My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36018 Shady Bluff Lp Lot 19
Zephyrhills
>
Building Department
>
Building Plans
>
36018 Shady Bluff Lp Lot 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 3:58:18 PM
Creation date
2/19/2025 9:07:43 AM
Metadata
Fields
Template:
Building Plans
Street #
36018
Location
Shady Bluff Lp Lot 19
Contractor
Windward Homes
Building Plans - Permit #
7478
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
db t <br />AWLICATION INSTRUCTIONS <br />Hoot Deck: Use only over ra well -seasoned, supported wood deck tightly <br />constructed with maximum 6" wide lumber, having adequate nati-holding <br />capacity. Plywood docking as recommended by the Engineered Wood <br />Asuclatlon Is acceptable. <br />For ridge vent to function properly, It must be the only high or exhaust vent <br />for the venW attic space. Ridge vents will not function properly 11 used In <br />conjunction with gable -end louvers, turbines, roof verft or power vends. <br />Slope Restrictions-, Use only on slopes between 3/12 and 16/12 <br />STEP 1 <br />Calculations for a Balanced Ventilation System <br />To achieve a "balamed systlem" with Cobre Ridge Runnerridge vent, there <br />must be an air inta0ce system (i.e., softie or undereave vents). For proper von, tilation, <br />the amount of undereave ventilation must equal the amount of ventlief at <br />the ridge. KM: In no cake should the amount of exhaust ventilation exceed the <br />amount of intake ventilation.. <br />To determine the minimum- square feet of not free ventilating area {NFVA.) <br />needed for a balanced ventilation system, use the following formula: <br />Sg. ft. of attic floor shade <br />300 <br />= Min. S4. ft., of NFVA needed <br />COW Ridge FtunnW ridge vent has 12.5 square Inches of NFVA per lineal foot. <br />To determirlie how many feet of Cobra" Ridge Runner -ridge vent is needed, <br />use the fallowing formula: <br />1/2 x {Min. Sq. ft, of NFVA needed) x 144 112.5 = Min. lineal foot of ridge <br />vent needed <br />To determine the amount of undereave vent nKpdred, use the following formula: <br />X = NFVA (Sq. In. per. tint, it.) of ft undereave vet or Intake vent <br />system selected <br />V x (Min. Sq. R. of NFVA needed) x 144/X = Min, lineal feet of undereave <br />STEP 2 vent needed <br />Instruction For Slots <br />Attar calculating the total length of Cobra* Ridge Runner -ridge vent needed, <br />determine the necessary slot opening requW. <br />Dote: If installing on an existing roof, remove the cap shingles from the ridge. <br />Roots without a ridge board: cut an opening along the ridge, na" on each side of the <br />roof ridge (Figure A). <br />Roofs with a ridge hoard. cul an opening along the ridge,11la" on each side of the roof <br />ridge )Figure 8). <br />Note: Maximum slot opening is 31A" wide. <br />Mark off and cut the slot opening, making sure that the ends of the opening stop at <br />least ti ° from any end walls or hip Intersections and 12" from chimneys (Fipre C). <br />Where short ridges (dormers, ridge intersections) are used, marts and cut the slot <br />making sure that tfte end of the opening stops at lent 12" from the ridge intersection <br />(Figure D). <br />0`x I I tent Rai <br />Fig. A <br />No Ridoe Board <br />Fig. <br />With i • Board <br />Fig. C <br />�Mt M1MM1�M�IIMMl� <br />r �'A <br />Fig. <br />it <br />Copyright'c� 2000 Windward homes No portion may be copied or reproduced without the prior written permission of Windward Homes <br />Share drive W: Quality Control Checklist;Roofing (680)/ Roofing Install Shingle Final t:aroup 680 rev 03-16-07 /Page 3 of <br />zy <br />m <br />Z <br />Windwardj Homes <br />PLAN © 2003 WINDWARD HOMES. ALL RIGHTS RESERVED <br />
The URL can be used to link to this page
Your browser does not support the video tag.