XRR <br />1 <br />1 <br />i <br />XRR <br />XRR <br />L.o-.....J <br />XRR <br />XRR <br />DEMO FIRE PROTECTION PLAN <br />X <br />X <br />X <br />N <br />0 <br />I <br />C2`NEW FIRE PROTECTION PLAN <br />M <br />M. <br />X <br />X <br />FAC 61 G15-32.003 NOTES <br />32.003 1 THE FIRE SPRINKLER CONTRACTOR SHALL PREPARE DETAILED WORKING PLANS IN <br />ACCORDANCE WITH NFPA 13, 2013 EDITION. THE FIRE PROTECTION SYSTEM LAYOUT 1. <br />SHALL FOLLOW THE DESIGN GUIDELINES SET FORTH IN THESE FIRE PROTECTION <br />ENGINEERING DOCUMENTS. <br />32.003(2) THE FIRE SPRINKLER CONTRACTOR SHALL OBTAIN THE ACCEPTANCE TESTS FROM <br />THE LOCAL AUTHORITY. THE ACCEPTANCE TEST FOR THE SPRINKLER SYSTEM <br />PIPING SHALL BE IN ACCORDANCE WITH NFPA 13, CHAPTER 16 AND NFPA 25. 2. <br />41 <br />FAC 61 G 15-32.004 NOTES <br />4. <br />32.004(2)(a) <br />THE POINT OF SERVICE IS INDICATED AT BACKFLOW PREVENTER. AT THIS POINT, <br />THE SYSTEM IS DEDICATED SOLELY FOR FIRE PROTECTION PURPOSES. NO <br />5. <br />DOMESTIC WATER SHALL BE TAKEN FROM THE SYSTEM BEYOND THIS POINT FOR <br />OTHER PURPOSES. <br />6, <br />32.004(2)(b) <br />THE FOLLOWING ARE APPLICABLE STANDARDS: <br />- 2017 FLORIDA FIRE PREVENTION CODE 6TH EDITION <br />7. <br />- NFPA 13, 2013 EDITION, INSTALLATION OF SPRINKLER SYSTEMS. <br />- NFPA 24, 2013 EDITION, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE <br />SERVICE MAINS AND THEIR APPURTENANCES. <br />8. <br />- NFPA 25, 2014 EDITION, INSPECTION, TESTING AND MAINTENANCE OF WATER - <br />BASED FIRE PROTECTION SYSTEMS. <br />9. <br />32.004(2)(c) <br />CLASSIFICATIONS OF HAZARD OCCUPANCIES FOR THE AREAS OF DESIGN SHALL <br />BE AS INDICATED ON THE DRAWINGS. <br />10 <br />32.004(2)(d) <br />THE SPRINKLER SYSTEM SHALL BE WET PIPE FOR CLASSROOMS, CORRIDORS <br />AND OFFICES FOR A LIGHT HAZARD OCCUPANCY AND SHALL BE HYDRAULICALLY <br />11 <br />CALCULATED PER NFPA 13, 2013 EDITION, 0.10gpm/sq.ft. OVER THE MOST REMOTE <br />1500sq.ft. SPRINKLERS SHALL HAVE A TEMPERATURE RATING OF 155°F AND THE <br />SPACING SHALL BE 225sq.ft. INCLUDE A FIRE HOSE ALLOWANCE OF 100gpm. THE <br />SPRINKLER SYSTEM SHALL BE WET PIPE FOR THE MECHANICAL ROOMS AND <br />STORAGE FOR AN ORDINARY HAZARD GROUP 1 OCCUPANCY AND SHALL BE <br />HYDRAULICALLY CALCULATED PER NFPA 13, 2013 EDITION, 0.15gpm/sq.ft. OVER THE <br />MOST REMOTE 1500sq.ft. SPRINKLERS SHALL HAVE A TEMPERATURE RATING OF <br />1 <br />155"F AND THE SPACING SHALL BE 130sq.ft. INCLUDE A FIRE HOSE ALLOWANCE OF <br />250gpm. <br />2. <br />32.004(2)(e) <br />WATER SUPPLY: THESE BUILDINGS WILL EACH HAVE A NEW 8" WATER SUPPLY <br />FOR FIRE SPRINKLER PROTECTION, WHICH CONNECTS TO A LOOPED WATER <br />MAIN. <br />3. <br />32.004(2)(1) <br />FIRE PROTECTION CONTRACTOR SHALL PERFORM A FIRE HYDRANT FLOW TEST <br />AND VERIFY THAT THE AVAILABLE PUBLIC WATER SUPPLY WILL SUPPORT THE <br />DESIGN CRITERIA. FLOW TEST SHALL BE NO OLDER THAN 6 MONTHS. <br />32.004(2)(g) <br />VALVE AND ALARM REQUIREMENTS: ALL CONTROL VALVES ON SPRINKLER <br />4. <br />RISERS AND FIRE PROTECTION BACKFLOW PREVENTERS