XRR
<br />1
<br />1
<br />i
<br />XRR
<br />XRR
<br />L.o-.....J
<br />XRR
<br />XRR
<br />DEMO FIRE PROTECTION PLAN
<br />X
<br />X
<br />X
<br />N
<br />0
<br />I
<br />C2`NEW FIRE PROTECTION PLAN
<br />M
<br />M.
<br />X
<br />X
<br />FAC 61 G15-32.003 NOTES
<br />32.003 1 THE FIRE SPRINKLER CONTRACTOR SHALL PREPARE DETAILED WORKING PLANS IN
<br />ACCORDANCE WITH NFPA 13, 2013 EDITION. THE FIRE PROTECTION SYSTEM LAYOUT 1.
<br />SHALL FOLLOW THE DESIGN GUIDELINES SET FORTH IN THESE FIRE PROTECTION
<br />ENGINEERING DOCUMENTS.
<br />32.003(2) THE FIRE SPRINKLER CONTRACTOR SHALL OBTAIN THE ACCEPTANCE TESTS FROM
<br />THE LOCAL AUTHORITY. THE ACCEPTANCE TEST FOR THE SPRINKLER SYSTEM
<br />PIPING SHALL BE IN ACCORDANCE WITH NFPA 13, CHAPTER 16 AND NFPA 25. 2.
<br />41
<br />FAC 61 G 15-32.004 NOTES
<br />4.
<br />32.004(2)(a)
<br />THE POINT OF SERVICE IS INDICATED AT BACKFLOW PREVENTER. AT THIS POINT,
<br />THE SYSTEM IS DEDICATED SOLELY FOR FIRE PROTECTION PURPOSES. NO
<br />5.
<br />DOMESTIC WATER SHALL BE TAKEN FROM THE SYSTEM BEYOND THIS POINT FOR
<br />OTHER PURPOSES.
<br />6,
<br />32.004(2)(b)
<br />THE FOLLOWING ARE APPLICABLE STANDARDS:
<br />- 2017 FLORIDA FIRE PREVENTION CODE 6TH EDITION
<br />7.
<br />- NFPA 13, 2013 EDITION, INSTALLATION OF SPRINKLER SYSTEMS.
<br />- NFPA 24, 2013 EDITION, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE
<br />SERVICE MAINS AND THEIR APPURTENANCES.
<br />8.
<br />- NFPA 25, 2014 EDITION, INSPECTION, TESTING AND MAINTENANCE OF WATER -
<br />BASED FIRE PROTECTION SYSTEMS.
<br />9.
<br />32.004(2)(c)
<br />CLASSIFICATIONS OF HAZARD OCCUPANCIES FOR THE AREAS OF DESIGN SHALL
<br />BE AS INDICATED ON THE DRAWINGS.
<br />10
<br />32.004(2)(d)
<br />THE SPRINKLER SYSTEM SHALL BE WET PIPE FOR CLASSROOMS, CORRIDORS
<br />AND OFFICES FOR A LIGHT HAZARD OCCUPANCY AND SHALL BE HYDRAULICALLY
<br />11
<br />CALCULATED PER NFPA 13, 2013 EDITION, 0.10gpm/sq.ft. OVER THE MOST REMOTE
<br />1500sq.ft. SPRINKLERS SHALL HAVE A TEMPERATURE RATING OF 155°F AND THE
<br />SPACING SHALL BE 225sq.ft. INCLUDE A FIRE HOSE ALLOWANCE OF 100gpm. THE
<br />SPRINKLER SYSTEM SHALL BE WET PIPE FOR THE MECHANICAL ROOMS AND
<br />STORAGE FOR AN ORDINARY HAZARD GROUP 1 OCCUPANCY AND SHALL BE
<br />HYDRAULICALLY CALCULATED PER NFPA 13, 2013 EDITION, 0.15gpm/sq.ft. OVER THE
<br />MOST REMOTE 1500sq.ft. SPRINKLERS SHALL HAVE A TEMPERATURE RATING OF
<br />1
<br />155"F AND THE SPACING SHALL BE 130sq.ft. INCLUDE A FIRE HOSE ALLOWANCE OF
<br />250gpm.
