Laserfiche WebLink
SIMPSON HGAMV <br />W/ <br />(4) 1/4"xl 1/2" SDS <br />SCREWS <br />TO BLOCKING & (� <br />1 /4"X2 3/4" <br />TITEN TO CMU <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2; 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) MAX. 9" <br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/ UNSUPPORTED, <br />SCHEDULE FOR SHEATHING DETAIL-7 (2) 16d NAILS-? IF >9" SEE 10/S6 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />45°± <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />MAX 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) <br />IF >9" SEE 10/S6 <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING <br />SCHEDULE FOR SHEATHING DETAIL <br />45' ± <br />SEE STRUCTURAL <br />NOTES AND NAILING <br />2x4 CRO <br />BRACE <br />SCHEDULE FOR <br />APPROX. 8" FROM <br />SHEATHING DETAIL <br />2x4 KICKER <br />2x8 SYP#2 "L" BRACE TO <br />RIDGE FASTENED AT <br />@ 8'-0" 0/C. <br />EXTEND AT LEAST 90% OF <br />EACH JOINT W/ (3) 10d <br />„ „ <br />L BRACE TO EXTEND <br />Zx4 CROSS BRACE <br />WEB LENGTH &NOTCH AT <br />' <br />& (2)10d TOE NAILS @ <br />' <br />AT LEAST 90% OF WEB <br />APPROX. 8" FROM <br />BOTTOM CHORD (SEE TABLE) <br />EA. END @ 48" O.C. <br />LENGTH (SEE TABLE) <br />RIDGE FASTENED AT <br />SIMPSON H2.5A w/ (10) 8d <br />2x8 P.T. <br />GABLE TRUSS <br />EACH JOINT wJ (3)10d & <br />FROM LEDGER TO <br />SILL <br />1/2" CDX PLYWOOD OR <br />(2)10d TOE NAILS @ EA. <br />'* <br />BLOCKING <br />' <br />7/16" OSB SHEATHING <br />END <br />ATTACHED W/ 10d <br />GYPSUM WALL BOARD <br />GABLE TRUSS <br />NAILS @ 6" O.C. EDGES <br />2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST <br />1/2" CDX PLYWOOD OR 7/16" <br />' <br />AND 12" O.C. FIELD <br />(4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOMJ7 <br />OSB SHEATHING ATTACHED <br />10dX3" @ 3" O/C <br />CORD ATTACHED W/ (2) 16d TOENAILS <br />w/ 10d NAILS @ 6' O.C. <br />THROUGH CHORD <br />2"x4" LEDGER (MATCH BOTTOM CHORD <br />EDGES AND 12" O.C. FIELD <br />INTO 2"x6" P T PLATE <br />SLOPE OF ADJACENT SCISSOR TRUSS) <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />`- DOUBLE TOP PLATE <br />2x4 CROSS BRACE APPROX. 8" <br />FROM RIDGE FASTENED AT <br />EACH JOINT w/ (3) 1 Od & (2) 1 Od <br />TOE NAILS @ EA. END <br />2x FRAME WALL (SEE WALL <br />SECTION FOR SIZE & SPACING) <br />1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 10d NAILS @ 6" O.C. EDGES <br />AND 12" O.C. FIELD <br />(2) 16d NAILS <br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH "L" BRACE HERE 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING <br />FASTEN WITH 10dx3" @ 4" O/C SPACED WEEP SCREED 1/2" x 8" "J" BOLT @ 48" O.C.IT <br />THE FIRST (4) ROWS OF TRUSSES 2x4 "T" ON TOP OF PANEL <br />INSTALLED PER MANUF. WEEP SCREED FROM EA. END TYP. TOP &BOTTOM <br />@ 48" O.C. BLOCKING, FASTEN WITH <br />SIMPSON META12 w/ (7) 10dxl 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2) 16d TOENAILS <br />MOISTURE BARRIER 1 Odx3" @ 4" O/C <br />1/2"x 8 J BOLT @ 32 O.C. MINIMUM 6 FROM O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK - MOISTURE BARRIER <br />PLATE SPLICES w/ 3/16"x2" PLATE WASHER SIMPSON META12 w/ (7) ALTERNATE SIMPSON MSTAM24 wl (7) 10d NAILS <br />NOTE: IF EMBEDDED 10dx1 1/2" NAILS AT EA. & (4) 1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH <br />STRAP MISSED VERTICAL TRUSS VERTICAL WEB (24" GABLE WEB <br />WEB, USE MSTAM36 w/ (7) SECTION 1 O.C. MAX) w/ MIN. 4" SECTION <br />2 <br />1Od NAILS & (4) 1/4"x21/4" SCALE: N.T.S. EMBEDMENT IN KO BLOCK <br />TITEN ON OUTSIDE S5 SCALE: N.T.S. 5 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />REFER TO DETAIL J N N AND FASTENERS. (MIN. FIRST 4 BAYS) <br />ON SHEET S5 FOR <br />X-BRACING, AND TOP CV M ch <br />SEE STRUCTURAL <br />CHORD BLOCKING ix <br />N NOTES AND NAILING <br />INFORMATION � SCHEDULE FOR <br />1 1 SHEATHING DETAIL BACKNAIL w/ <br />WOOD TRUSSES 1/ (2) 16d NAILS <br />`° 00 00 2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />2x4 RAT RUN BRACING RIDGE FASTENED AT <br />AT 24" O.C. ON TOP OF 1 1 2 1 1 2 <br />BOTT. CHORD FOR 4 EACH JOINT w/ (3) <br />TRUSS SPANS 10d & (2) 10d TOE <br />ATTACHED W/ 2 - 16d NAILS @ EA. END <br />AT EA. TRUSS JOINT (2) 2" x 4" LAMINATIONS W/ (1) ROW (3) 2" x 4" LAMINATIONS W/ (1) ROW (3) 2" x 6" LAMINATIONS W/ (2) ROWS OF 2x4 PANEL BLOCKING <br />OF STAGGERED 10d COMMON WIRE NAILS OF STAGGERED 30d COMMON WIRE NAILS STAGGERED 30d COMMON WIRE NAILS @ 48" 0/C FOR THE (2) 16d NAILS <br />2x4 BLOCKING @ 24" (D = 0.148", L = 3") OR EQUAL (D = 0.207", L = 4 1/2") OR EQUAL FIRST (4) ROWS OF <br />O/C w/ (2) 16d (D = 0.207 , L = 4 1/2) OR EQUAL TRUSSES FROM EA. <br />TOENAILS @ EA. END NOTES: END TYP. TOP & <br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 51/2" LAG SCREWS OR EQUAL BOTTOM ATTACHED <br />MASONRY WALL OF THE COLUMN (SPACE AS SHOWN FOR 3-PLY) w/ (2) 16d TOENAILS <br />ARCHITECTURAL FINISH 2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />(SPACE AS SHOWN FOR 3- <br />PLY) <br />2x4 LEDGER (MATCH BOTTOM CHORD <br />SLOPE OF ADJACENT TRUSS) <br />SECTION 3 <br />SCALE: N.T.S. S5 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL wl (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND <br />NAILING SCHEDULE FOR SHEATHING <br />DETAIL 1 <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />RIDGE FASTENED AT <br />"L" BRACE TO EXTEND <br />EACH JOINT w/ (3) <br />; <br />AT LEAST 90% OF WEB <br />10d & (2) 10d TOE <br />LENGTH (SEE TABLE) <br />NAILS @ EA. END <br />GABLE TRUSS <br />2x4 PANEL BLOCKING <br />1/2" CDX PLYWOOD OR <br />@ 48" 0/C FOR THE <br />(2) 16d <br />7/16" OSB SHEATHING <br />FIRST (4) ROWS OF <br />NAILS <br />ATTACHED w/ 10d NAILS <br />TRUSSES FROM EA. <br />@ 6" O.C. EDGES AND 12" <br />END TYP. TOP & <br />O.C. FIELD <br />BOTTOM ATTACHED <br />WI (2)16d TOENAILS <br />2x4 "T" ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />10dx3" @ 4" O/C <br />SIMPSON HGAI OKT w/ (4) 1/4"xl 1/2" SDS SCREWS TO <br />TRUSS & (4) 1/4"x3" SDS SCREWS TO PLATES AT 24" O.C. <br />SIMPSON SP2 w/ (12) 1 Od <br />MAX. 9" <br />UNSUPPORTED, 8d @ 6"0/C <br />IF >9" SEE 10/S6 r-WOOD TRUSSES <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 1Od NAILS @ 6" O.C. <br />SIMPSON HGAM1OKTA w/ (4) <br />E ES AND 12" O.C. FIELD <br />1/4"x1 1/2" SDS SCREWS TO <br />JACK TRUSS <br />BLOCKING & (4) 