My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36018 Shady Bluff Lp Lot 19
Zephyrhills
>
Building Department
>
Building Plans
>
36018 Shady Bluff Lp Lot 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 3:58:18 PM
Creation date
2/19/2025 9:07:43 AM
Metadata
Fields
Template:
Building Plans
Street #
36018
Location
Shady Bluff Lp Lot 19
Contractor
Windward Homes
Building Plans - Permit #
7478
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSB960 Instructions <br />Installation of SSB960 roof vents should corn <br />'il ply with all local standards and regulations. <br />Ar CAUTION: Use appropriate safety glasses, <br />gloves and other equipment to avoid injury. <br />W oak <br />ede bit <br />Figure 1 • Figura 1 <br />Figure 2 - Figural 2 <br />New CortruCtion <br />or tie -Roofing <br />Determine the location of vents: <br />Evenly space the roof vents along the width of the roof, marking <br />the location of all roof vents before cutting holes. Center the holes <br />between the rafters within from the peak of the roof. Mark a 10" <br />circular outline for the hole on the roof. (Figure 1) <br />Cut and prepare the opening: <br />Cut the holes in the sheathing before applying shingles. Shingle up <br />until the first full course of shingles covers the bottom of the hole. <br />Cut the excess shingles away from the hole. (Figure 2) (For <br />increased weather protection on new construction or re -roofing <br />applications, use an 18"xl8" piece of GAF Weather Watch or <br />GAF StorrnGuard" Leak Barrier. Center the leak barrier over the <br />hole. Remove release film, press into place and cut away the leak <br />barrier spanning the hole.) <br />Position the vent and nail the vent into place: <br />The top of the SSB960 has an up-arrow formed into the flashing. <br />Make sure the vent is in proper position. Nail the vent securely into <br />place, spacing the nails every 4" apart around the perimeter. The <br />nails should be 1"from the edge of the vent flange. Seal all seams <br />and nail heads with an approved sealant, such as silicone, roofing <br />cen-r-nt, or waterproof caulking. (Figure 3) <br />Complete shingle installation: <br />Continue installing shingles, overlapping the flange on the vent. <br />Cut the shingles around the top of the vent to match its shape. <br />(Figure 4) <br />NOTE; In Gareth, o y N G,pF and Quality You Can Trust Slnce 7886- - _ <br />Tirnbedine loges are regsteredtradematks. frO177 MOrth America's Largest Roofing <br />None Sdamwasios egnarbre3sa CGAFy � and Ventilation Manufacturer <br />Tim Wine son mazcas regstradas an Canada. <br />REMAROUE: Serfs tes nixes GAF at <br />Timberline s nt des marque de SliFiis <br />can merce d6po9i&-_, au Canada COnponwM <br />roof peak <br />Figure 5 • Figural 6 <br />Figure 8 • Figural 8 <br />Addin.g an SSB960 <br />to Finished Roofs <br />Determine the location of vents. <br />Inspect the altc to determine Me location of rafters and other <br />obstructions. Evenly space the roof vents along <br />, thewidth of ft <br />roof, marking the location of all roof vents before cutting holes. <br />Center the holes between the rafters within 2 front The peak of the <br />roof- Mark a 10" circular outline for the bole on the top of shingles. <br />(Figure 5) <br />Cut, and prepare the opening: <br />Using a sharp knife, cut away the shingles (Figure BA). Cut through <br />the sheathing using a reciprocating saw (Figure 613).. Carefully <br />remove the roofing mails within 3"of the tole_ Cut the shingles at the <br />top of the hole to accommodate the shape of the roof vent. (For <br />increased weather protection on new construction -or re -roofing <br />applications, use an 18"x18" piece of GAF Weather Watch'or <br />GAF StormGuard® Leak Barrier. Center The leak barrier over the <br />hole. Remove release film, press into place and cutaway the leak <br />barrier spanning the hole.) <br />Position the vent: <br />Apply a generous amount of silicone, roofing cement, or water- <br />proof caulking to the perimeter of the hole:. (Figure 7A). Slide the <br />vent into place beneath the shingles, ensuring that the throat of the <br />vent is centered on the hole (Figure 7B). The shingles should <br />overlap the top half of the vent flange. The bottom half of the <br />vent's flange will be exposed on top of the shingles. <br />Nail the vent Into place: <br />Nail the vent into place, spacing the nails every 4" around the <br />perimeter of the vent. The nails should be 1"in from the edge of <br />the vent flange. Replace nails in the shingles as necessary to ensure <br />a proper seal. Use silicone, roofing cement, or waterproof caulking <br />to seal any exposed nails. (Figure 8) <br />NOTE: In Canada, only the GAF and Quality You Can Trust Sitrce 1886- - - <br />Timberhne logos are registered trademarks. from North Americas Lar9esr Roofing <br />Mine Sdam on mare to lox sabres dal GAF y and Ventilation Manufacturer <br />Timberline son marcas regstradas vt Cartad3 <br />REMAROUE: Seuis les nom s GAF e( iw <br />T!mberline scot des marques de GAFYQ9MLIt <br />commerce dapoa6es au Canada QORPORMON <br />T <br />r� <br />W <br />SHEET NO. <br />IN3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.