Laserfiche WebLink
SIMPSON HGAMV <br />W/ <br />(4) 1/4"x1 1/2" SDS <br />SCREWS <br />TO BLOCKING & (z <br />1/4"x2 3/4" <br />TITEN TO CMU <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSHI - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) MAX. 9" <br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/7 UNSUPPORTED, <br />SCHEDULE FOR SHEATHING DETAILS (2) 16d NAILS IF >9" SEE 10/S6 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />MAX. 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) <br />IF >9" SEE 1 O/S6 <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING <br />SCHEDULE FOR SHEATHING DETAIL <br />45*± <br />45' ± <br />SEE STRUCTURAL <br />NOTES AND NAILING <br />2x4 CR0 <br />BRACE <br />SCHEDULE FOR <br />APPROX. 8" FROM <br />SHEATHING DETAIL <br />2x4 KICKER <br />2x8 SYP#2 "L" BRACE TO <br />RIDGE FASTENED AT <br />�° 8'-0" 0/C. <br />EXTEND AT LEAST 90% OF <br />EACH JOINT W/ (3) 10d <br />"L" BRACE TO EXTEND <br />2x4 CROSS BRACE <br />WEB LENGTH &NOTCH AT <br />' <br />& (2)10d TOE NAILS @ <br />AT LEAST 90% OF WEB <br />APPROX. 8" FROM <br />BOTTOM CHORD (SEE TABLE) <br />EA. END @ 48" O.C. <br />•.• <br />LENGTH (SEE TABLE) <br />RIDGE FASTENED AT <br />SIMPSON H2.5A w/ (10) 8d <br />2x8 P.T. <br />GABLE TRUSS <br />EACH JOINT w/ (3) 10d & <br />FROM LEDGER TO <br />• SILL <br />1/2" CDX PLYWOOD OR <br />d TOE NAILS @ EA. <br />.• <br />BLOCKING <br />' <br />7/16" OSB SHEATHING <br />END <br />ATTACHED W/ 10d <br />GYPSUM WALL BOARD <br />GABLE TRUSS <br />NAILS @ 6" O.C. EDGES <br />2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST <br />1/2" CDX PLYWOOD OR 7/16" <br />' <br />AND 12" O.C. FIELD <br />(4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM <br />CORD ATTACHED W/ (2) 16d TOENAILS <br />OSB SHEATHING ATTACHED <br />10dX3" @ 3" O/C <br />THROUGH CHORD <br />2x4 LEDGER (MATCH BOTTOM CHORD <br />w/ 10d NAILS @ 6" O.C. <br />EDGES AND 12" O.C. FIELD <br />IDF <br />INTO 2"x6" P T PLATE <br />SLOPE OF ADJACENT SCISSOR TRUSS) <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />DOUBLE TOP PLATE <br />2x4 CROSS BRACE APPROX. 8" <br />FROM RIDGE FASTENED AT <br />EACH JOINT w/ (3) 10d & (2) 10d <br />TOE NAILS @ EA. END <br />2x FRAME WALL (SEE WALL <br />SECTION FOR SIZE & SPACING) <br />1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 1 Od NAILS @ 6" O.C. EDGES <br />AND 12" O.C. FIELD <br />(2) 16d NAILS <br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL <br />NOTCH L BRACE HERE 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING <br />WEEP SCREED THE FIRST 4 ROWS OF TRUSSES 2x4 "T" ON TOP OF PANEL <br />FASTEN WITH 10dx3" @ 4" 0/C SPACED INSTALLED PER MANUF. 112" x 8" "J" BOLT @ 48" O.C. WEEP SCREED FROM EA. END TYP. TOP &BOTTOM-.jVr <br />@ 48" O.C. BLOCKING, FASTEN WITH <br />MOISTURE BARRIER SIMPSON META12 w/ (7) 10dx1 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2) 16d TOENAILS 10dx3" @ 4" 0/C <br />1/2 x 8 J BOLT @ 32 O.C. MINIMUM 6 FROM O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK - <br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER MOISTURE BARRIER <br />SIMPSON META12 w/ (7) ALTERNATE SIMPSON MSTAM24 w/ (7) 10d NAILS <br />NOTE: IF EMBEDDED 10dx1 1/2" NAILS AT EA. & (4) 1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH <br />STRAP