<br />61 G15-32.004 ENGINEERING DOCUMENT INFO.
<br />61G15-32.004 (2)(A-M):
<br />A. POINT OF SERVICE:
<br />THE POINT OF SERVICE CONSISTS OF AN 8" FIRE MAIN THAT SERVES THE FIRE HYDRANTS ON SITE. 8" FIRE
<br />MAINS SHALL BE PROVIDED WITH A BACKFLOW PREVENTION DEVICE ASSEMBLY. TWO FIRE DEPARTMENT
<br />CONNECTIONS SHALL BE PROVIDED AS REQUIRED FOR HIGH-RISE BUILDINGS.
<br />B. APPLICABLE CODES AND STANDARDS:
<br />IN ADDITION TO LOCAL ORDINANCES, APPLICABLE CODES AND STANDARDS ARE AS FOLLOWS:
<br />• FLORIDA BUILDING CODE, SEVENTH EDITION (2020)
<br />• FLORIDA FIRE PREVENTION CODE, SEVENTH EDITION (2020)
<br />• NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION
<br />• NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION
<br />SYSTEMS, 2017 EDITION
<br />C. CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR AREA SHALL BE AS FOLLOWS:
<br />LIGHT HAZARD (LH): CORRIDORS, OFFICES, BATHROOMS AND AREAS OF SIMILAR FIRE LOAD.
<br />ORDINARY HAZARD GROUP 1 (01-11): MECHANICAL ROOMS, ELECTRICAL ROOMS, AND AREAS OF SIMILAR FIRE
<br />LOAD.
<br />ORDINARY HAZARD GROUP 2 (OH2): GENERATOR ROOM, STORAGE AREAS AND AREAS OF SIMILAR FIRE LOAD.
<br />D. DESIGN APPROACH
<br />SCOPE OF WORK CONSISTS OF THE INSTALLATION OF A NEW FIRE SPRINKLER SYSTEM.
<br />LIGHT HAZARD: FIRE PROTECTION SHALL BE PROVIDED BY A WET PIPE AUTOMATIC SPRINKLER SYSTEM, USING
<br />EXPOSED STEEL SUPPLY PIPING ROUTED BELOW STRUCTURE. IN ROOMS/AREAS PROVIDED WITH CEILINGS PIPING
<br />SHALL BE LOCATED ABOVE THE CEILING. PIPING SHALL SUPPLY UPRIGHT SPRINKLER HEADS IN EXPOSED AREAS
<br />AND CONCEALED PENDENT SPRINKLER HEADS IN ROOMS PROVIDED WITH CEILINGS. DESIGN DENSITY: 0.10
<br />GPM/SQ. FT. FOR A 1,500 SQ. FT. AREA OF SPRINKLER OPERATION. HEAD TEMPERATURE RATING: 155 DEGREE F.
<br />SPACING: FOR STANDARD COVERAGE HEADS, 15 FT. MAXIMUM WITH A MAXIMUM PROTECTION AREA OF 225 SQ. FT.
<br />AREA REDUCTION ALLOWED PER NFPA.
<br />ORDINARY HAZARD GROUP 1: FIRE PROTECTION SHALL BE PROVIDED BY A WET PIPE AUTOMATIC SPRINKLER
<br />SYSTEM, USING EXPOSED STEEL SUPPLY PIPING ROUTED BELOW STRUCTURE. IN ROOMS/AREAS PROVIDED WITH
<br />CEILINGS PIPING SHALL BE LOCATED ABOVE THE CEILING. PIPING SHALL SUPPLY UPRIGHT SPRINKLER HEADS IN
<br />EXPOSED AREAS AND CONCEALED PENDENT SPRINKLER HEADS IN ROOMS PROVIDED WITH CEILINGS. DESIGN
<br />DENSITY: 0.15 GPM/SQ. FT. FOR A 1,500 SQ. FT. AREA OF SPRINKLER OPERATION. HEAD TEMPERATURE RATING: 155
<br />DEGREE F. SPACING: FOR STANDARD COVERAGE HEADS, 15 FT. MAXIMUM WITH A MAXIMUM PROTECTION AREA OF
<br />130 SQ.FT. AREA REDUCTION ALLOWED PER NFPA.
<br />ORDINARY HAZARD GROUP 2: FIRE PROTECTION SHALL BE PROVIDED BY A WET PIPED AUTOMATIC SPRINKLER,
<br />USING STEEL SUPPLY PIPING LOCATED ABOVE THE CEILING, WITH PIPE DROPS TO STANDARD COVERAGE PENDENT
<br />HEADS LOCATED IN THE CEILING. DENSITY: 0.20 GPM/SQ. FT. FOR A 1500 SQ. FT. AREA OF SPRINKLER OPERATION.
