Laserfiche WebLink
" <br />N <br />2 LBS. EPS <br />FOAM <br />1 1/2" <br />5 vl NJ11 = 1_n11 <br />" " <br />�� fV <br />0 2 LBS. EPS o <br />FOAM <br />6 BRACKE7 DETAIL <br />7 <br />G7 <br />• <br />0 <br />2 LBS. EPS <br />FOAM <br />M= <br />0 <br />CV <br />4" 4" 4" 4" <br />1. 1'-4" <br />11 = 1 1_n11 <br />1 v211 <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />11 = 1 1_nll <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />12 MANUFACTURED <br />5 ROOF TRUSS <br />MTL DRIP EDGE <br />~` 2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />1'-0" ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />1 <br />7"X1" THICK SMOOTH <br />STUCCO BAND —� <br />DC <br />4"X1"THICK SMOOTH 411 <br />STUCCO BAND <br />GARAGE 10 11 1 DETAIL <br />'I _ ia _ _11n <br />11 <br />12 <br />13 <br />12" X 1 1/4" THICK SMOOTH <br />STUCCO BAND <br />3 1/2" SMOOTH STUCCO <br />FINISH <br />PERMA WRAP COLUMN <br />OR EQUAL <br />4" SMOOTH STUCCO <br />FINISH <br />0 <br />" SMOOTH STUCCO <br />OVER CMU <br />2' 2" <br />SMOOTH STUCCO <br />OVER CMU <br />ELEV AT 0'A. <br />FIRST FLOOR FF <br />5/8" STUCCO OVER <br />CMU <br />4" STUCCO BAND <br />GARAGE <br />DOOR <br />4" 1'-0" 2"X2" THICK PAINTED <br />RAISED TRIM BAND <br />F�li <br />6"X1" THICK PAINTED <br />zo <br />RAISED TRIM BAND <br />5/8" STUCCO OVER <br />CMU <br />io <br />11 = 1 1_nll <br />SHINGLE <br />DRIP "V" SCREED, <br />AT BOTTOM OF <br />BAND <br />1'-4" <br />N I L I L_ <br />N I <br />FRONT ELEVATION A <br />1 /4" = 1'-019 <br />SHINC <br />ROOF <br />FIRST FLOOR FF <br />7/8" STUCCO z <br />OVER * J � <br />FRAME O U) w 4 <br />7"X2" THICK <br />PAINTED RAISED <br />TRIM BAND <br />6"X2" PAINTED <br />RAISED TRIM <br />BAND <br />4' OFF RIDGE VENT <br />12 <br />15 <br />J. M C <br />FLASHING — — <br />A/C UNIT <br />AND PAD <br />oo <br />ti m <br />REAR ELEVATION A <br />ELEV AT 18'-0" <br />T.O.P. <br />1'-0" <br />ELEV AT 10'-0" <br />* 2ND FLOOR FF <br />_ ELEV AT 8'-8" <br />MID -WALL T.O.M. <br />WEEP <br />SCREED <br />TYP. <br />5/8" STUCCO <br />ON CMU <br />_ _ ELEV AT 0'-0' <br />1ST FLOOR FF <br />r 1 /811 = 1 1_011 <br />4' OFF RIDGE VENT <br />T! I I _u 7 1111 -11 T I IWI T I I I I I T 1 12 <br />SHINGLE 5 <br />ROOF <br />I�111�1�1i1/�%::�■I��il�l�'�aau■ulrl■Irlrl■I�IrI■ulrl■Irlrl■ulrl■ulrl■Irnl■ulrl■unl■ulrl■ulu■ulrl■unl■unl■ulrl■ulrl■ulli` <br />Ill■I/r!'iInn■I�111!.�.1■I�III■11111■I�111■UIII■11111■11111■UIII■UIII■11111■UIII■I�III■11111■11111■UIII■IrI11■I�III■ulrl■ulu■ulu■Irnla_ 1 , <br />n■1-a,■,■uuv-..1�In�uul�ulo�l.11ul.Illr1.111.1.111�1�111�1.IIIrl�lll�l�l11■L111�1�111�1.01�1.1�I�1�1�1�1.1�1�1.111■I�111�1.111�1�111�1�11i�.. <br />• 11 � <br />• <br />��.1■Ir111■Irlll■Llll�ynll■Irin■I■111■ueu■I�IIt■I■._ <br />� - • • _.,;.:nl�uirl�um�iurl�,�r�uuul■Inn�i��n�l�nl�inn�i ::_,_ <br />ELEV AT 18'-0" <br />T.O.P. <br />7/8" <br />STUCCO <br />OVER FRAME <br />CASING BEAD <br />W/ WEEPS <br />OVER <br />FLASHING <br />ELEV AT 10'-0" <br />2ND FLOOR FF <br />� <br />ELEV AT 8'-8" <br />T.O.M. <br />SHINGLE <br />ROOF <br />011 <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />16'-4" 6'-0" <br />w <br />a <br />0 <br />J <br />W <br />O <br />N <br />w <br />a <br />ON <br />J <br />U) C6 <br />4' OFF RIDGE <br />VENT <br />�o. <br />CD <br />0 <br />0 <br />0 <br />SLOPE p w <br />U. w SLOPES <br />5:12 �> <br />:t> 5:12 <br />11 11 11 11 11 I1 11 11 I I 11 11 