MISSED VERTICAL SECTION TRUSS VERTICAL WEB (24" GABLE WEB SECTION <br />WEB, USE MSTAM36 w/ (7) O.C. MAX) w/ MIN. 4" <br />2 <br />1Od NAILS & (4) 1/4"x21/4" SCALE: N.T.S. EMBEDMENT IN KO BLOCK <br />TITEN ON OUTSIDE 55 SCALE: N.T.S. 55 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA, END. <br />SEE SCHEDULE - [RSHI - ON FRAMING SHEET FOR SHEATHING <br />REFER TO DETAIL J - AND FASTENERS. (MIN. FIRST 4 BAYS) <br />ON SHEET S5 FOR _ N N <br />X-BRACING, AND TOP N "' "' SEE STRUCTURAL <br />CHORD BLOCKING N _ NOTES AND NAILING <br />00 00 x x <br />INFORMATION CO SCHEDULE FOR <br />1 1 SHEATHING DETAIL BACKNAIL w/ <br />WOOD TRUSSES 1/ (2) 16d NAILS <br />00 <br />2"x4"CROSS BRACE <br />2x4 RAT RUN BRACING APPROX. 8" FROM <br />AT 24" O.C. ON TOP OF RIDGE FASTENED AT <br />EACH JOINT w/ (3) ; <br />BOTT. CHORD FOR 4 10d & (2) 10d TOE <br />TRUSS SPANS NAILS @ EA. END <br />ATTACHED W/ 2 -16d <br />AT EA. TRUSS JOINT 2X4 PANEL BLOCKING <br />(2) 2" x 4" LAMINATIONS W/ (1) ROW (3) 2" x 4" LAMINATIONS W/ (1) ROW (3) 2" x 6" LAMINATIONS W/ (2) ROWS OF <br />2x4 BLOCKING 24" OF STAGGERED 10d COMMON WIRE NAILS OF STAGGERED 30d COMMON WIRE NAILS STAGGERED 30d COMMON WIRE NAILS @ 48" O/C FOR THE (2) 16d NAILS <br />@ (D = 0.148", L = 3") OR EQUAL (D = 0.207", L = 4 1/2") OR EQUAL (D = 0.207", L = 41/2") OR EQUAL FIRST (4) ROWS OF <br />O/C w/ (2) 16d TRUSSES FROM EA. <br />TOENAILS @ EA. END NOTES: END TYP. TOP & <br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 51/2" LAG SCREWS OR EQUAL BOTTOM ATTACHED <br />MASONRY WALL OF THE COLUMN (SPACE AS SHOWN FOR 3-PLY) w/ (2) 16d TOENAILS <br />ARCHITECTURAL FINISH 2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />OF THE LAST LAMINATION SPACE AS SHOWN FOR 3-PLY <br />2x4 LEDGER (MATCH BOTTOM CHORD <br />SLOPE OF ADJACENT TRUSS) <br />SECTION 3 <br />SCALE: N.T.S. SrJ <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND <br />NAILING SCHEDULE FOR SHEATHING <br />DETAIL <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 1 O/S6 <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />RIDGE FASTENED AT <br />"L" BRACE TO EXTEND <br />EACH JOINT w/ (3) <br />; <br />AT LEAST 90% OF WEB <br />10d & (2) 10d TOE <br />LENGTH (SEE TABLE) <br />NAILS @ EA. END <br />GABLE TRUSS <br />2x4 PANEL BLOCKING <br />1/2" CDX PLYWOOD OR <br />@ 48" O/C FOR THE <br />(2) 16d <br />7/16" OSB SHEATHING <br />FIRST (4) ROWS OF <br />NAILS <br />ATTACHED w/ 10d NAILS <br />TRUSSES FROM EA. <br />@ 6" O.C. EDGES AND 12" <br />END TYP. TOP & <br />O.C. FIELD <br />BOTTOM ATTACHED <br />W/ (2) 16d TOENAILS <br />2x4 "T" ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />1Odx3" @ 4" O/C <br />SIMPSON HGAI OKT w/ (4) 1/4"x1 1/2" SDS SCREWS TO <br />TRUSS & (4) 1/4"x3" SIDS SCREWS TO PLATES AT 24" O.C. <br />DBL. TOP PLATE <br />SIMPSON SP2 w/ (12) 10d <br />NAILS AT EACH STUD <br />STUD WALL (SEE TYP. SEC.) <br />SECTION <br />K�4 <br />SCALE: N.T.S. <br />SrJ <br />MAX. 9" <br />UNSUPPORTED, 8d @ 6"0/C <br />IF >9" SEE 10/S6 r-WOOD TRUSSES <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />_1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 10d NAILS @ 6" O.C. <br />SIMPSON HGAMI OKTA w/ (4) <br />E ES AND 12" O.C. FIELD <br />1/4"x1 1/2" SDS SCREWS TO <br />JACK TRUSS <br />BLOCKING & (4) 1/4"x2 3/4" <br />SEE PLAN