Laserfiche WebLink
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETA16 W/ (9) 10d x 1 1/2" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />SIMPSON LTA2 W/ (8) 10d x 1 1/2" HDG NAILS, WOOD TO WOOD: <br />SIMPSON H10A OR LGT2 W/ 10d x 1 1/2" HOG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />7. LINTELS SHALL HAVE 4" NOMINAL BEARING (C). <br />6. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />9. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 21K MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 PIIS36, .177" " x 2 7/8" LONG, WITH WASHER ® 16" O.C. <br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />12. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />TRUSS MANUFACTURER / ENGINEER NOTES: <br />1. ROOF GIRDERS W/ UPLIFT IN EXCESS OF 2,500 LBS SHALL BE <br />FABRICATED W/A 2x6 BTM. CHORD (MIN.) <br />2. COORDINATE ANY TRAY/COFFERED CEILINGS, AND ATTIC ACCESS <br />WITH THE ARCHITECTURAL PLANS TRAYS AND COFFERS ARE NOT <br />SHOWN ON THIS PLAN IN ORDER TO AVOID CONFUSION AND MISTAKES. <br />3. TRUSS COMPANY / ENGINEER IS RESPONSIBLE FOR ALL TRUSS TO <br />TRUSS CONNECTIONS. <br />4. AVOID PLACING A TRUSS PERPENDICULAR TO A STEEL COLUMN. <br />MAINTAIN AT LEAST 6" FROM THE CENTER OF THE COLUMN. <br />COLUMN SCHEDULE <br />MARK <br />SIZE 6 <br />BASE PLATE OR <br />REMARK <br />DESCRIPTION <br />REINFORCEMENT <br />WD-1 <br />4X6 (3)5"x5 X") SYP. <br />HTT4 W15/6" DIA x 5" <br />5/S3.1A <br />PT., WOOD POST <br />EXP. 80LT <br />ROOF FRAMING PLAN <br />SCALE: 1 /4" = V-0" <br />1441 N. RONALD REAGAN BI <br />LONGWOOD,FL32750 <br />PH: 407-774.6078 <br />FAX: 407-774.4078 <br />www.abdeslgngroup.com <br />L AA k: 0003325 <br />13 <br />� <br />O <br />eunDiv. so LOT: <br />ABBOTT PARK <br />LOT ##39 <br />BLK" ##9 <br />P1toj=T <br />04181.000-39091 <br />moDEL" <br />4EHB <br />"2605-HAYDEN" <br />GAFt"M 8WING: <br />RIGHT <br />PAoz: <br />ROOF <br />FRAMING PLAN <br />AND NOTES <br />160 MPH EXP. C <br />A-z%Ln-a- 6/12/20 <br />DATE <br />8CALM 1/4"=1'-O" <br />ammuT <br />s6 <br />