11 11 11 1I 11 11 I I 11 I I I I 11 11 1 <br />•' II�I�III�I�III�I�III�IIIIIr■I�III�IIIII�IIIII�I�lllr■I�111�11111�1�I11�1�1111■11111�11111�1�111�1�111�11111�11111�I�1111�1�111�11111�1�111�1�1111 <br />..,I'in■I■In■unl■uul■ullul■nul�nlrl■lu�l�ln■I.Info/ll�uln�l.uul.lu�uln�l�lu�l.nl�ulu�l.ln�l.ul�l./u�uul�uln�ulu■ul�l■I ' � \ <br />11 \ <br />1 • <br />�- - ■ MOWN <br />0.1 0 - <br />STUCCO i U w <br />1ON <br />L� OPE SLOPE O <br />— — — — — — — — — — — — — — — — ELEV AT 0'-0" 12 5:12 m <br />1 ST FLOOR FF <br />LEFT ELEVATION A <br />1 /811 = 1'-011 <br />SLOPE <br />5:12 <br />ROOF PLAN A <br />1 /8if = 1'-011 <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />MAY 0 2 2023 <br />Virtual Review Assist, Inc. <br />Plans Review completed and appTEd'tion <br />for compliance with the 2020 FBC 7t <br />by Debra Anne Klahr PX2300 <br />GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 7TH EDITION (2020) FBC SECTION R806 <br />FORMULA = S.F. / 150 (1/150) * 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA = 1697 SQ FT <br />VENTILATION REQUIRED = 815 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 407 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =1218 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET (MEASURE <br />VERTICALL BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE B LANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />* OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />* SOFFIT VENTS - 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />* LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA I FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE "i ESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACE ABILITY TO MANUFACTURER AND PRODUCT <br />Y.,wd <br />1O F F/ <br />--- <br />CM <br />N <br />o <br />N <br />t, - <br />Cn <br />2 <br />co <br />LID <br />�,�,� ♦�P.3., 5y. <br />z <br />LU <br />O <br />W <br />z <br />Q <br />V) <br />N LO <br />W L .= '0 q U <br />0 C) <br />M(n U -0CI) <br />-L <br />O08mQ <br />NLU <br />n ` <br />QN <br />co <br />E� <br />W <br />L C3 N <br />O a � <br />N C <br />ow LU0 <br />< V; ~W _j X� zm <br />0LLU <br />< <br />XLL <br />0� <br />aJU)O-/0Z= <br />dOaZU-Iy-Z� <br />OU)MMOZO�OOmZnW_ <br />Q:Q <br />co OZ <br />fxa.WCY <br />WAxQ6DJW<—LO <br />� <br />a <br />OW <br />Ow 0 :) oZ <br />QLL <br />Q <br />U_< O QI, <br />R <br />0 <br />0 <br />zw <br />CV) <br />Q M LO <br />z <br />I— W a. M <br />< <br />Z00 <br />U <br />W <br />W <br />JC:) <br />O <br />T� <br />O <br />O <br />O <br />O <br />O <br />O <br />N <br />O <br />CM <br />O <br />O <br />O <br />0000 <br />O <br />ZB <br />O <br />O <br />N <br />O <br />N <br />o <br />N <br />0 <br />1 <br />' <br />z <br />LoN <br />`1 , <br />w <br />o <br />O <br />O <br />o <br />O <br />ui <br />O <br />Co <br />i <br />z <br />W <br />U <br />z <br />aw <br />O <br />0 <br />W <br />V <br />O O _O <br />U U cn <br />-0 <br />O <br />or< <br />Q <br />Z <br />a_a <br />rl <br />F- <br />w Q <br />Ln <br />= <br />m=w <br />F-2 <br />N <br />O <br />ozom <br />LU <br /><�� <br />0 <br />ZWO <br />O <br />Q <br />U <br />gwlr <br />z <br />�z <br />Z <br />F- <br />pL) <br />_o <br />W <br />z <br />Z <br />z <br />w <br />W <br />J <br />� <br />V <br />0 <br />LAST PLOT DATE <br />N <br />• <br />March 31, 2023 <br />O <br />EXTERIOR <br />J <br />ELEVATIONS & ROOF <br />PLAN A <br />