Laserfiche WebLink
FIRE PROTECTION LEGEND <br />FIRE PROTECTION SPECIFICATIONS <br />SPRINKLER NOTES <br />C <br />0 <br />CL <br />D <br />a <br />i <br />a <br />0 <br />0 <br />r- <br />0 <br />N <br />ti <br />E <br />O <br />e� <br />2 <br />U <br />L <br />C <br />a <br />m <br />0 <br />W <br />SYMBOL DESCRIPTION <br />SYMBOL DESCRIPTION <br />F <br />FIRE LINE OR MAIN <br />= <br />FIRE DEPARTMENT VALVE CABINET <br />A/S <br />AUTOMATIC SPRINKLER MAIN <br />FP-1, ETC <br />FIXTURE INDENTIFICATION <br />D <br />DRAIN LINE <br />CONNECTION TO EXISTING <br />PIPE TURNED UP <br />• <br />FIRE EXTINGUISHER <br />a <br />PIPE TURNED DOWN <br />FLOW SWITCH <br />r <br />BALL VALVE <br />CAP ON LINE <br />--� <br />CHECK VALVE <br />* <br />HYDRAULIC CALCULATION PIPE NODE 1-100 <br />UNION IN PIPE <br />Q <br />HYDRAULIC CALCULATION SPRINKLER <br />D *' <br />_ <br />O.S.&Y. GATE OR BUTTERFLY VALVE <br />W/TAMPER SWITCH. <br />REMOVE EXISTING HEAD AND PLUG FITTING <br />--�F- <br />CHECK VALVE <br />REMOVE EXISTING HEAD & EXTEND 1' BRANCH LINE <br />TO NEW HEAD LOCATION <br />CONTROL VALVE AND CHECK VALVE WITH <br />FLOW AND TAMPER SWITCHES <br />PIPING TO BE REMOVED <br />i-o--o <br />SPRINKLER HEAD BELOW DUCTWORK <br />FIRE PROTECTION ABBREVIATIONS <br />F.H.C. <br />FIRE HOSE CABINET <br />E.P. <br />ELECTRICAL PANEL <br />F.E. <br />FIRE EXTINGUISHER <br />F.E.0 <br />FIRE EXTINGUISHER CABINET <br />A/S <br />AUTOMATIC SPRINKLER <br />F.D.V.C. <br />FIRE DEPARTMENT VALVE CABINET <br />F.SP. <br />FIRE STANDPIPE <br />O.S. & Y. <br />OUTSIDE STEM AND YOKE <br />RCV <br />RISER CONTROL VALVE <br />A.F.F. <br />ABOVE FINISHED FLOOR <br />T.S. <br />TAMPER SWITCH <br />F.S. <br />FLOW SWITCH <br />F.D.V. <br />FIRE DEPARTMENT VALVE <br />A.H.J <br />AUTHORITY HAVING JURISDICTION <br />SPRINKLER HEAD LEGEND <br />TYPE K-FACT TEMP LOCATION <br />1. CONCEALED - QRS (WHITE COVER PLATE) 5.6 1550 ALL SPACES UNLESS OTHERWISE NOTED <br />2. UPRIGHT GENERAL - ORS 5.6 2000 TOP OF ELEVATOR SHAFT <br />* SEE SPECIFICATIONS FOR MODEL NUMBERS. <br />* PLUG ALL UNUSED OUTLETS. <br />FIRE COMPONENT SCHEDULE <br />IDENTITY <br />COMPONENT <br />FP-1 <br />FIRE EXTINGUISHER (ABC - 10 LB. - RECESSED CABINET) <br />REGULATORY REQUIREMENTS <br />A. NFPA 101: Life Safety Code (2006). <br />B. NFPA 13: Standard for Sprinkler Systems (2002). <br />C. Florida Fire Marshall's Rules 69A-3.012 F.A.C. - (2007). <br />D. Florida Building Code - 2007 with 2009 ammendments. <br />ALL PRODUCTS ASSOCIATED WITH THE SPRINKLER SYSTEM SHALL BE <br />UNDERWRITERS LABORATORIES (UL) LISTED AND/OR FACTORY MUTUAL <br />(FM) APPROVED. <br />PIPE <br />INTERIOR PIPE AND FITTINGS: <br />THREADABLE THINWALL ASTM-A-795, TYPE E, GRADE A BY ALLIED 'DYNA-THREAD' (OR <br />APPROVED EQUAL) WITH CRR=1.0, U.L. LISTED FOR THREADED PIPE ENDS, AND / OR U.L. <br />LISTED ALLIED XL/BLT PIPE (OR APPROVED EQUAL) FOR UNTHREADED THINWALL PIPING <br />UP TO 3. PROVIDE ABF COATING ON PIPING. <br />FITTINGS: <br />1. MECHANICAL COUPLINGS: ROLL GROOVE RIGID TYPE BY <br />VICTAULIC OR GRINNELL. <br />2. CLASS 125 CAST IRON SPRINKLER FITTINGS - <br />SCREWED, FLANGED, OR GROOVED -END. <br />3. ALL FITTINGS SHALL BE BY THE SAME MANUFACTURER. <br />IIIttTiT�T T� <br />PROVIDE UL LISTED AND FM APPROVED HANGERS. ACCEPTABLE MANUFACTURERS: <br />GRINNELL, BLINE, VIKING, FEE AND MASON. <br />1. GRINNELL ADJUSTABLE CLEVIS HANGER #260 MSS, TYPE 1 FOR PIPING 21/Z AND LARGER. <br />2. GRINNELL ADJUSTABLE SWIVEL RING HANGER *69 FOR PIPING 2' AND SMALLER. <br />CLAMPS: <br />1. C-CLAMPS: <br />GRINNELL *92 WITH RETAINER CLIP, MSS TYPE 23. <br />2. MALLABLE BEAM CLAMPS: <br />GRINNELL FIGURE #218, MSS TYPE 30. <br />EXPANSION ANCHORS: <br />1. HILTI-HDT-KWIK-BOLT, ZINC PLATED, METAL EXPANSION ANCHOR. <br />ANCHOR TO MEET U.L., ICBO-4627 AND FM LISTINGS. <br />FIRE EXTINGUISHERS AND CABINETS: <br />ACCEPTABLE MANUFACTURERS:POTTER-ROEMER & CROKER <br />FIRE EXTINGUISHER CABINET (ABC EXTINGUISHER) <br />CABINET - #1704-A WHITE BAKED ENAMEL STEEL BOX WITH FULL ACRYLIC PANEL DOOR. <br />EXTINGUISHER: # 3010, TEN POUND ABC, MULTI -PURPOSE DRY CHEMICAL. <br />FINISH: *1961 DECAL LETERING FOR CABINET. PAINT EXTERIOR CABINET FRAME TO MATCH <br />WALL SURFACE. <br />SPRINKLER HEADS: <br />ACCEPTABLE MANUFACTURERS: GRINNELL, VIKING, & RELIABLE. <br />SPRINKLER HEADS SHALL BE U.L. LISTED AND F.M. APPROVED. CONCEALED TYPE <br />QUICK RESPONSE SPRINKLER HEAD MAY BE U.L. LISTED ONLY. <br />CHROME PENDENT: VIKING MICROFAST MODEL VK302, BULB TYPE, 1/� ORIFICE, PENDENT, QUICK <br />RESPONSE, STANDARD COVERAGE, 5.6 K-FACTOR, 155 DEGREE UNLESS NOTED OTHERWISE. <br />PIPE INSTALLATION <br />PROVIDE HANGERS ON ALL ARM OVERS OF 12' OR MORE. <br />SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE <br />WITH UL FIRE RESISTANCE INDEX FOR THROUGH -PENETRATION FIRESTOP <br />SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECT. <br />PROVIDE TRAPEZE TYPE HANGERS WHERE NECESSARY TO SUPPORT PIPE <br />WHEN STRUCTURAL STEEL IS NOT DIRECTLY ABOVE FOR SUPPORT. <br />THE CONTRACTOR SHALL PROVIDE SPRINKLER SHOP DRAWINGS AND PRODUCT DATA <br />SUBMITTALS TO ARCHITECT AND ENGINEER FOR APPROVAL PRIOR TO INSTALLATION TO <br />CONVEY THAT HE UNDERSTANDS THE INTENT OF CONTRACT DOCUMENTS AND TO <br />FACILITATE COORDINATION OF SPRINKLER SYSTEM WITH OTHER TRADES. THE <br />DRAWINGS SHALL INCORPORATE ALL OF THE REQUIREMENTS OF NFPA 13. <br />ALL MATERIAL SHALL BE DOMESTIC AND SHALL BE MANUFACTURED WITHIN THE UNITED <br />STATES OF AMERICA. <br />LABEL PIPING WITH SETON SNAP -ON LABELS, OR APPROVED EQUAL, TO DENOTE CONTENTS AND <br />DIRECTION OF FLOW, AT NO MORE THAN 20 FOOT INTERVALS AND AT LEAST ONCE IN EACH <br />SPACE THAT PIPE PASSES THRU. COLOR SHALL CONFORM TO ASME 13.1 WITH MINIMUM 2' HIGH <br />LETTERING. <br />ni necrni iT <br />CONTRACTOR SHALL PROVIDE AS BUILT DRAWINGS IN AUTOCAD FORMAT AT COMPLETION <br />OF PROJECT. <br />I. ALL FIRE PROTECTION SYSTEM SHALL BE IN COMPLIANCE WITH THE STATE AND <br />LOCAL FIRE CODES AND ORDINANCES AND AS PER NFPA 13 - 2002 AND <br />NFPA 14 - 2003 EDITION REQUIREMENTS. <br />2. MAKE ALL OFFSETS REQUIRED AS PER JOB CONDITIONS. <br />3. CONTRACTOR TO PROVIDE AND TURN OVER TO THE OWNER AT LEAST (6) <br />SPARE SPRINKLERS OF SAME TYPE AND TEMPERATURE RATING BEING INSTALLED <br />INSIDE OF SPARE SPRINKLER CABINETS. COORDINATE LOCATION WITH OWNER. <br />4. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE SPRINKLER HEAD LOCATIONS WITH <br />SOFFITS AND ANY CEILING OBSTRUCTIONS PER NFPA 13. <br />5. ALL SPRINKLER HEADS SHALL BE CENTERED AND PRESENT A NEAT AND <br />BALANCED CEILING PATTERN UNLESS SHOWN OTHERWISE. <br />6. PROVIDE AND MAINTAIN A MINIMUM CLEARANCE OF 18' BETWEEN THE <br />BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, <br />FILE, SHELVING, ETC. <br />7. CONTRACTOR SHALL FIELD VERIFY LOCATION AND QUANTITY OF ALL CEILING <br />MOUNTED DEVICES INCLUDING SMOKE DETECTORS TO BE REMOVED DURING <br />CONSTRUCTION TO INSTALL SPRINKLER PIPING. EXISTING EQUIPMENT AND FIXTURES <br />SHALL BE REPAIRED TO ORIGINAL OPERATION OR REPLACED SHOULD THEY BE <br />DAMAGED DURING CONSTRUCTION. <br />8. SCHEDULE 5 PIPING AND FLEXIBLE SPRINKLER HEAD DROPS ARE <br />NOT APPROVED OR ACCEPTED PRODUCTS. <br />9. CONTRACTOR SHALL COORDINATE WITH STRUCTURE AND OTHER TRADES <br />BEFORE INSTALLING SPRINKLER WORK. <br />10. SPRINKLER HEAD RATED a 155 DEGREES F. t/¢ ORIFICE WITH 5.6 K-FACTOR, <br />QUICK RESPONSE UNLESS OTHERWISE NOTEb. <br />11. INSTALL PIPING TIGHT TO STRUCTURE WHERE POSSIBLE. <br />12. SPRINKLER SYSTEM SHALL BE INSTALLED BY A STATE CERTIFIED FIRE <br />PROTECTION CONTRACTOR. <br />13. SPRINKLER PIPING SHALL BE THREADABLE THINWALL ALLIED 'DYNA-THREAD' WITH <br />CRR=1.0. U.L. LISTED AND / OR U.L. LISTED ASTM A-795 TYPE E. GRADE A <br />ELECTRIC RESISTANCE WELDED BY ALLIED OR APPROVED EQUAL FOR PIPINb UP <br />TO 3'. PROVIDE ABF COATING ON PIPING. <br />14. SYSTEM DESIGNED FOR LIGHT HAZARD OCCUPANCY, AND ORDINARY HAZARD <br />OCCUPANCY GROUP IIN MECH AND STORAGE ROOMS. CONTRACTOR SHALL PROVIDE <br />HYDRAULIC CALCULATIONS TO THE STREET MAIN UTILIZING A FLOW TEST TAKEN <br />NO MORE THAN 180 DAYS BEFORE INSTALLATION IF REQUIRED BY THE LOCAL AHJ. <br />15. CONTRACTOR SHALL REMOVE EXISTING SPRINKLER HEADS AS SHOWN AND <br />ADJUST PIPING TO NEW CEILING PATERN. <br />16. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED <br />SO AS TO AVOID ANY PIPE ROUTING PROBLEMS. <br />17. EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED <br />FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE <br />DRAWINGS MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE <br />PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES, LOCATION, TYPE <br />AND SIZE PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS IMPACTING WORK <br />SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT FOR <br />COORDINATION PRIOR TO CONSTRUCTION. <br />18. CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL EXISTING FIRE MAINS AND <br />SPRINKLER PIPING TO FACILITATE THE INSTALLATION OF NEW ELECTRICAL <br />MECHANICAL AND PLUMBING SYSTEMS. THIS INCLUDES ALL CEILING SPACES. <br />SHAFTS. WALLS. ETC. <br />19. CONTRACTOR SHALL RAISE ALL EXISTING SPRINKLER PIPING WITHIN SCOPE TIGHT TO <br />STRUCTURE AND PROVIDE NEW FITTINGS THROUGHOUT. <br />20. PRESSURE TEST PIPING AT 200 PSIG FOR A MINIMUM OF TWO HOURS. IF LEAKS <br />ARE FOUND THEN CONTRACTOR SHALL FIX LEAKS AND TEST AGAIN. CONTRACTOR <br />SHALL ALSO PROVIDE ALLOWANCE IN BID FOR PRESSURE TESTING OF EXISTING <br />PIPING SHOWN TO REMAIN AT 200 PSIG FOR A MINIMUM OF 2 HOURS. ALLOWANCE <br />SHALL INCLUDE FIXING LEAKS AND RETESTING. <br />21. FIRE PROTECTION CONTRACTOR SHALL PREPARE A SET OF INSTALLATION SHOP <br />DRAWINGS BASED ON PIPE SIZES SHOWN COORDINATED WITH ALL THE ENGINEERING <br />DISCIPLINES AND FIRE PROTECTION PIPING. THESE SHOP DRAWINGS SHALL BE <br />SUBMITTED TO SSR ENGINEERS FOR APPROVAL PRIOR TO FABRICATION <br />INSTALLATION OR SUBMITTAL TO BUILDING DEPARTMENT. ALSO, MATERIAL <br />SUBMITTALS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL <br />PRIOR TO ANY INSTALLATION. <br />22. CONTRACTOR SHALL PROVIDE PROVISIONS FOR FLUSHING SPRINKLER PIPING PER <br />NFPA 13, 8.14.16. SHOW LOCATIONS OF FLUSHING CONNECTIONS ON SPRINKLER SHOP <br />DRAWINGS. <br />23. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE <br />WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP <br />SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND <br />SPECIFICATIONS. <br />24. ALL GROOVED AND SCREWED FITTING SHALL BE APPROVED BY AN ENGINEER WHO <br />RESERVES THE RIGHT TO DISAPPROVE ANY FITTING. ALL FITTING TYPES SHALL BE <br />FROM THE SAME MANUFACTURER. <br />25. VISIT THE SITE TO CHECK AND VERIFY ALL EXISTING CONDITIONS PRIOR TO BIDDING <br />TO INSURE THE COORDINATION OF THE FIRE SERVICES WITH EXISTING CONDITIONS. <br />26. CUTTING OF STRUCTURAL AND/OR ARCHITECTURAL MEMBERS TO BE DONE ONLY <br />WITH THE WRITTEN APPROVAL OF THE ARCHITECT AND STRUCTURAL ENGINEER. <br />27. SPRINKLER HEADS ARE TO BE COORDINATED WITH ALL CEILING DEVICES (LIGHTS, <br />DIFFUSERS, ETC.) AND STRUCTURAL SYSTEM. <br />28. INDICATE CENTER TO CENTER DIMENSIONS AND/OR PIPE CUT LENGTHS AND <br />NOMINAL PIPE DIAMETERS OF ALL PIPING ON SHOP DRAWINGS. <br />29. INDICATE PIPE TYPE. SCHEDULE OF WALL THICKNESS AND METHOD OF JOINING ON <br />SHOP DRAWING. <br />30. PROVIDE A PERMANENTLY ATTACHED NAME TAG STATING THE REQUIRED DESIGN <br />CRITERIA FOR EACH HYDRAULICALLY DESIGNED SYSTEM. <br />31. IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOUND <br />BETWEEN THESE PLANS, OTHER ENGINEERING PLANS, THE ARCHITECTURAL PLANS <br />AND/OR FIELD CONDITIONS PRIOR TO FINAL BID PRICE OR FINAL PERMITTING. <br />32. IN CASE OF DISPUTE OR DOUBT AS TO INTENT OF DRAWINGS OR SPECIFICATIONS, <br />OBTAIN ARCHITECT/ENGINEER'S DECISION BEFORE PROCEEDING WITH WORK