<br />HEAD TEMPERATURE RATING: 155 DEGREE F. SPACING: FOR STANDARD COVERAGE HEADS, 15 FT. MAXIMUM WITH A
<br />MAXIMUM PROTECTION AREA OF 130 SQ. FT. AREA REDUCTION ALLOWED PER NFPA 13.
<br />FIRE STOPPING FOR STEEL PIPE PENETRATING A CONCRETE FLOOR OR A CONCRETE BLOCK WALL:
<br />UL SYSTEM NO. C-AJ-1001, USE 3M TYPE CP ZSWB + CAULK, F RATING 3 HRS.
<br />E. CHARACTERISTICS OF WATER SUPPLY:
<br />EXISTING -INCH MUNICIPAL WATER MAIN RUNS ALONG XX ROAD. ONE 8" TAP WILL FEED THE
<br />PROJECT. DURATION IS GOOD BASED ON THE HYDRANT FOW TEST SHOWN IN ITEM (F) BELOW.
<br />F. FIRE FLOW TEST:
<br />• UNAVAILABLE AT THIS TIME.
<br />G. VALVING AND ALARM REQUIREMENTS TO MINIMIZE POTENTIAL FOR IMPAIRMENTS AND
<br />UNRECOGNIZED FLOW OF WATER:
<br />THE FIRE SPRINKLER SYSTEMS FOR THE BUILDING SHALL HAVE A WATER FLOW SWITCH WITH A LOCAL AUDIBLE
<br />ALARM AND REMOTE STATION MONITORING. THE BACKFLOW PREVENTION DEVICE ASSEMBLY SHUT-OFF VALVES
<br />AND ANY OTHER SHUT-OFF VALVES USED IN THE WATER SUPPLY PIPING FOR THIS SPRINKLER SYSTEM SHALL HAVE
<br />TAMPER SWITCHES WITH FIRE ALARM MONITORING.
<br />H. THE WATER PURVEYOR TO THIS DEVELOPMENT REGULARLY MAINTAINS AND TESTS THAT THEIR WATER IS IN
<br />COMPLIANCE WITH ALL STATE AND FEDERAL DRINKING WATER STANDARDS. THE SUPPLY IS MONITORED AND AS
<br />SUCH IT IS OF A QUALITY THAT WOULD NOT BE REASONABLY EXPECTED TO LEAD TO MIC.
<br />I. BACKFOW PREVENTION AND METERING SPECIFICATIONS:
<br />THE BACKFOW PREVENTION DEVICE ASSEMBLY AND THE METERING EQUIPMENT SHALL MEET THE REQUIREMENTS
<br />OF THE LOCAL WATER PURVEYOR. THE BACKFOW PREVENTION DEVICE ASSEMBLY IS TO HAVE A MAXIMUM
<br />ALLOWABLE PRESSURE DROP OF 10 PSI @ 1000 GPM. BACKFLOW PREVENTION DEVICE IS INDICATED ON FLOOR
<br />PLAN.
<br />J. QUALITY AND PERFORMANCE SPECIFICATIONS OF FIRE PROTECTION COMPONENTS:
<br />FIRE PROTECTION SYSTEM COMPONENTS SHALL BE UNDERWRITERS LABORATORIES LISTED OR FM APPROVED TO.
<br />ENSURE QUALITY OF SYSTEM COMPONENTS. COMPONENTS SHALL ALSO BE PROVIDED IN ACCORDANCE WITH
<br />PERFORMANCE REQUIREMENTS IN FIRE PROTECTION TECHNICAL SPECIFICATIONS.
<br />K. FOR HIGH HAZARD OCCUPANCY CLASSIFICATIONS, STORAGE OCCUPANCIES, AND FACTORY
<br />OCCUPANCIES, AS DEFINED IN SECTIONS 307, 311, AND 306, RESPECTIVELY, OF THE FLORIDA
<br />BUILDING CODE, BUILDING, AND HIGH-RISE BUILDINGS, AS DEFINED IN SECTION 202 OF THE
<br />FLORIDA BUILDING CODE, BUILDING, A DETERMINATION OF WHETHER A FIRE PUMP IS REQUIRED AND IF SO, THE
<br />SPECIFIC VOLUMETRIC FLOW AND PRESSURE RATING OF THE PUMP. THE FLORIDA BUILDING CODE IS
<br />INCORPORATED BY REFERENCE IN SUBSECTION 61G15-18.011(6), F.A.0 FIRE PUMP SERVING THE BUILDING FIRE
<br />PROTECTION SYSTEM IS EXISTING TO REMAIN.