<br />2.
<br />32.004(2)(e)
<br />WATER SUPPLY: THESE BUILDINGS WILL EACH HAVE A NEW 8" WATER SUPPLY
<br />FOR FIRE SPRINKLER PROTECTION, WHICH CONNECTS TO A LOOPED WATER
<br />MAIN.
<br />3.
<br />32.004(2)(1)
<br />FIRE PROTECTION CONTRACTOR SHALL PERFORM A FIRE HYDRANT FLOW TEST
<br />AND VERIFY THAT THE AVAILABLE PUBLIC WATER SUPPLY WILL SUPPORT THE
<br />DESIGN CRITERIA. FLOW TEST SHALL BE NO OLDER THAN 6 MONTHS.
<br />32.004(2)(g)
<br />VALVE AND ALARM REQUIREMENTS: ALL CONTROL VALVES ON SPRINKLER
<br />4.
<br />RISERS AND FIRE PROTECTION BACKFLOW PREVENTERS SHALL HAVE A TAMPER
<br />SWITCH. THE FLOW SWITCH SHALL BE SET TO NOT ALARM WITH MINOR CITY
<br />5.
<br />WATER PRESSURE FLUCTUATIONS. HOWEVER, THE FLOW OF ONE SPRINKLER
<br />HEAD SHALL PRODUCE AN ALARM CONDITION BY TRIPPING THE FLOW SWITCH.
<br />ALL FLOW AND TAMPER SWITCHES SHALL BE CONNECTED TO THE BUILDING FIRE
<br />6.
<br />ALARM PANEL. FLOW SWITCHES SHALL ALSO SOUND THE ELECTRIC ALARM BELL
<br />ON THE OUTSIDE WALL. FIRE SPRINKLER CONTRACTOR SHALL VERIFY AND TEST
<br />PER NFPA 13.
<br />7.
<br />32.004(2)(h)
<br />THE LOCAL WATER PURVEYOR IS REQUESTED TO ADVISE THE ENGINEER OF
<br />RECORD IF CONDITIONS EXIST IN THEIR WATER SUPPLY THAT COULD LEAD TO
<br />MIC, SO THAT THE ENGINEER CAN DESIGN CORRECTIVE MEASURES. THERE ARE
<br />8.
<br />NO KNOWN MIC CONDITIONS IN THE ORANGE COUNTY WATER SYSTEMS.
<br />32.004(2)(i)
<br />BACKFLOW PREVENTER AND METERING SPECIFICATIONS SHALL MEET OR EXCEED
<br />REQUIREMENTS OF THE CITY OF WINTER GARDEN UTILITIES. THE MAXIMUM
<br />ALLOWABLE PRESSURE LOSS ACROSS THE DEVICE SHALL BE 8" PSI AT SYSTEM
<br />DEMAND.
<br />9.
<br />32.004(2)(I)
<br />YARD AND INTERIOR FIRE PROTECTION COMPONENTS: PRODUCT DATA SHEETS
<br />SHALL BE SUBMITTED BY THE SPRINKLER CONTRACTOR ALONG WITH THEIR SHOP
<br />DRAWINGS. ALL FIRE PROTECTION DEVICES AND COMPONENTS SHALL BE UL
<br />10
<br />LISTED AND FM APPROVED.
<br />32.004(2)(k)
<br />A FIRE PUMP IS NOT REQUIRED.
<br />32.004(2)(1)
<br />A FIREWATER STORAGE TANK IS NOT REQUIRED.
<br />11
<br />32.004(2)(m) OWNER'S CERTIFICATE IN STORAGE OCCUPANICIES, THE OWNER'S INFORMATION
<br />CERTIFICATE IS REQUIRED FROM THE PROPERTY OWNER AS IT CLEARLY DFINES
<br />12
<br />THE STORAGE CONFIGURATION OF THE SPACE FOR THE CURRENT AND FUTURE
<br />USE OF THE PROPERTY, AS REQUIRED BY THE CODES AND STANDARDS SET
<br />FORTH IN SUB -SECTION 61G15-32.02 (7), F.A.C.