1/4"x2 3/4" <br />SEE PLAN FOR <br />TITEN TO CMU <br />CONNECTION <br />OF THE LAST LAMINATION 2x4 "T" ON TOP OF PANEL ` <br />3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2) 16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION BLOCKING, FASTEN WITH L 2x4 BLOCKING W/ <br />EXT. WALL CONN. 6a COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF 10dx3" @ 4" O/C (2) 12d TOENAILS <br />NON - LOAD BEARING LOCATION B.U.C., SAME NUMBER OF ROWS, SAME SPACING) <br />D SECTION <br />SEE TYP. WALL SECTION FOR SCALE: 3/4"=V-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT-UP COLUMNS 8 9 <br />ADDITIONAL INFORMATION. SCALE: N.T.S. S5 SCALE: N.T.S. S5 <br />11NIMUM 2x <br />,ROSS BRACING <br />SEE PLAN FOR <br />OCATIONS) <br />(2) 16d PER <br />JOINT <br />�- CONTINUOUS BOTTOM CORD BRACING 2"x4" MIN. SEE M/S5 <br />CROSS BRACING DETAIL rj__� <br />SCALE: N.T.S. S5 <br />GABLE END BRACING DETAIL <br />TOENAIL <br />(2) 16d NA <br />12" <br />RSH SCHEDULE <br />ATTACHMENT <br />#2 SYP BLK'G @ 16" O.C. <br />Od x 0.131" <br />NAILS EA. SIDE <br />IT. 2x4 #2 SYP w/ 10d <br />XO.131" @ 8" O.C. <br />ALTERNATE NON -DROP <br />GABLE END DETAIL 10 <br />SCALE: N.T.S. S5 <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SCALE: N.T.S. <br />PRE-ENGINEERED <br />WOOD TRUSSES <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES <br />�- MINIMUM (2) 16d PER JOINT \- MINIMUM 2X4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL <br />SCALE: N.T.S. <br />6" OVERLAP <br />M <br />S5 <br />"L" BRACE W/ 10d @ 4" O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />2x4 BLOCKING 2x4 "T" BLOCKING <br />@ 48" O.C. 16d NAIL <br />"L" BRACE <br />ATTACHED W/ <br />1Od NAILS @ 4" <br />O.C. TYPICAL <br />GABLE TRUSS WEB <br />DOUBLE "L" BRACING DETAIL 5 <br />SCALE: N.T.S. S5 <br />2x4 "T" BLOCKING <br />2x4 BLOCKING @ <br />48" O.C. <br />L' BRACE ATTACHED 16d NAIL <br />W/ 1 Od NAILS @ 4" 0.C� <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL 6 <br />SCALE: N.T.S. S5 <br />DIAPHRAGM <br />BLOCKING @ <br />48" 0/C GABLE TRUSS <br />TRUSS VERTICAL <br />DBL. TOP PLATE NAILS AT EACH STUD (2) 2"x8" "L" BRACE J <br />STUD WALL (SEE TYP. SEC.) FASTENED WITH (3) <br />16d PER SIDE <br />SECTION 4 SCISSOR GABLE "T" BRACE <br />SCALE: N.T.S. S5 AS PER HIB 91 SCALE: N.T.S. S5 <br />2 x 4 BLOCKING w/ (2) 10d <br />TOE NAILS AT EACH END @ <br />24" O/C (TYP) <br />• <br />EXT. WALL CONN. (� NON -LOAD <br />BEARING LOCATIOf� (UNEVEN CLG.) <br />SEE TYP. WALL SECTION FOR <br />ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />"L" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />"L" BRACE <br />(1) 2"x4" (U.N.O.) <br />"L" BRACE <br />2"x6" (U.N.O.) <br />"L" BRACE <br />24" <br />0'0" - T-O" <br />T-O" - 6'-0" <br />6'-0" & GREATER <br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 1Odx3" NAILS @ 4" 0/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />SIMPSON HGAIOKT w/ (4) 1/4„xl 1/2" SDS^^ ^ <br />GABLE END BRACING DETAIL SCALE:3/4"=l'-O" <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SIMPSON SP2 w/ (12) <br />10d NAILS AT EACH <br />STUD <br />HIP FRAMING REFERENCE PLAN <br />20'-0" MAX 20'-0" MAX <br />"X" BRACE