Laserfiche WebLink
TEMPORARY TAPE <br />'FLgP' TO HOLD FLAP <br />4,1 HIOUSE <br />WRAP 7 <br />A I % <br />9' <br />ROUGH <br />OPENING: <br />HOUSE <br />WRAP <br />SHEATHING <br />WINDOW FLASHING METHOD 'A -I' <br />A A WINDOW INSTALLER WILL CUT THE BUILDING PAPER At A 4 ANGLE TO A POINT S' UP AND S' OUT <br />Ol FROM THE UPPER CORNERS OF THE ROUGH OPENING. <br />B. THIS WILL MAKE A FLAP' THAT WILL BE USED TO COVER THE HEAD FLASHING IN STEP 6. <br />TEMPORARY TAPE <br />TLAP' <br />TO HOLD FLAP <br />�/ <br />LWOI1cSE <br />WR�IP 7 <br />SHEATHING <br />ROUGH <br />OPENING: <br />4' <br />SILL WRAP <br />ILL FLASHNG <br />HOUSE LIN< <br />WRAP INSTALL FLEXIBLE <br />FLASHING <br />SHEATHING CORM AT <br />WINDOW SILL <br />WINDOW FLASHING METHOD 'A -I' <br />3-STEP PROCESS: <br />�2 A INSTALL SILL FLASHING (EXTENDING 4' BEYOND THE ROUGH OPENING ON EACH SIDE) <br />B, INSTALL CORNER SHIELD FLASHING (FASTEN WITH MOISTOP SEALANT OR E") <br />C. INSTALL SILL WRAP (MUST COMPLETELY COVER ROUGH OPENING SILL (INCLUDING CORNER SHIELDS) <br />METAL FLASHING <br />DOUBLE LAYER SPLINE APPLIED <br />VERTICALLY (IF USING FELT, SPLIT <br />36' - WIDE SHEET IN HALF) <br />2' TO 4' LAP AT <br />HORIZONTAL JOINT <br />2' TO 4' LAP AT <br />` <br />HORIZONTAL JOINT <br />SHEATHING <br />I <br />. I <br />BUILDING PAPER <br />HOUSEWRAP <br />I I <br />I -CUT I am <br />` <br />WINDOW 1 1 <br />i <br />OPLI\w <br />SHEATHING <br />(BUILDING PAPER <br />OR HOUSEWRAP) <br />CARRIED I' TO 2'%- <br />BELOW BOTTOM <br />OF SHEATHING <br />-%- 4' TO 6' LAP AT <br />VERTICAL JOINT <br />9' (6' MIND BEYOND <br />CORNER BOARD <br />SHEATHING <br />WRAP DETAIL <br />SCALE: N.T.S. <br />TEMPORARY TAPE <br />%AP' <br />TO HOLD FLAP <br />�NOIISE <br />WRAP <br />SHEATHING: <br />CAULK BEHIND <br />WINDOW FLANGE <br />BEFORE <br />INSTALLATION, <br />WINDOW FLANGE <br />SILL FLASHING <br />HOUSE <br />WRAP <br />SHEATHING <br />WINDOW FLASHING METHOD 'A -I' <br />OA APPLY A CONTINUOUS BEAD OF CAULKMG ON THE BACK SIDE OF THE WINDOW FLANGE. <br />B. INSTALL THE WINDOW ACCORDING TO THE MAR FACTURERS SPECIFICATIONS. <br />TEMPORARY TAPE <br />'FLAP'_\ <br />TO HOLD FLAP <br />// HOUSE <br />WRAP <br />HEAD FLASHING <br />JAM FLASHING <br />WINDOW FLANGE <br />HOUSE <br />WRAP <br />SILL FLASHING <br />SHEATHING <br />WINDOW FLASHING METHOD 'A -I' <br />OA INSTALL HEAD FLASHM3 OVER THE WINDOW FLANGE. <br />B. EXTEND THE HEAD FLASHING 6' BEYOND THE ROUGH OPENING ON EACH SIDE. <br />TO ALLOW MOISTURE TO BE DIVERTED TO THE OUTSIDE SURFACE <br />TEMPORARY TAPE <br />TO HOLD FLAP <br />HOUSE <br />WRAFi7 <br />SHEATHING <br />JAM FLASHING <br />WINDOW FLANGE <br />cJJ <br />HOUSE <br />WRAP <br />SILL FLASHING <br />SHEATHING <br />WINDOW FLASHING METHOD 'A -I' <br />OA INSTALL JAMB FLASHING OYER THE WINDOW FLANGE ON EACH SIDE. <br />B. EXTEND THE JAMB FLASHING 4' ABOYE THE ROUGH OPENING AND S' BELOW THE RI OPENING. <br />C. INSTALL THE WINDOW ACCORDING TO THE MAREACTURERS