SHALL HAVE A TAMPER <br />SWITCH. THE FLOW SWITCH SHALL BE SET TO NOT ALARM WITH MINOR CITY <br />5. <br />WATER PRESSURE FLUCTUATIONS. HOWEVER, THE FLOW OF ONE SPRINKLER <br />HEAD SHALL PRODUCE AN ALARM CONDITION BY TRIPPING THE FLOW SWITCH. <br />ALL FLOW AND TAMPER SWITCHES SHALL BE CONNECTED TO THE BUILDING FIRE <br />6. <br />ALARM PANEL. FLOW SWITCHES SHALL ALSO SOUND THE ELECTRIC ALARM BELL <br />ON THE OUTSIDE WALL. FIRE SPRINKLER CONTRACTOR SHALL VERIFY AND TEST <br />PER NFPA 13. <br />7. <br />32.004(2)(h) <br />THE LOCAL WATER PURVEYOR IS REQUESTED TO ADVISE THE ENGINEER OF <br />RECORD IF CONDITIONS EXIST IN THEIR WATER SUPPLY THAT COULD LEAD TO <br />MIC, SO THAT THE ENGINEER CAN DESIGN CORRECTIVE MEASURES. THERE ARE <br />8. <br />NO KNOWN MIC CONDITIONS IN THE ORANGE COUNTY WATER SYSTEMS. <br />32.004(2)(i) <br />BACKFLOW PREVENTER AND METERING SPECIFICATIONS SHALL MEET OR EXCEED <br />REQUIREMENTS OF THE CITY OF WINTER GARDEN UTILITIES. THE MAXIMUM <br />ALLOWABLE PRESSURE LOSS ACROSS THE DEVICE SHALL BE 8" PSI AT SYSTEM <br />DEMAND. <br />9. <br />32.004(2)(I) <br />YARD AND INTERIOR FIRE PROTECTION COMPONENTS: PRODUCT DATA SHEETS <br />SHALL BE SUBMITTED BY THE SPRINKLER CONTRACTOR ALONG WITH THEIR SHOP <br />DRAWINGS. ALL FIRE PROTECTION DEVICES AND COMPONENTS SHALL BE UL <br />10 <br />LISTED AND FM APPROVED. <br />32.004(2)(k) <br />A FIRE PUMP IS NOT REQUIRED. <br />32.004(2)(1) <br />A FIREWATER STORAGE TANK IS NOT REQUIRED. <br />11 <br />32.004(2)(m) OWNER'S CERTIFICATE IN STORAGE OCCUPANICIES, THE OWNER'S INFORMATION <br />CERTIFICATE IS REQUIRED FROM THE PROPERTY OWNER AS IT CLEARLY DFINES <br />12 <br />THE STORAGE CONFIGURATION OF THE SPACE FOR THE CURRENT AND FUTURE <br />USE OF THE PROPERTY, AS REQUIRED BY THE CODES AND STANDARDS SET <br />FORTH IN SUB -SECTION 61G15-32.02 (7), F.A.C. <br />13 <br />GROUP "A-3" - ASSEMBLY AS PRIMARY OCCUPANCY <br />GROUP "B" - BUSINESS AT OFFICES <br />GROUP "S-1" 81 "S-2" - STORAGE AREAS <br />14 <br />15 <br />i 16 <br />"> V ) <br />X0 <br />FIRE PROTECTION GENERAL NOTES <br />SPRINKLER SYSTEM TO BE DESIGNED BY SPRINKLER CONTRACTOR. DRAWINGS INDICATE THE <br />SCHEMATIC LAYOUT DESIGN INTENT ONLY, HEADS INDICATED ON PLAN REPRESENT RECOMMENDED <br />LOCATIONS. CONTRACTOR TO VERIFY QUANTITY AND LOCATION OF HEADS AS PART OF DESIGN <br />BUILD CONTRACT. ALL NECESSARY ADDITIONAL HEADS SHALL BE PROVIDED AND INSTALLED AT NO <br />ADDITIONAL COST. <br />ALL FIRE PROTECTION WORK TO BE EXECUTED IN STRICT CONFORMANCE WITH NFPA 13 AND LOCAL <br />CODES AND AMENDMENTS. THE SYSTEM SHALL BE GUARANTEED FOR MINIMUM OF ONE (1) YEAR <br />FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER/ARCHITECT. <br />SPRINKLER SYSTEM DESIGN SHALL BE BASED ON 0.10/GPM FOR THE MOST REMOTE 1500 SQUARE <br />FEET. THIS IS BASED ON A LIGHT HAZARD CLASSIFICATION. <br />CONTRACTOR TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM AUTHORITY HAVING <br />JURISDICTION. <br />SPRINKLER HEADS SHALL BE PLACED IN CENTER OF TILES WHERE SUSPENDED CEILING EXIST. <br />COORDINATION