PLUMBING SPECIFICATIONS
<br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL ALL
<br />WORK SHALL BE IN ACCORDANCE WITH THE 2014 FLORIDA BUILDING CODES, WITH AMENDMENTS, AND LOCAL CODES AND ORDINANCES.
<br />INSTALLATION SHALL COMPLY WITH THE STANDARDS SET BY NFPA, ASHRAE, ASPE, SMACK NEC AND UL THE SYSTEMS, EQUIPMENT, DEVICES
<br />AND ACCESSORIES SHALL BE INSTALLED, FINISHED, TESTED AND ADJUSTED FOR CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL COORDINATE WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR
<br />WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED, BUT ITS EXTREME ACCURACY IS NOT
<br />GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF VARIOUS
<br />COMPONENTS, EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR
<br />SHOULD DISCREPANCIES APPEAR AMOUNG THE CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE MANUFACTURER'S
<br />RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST INTERPRETATION BEFORE PROCEDING WITH WORK. CONTRACTOR SHALL FURNISH AND
<br />INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE INSTALLATION WHETHER OR NOT SPECIFIED
<br />IN THE DOCUMENTS.
<br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING
<br />DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
<br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED.
<br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR
<br />MAINTENANCE SHALL BE LOCATED TO ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF REQUIRED. CONTRACTOR
<br />SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO ALLOW ACCESS, EVEN IF NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO
<br />OWNER.
<br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND
<br />LOADS AS DETAILED IN THE BUILDING CODE.
<br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS
<br />SHALL BE SEALED AIRTIGHT WITH MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED.
<br />EQUIPMENT TAGS: ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED TAG CORRESPONDING TO THE EQUIPMENT TAG ON THE ENGINEER'S
<br />DRAWINGS.
<br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS
<br />OR FLOORS. THE RATING OF THE FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE
<br />COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM E-84, NFPA-225, UL-723 NOT EXCEEDING:
<br />FLAME SPREAD 25 SMOKE DEVELOPED 50 FUEL DISTRIBUTED 50
<br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE.
<br />SERVICE AND PERMITS: CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITY COMPANIES FOR SERVICE AND CONNECTIONS AND SHALL
<br />PAY FOR PERMITS.
<br />SHOP DRAWINGS: EACH TRADE SHALL PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH PROCEDURES OUTLINED IN DIVISION 1.
<br />RESPONSIBILITY FOR ERRORS OR OMISSIONS IN THE SUBMITTALS SHALL NOT BE RELIEVED BY THE ARCHITECT'S OR ENGINEER'S REVIEW.
<br />ENGINEER'S PROCESSING WILL NOT CONSTITUTE A COMPLETE CHECK BUT WILL INDICATE ONLY THAT A GENERAL METHOD OF CONSTRUCTION
<br />AND DETAILING IS SATISFACTORY. AT A MINIMUM SUBMITTALS SHALL INCLUDE FIXTURES, VALVES, PIPING, INSULATION AND ACCESSORIES.
<br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES.
<br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE
<br />PARTS LIST FOR EACH PIECE OF EQUIPMENT.
<br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND
<br />MATERIALS, IN ORDER TO PROVIDE A "VIBRATION -FREE" RIGID INSTALLATION.
<br />DIELECTRIC UNIONS: PROVIDE DIELECTRIC UNIONS OR FLANGES AT CONNECTIONS OR CONTACT BETWEEN PIPES OF DISSIMILAR METALS.
<br />WATER PIPING: WATER PIPING SHALL BE CPVC TUBING. TUBING, FITTINGS AND CEMENT SHALL MEET ASTM D-2846, 100 PSI 0 180'F
<br />CONTINUOUS RATING. CPVC TUBING AND FITTINGS SHALL MEET 25/50 FLAME SPREAD/SMOKE DEVELOPED REQUIREMENTS FOR PLENUMS.
