Laserfiche WebLink
(43 1/211 (-)3 1/211 <br />5LOPE 1/4" PER 1'-0" TO DRAIN <br />SHOWER RECESS <br />.SLOPE DETAIL <br />SCALE N.T.6. <br />FIN15H FLOOR OVER SHEATHING OVER <br />WOOD FLOOR SYSTEM PER PLAN <br />WALL PER PLAN <br />P.T. 2"x4" CURB <br />TILE PER 5PEG - <br />SLOPE MUD <br />TOWARD D;�I�N <br />�L I I ' - FLOOR DRAIN <br />WATER PROOFING MEMBR�N�E <br />SHOWER CURB DETAIL <br />Ca) WOOD FRAMED FL SYS. <br />SCALE: 3/4" : 1'-0" <br />OPTIONAL L15TELLO TO BE <br />CENTERED ON NICHE ONLY <br />AT REAR OF NICHE BUT <br />NOT ON SIDE RETURNS <br />ID I U1 U I UL,)U AA I AALL I JD/C�MWTI;� <br />WALLS - TYP. ALL TUB/5WWR5. <br />NICHE AT BATH <br />SCALE: N15. <br />FIN15H FLOOR OVER REINF <br />CONG SLAB PER PLAN <br />-WALL PER PLAN <br />P.T. 2'lx4" CURB <br />JILE PER SPEC <br />SLOPE MUD�7 <br />IN <br />TOWARD D IN <br />LU T1. [.:.-FLOOR DRAIN <br />w WATER PROOFING MEMBRANE <br />RECESSED SHOWER <br />PETAIL @ CONC SLAB <br />SCALE; 3/4" : V-0" <br />161f <br />31/2" DEEP NICHE DETAIL <br />FOR OWNER BATHS <br />IF SHOWER VALVE 15 IN — <br />BLOCK WALL, THE NICHE <br />WILL BE IN OPP051TE WALL <br />INSTALL 2x6 BLOCKING <br />AT FIN. FL. BTWN 5TUD5 <br />AT ALL 5HWR. WALLS - <br />TYP, ALL 5HWR5, <br />N, <br />k <br />Q-3 <br />(ki <br />,,5EE DETAIL WP13 ON— "'c�_NICHE AT SHOWER <br />SHEET DT8 FOR ALL <br />FLOOR CUR55 SCALE: N.T.5. <br />FIN15H FLOOR OVER REINF <br />CONC 5LA5 PER PLAN - <br />WALL PER PLAN <br />—TILE PER 5PEG <br />SLOPE MUD (Oil <br />W <br />T <br />5 <br />A <br />L <br />L <br />0 <br />L <br />E <br />L <br />P <br />P <br />PE <br />E <br />E <br />R <br />R P <br />5P <br />L <br />E <br />A <br />MUD <br />N <br />TOWARD DRAIN rmK <br />Lu �—FLOOR DRA'IN <br />'WATER PROOFING MEMBRANE <br />ZERO -ENTRY SHOWER <br />DETAIL 0 CONC SLAB <br />SCALE: 3/4" - V-0" <br />CFULL 1/2 <br />&"RADIUS <br />mlu$­""� <br />Lu <br />CH <br />D. A7 <br />RND. ARCH <br />9 <br />Lu <br />Lu <br />31-611 AND <br />31-111 TO 11-011 <br />11-11" AND LARGER <br />SMALLER <br />VERIFY W1 PLAN <br />VERIFY W1 PLAN <br />9ERIFY W1 PL4N <br />UPPER FLOOR <br />NOTE: <br />WHEN AN 8" AND 12" RADIUS HEADER <br />ENGAGE INTO THE SAME COLUMN OR ARE <br />WITHIN CL05E PROXIMITY (WITHIN 2'-011), THEY <br />NEED TO ALL HAVE THE LARGER RADIUS. <br />11\76, <br />/2 <br />FULL 1/2 <br />rRND. <br />Lu <br />RAEAU5 <br />Lu <br />M QA <br />12" RADIUS <br />Lu <br />ARCH <br />:5 <br />LLJ LLI <br />LLI <br />Lu <br />314011 AND <br />31-111 TO 