SEE DET. J/S5 CONTINUOUS BOTTO CHORD BRACING 2X4 MIN. <br />d <br />w <br />C3 <br />w <br />0 <br />v <br />o <br />v <br />0 <br />v <br />w o <br />m - <br />< 0 <br />O <br />' <br />0 <br />d <br />w <br />— <br />— <br />— <br />— <br />o <br />o <br />— <br />— <br />— <br />— <br />o <br />Oi <br />o <br />Q <br />w <br />0 <br />z <br />w <br />\-BRACING w/ (3) 10d x 3" AT <br />EACH CONN. @ 24" O/C <br />—MOISTURE BARRIER <br />-BOND BEAM <br />-MASONRY WALL <br />ARCHITECTURAL FINISH NOTE: LTOP CHORD 2x4 #2 SYP BRACING <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING @ 16" O.C. MAX. FOR FIRST (4) <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING BAYS <br />THAT MY BE REQUIRED ZBOTTOM CHORD GABLE END BRACING <br />2) "T" BRACING MAY BE USED IN PLACE OF PERMANENT @ 4'-0" O.C. MAX. FOR FIRST (4) BAYS <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN ( L <br />AS PER BCSI SCALE: N.T.S. c+� <br />SCISSOR TRUSS <br />SCISSOR TRUSS <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />FIXED LOCATION ATTACHED W/ (2) 10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />COSMETIC DROP CEILING FRAMING <br />W/ DROP CEILING BRACING DETAIL <br />MEAN ROOF HEIGHT UP TO 30'-0" SCALE: NTS <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES SCALE: N.T.S. <br />FOR WIND SPEED SPECIFICATION <br />APR 0 8 2023 <br />Virf lal Review; Assist, Inc <br />Ia�iS kfEVIeW CO" !lfJ,°d and approved <br />;?r ;•r3rlpliance a� M the 2629 0c' 7t11 Edition <br />CM <br />N <br />0 <br />N <br />a <br />N <br />p <br />00 <br />4 <br />Lo <br />., <br />Q� <br />Q <br />t <br />2 <br />O <br />w <br />ly- <br />z <br />Q <br />to 0 LO <br />� <br />W L '= o u <br />M N ti <br />�� <br />II,.N M r <br />N V -0 iD � m <br />L M <br />B <br />o°o o� <br />Q <br />i U <br />_ z3 ^ <br />.N <br />Lu Q.N 2 <br />V <br />O�oE"m.5 <br />V' LLI <br />w <br />LW F W C6 W 2 � o <br />u0� <br />F- I-- <br />QryV <br />O?woQLLUO <br />Qo� ��U)oOJQQ D<dXJZX <br />onOo'�oZLLow-oomZ�u <br />Z� <br />OZn <br />w wV5 <br />I��O<QS�w ¢ <br />a0WQ Q <br />LL <br />QQQ <br />0w O <br />LL <br />O <br />O <br />Z N <br />0� <br />� CD <br />F.: <br />M O C) <br />Q Lo <br />CL <br />u) I� <br />I— cM <br />Z 0 <br />Z� <br />W <br />WO <br />J O <br />(D <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />O <br />O <br />O <br />O <br />O <br />♦- <br />IN <br />M <br />O <br />N <br />N <br />O <br />N <br />N <br />r' <br />M <br />M <br />O <br />0 <br />O <br />O <br />� <br />N <br />O <br />' <br />i <br />N <br />O <br />i <br />' <br />I <br />Z <br />O <br />N <br />Lu <br />w <br />Lo <br />N <br />cM <br />'-i <br />L6 <br />I <br />I <br />00 N <br />� Z <br />Q Z <br />W <br />O <br />Z <br />O <br />LJ.I <br />V <br />c o O <br />U V C/) <br />O <br />Ow_> <br />�— <br />0 <br />z <br />wE9 <br />z. <br />= <br />w=< <br />(� <br />m~w <br />I- <br />O <br />zo2 <br />ui <br />QI_-� <br />p <br />zwo <br />C� <br />Q <br />U <br />JwE <br />z <br />Z <br />z <br />m <br />m <br />L) <br />Oo�- <br />Z <br />z <br />z <br />w <br />ui <br />O <br />04 <br />O <br />LAST PLOT DATE <br />.. <br />STRUCTURAL <br />DETAILS <br />