<br />CONTRACTOR SHALL INSTALL CPVC IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL PROVIDE FOR EXPANSION AND
<br />CONTRACTION OF TUBING. TUBING SHALL BE SLEEVED AT PENETRATION OF CONCRETE SLABS OR WALLS. CPVC TUBING SHALL BE
<br />BFGOODRICH FLOWGUARD GOLD OR APPROVED EQUAL INSTALL PIPE SUPPORTS AT 3-FOOT INTERVALS FOR SIZES 1" OR SMALLER; INSTALL
<br />PIPE SUPPORTS AT 4-FOOT INTERVALS FOR 1-1/4- AND LARGER.
<br />WATER HAMMER ARRESTORS: INSTALL WATER HAMMER ARRESTERS AT EACH HOT AND COLD FIXTURE SUPPLY.
<br />EXPOSED PIPING: EXPOSED PIPING SHALL BE POLISHED CHROMIUM ON EITHER BRASS OR BRONZE. PROVIDE ADA INSULATED WATER AND
<br />WASTE LINE COVERINGS FOR WALL HUNG SINKS AND LAVATORIES.
<br />VALVES: ALL VALVES SHALL HAVE A MINIMUM OF 125 PSIG WORKING PRESSURE. VALVES AND COCKS MAY NOT BE INDICATED IN EVERY
<br />INSTANCE ON THE DRAWINGS, BUT WHETHER OR NOT SHOWN, ALL VALVES, COCKS AND CHECK VALVES NECESSARY FOR THE PROPER
<br />OPERATION OF THE SYSTEM SHALL BE FURNISHED AND INSTALLED. INSTALL ISOLATION/SHUT-OFF VALVES AT ALL MAIN RISERS, AND MAIN
<br />BRANCH TAKEOFFS. INSTALL ISOLATION/SHUT-OFF VALVES ON EACH INLET AND OUTLET OF EACH PIECE OF EQUIPMENT. PROVIDE A FLANGE
<br />OR UNION BETWEEN THE VALVE AND THE EQUIPMENT TO PERMIT DISCONNECTION, REMOVAL AND SERVICE.
<br />STERILIZATION OF DOMESTIC WATER SYSTEM: THE ENTIRE DOMESTIC WATER DISTRIBUTION SYSTEM SHALL BE THOROUGHLY STERILIZED AS
<br />REQUIRED BY THE HEALTH AUTHORITY OR WATER PURVEYOR HAVING JURISDICTION, OR IN THE ABSENCE OF A PRESCRIBED METHOD, THE
<br />PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652, OR AS DESCRIBED IN SECTION 610 FBC-P.
<br />VENTING THE STACKS SHALL BE EXTENDED THROUGH ROOF OF BUILDING TO POINTS NOT LESS THAN 12" ABOVE ROOF. VENTS SHALL BE
<br />OFFSET AS REQUIRED TO PENETRATE ROOFS AT LEAST 3 FEET FROM THE RIDGE OR EDGE OF BUILDING AND 10 FEET FROM ANY FRESH AIR
<br />INTAKE OR OPERABLE WINDOW OR DOOR.
<br />SANITARY, WASTE. AND VENT PIPING: ALL BURIED AND UNBURIED PIPING AND FITTINGS SHALL BE SCHEDULE 40 PVC-DWV. (SOLID CORE)
<br />SLOPE OF SANITARY OR DRAINAGE PIPING 2-1/2" AND SMALLER SHALL BE A MINIMUM OF 1/4" PER FOOT; PIPING 3" AND LARGER SHALL BE
<br />SLOPED A MINIMUM OF 1 /8" PER FOOT. CLEANOUTS WILL BE LOCATED NOT MORE THAN 100 FEET APART AND AT EACH CHANGE OF
<br />DIRECTION GREATER THAN 45' ALONG THE HORIZONTAL DRAIN. CLEANOUTS SHALL BE INSTALLED AT BASE OF EACH STACK. CONCEALED
<br />CLEANOUTS SHALL HAVE CAST BRASS CHROMIUM PLATED FLAT ACCESS COVER PLATE.
