Laserfiche WebLink
PLUMBING GENERAL NOTES <br />1. FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE <br />COMPLETION AND OPERATION OF ALL SYSTEMS IN THIS SECTION OF WORK IN <br />ACCORDANCE WITH ALL APPLICABLE CODES. <br />2. ALL PLUMBING FIXTURES AND PLUMBING SYSTEM EQUIPMENT SHALL BE <br />PROVIDED COMPLETE WITH ALL ACCESSORIES, HANGERS, VALVES, STOPS, <br />TAILPIECES, TRAPS, FAUCETS, STRAINERS, ETC. SEE FIXTURE SCHEDULE. <br />3. FURNISH AND INSTALL COMPLETE SYSTEMS OF SOIL, WASTE, VENT, HOT AND <br />INFIXTURES,AN / HER EQUIPMENT. <br />GOLD WATER PIPING FROM ALL PLUMBING OR OTHER <br />AND/OR <br />INSTALLED IN ACCORDANCE WITH PLUMBING <br />4. CLEANOUT PLUGS SHALL BE T LLED CCORD G <br />CODE REQUIREMENTS. PROVIDE CLEANOUT5 AT THE BASE OF ALL WASTE STACKS, <br />AT EVERY FOUR 45 DEGREE TURNS, AND AT EVERY 100 FEET. CLEANOUTS SHALL <br />BE PLACED IN READILY ACCESSIBLE LOCATIONS. <br />5. ALL SOIL, WASTE, AND VENT LINES SHALL BE CONCEALED IN THE BUILDING <br />CONSTRUCTION. <br />6. COPPER PIPING SHALL BE PROTECTED AGAINST CONTACT WITH MASONRY OR <br />DISSIMILAR METALS. ALL HANGERS SUPPORTS ANCHORS AND CLIPS SHALL BE <br />COPPER OR COPPER PLATED. WHERE COPPER PIPING 15 CARRIED ON IRON <br />TRAPEZE HANGERS WITH OTHER PIPING, SATISFACTORY AND PERMANENT <br />ELECTROLYTIC ISOLATION MATERIAL SHALL PROTECT THE COPPER AGAINST <br />CONTACT WITH OTHER METALS. <br />7. WHERE COPPER PIPING 15 SLEEVED THROUGH MASONRY, SLEEVES SHALL BE <br />COPPER OR RED BRASS. WHERE COPPER MUST BE CONCEALED IN A MASONRY <br />PARTITION OR AGAINST MASONRY, CONTACT SHALL BE PREVENTED BY COATING <br />THE COPPER HEAVILY WITH ASPHALTIC ENAMEL AND PROVIDING 15# ASPHALT <br />SATURATED FELT BETWEEN THE PIPE AND MASONRY. <br />8. THE PLUMBING CONTRACTOR SHALL COORDINATE CLOSELY WITH THE <br />MECHANICAL AND THE ELECTRICAL CONTRACTORS TO AVOID CONFLICT WITH OTHER <br />TRADES. <br />9. CEILING AREA HAS LIMITED SPACE. CONTRACTOR MUST COORDINATE WITH <br />OTHER TRADES FOR ALL STRUCTURES, PIPING, CONDUIT, DUCTWORK, LIGHTING, <br />ETC. TO PROPERLY BE INSTALLED. <br />10. ALL PIPE INSULATION SHALL RUN CONTINUOUSLY THROUGH FLOORS, WALLS, <br />AND PARTITIONS. <br />II. PROVIDE DRAIN VALVES IN THE HOT AND COLD WATER SYSTEM AT ALL LOW <br />POINTS TO ALLOW FOR COMPLETE DRAINAGE. <br />12. VACUUM BREAKERS SHALL BE PROVIDED FOR ALL FIXTURES TO WHICH HOSES <br />MAY BE ATTACHED. VACUUM BREAKERS SHALL BE PERMANENTLY ATTACHED. <br />13. WASTE AND VENT PIPING SHALL BE AS FOLLOWS: <br />BELOW SLAB: IF ALLOWED BY AHJ: SOLID WALL PVC PIPE, PVC SOCKET <br />FITTINGS, AND SOLVENT -CEMENTED FITTINGS. <br />ABOVE SLAB: IF ALLOWED BY AHJ; PVC PIPE, PVC SOCKET FITTINGS, AND <br />SOLVENT -CEMENTED FITTINGS. <br />BELOW SLAB: IF PVC IS NOT PERMITTED; SERVICE WEIGHT HUB AND SPIGOT <br />CAST IRON PIPING WITH HUB AND SPIGOT CAST IRON FITTINGS AND <br />COMPRESSION GASKETS ABOVE SLAB: SERVICE WEIGHT NO -HUB CAST IRON <br />PIPING WITH CAST IRON FITTINGS AND HEAVY DUTY BANDS. <br />14. STORM PIPING SHALL BE AS FOLLOWS: <br />BELOW SLAB: PVC PIPE, PVC SOCKET FITTINGS, AND SOLVENT -CEMENTED <br />FITTINGS. <br />ABOVE GROUND: SERVICE WEIGHT NC -HUB CAST IRON PIPING. <br />INSULATION IS REQUIRED ON ALL ROOF DRAIN BODIES AND HORIZONTAL RUNS <br />(ABOVE SLAB). yz THICK RIGID MOLDED FIBERGLASS WITH FITTINGS INSERTS, <br />PVC COVERS, AND VAPOR BARRIER JACKET. <br />15. DOMESTIC WATER PIPING ABOVE AND BELOW SLAB SHALL BE PEX TUBING. <br />INSULATION 15 REQUIRED ON ALL WATER SUPPLY PIPING ABOVE FINISHED FLOOR <br />WITH INSULATION HAVING A MINIMUM R FACTOR OF 6.5 DETERMINED AT 75'F IN <br />ACCORDANCE WITH ASTM C-177 OF NC INTERNATIONAL PLUMBING CODE OR PER <br />LOCAL JURISDICTION. <br />16. INVERT ELEVATIONS SHALL BE ESTABLISHED AND VERIFIED BEFORE WASTE <br />PIPING IS INSTALLED 50 THAT PROPER SLOPES WILL BE MAINTAINED. <br />17. THE PLUMBING CONTRACTOR SHALL PROVIDE WATER HAMMER PROTECTION ON <br />ALL WATER DISTRIBUTION PIPING WHERE QUICK -CLOSING VALVES ARE UTILIZED. <br />INSTALLATION OF AIR CHAMBERS OR SHOCK ARRESTORS SHALL BE IN ACCORDANCE <br />WITH PDI-WH2O1. SEE SHOCK ARRESTOR SCHEDULE (IF PROVIDED). <br />18. PROVIDE FULL PORT VALVES IN ALL BRANCH LINES OF THE HOT AND COLD <br />WATER DISTRIBUTION SYSTEM ON �4" AND LARGER CW 4 HW AND AS SHOWN ON <br />PLANS, RISERS, AND SCHEMATIC DETAILS. <br />19. REFER TO ARGHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS OF PLUMBING <br />FIXTURES. <br />20. PROVIDE ACCESS DOORS FOR ALL VALVES AND DEVICES REQUIRING ACCESS <br />WHEN LOCATED IN WALLS OR ABOVE INACCESSIBLE CEILING CONSTRUCTION. <br />21. PROVIDE DEEP SEAL TRAPS FOR ALL FLOOR DRAINS. <br />22. WHERE EARTHQUAKE LOADS ARE APPLICABLE IN ACCORDANCE WITH THE <br />PLUMBING CODE, PIPING AND EQUIPMENT SUPPORTS SHALL BE DESIGNED AND <br />INSTALLED FOR THE SEISMIC FORCES IN ACCORDANCE WITH THE <br />BUILDING CODE. <br />23. PROVIDE A U.L. L15TED ASSEMBLY FOR ALL PENETRATIONS THRU FIRE <br />RATED WALLS AND FLOORS. <br />24. PROVIDE PRESSURE REDUCING VALVE IF PRESSURE EXCEEDS 80 PSI. <br />25. ALL SUSPENDED MATERIALS AND EQUIPMENT SHALL BE INDVIDUALLY <br />SUPPORTED FROM THE BUILDING STRUCTURE. DO NOT SUSPEND ITEMS FROM THE <br />CEILING OR ITS SUPPORT SYTEM. <br />2 <br />E <br />m <br />v <br />�t: <br />O q <br />d U') <br />3 <br />O <br />I PLUMBING I ND <br />- <br />DOMESTIC COLD WATER PIPING <br />--- <br />115 DOMESTIC HOT WATER