<br />13
<br />GROUP "A-3" - ASSEMBLY AS PRIMARY OCCUPANCY
<br />GROUP "B" - BUSINESS AT OFFICES
<br />GROUP "S-1" 81 "S-2" - STORAGE AREAS
<br />14
<br />15
<br />i 16
<br />"> V )
<br />X0
<br />FIRE PROTECTION GENERAL NOTES
<br />SPRINKLER SYSTEM TO BE DESIGNED BY SPRINKLER CONTRACTOR. DRAWINGS INDICATE THE
<br />SCHEMATIC LAYOUT DESIGN INTENT ONLY, HEADS INDICATED ON PLAN REPRESENT RECOMMENDED
<br />LOCATIONS. CONTRACTOR TO VERIFY QUANTITY AND LOCATION OF HEADS AS PART OF DESIGN
<br />BUILD CONTRACT. ALL NECESSARY ADDITIONAL HEADS SHALL BE PROVIDED AND INSTALLED AT NO
<br />ADDITIONAL COST.
<br />ALL FIRE PROTECTION WORK TO BE EXECUTED IN STRICT CONFORMANCE WITH NFPA 13 AND LOCAL
<br />CODES AND AMENDMENTS. THE SYSTEM SHALL BE GUARANTEED FOR MINIMUM OF ONE (1) YEAR
<br />FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER/ARCHITECT.
<br />SPRINKLER SYSTEM DESIGN SHALL BE BASED ON 0.10/GPM FOR THE MOST REMOTE 1500 SQUARE
<br />FEET. THIS IS BASED ON A LIGHT HAZARD CLASSIFICATION.
<br />CONTRACTOR TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM AUTHORITY HAVING
<br />JURISDICTION.
<br />SPRINKLER HEADS SHALL BE PLACED IN CENTER OF TILES WHERE SUSPENDED CEILING EXIST.
<br />COORDINATION WITH ALL OTHER TRADES IS A MUST PRIOR TO ANY INSTALLATION. SEE
<br />ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR EXACT CEILING SPACE AVAILABLE.
<br />CONTRACTOR TO CONFIRM NECESSARY SIZE OF INCOMING SERVICE AND COORDINATE SUCH WITH
<br />GENERAL AND FUTURE PLUMBING.
<br />PRESSURE TEST PIPING SYSTEM AT 200 PSI FOR A MINIMUM OF 2 HOURS WITHOUT ANY LEAKS IN
<br />SYSTEM.
<br />FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR ANY INSPECTIONS, PERMITS, REQUIRED
<br />PRIOR TO INSTALLATION.
<br />PROVIDE SPARE SPRINKLER HEADS IN CABINET AT ALARM PANEL.
<br />FLEX SPRINKLER HEADS ARE ALLOWABLE TO BE USED FOR EASE OF PLACEMENT IN CEILING TILES.
<br />FIRE PROTECTION SPECIFICATIONS
<br />THE GENERAL CONDITIONS AND SUPPLEMENTAL GENERAL CONDITIONS ISSUED BY THE ARCHITECT
<br />SHALL GOVERN WHERE APPLICABLE.
<br />THIS CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AT THE JOB SITE BEFORE SUBMITTING
<br />BID. FAILURE TO RECOGNIZE WORK REQUIRED SHALL BE AT THE EXPENSE OF THIS CONTRACTOR.
<br />NO CONSIDERATION SHALL BE GIVEN FOR ADDITIONAL COMPENSATION AFTER THE LETTING OF BIDS.