<br />L. A VERIFICATION OF WHETHER A FIREWATER STORAGE TANK IS REQUIRED ON SITE AND IF SO, A DETERMINATION OF
<br />THE SIZE AND CAPACITY REQUIRED. A FIREWATER STORAGE SHALL NOT BE REQUIRED FOR THIS PROJECT.
<br />M. OWNER'S CERTIFICATE. IN STORAGE OCCUPANCIES, THE OWNER'S INFORMATION CERTIFICATE IS REQUIRED FROM
<br />THE PROPERTY OWNER AS IT CLEARLY DEFINES THE STORAGE CONFIGURATION OF THE SPACE FOR THE CURRENT
<br />AND FUTURE USE OF THE PROPERTY, AS REQUIRED BY THE CODES AND STANDARDS SET FORTH IN SUBSECTION
<br />61G15-32.002(7), F.A.C. THE BUILDING OWNER WILL PROVIDE OWNER'S INFORMATION CERTIFICATE OUTLINING THE
<br />STORAGE CONFIGURATION OF THE STORAGE SPACE FOR THE CURRENT AND FUTURE USE OF THE PROPERTY.
<br />GENERAL NOTES
<br />1. FIRE PROTECTION SYSTEM TO COMPLY WITH NFPA #
<br />31. PIPE SHALL BE REAMED AND CLEANED BEFORE
<br />13, AHCA AND ALL APPLICABLE STATE AND LOCAL CODES.
<br />ASSEMBLY, AND AFTER ASSEMBLY. THE ENTIRE
<br />PIPING SYSTEM SHALL BE FLUSHED CLEAN.
<br />2. ADHERE TO AND OBTAIN ALL PERMITS, LICENSES, AHCA
<br />AND ALL GOVERNMENT REQUIREMENTS.
<br />32. ADJUST NEW/EXISTING SPRINKLER PIPING AND SPRINKLE
<br />HEAD PLACEMENT TO ACCOMMODATE NEW/EXISTING
<br />3. FINAL INSPECTION AND APPROVAL BY LOCAL FIRE
<br />CEILING HEIGHTS AND STRUCTURAL CONFIGURATIONS.
<br />DEPARTMENT, BLDG. DEPT. AHCA AND
<br />ARCHITECT/ENGINEER.
<br />33. PROVIDE SYSTEM(S) WITH FLUSHING CONNECTION(S).
<br />4. A VISIT TO THE SITE TO CHECK AND VERIFY ALL
<br />34. PROVIDE SPRINKLERS ABOVE AND BELOW EXPOSED
<br />EXISTING CONDITIONS PRIOR TO BIDDING TO INSURE
<br />DUCTWORK, AN OBSTRUCTION, OR COMBINATIONS OF
<br />THE COORDINATION OF THE FIRE SERVICES WITH
<br />OBSTRUCTIONS 4 FEET OR WIDER.
<br />EXISTING CONDITIONS.
<br />35. INDICATE THE ROOM FUNCTIONS FOR EACH AREA
<br />5. CUTTING OF STRUCTURAL AND/OR ARCHITECTURAL
<br />ON THE SHOP DRAWINGS.
<br />MEMBERS TO BE DONE ONLY WITH THE WRITTEN
<br />APPROVAL OF THE ARCHITECT AND STRUCTURAL
<br />36. INDICATE THE LOCATION AND SIZE OF BLIND
<br />ENGINEER.
<br />SPACES AND CLOSETS ON THE SHOP DRAWINGS.
<br />6 FIRE SPRINKLER TEMPERATURE RATING AND PLACEMENT
<br />37. INDICATE THE TOTAL SQUARE FOOT AREA
<br />NEAR HEAT SOURCES SHALL COMPLY WITH NFPA 13
<br />PROTECTED BY SYSTEM(S) ON EACH FLOOR(S) ON
<br />TABLE 8.3.2.5 (a)
<br />THE SHOP DRAWINGS.