PIPING <br />- <br />- - - - - <br />VENT PIPING <br />WASTE (SANITARY SEWER) <br />FULL PORT VALVE <br />f <br />CHECK VALVE <br />PIPE UP <br />9 <br />PIPE DOWN <br />FIXTURE DESIGNATION <br />13 <br />FLOOR DRAIN <br />ABV <br />ABOVE <br />AFF <br />ABOVE FINISHED FLOOR <br />AHJ <br />AUTHORITY HAVING JURISDICTION <br />CW <br />COLD WATER <br />DN <br />DOWN <br />E.C. <br />ELECTRICAL SUB -CONTRACTOR <br />E L <br />FCO <br />FLOOR CLEAN OUT <br />FD <br />FLOOR DRAIN <br />FPHB <br />FREEZE PROOF HOSE BIBB <br />FR <br />FROM <br />G.C. <br />GENERAL CONTRACTOR <br />GCO <br />GRADE CLEAN OUT <br />HB <br />HOSE BIBB <br />HW <br />HOT WATER <br />M.C. <br />MECHANICAL SUB -CONTRACTOR <br />P.C. <br />PLUMBING SUB -CONTRACTOR <br />V <br />VENT <br />W <br />WASTE <br />WCO <br />WALL CLEAN OUT <br />PLUMBING FIXTURE SPECIFICA11ONS AND CONNECTION SCHEDULE <br />FAUGET'NALVE DRAIN BPS PIPE SIZES j <br />MARK FIXTURE TYPE MANUFACTURER MODEL NO. MATERIAL STYLE - MANIFACT._ ---__ -_ __� .__..__ ___ _._- __-- MOUPtTINCs i REPU►WC5 <br />MODEL. NO. SPOUT IEWNDLES CENTERS', TYPE SUE AND STOPS iWA51'E VENT] CW FW <br />F <br />WATER FLUSH AMERICAN CAp VITREOUS HANDICAP _ _ _ _ _ _ McQUIRE " ` " ' " _ _ PROVIDE WITH OLSONITE #q5 <br />WC CLOSET TANK STANDARD 4 2 ( FLOOR (SEAT. SEE NOTE I. <br />2998.012 CHINA ELONGATED 166LK <br />f j • <br />WALL AMERICAN VITREOUS HANDICAP DELTA SINGLE " " McQUIRE u " " " ; WALL <br />A�1/ LAVATORY HUNG STANDARD 0124.024 CHINA SHELFBACK 523 WF NDF STANDARD LEVER 4 GRID I 185 lye I %� HUNG SEE NOTE 2. <br />} <br />I � <br />Y <br />'i t 4 <br />- <br />PROVIDE TMOP`-HANGER WANDVAO <br />L MOP SINK <br />FLOOR <br />MUSTEE <br />19F MOLDED <br />20" X 24" MU5TEE <br />TWO <br />THREADED 4" - - <br />- 3" lye' 3i4" 14 FLOOR <br />BREAKER. ALSO INCLUDE WALL <br />MOUNTED <br />PLASTIC <br />34" HIGH 93.600 <br />HANDLES <br />HUNG SPRAYER W/ NOSE: TtS <br />... .._. <br /># - <br />HOSE <br />BIBB <br />STANDARD WOODFORD <br />24P CAST <br />BRASS <br />WALL _ <br />FAUCET <br />_ L005E <br />KEY <br />WALLINTERGRAL <br />VACUUM BREAKER <br />WALL <br />FPHB <br />FREEZE J.R.SMITH <br />`� CAST <br />BOX <br />LOOSE" <br />WALL <br />PROVIDE WITH INTEGRAL <br />HYDRANT <br />PRE <br />BRA55 <br />FAUCET <br />KEY <br />VACUUM BREAKER. <br />_ <br />................ ................... . - _ . .... _._ ... <br />WCO WALL <br />ROUND JOSAM 58890 <br />STAINLESS j <br />BRONZE <br />WALL <br />CLEAN -OUT <br />_ <br />TOP <br />._.._.. <br />STEEL <br />PLUG <br />__ _ _ <br />FLOOR <br />f GO <br />SQUARE JOSAM 56030 <br />CAST <br />BRONZE - - - - - - - :. FLOOR <br />CLEAN -OUT <br />._._... .._._......,_... ........_ .