OR BID <br />INVOLVED. FAILURE TO FOLLOW THIS INSTRUCTION SHALL CONSTITUTE LIABILITY <br />FOR DAMAGE TO OTHER WORK AND FOR REMOVING AND REPAIRING DEFECTIVE OR <br />MISLOCATED WORK IN PROPER MANNER. <br />33. <br />34. ALL SPRINKLER HEADS MOUNTED IN CEILING SHALL BE LOCATED A MINIMUM OF 4' <br />AWAY FROM ANY WALLS, CEILING HEIGHT CHANGES OR ANY OTHER VERTICAL <br />INTERSECTING STRUCTURAL SURFACE. <br />35. PIPE SHALL BE REAMED AND CLEANED BEFORE ASSEMBLY, AND AFTER ASSEMBLY. <br />THE ENTIRE PIPING SYSTEM SHALL BE FLUSHED CLEAN. <br />36. ALL PENETRATIONS OR OPENINGS FROM REMOVED <br />PIPES THROUGH EXISTING BUILDING <br />WALLS AND FLOORS SHALL BE SLEEVED AND/OR <br />PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL <br />DRAWINGS FOR FINAL FINISHES. <br />37. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE <br />TO EXISTING PIPING OR EQUIPMENT DUE TO NEW <br />CONSTRUCTION AND HE SHALL RESTORE EXISTING <br />WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE <br />OWNER. <br />38. PROVIDE HANGERS ON ALL ARMOVERS OF 12' OR MORE IN LENGTH AND PER <br />NFPA 13. <br />39. WARRANTY/GUARANTEE <br />A.THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE STABILITY <br />OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION <br />FOR THE PERIOD OF ONE YEAR. <br />B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING <br />DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY <br />THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE <br />OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE <br />DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE <br />ORIGINAL DEFECT OR REPAIR THERETO. <br />40. PROVIDE HEAD GUARDS ON ALL SPRINKLERS IN MECHANICAL ROOMS, ELECTRICAL <br />ROOMS AND ALL ROOMS WITH EXPOSED CEILINGS. <br />41. SPRINKLER HEADS SHALL BE A MINIMUM OF 12' FROM ANY DIFFUSER PER NFPA 13. <br />42. PROVIDE SPRINKLERS ABOVE AND BELOW DUCTWORK, CONDUIT, PIPING, ETC. 48' IN <br />WIDTH AND LARGER. THIS INCLUDES SYSTEMS LOCATED ADJACENT TO EACH <br />OTHER WHICH THEIR COMBINED WIDTH IS 48' OR LARGER. <br />43. PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL AND PHONE PANELS OR <br />EQUIPMENT. <br />44. THEFIRE <br />JOBOPROGRESSES. CONTRACTOR SHALL <br />CHANGE SHALL BE MADEATOEDFIREP PROTECTION <br />DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED <br />FOR APPROVAL. <br />45. FIRE PROTECTION SERVICES TO BE REMOVED SHALL BE CAPPED. <br />46. CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES <br />2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME <br />CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND <br />WEEKEND OVERTIME WORK, AS NECESSARY. TO COMPLETE THE SCOPE <br />OF THE CONTRACT. <br />47. SSR IS CONTRACTED BY THE HOSPITAL/OWNER TO BE THE ENGINEER OF RECORD <br />FOR THIS PROJECT. CONTRACTOR SHALL PRODUCE SHOP DRAWINGS WHICH MATCH <br />WHERE REQUIRED BY SITE CONDITIONS OR APPLICABLE CODES. <br />48. CONTRACTOR SHALL PATCH WALLS, FLOORS, ROOFING