Laserfiche WebLink
PLUMBING SPECIFICATIONS <br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL ALL <br />WORK SHALL BE IN ACCORDANCE WITH THE 2014 FLORIDA BUILDING CODES, WITH AMENDMENTS, AND LOCAL CODES AND ORDINANCES. <br />INSTALLATION SHALL COMPLY WITH THE STANDARDS SET BY NFPA, ASHRAE, ASPE, SMACK NEC AND UL THE SYSTEMS, EQUIPMENT, DEVICES <br />AND ACCESSORIES SHALL BE INSTALLED, FINISHED, TESTED AND ADJUSTED FOR CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL COORDINATE WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR <br />WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED, BUT ITS EXTREME ACCURACY IS NOT <br />GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF VARIOUS <br />COMPONENTS, EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR <br />SHOULD DISCREPANCIES APPEAR AMOUNG THE CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE MANUFACTURER'S <br />RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST INTERPRETATION BEFORE PROCEDING WITH WORK. CONTRACTOR SHALL FURNISH AND <br />INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE INSTALLATION WHETHER OR NOT SPECIFIED <br />IN THE DOCUMENTS. <br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING <br />DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. <br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED. <br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR <br />MAINTENANCE SHALL BE LOCATED TO ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF REQUIRED. CONTRACTOR <br />SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO ALLOW ACCESS, EVEN IF NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO <br />OWNER. <br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND <br />LOADS AS DETAILED IN THE BUILDING CODE. <br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS <br />SHALL BE SEALED AIRTIGHT WITH MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED. <br />EQUIPMENT TAGS: ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED TAG CORRESPONDING TO THE EQUIPMENT TAG ON THE ENGINEER'S <br />DRAWINGS. <br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS <br />OR FLOORS. THE RATING OF THE FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE <br />COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM E-84, NFPA-225, UL-723 NOT EXCEEDING: <br />FLAME SPREAD 25 SMOKE DEVELOPED 50 FUEL DISTRIBUTED 50 <br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE. <br />SERVICE AND PERMITS: CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITY COMPANIES FOR SERVICE AND CONNECTIONS AND SHALL <br />PAY FOR PERMITS. <br />SHOP DRAWINGS: EACH TRADE SHALL PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH PROCEDURES OUTLINED IN DIVISION 1. <br />RESPONSIBILITY FOR ERRORS OR OMISSIONS IN THE SUBMITTALS SHALL NOT BE RELIEVED BY THE ARCHITECT'S OR ENGINEER'S REVIEW. <br />ENGINEER'S PROCESSING WILL NOT CONSTITUTE A COMPLETE CHECK BUT WILL INDICATE ONLY THAT A GENERAL METHOD OF CONSTRUCTION <br />AND DETAILING IS SATISFACTORY. AT A MINIMUM SUBMITTALS SHALL INCLUDE FIXTURES, VALVES, PIPING, INSULATION AND