SPECIFICATIONS. <br />2HIOUSE <br />'FLAP' WRAP7 <br />� —-----------------------------7 <br />mm <br />r <br />SILL FLASHING <br />WINDOW FLANGE <br />WINDOW FLASHING METHOD 'A -I' <br />OA ALLOW THE BUILDING PAPER %AP' TO DRAPE OYER THE HEAD FLASHING. <br />AD FLASHING <br />JAM FLASHING <br />HOUSE <br />P' <br />WRAF7 <br />HEATHER RESISTANT <br />FLASHING <br />CONSTRUCTION TAPE <br />JAM FLASHING <br />HOUSE <br />WRAP <br />SILL FLASHING <br />SHEATHING WINDOW <br />FLANGE <br />WINDOW FLASHING METHOD 'A -I' <br />OA APPLY WEATHER RESISTANT TAPE OVER THE 4 ANGLE CUT ON THE BUILDING PAPER <br />B. ON INSIDE PERIMETER OF WINDOW APPLY CONTINUOUS BEAD OF SEALANT OR EXPANDABLE FOAM <br />DANSCO <br />ENGINEERING, LLC <br />P.O. BOX 3400 <br />Apollo Beach, Florida 33572 <br />p. 813.645.0166 <br />f. 813.645.9698 <br />www.danscoenginee6ng.com <br />CA 25948 <br />o <br />N <br />Z E <br />�5),IN. <br />z <br />In <br />a(nL-Li <br />�JWSu-^ <br />RC zQ <br />} d LP <br />U 00 <br />Z <br />wW3 <br />J <br />0 <br />J <br />� <br />U <br />III <br />v) <br />w <br />W <br />I-- <br />LLJ <br />°' <br />V) <br />_ <br />cV <br />r— <br />J <br />Q <br />1 <br />m <br />cn <br />LW <br />Q <br />O <br />°° <br />0 <br />~ <br />O <br />z <br />Z <br />U <br />Z <br />0 <br />0 <br />0000 <br />� <br />CL <br />cn <br />TO THE BEST OF THE ENGINEER'S <br />KNOWLEDGE AND BELIEF, THE STRUCTURAL <br />PLANS AND SPECIFICATIONS COMPLY WITH <br />6TH EDITION (2017) FLORIDA RESIDENTIAL <br />BUILDING CODE, SECTION R301 FOR <br />140 MPH (Vold = 108MPH), 3 SEC. GUST, <br />EXPOSURE "C" ENCLOSED (INTERNAL <br />PRESSURE COEFFICIENT = i0.18) WIND ZONE <br />THIS DRAWING AND DESIGN IS VAUD FOR 12 MONTHS <br />AFTER THE DATE IT IS SIGNED AND SEALED. <br />SIGNED AND SEALED FOR THE STRUCTURAL PORTION <br />OFTHIS DRAWINGONLY. <br />02019 LENNAR CORP: THIS PLAN MAY NOT BE <br />REPRODUCED IN ANY MANNER WIMOUT WRITTEN <br />CONSENT FROM LENNAR CORPORATION. <br />02019 • THESE DRAWINGS AND DESIGNS ARE THE <br />JOINT PROPERTY OF DANSCO ENGINEERING, LLC AND <br />THE CLIENT ON THIS PROJECT. ANY REPRODUCTION <br />OR UNAUTHORIZED USE IS PROHIBITED. <br />REVISION: <br />DATE DESCRIPTION <br />UPDATED CONNECTION <br />06.08.18 1.01 CROSS-REFERENCE TABLE <br />AND STAIR STRAP <br />01.09.19 1.02 ROOF UNDERLAYMENT REV. <br />02 11 19 1.03 UPDATED CONNECTION <br />CROSS-REFERENCE TABLE <br />VERSION NO.. 1.0310.2.11.19 <br />0 <br />c.s <br />L0 <br />c <br />od <br />w <br />O <br />sz <br />Co <br />J <br />0 <br />W <br />= <br />U <br />WC',e <br />U'� r <br />3 <br />W w4 _3 <br />W D <br />�� <br />w* <br />�* <br />Z :E = Uj <br />IN4 LLl <br />a to <br />W a <br />o <br />SHEET <br />TITLE: <br />WINDOW <br />FLASHING <br />DETAILS & NOTES <br />SHEET INFORMATION: <br />JOB NO.: <br />390441 <br />DATE ISSUED: <br />04.04.19 <br />DRAWN BY: <br />LF <br />REVIEWED BY: <br />TH <br />WF-1 <br />O <br />O <br />00 <br />0*4 <br />r— <br />