11-011 <br />11-11" AND LARGER <br />SMALLER <br />VERIFY W1 PLAN <br />VERIFY W1 PLAN <br />9ERIFY W1 PL4N <br />MAIN FLOOR <br />TYPICAL INTERIOR ARCHES <br />SCALE: 1/4" = 1'-0" <br />SHOWER HEAD <br />PER SPEC <br />VALVE PER <br />5PEG <br />5qOWER FLOOR—� <br />PER 5PEC <br />TYP. VALVE AND <br />SHWR. HEAD DETAIL <br />SCALE: 1/2" - 1'-0" <br />x <br />Lu <br />11/2 " THICK <br />C0 <br />Lu <br />t2k <br />i_3 <br />3/411 <br />THICK <br />LIGHT FIXTURE PER 5PEC'5 <br />MIRROR ADHERED TO WALL W1 <br />TEMPERED GLA65 W1 <br />MASTIC INSTALLED AS PER MANF <br />—HARDWARE <br />PER 5PEC5 <br />AND TO MEET A6TM STANDARDS <br />---KNEE <br />WALL PER PLAN <br />4" BACK 5PA5H PER 5PEG'5 <br />Lu <br />ik <br />CURB PER PLAN <br />BATHROOM VANITY <br />tD <br />+ . , <br />FLOORING PER PLAN---\ <br />�6 <br />+ �Ik <br />PER 5PEC'5 <br />-FLOORING PER PLAN <br />TYP. <br />SHOWER <br />TYP. <br />MIRROR AND <br />ENCLOSURE DETAIL <br />LIGHTING <br />(@ VANITY <br />SCALE: 1/2" = 1'-0" <br />SCALE: 1/2" : V-0" <br />5AND FIN15H KEYSTONE <br />(IF APPLICABLE) <br />RAISED 5AND FIN15H <br />TEXTURED BANDING <br />NOTE: <br />TH16 DETAIL 5HOW5 THE TYPICAL THICKNE55 OF ALL RA15ED <br />TEXTURED FIN15P BANDING AND SAND FIN15HED KEY5TONE5 <br />(WHERE APPLICABLE) IF THICKNESS 15 TO BE DIFFERENT IT <br />WILL BE CALLED OUT AT SPECIFIC KEYNOTE CALL -OUT <br />RAISED TEXTURED FINISH BANDING <br />AND/ OR SAND FINISH KEYSTONE <br />TypIrA <br />%..ML DETAIL <br />SEE SHEET DT6 <br />FOR STUCCO NOTE5. <br />NOTE: FRAME IN <br />UNDER SIDE OF OPNG. <br />W1 2x ON IT 51DE <br />RIDGE <br />R.O. <br />Y-1011 <br />TILE 4' OF RIDGE VENT <br />POLE 51ZE: 12"x4(o" <br />RIDGE <br />:%� ig�] <br />SHINGLE 110-D OFF RIDGE VENT <br />POLE 51ZE: 10"x2l" <br />ROOF VENT <br />DETAIL <br />SCALE: NTS <br />TOWEL BAR <br />T.P. HOLDER <br />S-1 <br />TYP. BATH ROOM <br />ACC. DETAI L <br />SCALE: 1/2" : 1411 <br />APPLY AGRO55 IN51DE — <br />FACE OF BLOCK OPENING <br />:-:-, - "'.7 <br />.............. <br />6" MIN, WIDE ACRO56 <br />FRONT FACE <br />11-0" MIN <br />_T_/_A5OVE 5'ILL <br />1'-0' MIN. <br />BELOW SILL <br />SCALE: 3" : 1'-0' ELASTOMERIC PAINTED <br />I SILL DETAIL <br />MASONRY APPLICATION ONLY <br />ROOFING MATERIAL <br />SCALE: NT5 <br />FIBERGLA55 SHINGLE: <br />- SYNTHETIC ROOF UNDERLAYMENT INSTALLED PER <br />MANUFACTURE SPECS <br />- 1/16" APA RATED 5PEATING <br />ASPHALT SHINGLES (IF APPLICABLE): <br />1. WIND IRE515TANCE OF ASPHALT SHINGLES. - ASPHALT SHINGLES SHALL