FOR <br />TITEN TO CMU <br />CONNECTION <br />( ) 2x4 "T" ON TOP OF PANEL <br />BLOCKING, FASTEN WITH L 2x4 BLOCKING W/ <br />EXT. WALL CONN. 3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2) 16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION 10dx3" @ 4" 0/C (2) 12d TOENAILS <br />NON -LOAD BEARING LOCATION COMMON BAILS. (ONE INTO EACH OUTSIDE FACE OF <br />D B.U,C., SAME NUMBER OF ROWS, SAME SPACING) <br />SEE TYP. WALL SECTION FOR SCALE: 3/4"=1'-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT-UP COLUMNS SECTION g <br />r - <br />ADDITIONAL INFORMATION. <br />IINIMUM 2x <br />;ROSS BRACING <br />3EE PLAN FOR <br />OCATIONS) <br />(2) 16d PER <br />JOINT <br />'- CONTINUOUS BOTTOM CORD BRACING 2"x4" MIN. SEE M/S5 <br />CROSS BRACING DETAIL r�_J� <br />SCALE: N.T.S. S5 <br />TOENAIL 1 <br />(2) 16d NA <br />12" <br />SH SCHEDULE <br />,TTACHMENT <br />? SYP BLK'G @ 16" O.C. <br />i x 0.131" <br />AILS EA. SIDE <br />. 2x4 #2 SYP w/ 1 Od <br />XO.131" @ 8" O.C. <br />ALTERNATE NON -DROP <br />GABLE END DETAIL 10 <br />SCALE: N.T.S. SrJ <br />GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S. <br />SCALE: N.T.S. <br />PRE-ENGINEERED <br />WOOD TRUSSES <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES <br />SCALE: N.T.S. S5 <br />MINIMUM (2) 16d PER JOINT `- MINIMUM 2x4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL <br />GABLE END BRACING DETAIL <br />SCALE: N.T.S <br />6" OVERLAP <br />"L" BRACE W/ 10d @ 4" O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />EXT. WALL CONN. @ NON - LOAD <br />BEARING LOCATION (UNEVEN CLG.) <br />SEE TYP. WALL SECTION FOR <br />ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />1" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />"L" BRACE <br />(1) 2"x4" (U.N.O.) <br />"L" BRACE <br />2"x6" (U.N.O.) <br />"L" BRACE <br />24" <br />0'0" - T-0" <br />T-O" - 6-0" <br />6-0" & GREATER <br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLL WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 10dx3" NAILS @ 4" 0/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />SIMPSON HGAIOKT w/ (4) 1/4"x1 1/2" SDS <br />SCREWS TO TRUSS & (4) 1/4"xY SDS SCREWS <br />TO PLATES (TYP.) <br />GABLE TRUSS <br />STUDS @ 16" O.C. SIMPSON SP2 w/ (12) <br />1 Od NAILS AT EACH <br />SCALE: 3/4"=1'-0" STUD <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />HIP FRAMING REFERENCE PLAN <br />2 x 4 BLOCKING w/ (2) 10d <br />TOE NAILS AT EACH END @ <br />24" O/C (TYP) <br />z <br />w <br />\_BRACING w/ (3) 10d x 3" AT <br />EACH CONN. @ 24" O/C <br />-MOISTURE BARRIER <br />-BOND BEAM <br />MASONRY WALL <br />ARCHITECTURAL FINISH NOTE: LTOP CHORD 2x4 #2 SYP BRACING <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING @ 16" O.C. MAX. FOR FIRST (4) <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING BAYS <br />THAT MY BE REQUIRED ZBOTTOM CHORD GABLE END BRACIN( <br />2) "T" BRACING MAY BE USED IN PLACE OF PERMANENT @ 4'-0" O.C. MAX. FOR FIRST (4) BAYS <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN rL� <br />2x4 BLOCKING 2x4 "T" BLOCKING <br />@ 48" O.C. 16d NAIL <br />"L" BRACE <br />ATTACHED W/ <br />1Od NAILS @ 4" <br />O.C. TYPICAL <br />GABLE TRUSS WEB <br />DOUBLE "L" BRACING DETAIL 5 <br />SCALE: N.T.S. S5 <br />2x4 "T" BLOCKING <br />2x4 BLOCKING @ <br />48'' O.C. 16d NAIL <br />L BRACE ATTACHED <br />W/ 1 Od NAILS @ 4" O.C. <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL 6 <br />SCALE: N.T.S. S5 <br />DIAPHRAGM <br />BLOCKING @ <br />48" 0/C GABLE TRUSS <br />TRUSS VERTICAL <br />(2) 2"x8" "L" BRACE J <br />FASTENED WITH (3) <br />16d PER SIDE <br />SCISSOR GABLE "T" BRACE <br />AS PER HIB 91 SCALE: N.T.S. S5 <br />20'-0" MAX 20'-0" MAX <br />"X" BRACE SEE DET. J/S5 � � CONTINUOUS BOTTO CHORD BRACING 2X4 MIN. <br />C'1 <br />w <br />pw <br />0 <br />v <br />q <br />0 <br />z o <br />w 1 <br />w <br />o <br />0 ' <br />o <br />' <br />0 <br />d <br />ui <br />— <br />— <br />— <br />q <br />Q <br />o <br />>�~ <br />cIt <br />T <br />cC <br />G <br />LU <br />AS PER BCSI <br />SCISSOR TRUSS <br />SCALE: N.T.S. <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />FIXED LOCATION ATTACHED W/ (2) 10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />COSMETIC DROP CEILING FRAMING <br />SCISSOR TRUSS <br />W/ DROP CEILING BRACING DETAIL <br />MEAN ROOF HEIGHT UP TO 30'-0" SCALE: NTS <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES SCALE: N.T.S. <br />FOR WIND SPEED SPECIFICATION <br />JUL 2 1 2023 <br />ost. I n C <br />and approved <br />z0 ESC 7th Editi <br />hr PX2300 <br />co <br />04 <br />:; S;,`' <br />yr <br />. :x.84t <br />CC <br />" - 40 6+r <br />s001 <br />�'y? <br />4 Q <br />a I � i, <br />A <br />O <br />0 <br />w <br />w <br />0 <br />z <br />Q <br />L <br />_W <br />'= ,o q U <br />m �m� 2 <br />N <br />_� <br />V) <br />M <br />*t �' <br />V -0-0— 2 co <br />0 L O <br />U 00 <br />0 LL g N Q <br />c � <br />V w00 aN } <br />W <br />L. C) E - <br />° a <br />W <br />(' W <br />dui wow <br />w�¢ o:�-' XgQyza: z <br />Q O� X ���� W U) LL V O0 0, J O <br />Q Q U <br />Da z,�w0z20 h <br />ocn��Ozoo'oomZ= 2 <br />Q 0 <br />U)0 Z <br />wL5- jVnwwu,U5�wQO <br />¢aWOw LuZo�U�¢ <br />00of c Z) p¢z Q <br />U_ O <br />U) <br />O <br />O <br />N <br />Ow <br />4 <br />u�� <br />> V) o <br />Q U co Ln <br />LLJ Q LA <br />Q u 00 <br />Z <br />Z <br />W <br />�� <br />kO <br />[t <br />N <br />N <br />N <br />N <br />N <br />N <br />O <br />cy) <br />V-- <br />qt <br />T- <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />O <br />O <br />O <br />6 <br />al <br />CD <br />00 <br />00 <br />o <br />N <br />O <br />O <br />r' <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />CN <br />O <br />N <br />O <br />CV <br />0 <br />N <br />O <br />CA <br />N <br />O <br />O <br />O <br />O <br />T­ <br />O <br />O <br />N <br />r- <br />M <br />O <br />0 <br />11 <br />0 <br />O <br />0 <br />O <br />0 <br />O <br />r <br />O <br />T.- <br />CV <br />0 <br />O <br />p <br />1 <br />2 <br />N U <br />L <br />CU <br />>I <br />NI <br />d'II <br />M () <br />Z Z <br />_ <br />z O <br />vV <br />w�~0 <br />O <br />� <br />Q <br />Uo� <br />�Q <br />� <br />~ <br />0 <br />W LU <br />CL <br />Lr) - <br />Z <br />Z <br />w P <br />r Q <br />�moz <br />0Z <br />r=n0=z <br />V <br />O t= J <br />aZ <br />Z�Zrl <br />z <br />� <br />Lu '� <br />°a� <br />Z <br />O <br />S2z <br />Z <br />�QO <br />' <br />Z <br />U <br />o�a. <br />0 <br />�m <br />z <br />a <br />z <br />w <br />J <br />W <br />M <br />N <br />N <br />� <br />O <br />LAST PLOT DATE <br />May. 8, 23 <br />STRUCTURAL <br />z Q <br />J <br />DETAILS <br />