<br />T PIPE ROUTING SHOWN SHALL BE USED AND ANY
<br />38, INDICATE THE NUMBER OF SPRINKLERS ON EACH
<br />ADDITIONAL OFFSETS OR FITTINGS REQUIRED FOR
<br />RISER PER FLOOR ON THE SHOP DRAWINGS,
<br />PROPER INSTALLATION, COORDINATION WITH OTHER
<br />TRADES, AND/OR TO MAINTAIN PROPER
<br />39. PROVIDE HEAD GUARDS ON SPRINKLER HEADS IN
<br />CLEARANCES SHALL BE PROVIDED. VERIFY
<br />ELECTRIC, TELEPHONE AND MECHANICAL ROOMS.
<br />STRUCTURAL, MECHANICAL, ELECTRICAL
<br />INSTALLATIONS AND AVOID ALL OBSTRUCTIONS OR
<br />40. ALL PENDENT SPRINKLERS SHALL BE
<br />INTERFERENCES.
<br />CENTER -OF -TILE, UNLESS MAXIMUM DISTANCES
<br />FROM WALLS OR BETWEEN HEADS IS EXCEEDED. ALL
<br />8, REFER TO ARCHITECTURAL REFLECTED CEILING
<br />SPRINKLER HEADS MOUNTED IN CEILING SHALL BE
<br />PLANS AND ELECTRICAL LIGHTING DRAWINGS FOR
<br />LOCATED A MINIMUM OF 4" AWAY FROM ANY
<br />CEILING DESCRIPTIONS AND HEIGHTS.
<br />WALLS, CEILING GRID MEMBERS, CEILING HEIGHT
<br />CHANGES OR ANY OTHER VERTICAL INTERSECTING
<br />9. FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE
<br />STRUCTURAL SURFACE.
<br />WALLS, CEILINGS, FLOORS, ROOFS, ETC., FLASH AND
<br />COUNTERFLASH ROOF PENETRATIONS.
<br />41. FIRE PROTECTION CONTRACTOR SHALL ASSIST IN
<br />PREPARATION OF COORDINATION DRAWINGS FOR ALL
<br />10. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE
<br />LEVELS WHICH INDICATE ALL THE ENGINEERING
<br />NON -ACCESSIBLE CEILINGS AND CHASES.
<br />DISCIPLINES & FIRE PROTECTION PIPING, THESE
<br />DRAWINGS SHALL BE PREPARED & APPROVED BY
<br />11. SPRINKLER HEADS ARE TO BE COORDINATED WITH
<br />THE ENGINEER PRIOR TO ANY INSTALLATION. REFER
<br />ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES,
<br />TO SPECIFICATION SECTION 2333005 - COORDINATION
<br />CEILING SYSTEMS AND STRUCTURAL SYSTEM.
<br />DRAWINGS.
<br />12. INDICATE CENTER -TO -CENTER DIMENSIONS AND/OR
<br />42. FIRE SPRINKLER PIPING SHALL NOT TRAVEL WITHIN
<br />PIPE CUT LENGTHS AND NOMINAL PIPE DIAMETERS
<br />6 FEET OVER THE TOPS OF ELECTRICAL PANEL
<br />ON ALL PIPING.
<br />BOARDS PER N.F.P.A. 70.
<br />13. INDICATE PIPE TYPE, SCHEDULE OF WALL
<br />43. ALL SPRINKLERS SHALL MEET WITH NFPA #13
<br />THICKNESS AND METHOD OF JOINING ON SHOP
<br />TEMPERATURE RATINGS FOR FIRE SPRINKLERS (i.e.
<br />DRAWING.
<br />SPRINKLERS LOCATED IN A HIGH TEMPERATURE
<br />ZONE SHALL HAVE HIGH -TEMPERATURE
<br />14. PROVIDE STOCK OF EXTRA SPRINKLERS IN
<br />CLASSIFICATION SPRINKLERS AND SPRINKLERS
<br />ACCORDANCE WITH N.F.P.A.-13.
<br />LOCATED IN AN INTERMEDIATE ZONE SHALL HAVE
<br />INTERMEDIATE TEMPERATURE CLASSIFICATION
<br />15, PROVIDE DETAIL AND INDICATE TYPE OF HANGER TO
<br />SPRINKLERS).
<br />BE INSTALLED FOR SPRINKLER PIPING. METHODS
<br />OF HANGING PIPES, HEADERS AND BRANCHES
<br />44. FIRE PROTECTION CONTRACTOR SHALL PROVIDE
<br />SHALL BE IN ACCORDANCE WITH N.F.P.A. 13.