__. <br />TOP <br />_. ...._. <br />IRON <br />_.....................................__..._... <br />PLUG ! t <br />E <br />.. .. ........._.... .,........... ...........__. .. .... ... ......... .. ......... ... ... .......... ... .............._..._..............._.. .. ............... _.__.... ...._ ..... ___..... .....___..__...._............_............_. <br />aQ <br />GRADE ROUND JOSAM 56040 CAST BRONZE - _ _ _ _ _ _ _ _ _ _ PROVIDE 24'X24"X4" THICK <br />CLEAN -OUT' TOP IRON PLUG GRADE ;CONCRETE PAD AT GRADE. <br />FLOOR SQUARE CAST NIKALOY ' <br />FLOOR FD nnAIkI T.,r, J.R. SMITH 2O10 ;PROVIDE WITH TRAP PRIMER <br />- _ -- <br />NOTES: <br />1. SEE ARCH. ELEVATIONS FOR TRIP LEVER LOCATION. INSTALL TRIP LEVER TO WIDE 51DE OF STALL. SPECIFY TRIP LEVER LOCATION WHEN ORDERING. <br />2. INSULATE HOT AND COLD WATER SUPPLIES AND P-TRAP WITH TRUEBRO MODEL 102 INSULATION KIT. PROVIDE WITH POINT OF USE MIXING VALVE (LAWLER, MODEL #516) SET @ 105'F. <br />3. PROVIDE �4"HW SUPPLY PIPING WITH SHUT-OFF VALVE TO WALL HUNG HOSE SPRAY (ADJACENT TO MOP SINK). SEE MOP 51NK (5-1) FOR ADDITIONAL INFORMATION. <br />VACUUM <br />BREAKER <br />"LAWLER, MODEL# 66-25" MIXING VALVE -\ <br />SHUT-OFF <br />VALVE <br />UNION (TYP) <br />lye" DEEP GALV. WATER <br />DRAIN PAN HEATER <br />SET @ 140, <br />I" DRAIN LINE <br />TO MOP SINK <br />C.W. MAKE-UP <br />120' <br />H.W. TO FIXTURES <br />"AMTROL" EXPANSION TANK <br />TEMPERATURE AND <br />PRESSURE RELIEF VALVE <br />WATER HEATER ON PLATFORM BY <br />G.C. SIZE PER LOCAL SEISMIC <br />REQUIREMENTS AND TOTAL WEIGHT <br />OF WATER HEATER FULL OF WATER. <br />HB "-DISCHARGE FULL SIZE OF VALVE <br />DISCHARGE TO MOP SINK WITH ELBOW <br />TURNED DOWN <br />DWATER HEATER DIAGRAM <br />NO SCALE <br />NOTE: <br />I. INSTALL WATER HEATER PER MANUFACTURER REQUIREMENTS. <br />2. PROVIDE HEAT TRAP ON CW AND HW LINES PER INTERNATIONAL <br />ENERGY CONSERVATION CODE , 5ETION C404.3. <br />ENGINEERING <br />2923 South Tryon Street Suite 280 <br />Charlotte, North Carolina 28203 <br />tel 704.373.0068 fax 704.373.0260 <br />MECHANICAL ELECTRICAL. PLUMBING <br />%%011r,nu111111*0 <br />11 <br />ATE OF <br />, <br />no <br />L <br />IIIII1RAMp`27, 2021 <br />^ I0- <br />V) n <br />WJ 0 <br />V <br />Z <br />Z�- <br />Z <br />i- W <br />__l <br />ULn <br />co 0 <br />WCO J <br />_IN-j w <br />a <br />O1--wo <br />Qu) 0 ., <br />L0 F- J Z a <br />W = 0 za <br />W <br />i� JJ <br />N 0 <br />oy��OLt� a <br />tlI <br />rat <br />od aw RNA on agrt. b. Cman' <br />J�e1 <br />aop %ht 201,% cm" "OWN <br />N000ioM. <br />o ded �wrtom ate' <br />REV. I DESCRIPTION <br />09-23-2021 <br />SCHEDULE, NOTES <br />AND LEGENDS <br />pml <br />N r <br />N <br />