Laserfiche WebLink
4' OFF <br />SHINGLE ROOF RIDGE VENT <br />(A45 5 12 III III III III 12 5 A5 � SHINGLE ROOF I - <br />O.H. z A5 <br />7 b= v <br />A5 - r B <br />7/8 STUCCO `" _`o 1 <br />OVER FRAME-----, `,� <br />12" PAINTED RAISED <br />STUCCO BAND <br />DRIP "V" SCREED <br />5/8 STUCCO I <br />OVER CMU-� <br />PAINTED METAL <br />GARAGE DOOR <br />INININI MININ <br />■ ■MEN ITE7 <br />A5 <br />FRONT ELEVATION A <br />U 3/16" = 1'-0" <br />_ ELEV AT 18'-0" Allk <br />SECOND FLOOR CEILING <br />7/8 STUCCO <br />OVER PLYWOOD <br />7 <br />A5 CASING BEAD <br />W/ WEEPS OVER <br />12 FLASHING <br />4 _ ELEV AT 10'-0" <br />SECOND FLOOR FF <br />ELEV AT 8-8 <br />FIRST FIRST FLOOR CEILING <br />6" PAINTED RAISED <br />d TRIM BAND <br />`° 6" PAINTED RAISED <br />TRIM BAND <br />ELEV AT 0'-0" <br />FIRST FLOOR FF <br />4' OFF <br />RIDGE VENT <br />6 SHINGLE ROOF <br />A5 12 <br />5 12 <br />z�_ <br />�w <br />- 7/8" STUCCO <br />`V M <br />L <br />� OVER FRAME <br />C.J.1 SS C.J1 <br />L 14'-0" <br />WEEP CASING BEAD <br />SCREED W/ WEEPS <br />OVER <br />FLASHING <br />0 <br />bo 60 ao <br />io V5/8" STUCCO <br />OVER CMU <br />Ilk <br />REAR ELEVATION A <br />3/16" = 1'-0" <br />_ ELEV AT 18'-0" <br />SECOND FLOOR CEILING <br />ELEV AT 10'-0" <br />- SECOND FLOOR FF <br />ELEV AT 8'-8" <br />FIRST FLOOR CEILING <br />_ ELEV AT 0'-0" <br />FIRST FLOOR FF <br />A5 12 <br />5 12 <br />5 <br />_ ELEV AT <br />SECOND FLOOR CEILING <br />718" STUCCO N M <br />OVER FRAME <br />C.J.I C.J.I C.J.I CjI C.J.I <br />6'-4" 10'-0" 10'-8" L 10'-0" 6'-4" 3'-U <br />4 Ilk- _ ELEV AT 10'-0" <br />Alk <br />SECOND FLOOR FF <br />DRIP <br />SCREED ELEV AT 8'-8" <br />WEEP 5/8" STUCCO FIRST FLOOR AT <br />SCREED OVER CMU <br />ELEV AT 0'-0" <br />FIRST FLOOR FF <br />3 RIGHT ELEVATION A <br />3/16" = 1'-0" <br />RIDGE VENT-, <br />- •.��I■I�1�1■1�1�1■I�I�n�i����■�■�II■I�111■I�1�1■I��... <br />■■s��■■■mow r <br />"m�.._ <br />I I I I I <br />I I I I I <br />I I I I I <br />7/8" STUCCO - —OVER <br />FRAME <br />12 <br />Y I C.J� C.J.I C.J.I C.J.I C.J.I <br />3'-4" 8,-8„ 8'-8„ 8'-8„ 8'-8" 3'-4" <br />%-5/8" STUCCO WEEP <br />OVER CMU SCREED <br />CASING BEAD m <br />W/ WEEPS <br />OVER <br />FLASHING <br />LEFT ELEVATION A <br />3/16" = 1'-0" <br />_ ELEV AT 18'-0" <br />SECOND FLOOR CEILING <br />ELEV AT 10'-0" <br />4 SECOND FLOOR FF <br />ELEV AT 8'-8" <br />FIRST FLOOR CEILING <br />ELEV AT 0'-0" <br />FIRST FLOOR FF <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A 'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />\/RA -- <br />Virtual Review Assist, Inc. <br />Plans Review completed and appr v <br />for compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />04 <br />04 <br />7 <br />', <v <br />r 1#4 J 17op <br />LO <br />O <br />a <br />lLO <br />Y <br />}(5 , <br />f4U Q <br />1 <br />N <br />I.L <br />y t �04'bb d <br />w <br />0 <br />w <br />z <br />> LO - E <br />i o O <br />r-, <br />W <br />VJ Q CY)� 04 <br />N <br />U Q-- 0) - <br />A' i L 0 <br />W O' 2 0 <br />at 0 <br />0 6 <br />Q <br />U6� <br />—,_ <br />•N <br />w QN <br />i o EM <br />a <br />LLJ 0 LU <br />w <br />❑W H W J W O <br />CLLI <00Q�¢�VO0_O <br />Q I- <br />~ <br />K <br />O�u- <br />OOROOmzaOWw <br />FQ <br />Z <br />ItQ <br />U) <br />az~z�¢pU) O�o�❑O <br /><Qw<_LL1ZaQ <br />IL <br />OW F YU <br />oLL Q ❑Z Qa�o <br />Q <br />w <br />O <br />0 <br />Z CV <br />0w <br />CO <br />Q co r- <br />LL <br />U) <br />ti <br />M <br />Z00 <br />U <br />W <br />J O <br />O <br />J <br />d' <br />co <br />O <br />CDO <br />N <br />CDr <br />N <br />N <br />N <br />o <br />N <br />N <br />0 <br />N <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />N <br />O <br />r <br />O <br />N <br />O <br />0 1 <br />O <br />r <br />c� <br />r <br />r <br />O <br />N <br />O <br />Z <br />O <br />NU-) <br />w <br />O <br />o <br />0 <br />0 <br />o <br />In <br />COLO <br />wZ� <br />¢z <br />O <br />W <br />z uwi <br />O <br />wo_o <br />V <br />ozj <br />z <br />LO <br />—0 <br />0 <br />o�0 <br />Q <br />Z <br />CL <br />� <br />� <br />F_ <br />1x W <br />N <br />m�w <br />N <br />ZOO <br />oT_ <br />W <br /><�_-.D <br />• <br />N <br />O <br />zxo <br />Z <br />w <br />aZ� <br />Mz <br />Z <br />�� <br />U <br />J <br />0 <br />_o <br />W <br />z <br />¢ <br />z <br />z <br />w <br />W <br />C3 <br />co <br />0 <br />0 <br />LAST PLOT DATE <br />. <br />April 29, 2022 <br />z <br />0 <br />EXTERIOR <br />-"I <br />ELEVATIONS A <br />