<br />ANY/ALL 1-INCH SPRIG -UPS FOR UPRIGHT
<br />HANGERS SHALL NOT INTERFERE WITH ANY OTHER
<br />SPRINKLERS TO ACHIEVE NFPA REQUIRED
<br />TRADE. POWDER DRIVEN STUDS SHALL NOT BE
<br />DEFLECTOR DISTANCE(S) FROM ANY/ALL
<br />USED.
<br />STRUCTURAL MEMBERS. COSTS FOR UPRIGHT
<br />SPRINKLERS SPRIG -UPS SHALL BE INCLUDED IN
<br />16. ALL GROOVED & SCREWED FITTING SHALL BE
<br />THIS BID WHETHER OR NOT SAID SPRIG -UPS ARE
<br />APPROVED PRIOR TO ANY INSTALLATION BY
<br />GRAPHICALLY SHOWN IN THE BID DOCUMENTS.
<br />ENGINEER WHO RESERVES THE RIGHT TO
<br />DISAPPROVE ANY FITTING.
<br />45. ALL EXISTING FIRE SPRINKLERS WITHIN THE SMOKE
<br />COMPARTMENT WHICH ARE PART OF THE PROJECT
<br />17. ALL SCREWED PIPING SHALL BE SCHEDULE 40 PIPE
<br />SCOPE SHALL BE REPLACED WITH QUICK RESPONSE
<br />IN ACCORDANCE WITH SPECIFICATIONS ASTM
<br />SPRINKLERS. THE NEW OR REPLACEMENT QUICK
<br />A1351A795 AND SHALL BE JOINED BY SCREWED
<br />RESPONSE SPRINKLERS SHALL MATCH THE EXISTING
<br />JOINTS IN ACCORDANCE WITH SPECIFICATION ANSI
<br />COLORS AND STYLE.
<br />B2.1.
<br />46. FIRE SPRINKLER CONTRACTOR SHALL SUBMIT DETAILED
<br />18. ALL GROOVED PIPING 2-1/2" OR LARGER SHALL BE
<br />SIGNED AND SEALED SPRINKLER SHOP DRAWINGS FOR
<br />SCHEDULE 10 ASTM Al35.
<br />SEPARATE PLAN CHECK AND APPROVAL.
<br />19. ALL SPRINKLER PIPING & FITTINGS SHALL BE
<br />47. LABEL ALL PIPING ASSOCIATED WITH THE FIRE
<br />INSTALLED RUST -FREE.
<br />PROTECTION SYSTEM (EXCEPT SPRINKLER BRANCH
<br />LINES) TO INDICATED PIPE USE AND DIRECTION OF FLOW
<br />20. AUTOMATIC SPRINKLER TEMPERATURE RATINGS OF
<br />(SEE EXAMPLES). LABELS SHOULD APPEAR AT 10'-0"
<br />GLASS BULB ELEMENTS TO BE IN ACCORDANCE
<br />INTERVALS ALONG PIPING, AND SHOULD BE PLACED SO
<br />WITH N.F.P.A. 13. ALL SPRINKLERS SHALL HAVE
<br />THEY ARE EASILY VIEWED FROM ANY ACCESS PANELS.
<br />CORROSIVE -RESISTANT COATING.
<br />LABELS SHALL BE RED WITH WHITE LETTERING, AND
<br />SHALL BE SIZED APPROPRIATELY FOR THE PIPE ON
<br />21. ALL VALVES FOR FIRE SERVICE SHALL BE LISTED
<br />WHICH THEY APPEAR. A SAMPLE ALONG WITH
<br />BY THE UNDERWRITER'S LABORATORIES, INC. AND
<br />MANUFACTURER'S SUBMITTAL DATA SHALL BE
<br />THE FACTORY MUTUAL LABORATORIES. VALVES
<br />SUBMITTED TO THE ENGINEER FOR WRITTEN APPROVAL
<br />SHALL BE FACTORY MARKED "UL" AND "FM", 175
<br />PRIOR TO ANY INSTALLATION.
<br />WORKING PRESSURE, AND 300 WORKING PRESSURE
<br />WHERE APPLICABLE.
<br />49. ALL SPRINKLERS IN AREAS WITH CEILINGS, SHALL BE
<br />CONCEALED TYPE, UNLESS OTHERWISE NOTED. FINAL
<br />22. ALL VALVES ON THE FIRE PROTECTION SYSTEM TO
<br />COLOR TO BE OBTAINED FROM ARCHITECT IN WRITING.