ACCESSORIES. <br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES. <br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE <br />PARTS LIST FOR EACH PIECE OF EQUIPMENT. <br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND <br />MATERIALS, IN ORDER TO PROVIDE A "VIBRATION -FREE" RIGID INSTALLATION. <br />DIELECTRIC UNIONS: PROVIDE DIELECTRIC UNIONS OR FLANGES AT CONNECTIONS OR CONTACT BETWEEN PIPES OF DISSIMILAR METALS. <br />WATER PIPING: WATER PIPING SHALL BE CPVC TUBING. TUBING, FITTINGS AND CEMENT SHALL MEET ASTM D-2846, 100 PSI 0 180'F <br />CONTINUOUS RATING. CPVC TUBING AND FITTINGS SHALL MEET 25/50 FLAME SPREAD/SMOKE DEVELOPED REQUIREMENTS FOR PLENUMS. <br />CONTRACTOR SHALL INSTALL CPVC IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL PROVIDE FOR EXPANSION AND <br />CONTRACTION OF TUBING. TUBING SHALL BE SLEEVED AT PENETRATION OF CONCRETE SLABS OR WALLS. CPVC TUBING SHALL BE <br />BFGOODRICH FLOWGUARD GOLD OR APPROVED EQUAL INSTALL PIPE SUPPORTS AT 3-FOOT INTERVALS FOR SIZES 1" OR SMALLER; INSTALL <br />PIPE SUPPORTS AT 4-FOOT INTERVALS FOR 1-1/4- AND LARGER. <br />WATER HAMMER ARRESTORS: INSTALL WATER HAMMER ARRESTERS AT EACH HOT AND COLD FIXTURE SUPPLY. <br />EXPOSED PIPING: EXPOSED PIPING SHALL BE POLISHED CHROMIUM ON EITHER BRASS OR BRONZE. PROVIDE ADA INSULATED WATER AND <br />WASTE LINE COVERINGS FOR WALL HUNG SINKS AND LAVATORIES. <br />VALVES: ALL VALVES SHALL HAVE A MINIMUM OF 125 PSIG WORKING PRESSURE. VALVES AND COCKS MAY NOT BE INDICATED IN EVERY <br />INSTANCE ON THE DRAWINGS, BUT WHETHER OR NOT SHOWN, ALL VALVES, COCKS AND CHECK VALVES NECESSARY FOR THE PROPER <br />OPERATION OF THE SYSTEM SHALL BE FURNISHED AND INSTALLED. INSTALL ISOLATION/SHUT-OFF VALVES AT ALL MAIN RISERS, AND MAIN <br />BRANCH TAKEOFFS. INSTALL ISOLATION/SHUT-OFF VALVES ON EACH INLET AND OUTLET OF EACH PIECE OF EQUIPMENT. PROVIDE A FLANGE <br />OR UNION BETWEEN THE VALVE AND THE EQUIPMENT TO PERMIT DISCONNECTION, REMOVAL AND SERVICE. <br />STERILIZATION OF DOMESTIC WATER SYSTEM: THE ENTIRE DOMESTIC WATER DISTRIBUTION SYSTEM SHALL BE THOROUGHLY STERILIZED AS <br />REQUIRED BY THE HEALTH AUTHORITY OR WATER PURVEYOR HAVING JURISDICTION, OR IN THE ABSENCE OF A PRESCRIBED METHOD, THE <br />PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652, OR AS DESCRIBED IN SECTION 610 FBC-P. <br />VENTING THE STACKS SHALL BE EXTENDED THROUGH ROOF OF BUILDING TO POINTS NOT LESS THAN 12" ABOVE ROOF. VENTS SHALL BE <br />OFFSET AS REQUIRED TO PENETRATE ROOFS AT LEAST 3 FEET FROM THE RIDGE OR EDGE OF BUILDING AND 10 FEET FROM ANY FRESH AIR <br />INTAKE OR OPERABLE WINDOW OR DOOR. <br />SANITARY, WASTE. AND VENT PIPING: ALL BURIED AND UNBURIED PIPING AND FITTINGS SHALL BE SCHEDULE 40 PVC-DWV. (SOLID CORE) <br />SLOPE OF SANITARY OR DRAINAGE PIPING 2-1/2" AND SMALLER SHALL BE A MINIMUM OF 1/4" PER FOOT; PIPING 3" AND LARGER SHALL BE <br />SLOPED A MINIMUM OF 1 /8" PER FOOT. CLEANOUTS WILL BE LOCATED NOT MORE THAN 100 FEET APART AND AT EACH CHANGE OF <br />DIRECTION GREATER THAN 45' ALONG THE HORIZONTAL DRAIN. CLEANOUTS SHALL BE INSTALLED AT BASE OF EACH STACK. CONCEALED <br />CLEANOUTS SHALL HAVE CAST