Laserfiche WebLink
12 <br />\Z I <br />INSULATION — <br />BAFFLE <br />INSULATION PER-- <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2x S.P.F. TOP PLATE <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />PRE ENGINEERSD <br />WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX, SHINGLE ROOF <br />-SHINGLE ROOF <br />15/32" CDX PLYWOOD OR 7/16" <br />O.S.B. (SEE ROOF NAILING <br />SCHEDULE ON SHT SN1) <br />ALUMINUM DRIP EDGE <br />,O ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE SOFFIT SHEET <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C:, 2 ROWS <br />1x2 NAILER <br />w PLYWOOD SHEATHING <br />J <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />W <br />o <br />16" O.C. 2X S.P.F. STUDS <br />m <br />W/ (4)16d TOENAILS TO TOP PLATE <br />O <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />F <br />� w <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />UI= <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />I <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />W <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA <- 1000 <br />B R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALE <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETALSEAT <br />ER PLAN <br />O <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" 0/C <br />CEILING & 8' O/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />1x WD FURRING @ 24" O.C. <br />BASEBOARD <br />MIN. 2500 PSI CONC. SLAB <br />MIN. PSI MAY VARY PER <br />d MUNICIPALITY <br />c <br />r °A °° <br />M I — — <br />�—III = 11511I—II <br />I I —I O I—III-1 I I NP11, <br />6x6w1AXW1.4 - I I —I' 1WWF OR FIBERMESH <br />-1 I 1=1 <br />STD. 90 HOOK (SEE DETAIL) <br />8"x8"X16" CONC. KNOCKOUT <br />BILK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />cn M <br />U <br />4"x4" INSPECTION PORT AT <br />'0- <br />EACH FILL CELL TYPICAL <br />w <br />D- <br />a <br />AT GARAGE CONTRACTOR <br />CD <br />TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />04"to 6" BELOW GRADE <br />INISH GRADE 00 <br />i t OI I O I„ I I III" \-STD. 90'HOOK <br />(3) # 5 REBAR ON 3" CHAIR (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 1'-8" <br />TYP 2-STORY WALL SECTION ,1 <br />SCALE. 3/4 -1-0 S6 <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />2nd FLC <br />BEAM/G <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 1 Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1 ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />ATE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAN D <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS N <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />FLOOR TRUSS <br />0° SEE FRAMING - <br />WEEP SCREED <br />(0 z PLAN • INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />0/C FOR THE 1ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1- " " <br />2"x BOT. PLATE <br />(2)10d@6"0.( <br />PRE-ENGINEE <br />FLOOR TRUS; <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />FLOOR CONNECTION B <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" S6 <br />FOR ADDITIONAL INFORMATION. <br />RIBBONS <br />DETAIL FLOOR TRUSS o <br />SCALE: 1 1/2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL SEE SHEATHING <br />SECTION C/S3 FOR SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT. < 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd 5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 W/ (10) 10d 2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD (MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. TYPICAL TENSION 2600#.) <br />2X P.T. PLATE 6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />a <br />° a. a <br />-1 O I_ co <br />—III—_ .' i° : <br />-III III— �<��'Q I —III III- <br />(3) #5 CONT. ON 3" <br />8" V-8" 1 8" I CHAIR W/ 3" MIN. <br />i CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" <br />ADDITIONAL SLAB INFORMATION. <br />S6 <br />B <br />15/32" OSB <br />EXPOSUREI <br />k,x <br />SHEATHING <br />x <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />D <br />o SECTION X-X IF <br />� NOT FULL <br />HEIGHT SHEET <br />U) <br />z <br />C <br />G <br />FLOOR <br />SYST M <br />(2)- 2x TOP PLATE WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />BEYOND ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />15/32" OSB <br />EXPOSUREI F <br />F <br />SHEATHING W <br />SOLID 2x U) <br />C <br />BLOCKING@ALL <br />C <br />SHEATHING 00 <br />EDGES (SEE <br />OPENING <br />SECTION X- <br />a cWi <br />C <br />x <br />� w <br />_ x <br />E <br />F <br />2xSTUDS w <br />BEYOND. U) <br />SEE PLAN a <br />O <br />\-2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM IAIAi i ri r11Ar1^K1 nlAr+nARA <br />3/8" <br />SPA <br />S 3/4' <br />SINGLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7116" <br />FLITCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTICAL BLOCKING <br />SECTION X-X <br />SF A�Npo� <br />�N <br />2x CRIPPLES @ - <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM y" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />0 <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />J <br />PENETRATE SURFACE MORE THAN)/a". <br />co <br />z <br />NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />0@ <br />NAIL AT TOP PLATE TWO ROWS @ 4" O.0 w/ 8d COMMON NAIL <br />z <br />LL = <br />CO NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />0 <br />OD NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />W <br />ccnn <br />@ STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />J 0 <br />w.' 8d COMMON NAIL <br />J <br />ww L=L 0 <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />J >- a � 0 w <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />u> F LL <br />OG (?) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />z N W p o F <br />MEMBER IF GABLE END <br />c W <br />NOTE: <br />rc WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />• 8d NAILS FOR WALL SHEATHING MUST BE MIN .131 X 2 1/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />2-ROWS 12d NAILS <br />O STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />-• INTERIOR HEADER: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1 Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />A�TFRi FLOOR TRUSS / <br />FN/n,_O'Q i BEAM <br />S4 <br />BOX HEADER <br />ONLY <br />SEE PLAN FOR REQUIRED' <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR � <br />FRAME WALL HEADER DETAIL ( M <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W 1.4xW 1.4 <br />`t WWF OR FIBERMESH <br />E d <br />CN <br />coIII=1 I I—III-1 I ° ° ° " <br />-III,,IIII <br />I III <br />(3) # 5 REBAR ON Y CHAIR 4" V-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />HEADER SUPPORT <br />NO, OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />1'4 <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9' 16' <br />1 (3) <br />(3) <br />(2) <br />(3) <br />(2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />°° JUL 21 2013 <br />Ili, FINISH GRADE <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />00 <br />T <br />o z <br />_� g <br />tuai Review Assist, Inc. roved <br />glans Review comptetetl and approved <br />for compliance with neeMahr PX2300 FBC 71h Edition <br />V by Debra An <br />S6 <br />M <br />N <br />O <br />CV <br />00 <br />LO <br />" - .a <br />LO <br />CD <br />M. P <br />e <br />i) s s <br />. = <br />a E: <br />W <br />Q <br />Q <br />L> <br />W "oo U <br />v <br />C-)co <br />NM m <br />N V 21 .U� M <br />O <br />'0Qu <br />sli O <br />Lo <br />�L°2itjNN/Wc <br />L <br />E <br />00 <br />70 _ CL <br />V <br />L <br />,a W O <br />QWmJ YQzL <br />mH- <br />~pLL <br />U <br />nl <br />¢z�� poJO pQpJn���O <br />Z0zmQQQ¢ <br />10� <br />zcy l�oH zoWoomZ <br />O_zuoz <br />u Z <br />�v—W9 <br />�WO2FwpQg2u Q. <br />< <br />o' <br />Y QLo �¢¢ O f— <br />N <br />O <br />O <br />N <br />0W <br />1-4 <br />(n <br />H O <br />�M C) <br />Q V M L0 <br />5- Ln LL N <br />W Q Ln <br />u <br />Q Q O <br />Z <br />W <br />W <br />J0 <br />mi <br />I- <br />N <br />N <br />N <br />N <br />N <br />N <br />1 <br />M <br />N <br />0 <br />N <br />0 <br />cV <br />0 <br />O <br />O <br />O <br />o <br />OD <br />M <br />r- <br />00 <br />00 <br />C)O <br />O <br />04 <br />O <br />O <br />N <br />O <br />N <br />O <br />CN <br />O <br />N <br />O <br />N <br />O <br />N <br />C)N <br />CA <br />CV <br />O <br />O <br />r <br />O <br />Op <br />0 <br />N <br />c; <br />0 <br />d <br />O <br />r <br />O <br />O) <br />O <br />O <br />O <br />O <br />r- <br />O <br />r- <br />CV <br />O <br />' <br />N <br />Lo <br />U) <br />'D <br />r- <br />o <br />N <br />0 <br />cM <br />00 <br />Lf� <br />0 <br />O <br />0 <br />ti <br />1 <br />00 <br />/0^ <br />z z <br />v / <br />0 <br />� <br />Q <br />,,0 <br />� <br />OCL=Q <br />Z <br />Z—� <br />WI~ <br />�mOZ <br />Z W <br />Q <br />�2ZWr <br />l <br />�ZZ <br />L0 <br />Lu I\ <br />O_j2z <br />O <br />00 <br />UU)ZU) <br />ry <br />• <br />z <br />Z <br />�Q0 <br />U <br />Q <br />13- <br />O"J <br />0 <br />�mm <br />m <br />z <br />Z <br />J <br />W(14 <br />� <br />0 <br />LAST PLOT DATE <br />> <br />May. 8, 23 <br />STRUCTURAL <br />z <br />Q <br />_I <br />DETAILS —MONO <br />