<br />BE ELECTRICALLY SUPERVISED. TYPE AND EXACT
<br />LOCATION OF FLOW AND SUPERVISORY SWITCHES
<br />50. ALL SPRINKLER ZONES SHALL MATCH FIRE
<br />SHALL BE ACCOMPLISHED/COORDINATED BETWEEN
<br />ALARM / SMOKE ZONES PRECISELY. FIRE SPRINKLER
<br />THE DIFFERENT RESPONSIBLE TRADES. ADDITIONAL
<br />CONTRACTOR SHALL OBTAIN AND COMPARE WITH THE
<br />WIRING OR ADDITIONAL SWITCHES REQUIRED SHALL
<br />LATEST PLANS/DOCUMENTS TO VERIFY FIRE SPRINKLER
<br />BE PROVIDED.
<br />AND FIRE ALARM/SMOKE ZONES ARE COORDINATED.
<br />23. BE ADVISED THAT PIPING SHOWN IS ARRANGED TO
<br />51. FIRE SPRINKLER TEMPERATURE RATING AND PLACEMENT
<br />ALLOW FOR FIRE ALARM ZONING. FIRE PROTECTION
<br />NEAR HEAT SOURCES SHALL COMPLY WITH NFPA 13
<br />PIPING ARRANGEMENT SHALL REFLECT AND ALLOW
<br />TABLE 8.3.2.5 (a)
<br />SAME ZONING AS SHOWN.
<br />24. CAUTION: FINAL SPRINKLER SHOP DRAWINGS SHALL
<br />BE SUBMITTED TO ENGINEER THROUGH ARCHITECT.
<br />NO INSTALLATION SHALL BE PERMITTED UNTIL
<br />SPRINKLER SHOP DRAWINGS HAVE BEEN APPROVED.
<br />25. SPRINKLERS SHALL COVER THE ENTIRE AREA OF
<br />ALL STRUCTURAL MEMBERS. SPRAY SHALL NOT BE
<br />BLOCKED BY WALLS, PARTITIONS OR STRUCTURAL
<br />COMPONENTS.
<br />26. IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER OF
<br />ANY DISCREPANCIES FOUND BETWEEN THESE PLANS,
<br />OTHER ENGINEERING PLANS, THE ARCHITECTURAL
<br />PLANS AND/OR FIELD CONDITIONS PRIOR TO FINAL
<br />BID PRICE OR FINAL PERMITTING.
<br />27. FIRE SPRINKLER TEMPERATURE RATING AND PLACEMENT
<br />NEAR HEAT SOURCES SHALL COMPLY WITH NFPA 13
<br />TABLE 8.3.2.5 (a)
<br />28. IN CASE OF DISPUTE OR DOUBT AS TO INTENT OF
<br />DRAWINGS OR SPECIFICATIONS, OBTAIN
<br />ARCHITECT/ENGINEER'S WRITTEN DECISION BEFORE
<br />PROCEEDING WITH BID INVOLVED.
<br />29. BEFORE SUBMITTING PROPOSAL OR BID, EXAMINE
<br />ALL DRAWINGS AND SPECIFICATIONS RELATING TO
<br />THIS PROJECT, THE AMOUNT OF SPACE AVAILABLE
<br />FOR PIPING, EQUIPMENT AND CONNECTING SERVICES,
<br />THE SITE OF THE WORK, THE REQUIREMENTS TO
<br />CORRELATE THE FIRE PROTECTION WORK WITH THAT
<br />OF OTHER TRADES AND THE TIME SCHEDULE
<br />NECESSARY TO PERFORM THAT WORK.
<br />30. AFTER EXAMINATION OF ALL PLANS AND
<br />SPECIFICATIONS, INCLUDE ALL THE COSTS
<br />NECESSARY FOR ALTERATION, MODIFICATIONS
<br />AND/OR ADDITIONS TO THE FIRE PROTECTION
<br />SYSTEM(S) NECESSARY TO MAKE A COMPLETE,
<br />APPROVED AND FINISHED INSTALLATION IN ALL
<br />ASPECTS. IT IS THE INTENT THAT ALL COSTS
<br />REQUIRED BE INCLUDED IN THE BID OF THIS TRADE.
<br />FIRE PROTECTION ABBREVIATIONS
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />GPM
<br />GALLONS PER MINUTE
<br />AMD
<br />AIR MAINTENANCE DEVICE
<br />GRV'D
<br />GROOVED
<br />BFV
<br />BACK FLOW VALVE
<br />HLL
<br />HIGH/LOW PRESSURE
<br />BFF
<br />BELOW FINISHED FLOOR
<br />NIC
<br />NOT IN CONTRACT
<br />CONT.