BRASS CHROMIUM PLATED FLAT ACCESS COVER PLATE. <br />DOMESTIC WATER HEATERS (ELECTRIC) WATER HEATER SHALL BE CERTIFIED BY THE NATIONAL SANITATION FOUNDATION. UNITS SHALL BE <br />EQUIPPED WITH CODE -APPROVED TEMPERATURE AND PRESSURE RELIEF VALVES. TANKS SHALL BE GLASS -LINED AND SHALL HAVE <br />MANUFACTURER'S STANDARD FIVE-YEAR WARRANTY. <br />PLUMBING FIXTURES AND TRIM: PLUMBING FIXTURES SHALL BE FURNISHED AND INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH <br />PROPER CONNECTIONS TO SUPPLY AND DRAINAGE PIPING. ALL FIXTURES SHALL BE FREE OF FLAWS AND DEFECTS OF ANY SORT IN MATERIAL <br />AND WORKMANSHIP AND SHALL OPERATE PERFECTLY WHEN INSTALLED IN ACCORDANCE WITH MANUFACTURER'S DIRECTIONS. CONTRACTOR <br />SHALL PROVIDE ROUGH -IN, AND SHALL CONNECT ALL FIXTURES TO THE PLUMBING SYSTEMS. ALL FIXTURES TO BE PROVIDED WITH <br />CHROME -PLATED SUPPLIES AND STOPS. PROVIDE 17 GAUGE CHROME -PLATED BRASS TRAPS FOR ALL FIXTURES WITHOUT INTEGRAL TRAPS. <br />PROVIDE CONCEALED ARM CARRIERS AND SUPPORTS FOR ALL FIXTURES REQUIRING SAME. <br />PIPE INSULATION: INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN ACCORDANCE WITH <br />RECOGNIZED INDUSTRY PRACTICES. SEAL ALL JOINTS, BREAKS, TEARS AND PENETRATIONS WITH FIRE RETARDENT, VAPOR BARRIER MASTIC. <br />COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEMS. INSULATE ALL DOMESTIC HOT WATER WITH 1" THICK FIBERGLASS <br />SECTIONAL PIPE COVERING WITH CANVAS JACKET OR ARMAFLEX AP. <br />TESTING: <br />TEST ALL WASTE AND VENT PIPING FOR A PERIOD OF NOT LESS THAN 8 HOURS BY CAPPING OR PLUGGING. ALL JOINTS TO A LEVEL OF THE <br />HIGHEST FIXTURE OR FITTINGS. FILLING THE SYSTEM WITH WATER, AND OBSERVING FOR LEAKS. TEST WATER PIPING AT 100 PSIG FOR A <br />PERIOD OF 8 HOURS, OBSERVING FOR ANY VISIBLE LEAKS. TEST PIPING AGAIN WITH FIXTURES INSTALLED. REPAIR ANY LEAKS FOUND BY <br />REMAKING JOINT. DO NOT USE CAULKING OR SIMILAR METHODS TO CORRECT LEAKS. UPON REPAIRING ANY LEAKS FOUND. AGAIN TEST THAT <br />PORTION OF THE SYSTEM AS DESCRIBED ABOVE. <br />EQUIPMENT FURNISHED BY OTHERS: WHERE SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL MAKE ALL PIPING CONNECTIONS TO <br />EQUIPMENT FURNISHED BY OTHERS. THIS WORK SHALL INCLUDE FURNISHING AND INSTALLATION OF ALL WATER AND DRAIN PIPING. ALL WORK <br />SHALL BE PERFORMED IN ACCORDANCE WITH RECOMMENDATIONS OF EQUIPMENT MANUFACTURER. <br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS <br />RECEIVED THE FINAL PAYMENT AND CERTIFICATION OF COMPLETION. ALL EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND <br />LABOR, FOR ONE YEAR FROM THE DATE OF THE CERTIFICATE OF COMPLETION. REPAIRS MADE DURING THIS PEROID MUST BE FULLY <br />GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN ADDITION, THE CONTRACTOR SHALL ASSUME FULL <br />RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER <br />INSTALLATION OF EQUIPMENT OR MATERIAL INSTALLED. <br />SUBSTITUTIONS: CONTRACTOR SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS <br />THAT REQUIRE CHANGES TO THE OTHER BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS, <br />ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL RE -DESIGN COSTS AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL <br />NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF ACCEPTABILITY OF SUBSTITUTION. ENGINEER RESERVES THE <br />RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL PROVIDE SPECIFIED OR <br />EQUIVALENT MATERIALS/EQUIPMENT AT NO ADDITIONAL COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED. <br />PROPOSED <br />SCALE: 1 /4" = 1'-0" <br />TARY <br />NECT NEW WC-1 <br />;E)4"STUB-UP <br />NECT NEW LAV-1 TO <br />-1 /4 BRANCH & EXISTING <br />,TACK (NOTE THAT <br />TING STACK IS OUTSIDE <br />TENANT DEMISING WALL <br />PLUMBING PLAN <br />PLUMBING LEGEND <br />DESCRIPTION <br />ABBREV. <br />SYMBOL <br />SANITARY PIPING <br />SAN <br />VENT PIPING <br />V <br />----- --------------- <br />DOMESTIC COLD WATER <br />CW <br />------- <br />DOMESTIC HOT WATER <br />HW <br />---------- <br />BALL/ISOLATION VALVE <br />BV <br />---D�Ja--- <br />GRADE CLEAN OUT <br />COTG <br />COTG� <br />FLOOR CLEAN OUT <br />FCO <br />FCO <br />PIPE TURNING UP <br />PIPE TURNING DOWN <br />C. <br />CAPPED PIPING <br />TYPICAL ITEM <br />TYP <br />CONNECTION BETWEEN <br />NEW & EXISTING <br />(E) <br />(E) <br />EXISTING <br />NOTE ON EXISTING UTLITIES: <br />CONTRACTOR SHALL FIELD VERIFY LOCATIONS & INVERTS OF <br />ALL EXISTING UTILITY MAINS INSIDE BUILDING (I.E. SEWER, <br />DOMESTIC WATER, ETC.) PRIOR TO ANY DEMOLITION OR <br />CONSTRUCTION. ADVISE ENGINEER OF ANY DISCREPANCIES <br />BEFORE PROCEEDING ANY FURTHER. <br />** USE OF CCTV CAMERA INTO EXISTING SANITARY REQUIRED <br />TO VERIFY PIPE ROUTING AND INVERT UNDER SLAB PRIOR TO <br />ANY SLAB CUTTING OR DEMOLITION/INSTALLATION. <br />NOTE TO CONTRACTOR <br />ON EXISTING CONDITIONS: <br />1, CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND <br />SURVEY ALL EXISTING CONDITIONS AND EQUIPMENT PRIOR <br />TO SUBMITTING BID FOR WORK REQUIRED BY THESE <br />DOCUMENTS. THIS INCLUDES ABOVE THE CEILING AND ON <br />TOP OF THE ROOF. <br />2. CONTRACTOR SHALL REFER TO AND READ THROUGH ALL <br />OF THE "CONTRACTOR'S SCOPE OF WORK" AS DEFINED IN <br />THE BID SPECIFICATIONS AND DOCUMENTS AS PART OF <br />THE BID PROCESS. <br />�.\� a �■ � � ► � �.\ � ��ja <br />JJCAf [26254 <br />STRUCTURAL DESIGN BY: <br />FERLITA ENGINEERING <br />CIVIL ENGINEERING <br />4221 N. Florida Av. <br />TAMPA, FLORIDA 33603 <br />PHONE (813) 234-5004 <br />_3E� C/) <br />N <br />a o V Z m <br />DD <br />mmro Z <br />uNp can <br />0 I <br />c m <br />m <br />w I) N <br />0 <br />r� <br />LLJ <br />N <br />C CD CD <br />z (n O <br />00 <br />LLJ o � <br />3: <br />� N <br />O <br />Uj <br />Q _J <br />J — � <br />0 Q= � <br />(D W O <br />O <br />C� N 0 <br />ENGINEERS SEAL <br />`,,' ,''�� <br />W % �I <br />.��E <br />���� �� • � C•E•N S ;c���i <br />No 56189 <br />,STATE OF •:IJJ <br />44/ <br />It 100% <br />SHEET <br />PLUMBING <br />FLOOR PLAN & <br />SPECIFICATIONS <br />DRAWING SETS <br />SHEET NUMBER <br />p I <br />ENGINEERING <br />Designer. <br />MATTHEW LEWIS, PE <br />Drown By. <br />�ofu <br />Q. <br />N <br />N <br />c <br />to <br />