<br />ENTIRE INSTALLATION SHALL BE PERFORMED IN A FIRST-CLASS WORKMANLIKE MANNER. THE
<br />COMPLETED SYSTEMS SHALL BE FULLY OPERATIONAL; ACCEPTANCE BY THE OWNER SHALL BE A
<br />CONDITION WITH OTHER TRADES IN ORDER TO AVOID INTERFERENCES, PRESERVE MAXIMUM
<br />HEADROOM AND AVOID OMISSIONS.
<br />CONTRACTOR TO MAKE ALL NECESSARY TAPS, AS CALLED FOR ON THE DRAWINGS.
<br />THIS CONTRACTOR SHALL REMOVE ALL DEBRIS ON COMPLETION OF THE JOB AND CLEAN ALL
<br />FIXTURES.
<br />IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO START-UP, ADJUST AND CHECK FOR
<br />PROPER OPERATION, ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT.
<br />THIS CONTRACTOR SHALL ALLOW IN HIS INITIAL BID THE COST OF SERVICE ON ALL EQUIPMENT
<br />INSTALLED UNDER HIS CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF FINAL INSPECTION
<br />OF THE WORK.
<br />THIS CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER, OWNERS INSURANCE
<br />UNDERWRITER, AND LOCAL FIRE DEPARTMENT FOR APPROVAL COMPLETE INSTALLATION AND
<br />DESIGN DRAWINGS SHOWING THE SPRINKLER SYSTEM LAYOUTS. THE LAYOUT SHALL INDICATE ALL
<br />OF THE SPRINKLER PIPING, SPRINKLER HEAD LOCATIONS AND DETAILS OF ANCHORS AND SUPPORTS
<br />AS REQUIRED.
<br />THE SPRINKLER SYSTEM SHALL BE LAID OUT TO ELIMINATE ALL CONFLICTS BETWEEN THE
<br />SPRINKLER SYSTEM AND THE STRUCTURE INCLUDING THE MECHANICAL AND ELECTRICAL SYSTEMS
<br />AS THEY ARE SHOWN ON THE CONTRACT DRAWINGS.
<br />THE LAYOUT SHALL INDICATE COORDINATION BETWEEN SUCH ITEMS AS DUCTWORK, LIGHTS,
<br />STRUCTURAL MEMBERS, ETC. PIPE FOR ABOVE GRADE SHALL BE NEW SCHEDULE 40 FOR BRANCHES
<br />AND SCHEDULE 10 FOR MAINS, STANDARD WEIGHT STEEL DESIGNED FOR 175 LB. WORKING
<br />PRESSURE, CONFORMING TO A.S.A. B36.10 MANUFACTURED IN THE U.S.
<br />FITTINGS SHALL BE NEW 125 LB. CAST IRON SCREWED OR FLANGED CONFORMING TO A.S.A. B16A
<br />MANUFACTURED IN THE U.S. AND APPROVED FOR FIRE PROTECTION SPRINKLER SYSTEMS.
<br />THE SPRINKLER RISERS, MAINS AND BRANCH PIPING SHALL BE SUPPORTED FROM THE BUILDING
<br />STRUCTURE, USING APPROVED TYPE STEEL HANGERS, BRACKETS, ANCHORS AND STUDS, OF SIZE
<br />AND NUMBER IN ACCORDANCE WITH N.F.P.A. #13.
<br />THE SPRINKLER SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH PAMPHLET 13 OF THE
<br />NATIONAL FIRE PROTECTION ASSOCIATION AND ALL REQUIREMENTS OF THE LOCAL FIRE
<br />DEPARTMENT AND OWNER'S INSURANCE UNDERWRITER.
<br />ALL PIPING ABOVE GRADE SHALL BE HYDROSTATICALLY TESTED AT 200 PSIG FOR A TWO-HOUR
<br />PERIOD IN ACCORDANCE WITH N.F.P.A. #24.
<br />CONTRACTOR IS RESPONSIBLE FOR SPACING, PIPE SIZE, OFFSETS, CLEARANCES, VALVES, ELBOWS,
<br />HANGERS, ALL ACCESSORIES AND QUANTITIES FOR ALL.
