Laserfiche WebLink
!L I <br />CROSS BRACING DETAIL (TYP.) <br />SCALE:NTS <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />---- <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. pg_�i <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />2X4 CONT. AT <br />T & B CHORD <br />TRUSS <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP, <br />N TRUSS <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING ACK <br />MAX 24" SPAN (EITHER USSES HIP <br />SIDE OR BOTH IF REQ'D) P G.T <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE:NTS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />„ 2x8 #2 SPF RIDGE BEAM <br />k 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />CONC.MASONRY <br />STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING r3 <br />WOOD TRUSS SCALE:NTS <br />A PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL STANDARD HEEL HEIGHT <br />SCALE:NTS <br />SIMPSON LSTA18 <br />w/ (12) 10d NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />(2) 2x8 #2 SYP wr <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />Ili1�:3�\di <br />BEAM @ RAISED ENTRY <br />2 MASONRY WALL 4 <br />SCALE:NTS <br />')IMPSON HUC410 w/ <br />6d INTO HEADER & ( <br />Od INTO BEAM - SEE <br />tOOF PAN FOR MOI <br />VFO <br />SEE FLOOR PAN FOR <br />SEE PLAN <br />FOR CANT. <br />COLUMN SIZE & BASE —7/16" OSB FLITCH PATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />7/16" OSB FLITCH PATE SEE FLOOR PAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A INDICATED ON SC EDULEIP ANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON MTS18 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A A <br />SEE PAN FOR <br />SEE PAN FOR <br />CANTILEVER IF <br />INDICATED <br />CORNER n SEE FOUNDATION <br />PAN FOR MORE INFO <br />f <br />COMMON BM. ATTACHMENT <br />SCALE:NTS <br />SCALE: 3/4"=V-0" <br />BM. SPLICE OVER <br />�4 CENTER OF POST <br />MIDDLE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL ENTRY FRONT WALL 6 <br />SCALE:NTS <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD - TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />W/ (3) 10d PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />'IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />W/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SIMPSON LUS26 w/ (8)10d NAILS - <br />OR IF 2 PLY TRUSS SIMPSONZ <br />LUS26-2 w/ (8)16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />2X10 #2 SYP CONT. LEDGER w/ (3) <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />(IF PARALLEL SEE 2/D2 FOR <br />LAG SCREWS INTO END OF EACH <br />BLOCKING INFO) <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW <br />ROOF g <br />SCALE: NTS <br />VARIES 2x STUDS @ 16" O.C. <br />ROOF SHEATHING SEE 1/S5 FOR SIMPSON (10) 10d <br />ATTACHED PER SEE PLAN FOR <br />ADDITIONAL NAILS AT BASE & SIMPSON <br />i� 8d NAILS AT VALLEY TRUSS <br />1 SP2 w/ 12 10d NAILS AT TOP <br />NAILING SCHEDULE OUTLOOKER ( ) 0 <br />2X4 #2 SPF BRACING @ INFO. 4" O.C. INFO. <br />16" O.C. W/ (4) 12d mil_ COMMON TRUSSES. EXTERIOR SHEATHINGI[ ATTACHED PER 2x BLOCKING BETWEEN STUDS <br />TOENAILS TO TOP —t�—�— SEE TRUSS PLAN 2x4 STUDS w/ SIMPSON NAILING SCHEDULE TO TRUSS W/ (2) 12d TOENAILS <br />PLATE & (2) 12d END MIN. (2) 2x4 FOR CONNECTION SP1 w/ (10) 10d NAILS EACH END ( BETWEEN TRUSSES <br />STRUCTURAL SHEATHING <br />NAILS TO TRUSS SPF TOP INFORMATION. AT BASE SEE J/S6 FOR GABL (2) 12d NAILS TO EACH VERTICAL <br />ATTACHED PER NAILING LOW ROOF/WALL <br />SCHEDULE BOTTOM CHORD PLATE MORE INFO. � � STUD) <br />TRUSS SHEATHING ATTACHED <br />-- <br />VARIES W/ - - � VARIES SEE PLAN 2x4 BASE PLATE W/ PER NAILING SCHEDULE 2x BASE PLATE W/ (2) G <br />FOR WALL LOCATION 1/2" PLYWOOD NAILS @ 16" O.C. ALONG W/ <br />ROOF SLOPE - - SIMPSON LSTA30 w/ - <br />SIMPSON MTS12 w/ (14) 10d x <br />(22) 10d NAILS OR E 16d NAILS TO TO <br />WOOD WALL ` 11 SIMPSON MTS12 w/ EACH COMMON s � i BELOW @ NAILS <br />6" O.C. <br />BLOCKING <br />OR TRUSS. 