Laserfiche WebLink
�--------- <br />,' ` 4" WIDE <br />STUCCO <br />+1 i BAND <br />i <br />2" <br />, GARAGE HEAD TRIM DETAIL <br />SCALE: 3/4"=1'-0" <br />WINDOW HEAD <br />4" WIDE <br />STUCCO <br />BAND <br />i <br />i <br />411 <br />i <br />4" WIDE <br />STUCCO <br />BAND WINDOW SILL <br />WINDOW HEAD & SILL DETAILS <br />SCALE: 3/4"=1'-0" SIM. AT FRONT ENTRY <br />9 <br />1'-011 <br />12 <br />5 <br />*35 SH <br />REAR ELEVATION <br />SCALE:1/4"=1'-0" <br />5:12 <br />0 <br />6068 SGD <br />12 <br />Q 5 <br />35 SH <br />ROOF SHINGLES PER <br />COMMUNITY <br />SPECS. <br />1'-011 <br />BLDG. HEIGHT <br />ROOF SHINGLES PER 5:12 ROOF SHINGLES PER <br />COMMUNITY SPECS. 12 Q COMMUNITY SPECS. <br />5 12 <br />5 <br />2 4" WIDE STUCCO BAND (+1) <br />6" FASCIA, TYP. <br />5:12i <br />T.O. MASONRY <br />TO WINDOW <br />1'-011 - 11-011 <br />1 4" WIDE <br />? STUCCO BAND <br />4" WIDE STUCCO BAND (+1) <br />�\__"'25 SH N144 lE10mmmr <br />T <br />1 <br />FIN. FLOOR - - - - - - - - - N <br />1'-4" STUCCO BAND RETURN 3068 16070 GARAGE DOOR <br />4" STUCCO BAND (+1) <br />FRONT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE <br />FINISH <br />TRIM COLOR <br />SAND <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C 1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />N 4 <br />p STA F <br />•0• <br />iS1ON Ai ,�N <br />cc <br />W <br />} 2 Er <br />3:00E- <br />>o <br /><0 <br />u) 0 Lu <br />Q i W F- <br />a-� W W <br />Y Q F- Z <br />,aLL00cn <br />Z qZ zLu <br />~ Z_ <br />L J Q � J <br />W a a = Er <br />_3cnp0U <br />�2zILL W <br />�F-QZ� <br />cz <br />cz <br />ca cotC <br />z(�z Q <br />'ai � Q <br />co <br />O � <br />Q <br />Q <br />cn <br />O <br />Z <br />o <br />O <br />m.-4 <br />U <br />> <br />01111 <br />w <br />0 <br />w <br />0 <br />0.1 <br />w <br />Z <br />2 <br />O <br />U) <br />U) <br />W <br />N <br />O� <br />rno <br />Z <br />a <br />a <br />a <br />a <br />a <br />4 2p21 <br />OMMUNITY: <br />LINKS A' CALUSA <br />SPRINGS <br />PLAN # 6100 <br />RELEASED: 9/30/21 <br />SHEET <br />