BE INSTALLED IN ACCORDANCE WITH FBC. <br />RE51DENTIAL loth EDITION (2011) - SECTION RW51fo AND RW52b.l. <br />2. ASPHALT SHINGLES SHALL ONLY BE USED ON ROOF SLOPES OF TWO UNITS VERTICAL IN 12 UNITS HORIZONTAL (2:12) OR <br />GREATER, <br />_ FOR ROOF 5LOPE5 FROM TWO UNITS VERTICAL IN 12 UNITS HORIZONTAL (2:12) UP TO FOUR UNITS VERTICAL IN 12 <br />UNITS HORIZONTAL (4:12), TWO LAYERS OF UNDERLAYMENT COMPLYING WITH A5TM D 22(o, TYPE I OR TYPE 11 OR <br />A5TM D 4a69, TYPE 11 OR TYPE IV OR A5TM D 6157115 REQUIRED IN ACCORDANCE WITH F.B.C. RESIDENTIAL loth <br />EDITION (2011) - SECTION R90�11. <br />- FOR ROOF SLOPES OF FOUR UNITS VERTICAL IN 12 UNITS HORIZONTAL (4:12) OR GREATER, ONE LAYER OF <br />UNDERLAYMENT COMPLYING WITH A5TM D 22(o, TYPE 11 OR A5TM D 4869, TYPE IV OR A5TM D 615115 REQUIRED IN <br />ACCORDANCE WITH F.5,C. RESIDENTIAL loth EDITION (2011) - SECTION RW5.1.1. <br />3. FA5TENER5 FOR ASPHALT 5PINGLE5 5PALL BE GALVANIZED STEEL, 5TAINLE55 STEEL, ALUMINUM OR COPPER ROOFING <br />NAILS, MINIMUM 12 GAUGE. <br />12 It-"- PRE ENGINEERED WOOD TRUSS <br />INSULATION PER COMMUNITY SPECS AND ENERGY CALC5 <br />HURRICANE ANCHOR AT EACH TRU55 <br />SEE TRU55 LAYOUT <br />ROOFING MATERIAL (SEE NOTES ABOVE) <br />ELEVATION VARIES 4­1 <br />TOP OF MA50NRY <br />METAL DRIP EDGE <br />2x FASCIA BOARD WRAPPED IN ALUM. <br />SEE ELEVATION FOR CLARIFICATION <br />VINYL SOFFIT <br />VARIES SEE ROOF PLAN <br />SOFFIT AND FASCIA DETAIL <br />U.S. <br />DAVIS BEWS <br />DESIGN GROVP <br />150 SrA-M SMEEr EASr <br />OUXMA& ROMA 34677 <br />813. 925.1300 TEL <br />80. 925. 1800 FAX <br />WWWnAVWEVv'&C0M <br />TAMPA o n� <br />-­_� EST 1994 e�z�— <br />I <br />0 <br />z <br />0 <br />M 'h! c) <br />0.4 = ko e, <br />> v) m <br />V) M Ln <br />@n LNn <br />U_ <br />zu <br />§ E <br />z <br />wz IT <br />LLJ <br />_j <br />0 <br />uj <br />CWL <br />8 '0) <br />co <br />1 a<: <br />2 z z <br />U 0!9 zw <br />g -. <br />ox: <br />22 8 <br />Ll I <br />uj <br />Lu <br />8 v) <br />z oz <br />u <br />iz <br />z <br />z <br />�b <br />z <br />0 <br />P__4 <br />0 <br />b <br />D <br />< <br />ct <br />0 UJ <br />j <br />F_ <br />LL 0 <br />uo) <br />U.J <br />z <br />C14 LLI <br />z <br />0 <br />z <br />U <br />Z <br />z 0 <br />0 u <br />Lu <br />z <br />p--q <br />Q <br />x <br />< <br />0 <br />z <br />z <br />P <br />uj <br />0 <br />z <br />rn <br />a- <br />Lu <br />SCALE <br />AS <br />NOTED <br />DATE 10-19-2018 <br />VERSION NO. <br />100 <br />SHEET NO. <br />DT2 <br />