AND CEILINGS TO MATCH <br />EXISTING FINISHES FOR DEMOLITION AND INSTALLATION OF FIRE PROTECTION <br />SYSTEMS. COORDINATE WITH ARCHITECTURAL DRAWINGS. <br />49. CONTRACTOR SHALL PROVIDE ALLOWANCE IN BID FOR AN ADDITIONAL 5 CONCEALED <br />HEADS WITH 10 FOOT 1' ARMOVER, I TEE AND 2 ELBOWS TO EACH HEAD. PROVIDE <br />LINE ITEM COST PER HEAD WITH ASSOCIATED ARMOVER, FITTINGS AND HANGERS. <br />INSTALL HEADS WHERE REQUIRED BY TEMPORARY WALLS, LOCAL AHJ,UNFORSEEN <br />CONDITIONS, ETC. <br />50. ALL EQUIPMENT AND PIPES IN MECHANICAL ROOMS SHALL BE LABELED. PIPE <br />LABELS SHALL INCLUDE DIRECTION OF FLOW. PAINT ALL EXPOSED FIRE MAIN <br />AND SPRINKLER PIPING RED. <br />51. PROVIDE A MINIMUM OF 6 INCHES IN BETWEEN ALL PIPING AND FIRE RATED AND SMOKE <br />TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES SPACE <br />SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER <br />TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />52. ENGINEERING SERVICES TO BE REMOVED SHALL BE CAPPED AND PLUGGED. <br />53. REFER TO DIVISION 15 SPECIFICATIONS FOR MORE INFORMATION. <br />54. CONTRACTOR SHALL PROVIDE 24/7 FIRE WATCH FOR ALL AREAS OF THE HOSPITAL <br />THAT HAVE THE FIRE PROTECTION SYSTEM SHUTDOWN FOR 4 HOURS OR MORE AS <br />REQUIRED PER THE FLORIDA FIRE PREVENTION CODE 2007. COORDINATE <br />REQUIREMENTS WITH OWNER. <br />55. ALL MATERIAL SHALL BE DOMESTIC AND SHALL BE MANUFACTURED WITHIN THE UNITED <br />STATES OF AMERICA. <br />DRAWING INDEX <br />SHEET <br />NUMBER <br />SHEET TITLE <br />FPO.1 <br />FIRE PROTECTION SPECS, LEGENDS, SCHEDULES, AND DRAWING INDEX <br />FP1.1 <br />FIRST FLOOR PLAN - DEMOLITION - FIRE PROTECTION <br />FP2.1 <br />FIRST FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION <br />FP5.1 <br />FIRE PROTECTION TYPICAL DETAILS <br />E. MO <br />r <br />- w <br />p'. T E OF : Lei % <br />P.• # z <br />R %�,,�G```` <br />Smith <br />Seckman <br />Reid, Inc. <br />600 West Hillsboro, Suite 300 <br />Deerfield Beach, FL 33441 <br />(954) 421-1260 <br />FAX: (954) 421-1466 <br />www.ssr-inc.com <br />Firm Certification - EB-0000867 <br />Dennis Davie PE - 58588 <br />John E. Moulder PE- 33200 <br />SSR JOB # 1137001.0 <br />rr' <br />4 <br />O <br />d o <br />� E <br />:s <br />a <br />v <br />d <br />M w <br />o <br />C <br />a ' <br />Cn <br />x <br />Q� L <br />0 <br />N <br />Cz <br />Cz_+ <br />0 Q <br />Cn <br />co Cz <br />C/) _0 <br />0 <br />-0 LL <br />(D <br />I <br />Cn 0) <br />C <br />0 m <br />(D <br />U <br />U) L+_ <br />U to <br />a) 0 <br />Q <br />_U <br />O 70 <br />U � <br />�--� CI) <br />O -Ne <br />1` <br />O <br />a) <br />�- CV <br />LL T- <br />Project No. 11006.00 <br />FP0A <br />02011 BHIPS Architects, Inc. <br />..y�v - T' �(�y 'i t <br />- - - .;a- 1. {i!f, _:- _ E• ::.. �.•' 9.i., •�,t +,rq I as •%e3 _L..y 4r - I •3�y <br />�i�ri:'_ : ; .. ._ .,, .•�Ic�! � :...,. t��!.:�.. r,b'��l:�t�; t�. �.� _��.,..�.. 1� _ n. � ,.. � � � :• i �.'. :.:�. P:1. �� i�..�, <br />