WITH ALL OTHER TRADES IS A MUST PRIOR TO ANY INSTALLATION. SEE <br />ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR EXACT CEILING SPACE AVAILABLE. <br />CONTRACTOR TO CONFIRM NECESSARY SIZE OF INCOMING SERVICE AND COORDINATE SUCH WITH <br />GENERAL AND FUTURE PLUMBING. <br />PRESSURE TEST PIPING SYSTEM AT 200 PSI FOR A MINIMUM OF 2 HOURS WITHOUT ANY LEAKS IN <br />SYSTEM. <br />FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR ANY INSPECTIONS, PERMITS, REQUIRED <br />PRIOR TO INSTALLATION. <br />PROVIDE SPARE SPRINKLER HEADS IN CABINET AT ALARM PANEL. <br />FLEX SPRINKLER HEADS ARE ALLOWABLE TO BE USED FOR EASE OF PLACEMENT IN CEILING TILES. <br />FIRE PROTECTION SPECIFICATIONS <br />THE GENERAL CONDITIONS AND SUPPLEMENTAL GENERAL CONDITIONS ISSUED BY THE ARCHITECT <br />SHALL GOVERN WHERE APPLICABLE. <br />THIS CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AT THE JOB SITE BEFORE SUBMITTING <br />BID. FAILURE TO RECOGNIZE WORK REQUIRED SHALL BE AT THE EXPENSE OF THIS CONTRACTOR. <br />NO CONSIDERATION SHALL BE GIVEN FOR ADDITIONAL COMPENSATION AFTER THE LETTING OF BIDS. <br />ENTIRE INSTALLATION SHALL BE PERFORMED IN A FIRST-CLASS WORKMANLIKE MANNER. THE <br />COMPLETED SYSTEMS SHALL BE FULLY OPERATIONAL; ACCEPTANCE BY THE OWNER SHALL BE A <br />CONDITION WITH OTHER TRADES IN ORDER TO AVOID INTERFERENCES, PRESERVE MAXIMUM <br />HEADROOM AND AVOID OMISSIONS. <br />CONTRACTOR TO MAKE ALL NECESSARY TAPS, AS CALLED FOR ON THE DRAWINGS. <br />THIS CONTRACTOR SHALL REMOVE ALL DEBRIS ON COMPLETION OF THE JOB AND CLEAN ALL <br />FIXTURES. <br />IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO START-UP, ADJUST AND CHECK FOR <br />PROPER OPERATION, ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT. <br />THIS CONTRACTOR SHALL ALLOW IN HIS INITIAL BID THE COST OF SERVICE ON ALL EQUIPMENT <br />INSTALLED UNDER HIS CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF FINAL INSPECTION <br />OF THE WORK. <br />THIS CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER, OWNERS INSURANCE <br />UNDERWRITER, AND LOCAL FIRE DEPARTMENT FOR APPROVAL COMPLETE INSTALLATION AND <br />DESIGN DRAWINGS SHOWING THE SPRINKLER SYSTEM LAYOUTS. THE LAYOUT SHALL INDICATE ALL <br />OF THE SPRINKLER PIPING, SPRINKLER HEAD LOCATIONS AND DETAILS OF ANCHORS AND SUPPORTS <br />AS REQUIRED. <br />THE SPRINKLER SYSTEM SHALL BE LAID OUT TO ELIMINATE ALL CONFLICTS BETWEEN THE <br />SPRINKLER SYSTEM AND THE STRUCTURE INCLUDING THE MECHANICAL AND ELECTRICAL SYSTEMS <br />AS THEY ARE SHOWN ON THE CONTRACT DRAWINGS. <br />THE LAYOUT SHALL INDICATE COORDINATION BETWEEN SUCH ITEMS AS DUCTWORK, LIGHTS, <br />STRUCTURAL MEMBERS, ETC. PIPE FOR ABOVE GRADE SHALL BE NEW SCHEDULE 40 FOR BRANCHES <br />AND SCHEDULE 10 FOR MAINS, STANDARD WEIGHT STEEL DESIGNED FOR 175 LB. WORKING <br />PRESSURE, CONFORMING TO A.S.A. B36.10 MANUFACTURED IN THE U.S. <br />FITTINGS SHALL BE NEW 125 LB. CAST IRON SCREWED OR FLANGED CONFORMING TO A.S.A. B16A <br />MANUFACTURED IN THE U.S. AND APPROVED FOR FIRE PROTECTION SPRINKLER SYSTEMS. <br />THE SPRINKLER