2X4 CONT. W/ 2 MIN. 2x4 #2 SPF STUDS @ �, (14) 10d x 1 1/2" NAILS TRUSS/ FRAMING �� <br />O TYP TOP & BOTTOM <br />SEE PLAN 16d COMMONS 16 O.C. W/ EXTERIOR TO FLOOR GIRDER <br />NAILS EACH SHEATHING ATTACHED BELOW @ 16" O.C. <br />PER NAILING SCHEDULE & / - <br />STUD TYP. T&B • MASONRY WALL BELOW: SIMPSON <br />(3) 12d TOENAILS TO ------ --- <br />°.. HETA16 w/ (9) 10d x 1 1/2" NAILS @ PLYWOOD <br />.� <br />FLOORING <br />TRUSS OR SEE PLAN FOR � � PLATE BELOW MASONRY WALL � 4-0 O.C. TO GABLE TRUSS __- ;. <br />ROOF SYSTEM TOP OF WALL OR BEAM H. BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN b >< <br />MIN. 2X4 #2 SYP P.T. PLATE 16" FLOOR SYSTEM FLOOR GIRDER (24) 10d x 1 1/2 NAILS @ 4 -0 O.C. - - <br />�� W/ 1/2"X8" EPDXY ANCHOR SEE PLAN FOR SEE PLAN FOR TO GABLE TRUSS LOW ROOF TRUSS W/ (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE @ 3" FROM EACH END & DIRECTION CONNECTION COMMON TRUSS RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE 16" O.C. MAX. SEE ROOF PLAN EXTENSION SEE TRUSS SIMPSON LUS24-2 w/ (16) <br />S H EAR T RAN S F E R INFO. SECTION @ FLOOR FOR CONNECTION MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />EXTERIOR. WALL SECTION @ ENTRY s CONNECTION 22 SECTION AT HIP GABLE 12 SECTION @ BUMP OUT 39 <br />SCALE:NTS SCALE:NTS SCALE: NTS SCALE:NTS <br />SCALE:NTS <br />DETAILS & SECTIONS <br />11 I I 1 I <br />$ '0 N <br />U <br />NOS OF �.UU <br />s FUO�,R. <br />0 <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 <br />Florida Building Code - <br />Residential 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />- N <br />J 4 <br />o � E ro r <br />, g8 2RW <br />0� <br />JA <br />r n p <br />CiQ J <br />t[') n <br />to <br />ay <br />to r L' - - nW <br />M M W uj <br />aa.= <br />qj'u• <br />z <br />=a Woo <br />CD J <br />W <br />COo�¢ a <br />rn d <br />IL azCo <br />N O Q-' <br />N Q U O- <br />° <br />z <br />" 1, <br />W <br />M ems- <br />z N � <br />�Op Q <br />z Gp CQQ$y <br />Z <br />� <br />Q <br />(Z � <br />N <br />z <br />o <br />Cz <br />1 ' <br />LL <br />y� <br />�L <br />(� <br />W R <br />O <br />to <br />W s <br />c N <br />877w <br />fr <br />Q <br />see <br />z <br />LL <br />a E <br />E <br />wa <br /><¢ <br />o0 <br />i <br />s <br />ze <br />o a <br />OV <br />K o <br />�aoz <br />U U <br />�U <br />Z <br />CD <br />o <br />ww <br />m,o <br />LL <br />p <br />N <br />0< <br />Z z <br />d o <br />LL <br />�w <br />� <br />o <br />O <br />yz w <br />w� <br />=� <br />�� <br />�o <br />a� <br />v <br />is <br />I <br />�3 <br />> d' <br />L. <br />Im <br />^ <br />4% <br />' <br />T <br />O <br />< <br />C^ V <br />m <br />W <br />M <br />T <br />— O <br />V/ <br />T <br />CN <br />f <br />T <br />l+ T <br />04 <br />04 O <br />T <br />ti <br />E <br />w <br />E T <br />(V r <br />p <br />Z <br />Z <br />E O <br />iri <br />WE <br />C <br />C <br />d <br />E <br />U 0 <br />d « <br />Q <br />C <br />JOB <br />NO: <br />20-8067 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />D 1 <br />