<br />THIS CONTRACTOR SHALL DESIGN AND INSTALL A COMPLETE SPRINKLER SYSTEM PER NFPA AND
<br />LOCAL CODES
<br />SPRINKLER SYMBOLS
<br />NEW CONCEALED -TYPE SPRINKLER HEAD
<br />EXISTING CONCEALED -TYPE SPRINKLER HEAD TO REMAIN
<br />EXISTING CONCEALED -TYPE SPRINKLER HEAD TO BE REMOVED
<br />N
<br />E
<br />C.
<br />0
<br />N
<br />N
<br />c
<br />_o
<br />n LO
<br />ro
<br />N �
<br />0 Ln
<br />m Mo
<br />C (00
<br />0 J
<br />m E -o
<br />a = N
<br />aD`'?`C
<br />L
<br />U) o O
<br />n
<br />Q Q 0
<br />x Am x =LL�G
<br />wy
<br />3wv�Z Lu
<br />Ewa p 0 4 2
<br />W Z O m Q Z O z W N
<br />�Ix
<br />WWLLW1Q
<br />W CLEL lim-, LULL,
<br />oc vawWx_v)�-
<br />WNWuj0ILU 73pZin
<br />xxaxz� zgocCD
<br />�WILDv) w aw
<br />N
<br />Dark Lewis "°" W
<br />0
<br />moo
<br />= ti
<br />CO ri
<br />�U'q:(
<br />NAM
<br />U EF
<br />O C C ui
<br />ui
<br />U) m o
<br />_ E LL a v
<br />m C X
<br />ro = m 4) m
<br />N (n H LL
<br />L
<br />�
<br />fM
<br />�
<br />00
<br />N
<br />N
<br />�
<br />O
<br />U)
<br />c
<br />cal
<br />C
<br />LO
<br />N
<br />O
<br />UU)
<br />O
<br />to to
<br />z
<br />f
<br />O
<br />b
<br />1 -
<br />'
<br />i
<br />U
<br />o
<br />o U)
<br />o
<br />_J
<br />=cu
<br />M
<br />W d
<br />cps�p -0
<br />U
<br />t
<br />CL
<br />m
<br />Cn
<br />j
<br />L C
<br />N
<br />�fAUZ
<br />z
<br />O
<br />F_
<br />a
<br />U
<br />W
<br />0 U)
<br />z
<br />O
<br />U)
<br />W
<br />W
<br />:.
<br />W
<br />Q
<br />0
<br />0
<br />z
<br />Ln
<br />CV
<br />EXISTING CONCEALED -TYPE SPRINKLER TO BE REMOVED AND RELOCATED
<br />cM
<br />cy)
<br />EXISTING CONCEALED -TYPE SPRINKLER RELOCATED
<br />(n
<br />U-
<br />EXISTING UPRIGHT -TYPE SPRINKLER HEAD TO REMAIN
<br />�
<br />z
<br />Q
<br />LO
<br />W
<br />(D
<br />EXISTING UPRIGHT -TYPE SPRINKLER HEAD TO BE REMOVED
<br />J
<br />�
<br />�
<br />�
<br />a
<br />Lljr�11
<br />rr11
<br />c
<br />NEW UPRIGHT -TYPE SPRINKLER HEAD
<br />tV
<br />V
<br />_
<br />O
<br />O
<br />H
<br />_J
<br />0
<br />m
<br />U-
<br />ch
<br />/-AREA OF WORK
<br />z0
<br />o
<br />U
<br />w
<br />N
<br />H
<br />O
<br />❑
<br />U-
<br />KEY PLAN
<br />a
<br />co
<br />M
<br />m
<br />p v
<br />1-
<br />C
<br />W
<br />Z
<br />o
<br />N
<br />0
<br />W
<br />W Y
<br />L
<br />U
<br />Ui
<br />Q
<br />0
<br />�U
<br />FP-1
<br />11
<br />COPYRIGHT © 2018 WALGREEN CO.
<br />
|