<br />CONTINUATION
<br />NTS
<br />NOT TO SCALE
<br />DN
<br />DOWN
<br />OS&Y
<br />OUTSIDE STEM & YOKE
<br />DWG.
<br />DRAWING
<br />PSI
<br />POUNDS I SQUARE INCH
<br />DPAC
<br />DRY PIPE AIR COMPRESSOR
<br />PAAC
<br />PRE ACTION AIR COMPRESSOR
<br />ELEC
<br />ELECTRIC
<br />PRV
<br />PRESSURE REDUCING VALVE
<br />EX.
<br />EXISTING
<br />PS
<br />PRESSURE SWITCH
<br />FDC
<br />FIRE DEPARTMENT CONNECTION
<br />STP
<br />STANDPIPE
<br />FE
<br />FIRE EXTINGUISHER
<br />TS
<br />TAMPER SWITCH
<br />FVC
<br />FIRE VALVE CABINET
<br />LINO
<br />UNLESS NOTED OTHERWISE
<br />FS
<br />FLOW SWITCH
<br />VRC
<br />VICTAULIC REDUCING COUPLING
<br />TAGS AND CALL OUT SYMBOLS
<br />DPAC
<br />DRY -PIPE SYSTEM AIR COMPRESSOR
<br />A
<br />REVISION CALLOUT
<br />QUANTITY
<br />10
<br />KEYNOTE CALLOUT
<br />PAAC
<br />PRE -ACTION SYSTEM AIR COMPRESSOR
<br />QUANTITY
<br />POINT OF CONNECTION
<br />)()(
<br />SECTION CALLOUT
<br />e
<br />POINT OF DEMARCATION
<br />1
<br />SECTION DESIGNATION
<br />SHEET NUMBER
<br />XX
<br />HYDRAULIC REFERENCE POINT
<br />FP3.1
<br />FS
<br />FLOW SWITCH EQUIPMENT TAG
<br />A
<br />DETAIL CALLOUT
<br />DETAIL DESIGNATION
<br />QUANTITY
<br />FP3.1
<br />SHEET NUMBER
<br />TS
<br />TAMPER SWITCH EQUIPMENT TAG
<br />QUANTITY
<br />PS
<br />PRESSURE SWITCH EQUIPMENT TAG
<br />XX
<br />QUANTITY
<br />ns
<br />FULLY SPRINKLERED SPACE
<br />HLL
<br />HIGH/LOW PRESSURE CONNECTION
<br />EQUIPMENT TAG
<br />ns
<br />PARTIALLY SPRINKLERED SPACE
<br />XX
<br />QUANTITY
<br />®
<br />"s
<br />NON SPRINKLERED SPACE
<br />HEAT DETECTOR
<br />�S P
<br />PHOTOELECTRIC DETECTOR
<br />IONIZATION DETECTOR
<br />FIRE PROTECTION SPRINKLER LEGEND
<br />n
<br />O
<br />1/2" BRASS QUICK RESPONSE CONCEALED PENDENT SPRINKLER 165°F - "K" FACTOR 5.6 - VIKING MODEL
<br />MIRAGE WITH COVER PLATE 135-F (SIN VK462). FINAL COLOR TO BE OBTAINED FROM ARCHITECT IN
<br />WRITING. PROVIDE ADDITIONAL 15% SUPPLY OF COVER PLATES.
<br />1/2" WHITE/BRASS QUICK RESPONSE UPRIGHT SPRINKLER 155°F - "K" FACTOR 5.6 - VIKING
<br />0
<br />MICROFAST MODEL "M" (SIN VK300).
<br />EXISTING SPRINKLER TO BE REPLACED WITH 1" ARM OVER TO NEW 1/2" WHITE QUICK RESPONSE
<br />1
<br />CONCEALED PENDENT SPRINKLER 1657 - "K" FACTOR 5.6 - VIKING MODEL MIRAGE WITH WHITE COVER
<br />PLATE 135-F (SIN VK462).
<br />FIRE PROTECTION PIPING AND SYMBOL LEGEND
<br />0
<br />NEW PIPING
<br />GROOVED FITTING AND/OR COUPLING
<br />0
<br />EXISTING PIPING
<br />F.C.
