Laserfiche WebLink
11 • I I __ I , I I I - — -'=- 19 1 -1 ,�. P'1.:1 r 1 1' yii, _,_ I..I i I I I _ _ ___I I I `j1> _ I I L Lam_ <br />G <br />V <br />6'-11" 6-0" <br />0 <br />(V <br />U <br />U <br />CJ1 <br />J 1 <br />E7 <br />LO <br />I <br />O <br />I <br />I <br />CJ5 <br />5 <br />I <br />I <br />® <br />A7G <br />I <br />8'-0" CEILING /A6 <br />I <br />j A5 <br />I <br />I <br />I <br />L--------- ------ ---- --------------- <br />------------------- <br />II I <br />I II II <br />I II II <br />I II II <br />I <br />I <br />I <br />I <br />II I <br />II II <br />I I -------------- <br />II L--------------, <br />/ C i <br />i- <br />8'-0" CEILING' <br />I <br />II <br />L1 <br />I <br />II <br />L--- <br />--------I --JL-------------J----------3 <br />I <br />I <br />II I <br />I <br />II .I <br />04 <br />II <br />I; II <br />II <br />O <br />N <br />I <br />I <br />II <br />O <br />I <br />l <br />I I <br />2.12 VAULTED CLG. <br />I <br />o <br />I <br />I <br />I <br />l i 8'-0" CEILING <br />-- - -- - - -- --- ---- ---- <br />in <br />co <br />---- <br />-- ----- <br />II <br />2.5/12 VAULTED CLG. <br />I <br />I <br />---� <br />I <br />I / L L -- <br />I I I I <br />--- ----J <br />------------------T-- <br />---T ---- <br />I II <br />II II <br />II II <br />II M <br />8'-0;";CEILING <br />I II <br />II II <br />I 11 <br />II <br />II II <br />II II <br />II II <br />II II <br />Z <br />Q <br />I II <br />IL------ ---------- <br />II <br />II <br />----JL----JL------------------------- <br />W W <br />F- --, <br />A1C <br />A/C: CHASE <br />i <br />I <br />U r <br />l i i <br />4 <br />L — — — — — J <br />I II <br />o <br />o <br />2.5/12 CLG. <br />I <br />Ij li A1B <br />I <br />I� 8'-0" C ING <br />II r A8 <br />I <br />c <br />II <br />I <br />II <br />o <br />A9 <br />b <br />II <br />II <br />8'4' CEILING <br />A11 <br />o <br />CJ3, <br />CJ5A <br />CJ5 <br />C111 <br />U <br />El <br />w <br />CJ3A <br />CJ3 <br />0 <br />1 <br />EJ7 <br />y✓� <br />U <br />C1 <br />LO <br />U <br />LO <br />�j ' <br />C1 <br />o <br />U <br />U - <br />N <br />U <br />U <br />4'-8" <br />6-0" <br />191-4" <br />ROOF FRAMING PLAN (ELEV B.' <br />1 /411 = 1'-011 <br />REFER TO ENG. <br />PACK FOR <br />CONNECTION <br />CJ3 <br />0 <br />1'-0 5/1 <br />TRUSS NOTES: <br />THE FLOOR AND ROOF TRUSS LAYOUT ON THESE PLANS <br />ARE SCHEMATIC DESIGN ONLY. FINAL FLOOR AND ROOF <br />TRUSS LAYOUTS TO BE DEVELOPED BY TRUSS <br />MANUFACTURER. TRUSS LAYOUTS AND TRUSS SHOP <br />DRAWINGS MUST BE REVIEWED AND APPROVED BY <br />DESIGN STYLES, INC. AND/ OR THE ENGINEER OF RECORD <br />PRIOR TO CONSTRUCTION. <br />TRUSS MANUFACTURER TO VERIFY ADEQUACY OF ALL <br />SPECIFIED LVL BEAMS AND MAKE ANY ADJUSTMENTS <br />NECESSARY DUE TO FINAL TRUSS DESIGN OR <br />CALCULATED REACTIONS. ALL MODIFICATION TO BE <br />REPORTED TO DESIGN STYLES, INC. AND THE ENGINEER <br />OF RECORD PRIOR TO CONSTRUCTION. <br />ELECTRICAL & HVAC LAYOUTS ARE BASED ON THESE <br />FRAMING LAYOUTS. ANY DEVIATIONS ARE TO BE <br />APPROVED BY DESIGN STYLES, INC. PRIOR TO <br />CONSTRUCTION. <br />TYPICAL TRUSS CONNECTORS <br />1. ALL CONNECTORS ARE "SIMPSON, STRONG -TIE". U.N.O. <br />2. USE MTS20'S OR H10A'S FOR ROOF TRUSS TO FRAME <br />CONNECTIONS. <br />3. ATTACH ALL FRAMING ABOVE ROOF TRUSSES TO <br />TRUSSES W/ MTS16'S. <br />4. USE HETA20 FOR ROOF TRUSS TO MASONRY <br />CONNECTIONS. <br />5. USE (2) HETA20 FOR GIRDER TRUSS TO MASONRY <br />CONNECTIONS. <br />6. USE (2) HTS30 OR H10A FOR GIRDER TRUSS TO FRAME <br />CONNECTIONS. <br />7. THE PREVIOUS CONNECTORS APPLY UNLESS <br />OTHERWISE NOTED. <br />8. SEE FLOOR PLAN AND FOUNDATION SHEETS FOR <br />OTHER CONNECTIONS. <br />DESIGN STYLES, INC. AND THE ENGINEER RESERVE THE <br />RIGHT TO MAKE ANY CHANGES AFTER FINAL TRUSS <br />INFORMATION IS SUPPLIED FROM TRUSS MANUFACTURER. <br />General Notes <br />1. ALL PARALLEL CHORD TRUSSES, FLAT TRUSSES <br />AND FLAT GIRDERS HAVE THE TOP CHORD <br />PARTIALLY PAINTED GREEN TO BE INSTALLED <br />GREEN SIDE UP. <br />2. ALL HANGERS TO BE SIMPSON HUS26 UNLESS <br />OTHERWISE NOTED. <br />3. ALL TRUSS SPACING IS 24" O.C. UNLESS <br />OTHERWISE NOTED. <br />4. PER TRUSS PLATE INSTITUTE BCSI-131 <br />RECOMMENDATION PERMANENT X-BRACING <br />SHOULD BE PLACED AT A MAXIMUM SPACING 15' <br />O.C. ACROSS THE SPAN, TO BE REPEATED AT A <br />MAXIMUM OF 20' BETWEEN EACH X-BRACE <br />THROUGHOUT THE STRUCTURE. <br />* PLEASE REFER TO BCSI-B1 FOR ANY ADDITIONAL <br />BRACING DETAILS. <br />ROOF LOADING SCHEDULE <br />TCLL = 20 PSF <br />TCDL = 7 PSF <br />BCLL = * PSF <br />BCDL = 10 PSF <br />TOTAL = 37 PSF <br />DURATION = 1.25 % <br />WIND SPD/TYPE = 140 <br />ENCLOSED <br />BLDG EXPOSURE = C <br />USAGE = RESIDENTIAL CAT II <br />WIND IMPORTANCE FACTOR = 1 <br />UPLIFTS BASED ON = 9.2 PSF <br />DESIGN CRITERIA <br />FBC 2020 <br />TPI 2014 <br />Truss member design & connector plates <br />NOTE: are designed for ASCE 7-16 and maximum <br />ALL VALLEY KITS MARKED "VK" OR "MVK" ARE forces from both components and claddings <br />CONVENTIONALLY FRAMED. PLEASE REFER TO and main wind force resisting systems. <br />ENGINEERING PACK FOR DETAILS <br />* These trusses have been reviewed to carry an <br />NOTES: <br />• FLOOR TRUSSES ARE CUTBACK 3/4" FROM EXTERIOR BLOCK <br />WALLS. <br />• FLOOR TRUSSES ARE CUTBACK 1/2" FROM FRAME WALLS. <br />• SEE ENGINEERING FOR FLOOR TRUSS CHASE AND STRONG <br />BACK LOCATIONS. <br />• SECOND STORY TRUSSES ARE CUT BACK 3/4"FROM EXTERIOR <br />WALLS. <br />NOTE: <br />DO NOT CUT OR ALTER TRUSSES WITHOUT CONSENT OF THIS <br />OFFICE. BACK CHARGES WILL NOT BE ACCEPTED WITHOUT PRIOR <br />WRITTEN APPROVAL BY OUR SERVICE DEPARTMENT AT <br />CARPENTER CONTRACTORS OF AMERICA, INC. 877-293-9487 <br />NOTE: <br />MULTI -PLY GIRDER CONNECTION. <br />ALL PLIES SHALL BE FASTENED TOGETHER (BOLTS, NAILS, AND <br />OR SCREWS) PRIOR TO INSTALLATION AND BEFORE ANY LOADS <br />ARE APPLIED. PER THE SUPPLIED ENGINEERING SHEETS. <br />NOTE: <br />ALL BEARING WALLS MUST BE ADEQUATELY DESIGNED TO CARRY <br />THE LOADS IMPOSED BY THE TRUSS OR TRUSSES, AND MUST BE <br />IN PLACE AND IN SERVICE BEFORE THE TRUSSES ARE SET IN <br />ORDER TO AVOID REPAIRS. <br />COLUMN NOTE: <br />REFER TO FOUNDATION PLAN FOR COLUMN SIZES <br />MAR 2 5 2023 <br />Virtual Review Assist. Inc. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 7th Edi <br />by Debra Anne Klahr PX2300 <br />SHINGLE ROOF <br />51 <br />12 <br />0 <br />HEEL= 4-1/16" <br />PLUMB 2X4 <br />CUT <br />12" <br />31I II II LABELED END MARK <br />2'-0" <br />TYPICAL 5' SETBACK CORNER -SET Total Truss Quantity = 79 <br />LABELING AND SPACING <br />REFER TO ENG. <br />PACK FOR CONNECTION <br />CJ5 <br />o CJ3 <br />U <br />CS U <br />U <br />V-0 5/16"--h 1, 2'-0" 1, 2'-0" <br />TYPICAL T SETBACK CORNER -SET <br />LABELING AND SPACING <br />ATTENTION! <br />DON'T LIFT SINGLE TRUSSES <br />1MTH SPANS LONGER THAN <br />30' BY THE PEAK <br />I CONSULT BCSI -81 <br />30' Span or less 30' to 60' <br />Spreader <br />60 degrees <br />,,l or less <br />I� 112 2/3 to 1/2 <br />line span approx. 1 Te Tine span approx. <br />REFER TO BCSI -131 <br />Truss must be set this way if crane used. <br />Truss is an example, your truss may not match. <br />Insist crane cperator sets truss this way. <br />additional 10# psf non -concurrent bottom chord live <br />load. <br />FLOOR <br />LOADING SCHEDULE <br />TCLL <br />= 40 PSF <br />TCDL <br />= 10 PSF <br />BCDL <br />= 5 PSF <br />TOTAL <br />= 55 PSF <br />ROOF DESIGNED FOR <br />SHINGLE <br />ALL REACTIONS <br />AND UPLIFTS <br />ARE SHOWN ON ENGINEERING. <br />WALL KEY <br />�i�i�i�i�i�i� ���I�•`�01 <br />LOAD# DESCRIPTION INIT. DATE <br />R/01 <br />Created from BID B312288A AS <br />8/6/2015 <br />RA01 <br />REV. ENTRY & ADD HIP Q REAR SHM <br />9118115 <br />RB01 <br />Add Vaulted ceiling in Great nn, AS <br />Diningrm.Kitchen Foyer & Ent <br />12/29/2015 <br />R801 <br />LC9 AND FBC2017 HAB <br />12/07/2017 <br />RC01 <br />RE-CALC A7G B.C. AS <br />7/23/2019 <br />RD01 <br />LCA JTH <br />1/4121 <br />CARPENTER <br />—� <br />CONTRACTORS <br />OF AMERICA <br />3900 AVENUE <br />G. N. W. <br />WINTER <br />HAVEN FLORIDA 33880 <br />PH❑NE: <br />(800) 959-8806 <br />FAX: <br />(863) 294-2488 <br />BUILDER : LENNAR HOMES <br />PROJECT :TOUCHSTONE <br />MODEL : 1450 <br />CCA PROJ/MODEL/ALT <br />7A2 / 1450B <br />ALT DESC: <br />OTC <br />LOT : BLOCK <br />DESIGNER PAGE <br />HAB <br />DATE <br />08 06 2015 <br />LAN# SCALE <br />N321594R 1 1 4 11=11 <br />N <br />N <br />0 <br />N <br />• <br />.3. <br />Cq <br />LO <br />Go <br />LO <br />r�A� <br />00 <br />Q <br />W <br />=O <br />0 <br />Z <br />Q <br />t^o` N LO - E <br />L Q' 0 0 <br />_W <br />L M C `2 <br />N U -0-0- 0 M <br />j .O 2 M <br />o M: 8 c <br />U a� Q <br />to Cj <br />V w a� <br />W L. COO, E <br />w w <br />V <br />ow w01- <br />Xj_M_,< Q:a110002_JO <br />Q <br />O O <br />awx 0 0200m0~¢Q <br />vOi�a�u�wwr_WLLX<0X_j <br />(n O Z <br />LL <br />¢< W 55-wz�wvoa <br />Ow 2 P �Uj <br />OLL Q =O O�<, <br />al <br />Lo <br />0 <br />Z CN <br />u) 5 ti <br />O <br />F.:M <br />Q M Lo <br />E—�O-LL <br />Ln <br />a 00 <br />Z0 <br />LU <br />W <br />J� <br />CO <br />N <br />III <br />III <br />O <br />N <br />N <br />N <br />0 <br />O <br />o <br />� <br />C3 <br />o <br />I <br />I <br />I <br />I <br />' <br />z <br />O <br />N <br />co <br />CD <br />L <br />> <br />C4 <br />M <br />l <br />l <br />l <br />i <br />co <br />ZH <br />(07 <br />QZ <br />W <br />O <br />LU <br />-%ZZ <br />0 <br />V <br />OO <br />U 55 <br />LC7 -� <br />o <br />ono <br />Z <br />aWa <br />O <br />2 <br />W=w <br />m�LU <br />rl <br />zoo <br />. . <br />W <br />O <br />C:)Q <br />gZX <br />.. <br />3 <br />Z <br />Z <br />az <br />?� <br />OU <br />12 <br />_0 <br />m <br />z <br />Z <br />z <br />W <br />W <br />J <br />O <br />N <br />N <br />O <br />Q <br />LAST PLOT DATE <br />O <br />• <br />Z0 <br />December 14, 2022 <br />ROOF FRAMING <br />PLANS B <br />