
<br />aka
<br />L
<br />W = a
<br />m�uJ
<br />rl
<br />ZOX
<br />LJ_I
<br />< � 0
<br />Q
<br />0
<br />zoo
<br />�■
<br />- �
<br />(.0"
<br />U
<br />a z
<br />z
<br />�z
<br />�
<br />0U
<br />0
<br />co
<br />z
<br />z
<br />z
<br />J
<br />w
<br />04
<br />0
<br />LAST PLOT DATE
<br />z 0
<br />STRUCTURAL
<br />DETAILS - RETRO FIT
<br />
|