<br />FLUSHING CONNECTION
<br />0
<br />UNDERGROUND PIPING
<br />NEW OS&Y GATE VALVE
<br />PIPE CAPPED
<br />WITH TAMPER SWITCH
<br />q
<br />�--0-
<br />NEW FLOW SWITCH
<br />PIPE PLUGGED
<br />NEW PRESSURE GAUGE
<br />DIELECTRIC UNION
<br />NEW BUTTERFLY VALVE
<br />DRY -PIPE VALVE ASSEMBLY
<br />-��'.
<br />NEW FLOOR CONTROL ASSEMBLY WITH
<br />EXISTING OS&Y GATE
<br />BUTTERFLY VALVE, FLOW SWITCH,
<br />VALVE WITH TAMPER SWITCH
<br />PRESSURE GAUGE, AND INSPECTORS
<br />TEST/DRAIN PIPING OUTLET
<br />�-�
<br />EXISTING FLOW SWITCH
<br />NEW CHECK VALVE
<br />EXISTING PRESSURE GAUGE
<br />NEW STANDPIPE
<br />EXISTING BUTTERFLY VALVE
<br />NEW HOSE REEL CABINET
<br />BUTTERFLY VALVE IN THE
<br />VERTICAL RISE
<br />Z--�
<br />INSPECTOR'S TEST/DRAIN - VICTAULIC
<br />TESTMASTER II #720 AND SPLASH BLOCK
<br />FG�93
<br />OS&Y IN THE VERTICAL RISE
<br />DOUBLE CHECK
<br />BACKFLOW PREVENTER
<br />EXISTING CHECK VALVE
<br />FREE STANDING FIRE
<br />DEPARTMENT CONNECTION
<br />E==B
<br />EXISTING STANDPIPE
<br />SAP
<br />SPRINKLER ALARM PANEL
<br />NEW FIRE VALVE CABINET
<br />R
<br />ALARM BELL
<br />AUXILIARY DRAIN WITH 1" GLOBE
<br />O
<br />VALVE AND I'V/4" HOSE ADAPTER
<br />FIRE HYDRANT
<br />WALL MOUNTED FIRE
<br />DEPARTMENT CONNECTION
<br />AIR SAMPLING CONTROL
<br />ASFP
<br />DETECTOR PANEL
<br />DESIGN DENSITY
<br />HAZARD
<br />CATEGORY
<br />SPRINKLER HEAD
<br />SPACING
<br />HOSE
<br />ALLOWANCE
<br />SPRINKLER DESIGN DEMAND (gpm/ft2)/ft2
<br />WET
<br />DRY
<br />LIGHT HAZARD
<br />225
<br />100
<br />0.10/1500
<br />0,10/1950
<br />ORDINARY HAZARD GROUP 1
<br />130
<br />250
<br />0.15/1500
<br />0.15/1950
<br />©
<br />ORDINARY HAZARD GROUP 2
<br />130
<br />250
<br />0.20/1500
<br />0.20/1950
<br />�D
<br />EXTRA HAZARD GROUP 1
<br />100
<br />500
<br />0.30/2500
<br />0.30/3250
<br />0
<br />ROOM TO BE PROTECTED BY CLEAN AGENT FIRE SUPPRESSION SYSTEM.
<br />exp U.S. Services Inc.
<br />t: +1.407.660.0088
<br />f: +1.407.660.1655
<br />2601 Westhall Lane
<br />Maitland, FL 32751
<br />USA
<br />fig
<br />www.exp.com
<br />�s�i
<br />Project #: 21011327
<br />ex
<br />Cart of Auth: 29701
<br />0 509.w
<br />�*S� J is a
<br />ftf d 1111111����
<br />TIMOTHY P. PENNOCK - PE-54516
<br />AdventHealth
<br />Zephyrhilis
<br />GENERATOR ADDITION
<br />u n to n OLI'
<br />A R C H I T E C T
<br />DATE SUBMISSION NO
<br />12.17.21 CONSTRUCTION DOCUMENTS
<br />FIRE PROTECTION LEGEND
<br />PROJ. NO. H-15027.00 SHEET
<br />DRAWN CMZ
<br />Fml 00
<br />1 ■ 2 ■ 3 ■ 4 ■ 8 ■ 6 ■ 7 ■ ■ 9 ■ 10 ■ 11 ■ 12 ■ 13 ■ 14 ■ 15 ■ 16 ■ 17 ■ 18 ■ 19 ■ 20
<br />Copyright HuntonBrady Architects P.A. All Rights Reserved. 333 S. Garland Ave., Suite 1100, Orlando, Florida 32801 (407) 839-0886 (407)839-1709/Faxwww.huntonbrady.com License AR91515
<br />
|