My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
39636 Dawson Chase Dr
Zephyrhills
>
Building Department
>
Building Plans
>
39636 Dawson Chase Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 5:04:18 PM
Creation date
2/19/2025 10:06:38 AM
Metadata
Fields
Template:
Building Plans
Street #
39636
Location
Dawson Chase Dr
Contractor
Lennar Home
Building Plans - Permit #
21715
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />CROSS BRACING DETAIL (TYP.)r <br />SCALE:NTS <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1 . WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 <br />MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER <br />wl MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE <br />IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST <br />PRE-ENG. TRUSS-----7 <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED W/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />U$ 2X4 BLOCKING <br />-]I- 2X4 DIAGONAL AT 8'-0" O.C. <br />q BETWEEN EA. TRUSS <br />MAX & EACH END ALTERNATE <br />DIRECTION TYP. <br />(D <br />C14 <br />-----Z-WOOD TRUSS -1 <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />E <br />0 <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W1 <br />ROOF SLOPE <br />'---2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />TRUSS OR <br />ROOF SYSTEM <br />SHEARTRANSFER <br />EXTERIOR. WALL <br />SCALE:NTS <br />'2L <br />CB <br />DB- <br />vyl Wv �l I I I A� v <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 wl (24) 10d x <br />1 1/2" NAILS EACH <br />0 <br />PRE-ENG. TRUSS <br />I I <br />P <br />CONT. ROOF SHEATHING AT TRUSS TO <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIAGONAL <br />AT 8'-0" <br />MAX <br />TRUSS <br />ROOF <br />SEE SHEATHING <br />P <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />'E <br />SHI <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP, <br />3�'A TRUSS <br />(2) 12D NAILS <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL r2 <br />SCALE:NTS <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w, <br />O.S.B. FLITCH PI <br />TOP @ TRUSS 8 <br />U.N.C. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 1 Od x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 1 Od <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 1 Od <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 1 Od <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />BEAM @ RAISED ENTRY <br />MASONRY WALL r4 <br />SCALE:NTS <br />SIMPSON LSTA18 <br />VERTICAL SCAB 2 x 6 w/ (12) 1 Od NAILS ISEE PLAN L. <br />SIMPSON HUC41 0 W/ (14) <br />#2 SPF 48" O.C. W/ (4) CENTERED AT I FOR CANTI <br />16d INTO HEADER & (6) — <br />1 Od TOP & BOTTOM SPLIT TO TIE 10d INTO BEAM - SEE <br />OR SIMPSON H2.5A w/ BEAMS TOGETHER ROOF PLAN FOR MORE <br />(10) 8d NAILS INFO <br />( <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A W/ (10) 8d NAILS <br />AT 48" O.C. <br />(OPTIONAL) <br />BEVEL CUTS <br />2x8 #2 SPF RIDGE BEAM <br />2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"0. C. MAX. W/ (3) 1 Od <br />COMMON TOENAILS TO TIE BEAM <br />2X4 CONT. AT--/ CONC.MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING r3 <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />gL VARIES <br />ROOF SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 #2 SPF BRACING @ <br />16" O.C. W/ (4) 12d <br />TOENAILS TO TOP <br />_. <br />l�A COMMON TRUSSES. <br />SEE TRUSS PLAN <br />PLATE & (2) 12d END <br />MIN. (2)2X4 <br />FOR CONNECTION <br />NAILS TO TRUSS <br />SPF TOP <br />INFORMATION. <br />BOTTOM CHORD <br />PLATE <br />4,VARIES SEE PLAN <br />FOR WALL LOCATION <br />MIN. 2x4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />OL SEE PLAN FOR <br />N <br />PLATE BELOW <br />TOP OF WALL <br />MIN. 2X4 #2 SYP P.T. PLATE <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />16" O.C. MAX. <br />INFO. <br />. ob. <br />SECTION <br />@ ENTRY <br />— <br />SCALE:NTS <br />7 -SEE FLOOR PLAN FOR <br />COLUMN SIZE& BASE OSB FLITCH PLATE <br />SEE FLOOR PLAN CONNECTION INFO REQ'D ONLY WHEN <br />FOR COLUMN SIZE INDICATED ON BM. <br />& ADDITIONAL INFO. SCHEDULE/PLAN <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />ASE <br />REQ'D ONLY WHEN COLUMN SIZE& B )7R <br />INDICATED ON BM. CONNECTION INFO <br />OPTION A SCHEDULE/PLAN OPTION B OPTION C <br />COMMON BM. TO POST ATTACHMENT rAN� <br />SEE ROOF PLAN SCALE: 3/411= 1 1-01, <br />FOR BEAM SIZE & LICE OVER <br />,Vl- BM. SP <br />A CENTER OF POST <br />CONNECTION INFO. <br />I SEE PLAN FOR <br />SIMPSON MTS1 8 W/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & <br />IAI <br />ADDITI(-%k <br />(WOOC <br />C <br />_AT EXTERIOR SHEATHING <br />ATTACHED PER <br />2X4 STUDS W/ SIMPSON <br />V, NAILING SCHEDULE <br />SP1 W/ (10) 1 Od NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 1 Od NAILS OR <br />SIMPSON MTS12 W/ <br />(14) 1 Od x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION r2 2 <br />SCALE:NTS <br />SEE PLAN FOR <br />CANTILEVER IF <br />INDICATED <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />GABLE <br />TRUSS <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />MIDDLE <br />SEE PLAN FOR <br />8d NAILS AT VALLEY TRUSS <br />4" O.C. INFO. <br />MASONRY WALL BELOW: SIMPSON <br />HETA1 6 w/ (9) 1 Od x 1 1/2" NAILS @ <br />MASONRY WALL 4 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM <br />BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN <br />44 (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />_. A TO GABLE TRUSS <br />COMMON TRUSS <br />-U=4V4= SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE rj_2_-� <br />SCALE:NTS <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />----SEE DETAIL 4/D 1 <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING t122 <br />a 11 <br />ATTACHED PER NAILING a ]a <br />SCHEDULE <br />2x SPF #2 <br />AT 16" O.C. <br />------BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL �/d'v` ENTRY FRONT WA <br />SCALE:NTS <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS W/ (3) 16d AT <br />EACH STUD -TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />W/ (3) 1 Od PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />I FOR ADDITIONAL INFORMATION <br />rIF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />W/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SIMPSON LUS26 W/ (8) 1 Od NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />ZSEE <br />LUS26-2 W/ (8) 16d NAILS TO <br />FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />2X1 0 #2 SYP CONT. LEDGER W/ (3) <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />LAG SCREWS INTO END OF EACH <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />(IF PARALLEL SEE 202 FOR <br />BLOCKING INFO) <br />'--MASONRYWALL <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW ROO F rg <br />SCALE:NTS <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 W/ (10) 1 Od <br />NAILS AT BASE & SIMPSON <br />SP2 W/ (12) 1 Od NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END (BETWEEN TRUSSES <br />N <br />(2) 12d NAILS TO EACH VERTICAL <br />LOW ROOF/WAL <br />N <br />STUD) <br />SHEATHING ATTACHE <br />N <br />PER NAILING SCHEDULE <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS12 W/ (14) 10d x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />AA <br />PLYWOOD <br />FLOORING <br />>< <br />LOW ROOF TRUSS W/ <br />(2) 2x6 BLOCKING UNDER FLOOR G.T. <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 W/ (16) <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ BUMP OUTr3q'� <br />SCALE:NTS <br />DETAILS & SECTIONS <br />(D !;2 <br />U-03 <br />< <br />__j <br />rl <br />U) <br />V) (D <br />Lu <br />0 LU <br />E <br />2 <br />C) <br />ca cli <br />E <br />a, - 8 <br />- - <br />TC -IOU CM0 <br />0 .1 " <br />-9 C3 <br />C__ <br />x__ U_ co <br />1� - 00 <br />I izz- <br />0 <br />CY) <br />CL -D <br />S. 73- <br />M< 6 <br />A I <br />RID-1 <br />\\I/' <br />/I <br />JAMEJJ111 <br />4t <br />0 U1 C' c; <br />LU D ;O� z <br />U) <br />0 <br />LU -4 -M <br />U i <br />z 2 <br />F5 " <br />z <br />LL <br />< M <br />LU 121 <br />0141111,-, '0 <br />E <br />rv, <br />I'll <br />135�� <br />__j 0 <(_C�! <br />= QC6 <br />cp <br />e <br />F <br />'?OF -SS\ <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />LE hi NAR <br />4600 W. Cypress St, Suite 200 1 Tampa, FL 33607 <br />www.LennarTampa.com <br />0 <br />ZZ o< <br />Za:CL. <br />LU < ce cr <br />z '21 <br />2, I <br />�zj LU <br />Co <br />U) <br />H <br />0 <br />j8 <br />z <br />> <br />z <br />< <br />F <br />(D <br />LU <br />U) <br />0 <br />'0 <br />OZ5 <br />z <br />< <br />:j LU <br />9 x <br />U <br />x <br />W <br />_j <br />!� 9 <br />9 0, Zo <br />0 <br />Ln <br />< <br />Lr) <br />LU <br />U <br />r_4 <br />N <br />Cl <br />Z' <br />< <br />z <br />z <br />LU <br />Ln <br />LU <br />uw, CY 2 �i <br />'=C 'LU - 8 <br />_j <br />.-I <br />Lij <br />< <br />z <br />9� z <br />0 <br />to <br />Z <br />*< <br />D �p S) <br />9R <br />Cal <br />0 <br />6 <br />Z <br />:5 <br />LLI <br />d (n <br /><Z <br />w <br />v-4 <br />10- <br />Ul) <br />-r-) <br />SCALE: AS NOTED <br />DATE 5/7/2019 <br />TECH: FLORES <br />VERSION NO <br />10 <br />SHEET NO. <br />D1 <br />I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.