RISERS, MAINS AND BRANCH PIPING SHALL BE SUPPORTED FROM THE BUILDING <br />STRUCTURE, USING APPROVED TYPE STEEL HANGERS, BRACKETS, ANCHORS AND STUDS, OF SIZE <br />AND NUMBER IN ACCORDANCE WITH N.F.P.A. #13. <br />THE SPRINKLER SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH PAMPHLET 13 OF THE <br />NATIONAL FIRE PROTECTION ASSOCIATION AND ALL REQUIREMENTS OF THE LOCAL FIRE <br />DEPARTMENT AND OWNER'S INSURANCE UNDERWRITER. <br />ALL PIPING ABOVE GRADE SHALL BE HYDROSTATICALLY TESTED AT 200 PSIG FOR A TWO-HOUR <br />PERIOD IN ACCORDANCE WITH N.F.P.A. #24. <br />CONTRACTOR IS RESPONSIBLE FOR SPACING, PIPE SIZE, OFFSETS, CLEARANCES, VALVES, ELBOWS, <br />HANGERS, ALL ACCESSORIES AND QUANTITIES FOR ALL. <br />THIS CONTRACTOR SHALL DESIGN AND INSTALL A COMPLETE SPRINKLER SYSTEM PER NFPA AND <br />LOCAL CODES <br />SPRINKLER SYMBOLS <br />NEW CONCEALED -TYPE SPRINKLER HEAD <br />EXISTING CONCEALED -TYPE SPRINKLER HEAD TO REMAIN <br />EXISTING CONCEALED -TYPE SPRINKLER HEAD TO BE REMOVED <br />N <br />E <br />C. <br />0 <br />N <br />N <br />c <br />_o <br />n LO <br />ro <br />N � <br />0 Ln <br />m Mo <br />C (00 <br />0 J <br />m E -o <br />a = N <br />aD`'?`C <br />L <br />U) o O <br />n <br />Q Q 0 <br />x Am x =LL�G <br />wy <br />3wv�Z Lu <br />Ewa p 0 4 2 <br />W Z O m Q Z O z W N <br />�Ix <br />WWLLW1Q <br />W CLEL lim-, LULL, <br />oc vawWx_v)�- <br />WNWuj0ILU 73pZin <br />xxaxz� zgocCD <br />�WILDv) w aw <br />N <br />Dark Lewis "°" W <br />0 <br />moo <br />= ti <br />CO ri <br />�U'q:( <br />NAM <br />U EF <br />O C C ui <br />ui <br />U) m o <br />_ E LL a v <br />m C X <br />ro = m 4) m <br />N (n H LL <br />L <br />� <br />fM <br />� <br />00 <br />N <br />N <br />� <br />O <br />U) <br />c <br />cal <br />C <br />LO <br />N <br />O <br />UU) <br />O <br />to to <br />z <br />f <br />O <br />b <br />1 - <br />' <br />i <br />U <br />o <br />o U) <br />o <br />_J <br />=cu <br />M <br />W d <br />cps�p -0 <br />U <br />t <br />CL <br />m <br />Cn <br />j <br />L C <br />N <br />�fAUZ <br />z <br />O <br />F_ <br />a <br />U <br />W <br />0 U) <br />z <br />O <br />U) <br />W <br />W <br />:. <br />W <br />Q <br />0 <br />0 <br />z <br />Ln <br />CV <br />EXISTING CONCEALED -TYPE SPRINKLER TO BE REMOVED AND RELOCATED <br />cM <br />cy) <br />EXISTING CONCEALED -TYPE SPRINKLER RELOCATED <br />(n <br />U- <br />EXISTING UPRIGHT -TYPE SPRINKLER HEAD TO REMAIN <br />� <br />z <br />Q <br />LO <br />W <br />(D <br />EXISTING UPRIGHT -TYPE SPRINKLER HEAD TO BE REMOVED <br />J <br />� <br />� <br />� <br />a <br />Lljr�11 <br />rr11 <br />c <br />NEW UPRIGHT -TYPE SPRINKLER HEAD <br />tV <br />V <br />_ <br />O <br />O <br />H <br />_J <br />0 <br />m <br />U- <br />ch <br />/-AREA OF WORK <br />z0 <br />o <br />U <br />w <br />N <br />H <br />O <br />❑ <br />U- <br />KEY PLAN <br />a <br />co <br />M <br />m <br />p v <br />1- <br />C <br />W <br />Z <br />o <br />N <br />0 <br />W <br />W Y <br />L <br />U <br />Ui <br />Q <br />0 <br />�U <br />FP-1 <br />11 <br />COPYRIGHT © 2018 WALGREEN CO. <br />