<br />DOMESTIC WATER HEATERS (ELECTRIC) WATER HEATER SHALL BE CERTIFIED BY THE NATIONAL SANITATION FOUNDATION. UNITS SHALL BE
<br />EQUIPPED WITH CODE -APPROVED TEMPERATURE AND PRESSURE RELIEF VALVES. TANKS SHALL BE GLASS -LINED AND SHALL HAVE
<br />MANUFACTURER'S STANDARD FIVE-YEAR WARRANTY.
<br />PLUMBING FIXTURES AND TRIM: PLUMBING FIXTURES SHALL BE FURNISHED AND INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH
<br />PROPER CONNECTIONS TO SUPPLY AND DRAINAGE PIPING. ALL FIXTURES SHALL BE FREE OF FLAWS AND DEFECTS OF ANY SORT IN MATERIAL
<br />AND WORKMANSHIP AND SHALL OPERATE PERFECTLY WHEN INSTALLED IN ACCORDANCE WITH MANUFACTURER'S DIRECTIONS. CONTRACTOR
<br />SHALL PROVIDE ROUGH -IN, AND SHALL CONNECT ALL FIXTURES TO THE PLUMBING SYSTEMS. ALL FIXTURES TO BE PROVIDED WITH
<br />CHROME -PLATED SUPPLIES AND STOPS. PROVIDE 17 GAUGE CHROME -PLATED BRASS TRAPS FOR ALL FIXTURES WITHOUT INTEGRAL TRAPS.
<br />PROVIDE CONCEALED ARM CARRIERS AND SUPPORTS FOR ALL FIXTURES REQUIRING SAME.
<br />PIPE INSULATION: INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN ACCORDANCE WITH
<br />RECOGNIZED INDUSTRY PRACTICES. SEAL ALL JOINTS, BREAKS, TEARS AND PENETRATIONS WITH FIRE RETARDENT, VAPOR BARRIER MASTIC.
<br />COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEMS. INSULATE ALL DOMESTIC HOT WATER WITH 1" THICK FIBERGLASS
<br />SECTIONAL PIPE COVERING WITH CANVAS JACKET OR ARMAFLEX AP.
<br />TESTING:
<br />TEST ALL WASTE AND VENT PIPING FOR A PERIOD OF NOT LESS THAN 8 HOURS BY CAPPING OR PLUGGING. ALL JOINTS TO A LEVEL OF THE
<br />HIGHEST FIXTURE OR FITTINGS. FILLING THE SYSTEM WITH WATER, AND OBSERVING FOR LEAKS. TEST WATER PIPING AT 100 PSIG FOR A
<br />PERIOD OF 8 HOURS, OBSERVING FOR ANY VISIBLE LEAKS. TEST PIPING AGAIN WITH FIXTURES INSTALLED. REPAIR ANY LEAKS FOUND BY
<br />REMAKING JOINT. DO NOT USE CAULKING OR SIMILAR METHODS TO CORRECT LEAKS. UPON REPAIRING ANY LEAKS FOUND. AGAIN TEST THAT
<br />PORTION OF THE SYSTEM AS DESCRIBED ABOVE.
<br />EQUIPMENT FURNISHED BY OTHERS: WHERE SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL MAKE ALL PIPING CONNECTIONS TO
<br />EQUIPMENT FURNISHED BY OTHERS. THIS WORK SHALL INCLUDE FURNISHING AND INSTALLATION OF ALL WATER AND DRAIN PIPING. ALL WORK
<br />SHALL BE PERFORMED IN ACCORDANCE WITH RECOMMENDATIONS OF EQUIPMENT MANUFACTURER.
<br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS
<br />RECEIVED THE FINAL PAYMENT AND CERTIFICATION OF COMPLETION. ALL EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND
<br />LABOR, FOR ONE YEAR FROM THE DATE OF THE CERTIFICATE OF COMPLETION. REPAIRS MADE DURING THIS PEROID MUST BE FULLY
<br />GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN ADDITION, THE CONTRACTOR SHALL ASSUME FULL
<br />RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER
<br />INSTALLATION OF EQUIPMENT OR MATERIAL INSTALLED.
<br />SUBSTITUTIONS: CONTRACTOR SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS
<br />THAT REQUIRE CHANGES TO THE OTHER BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS,
<br />ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL RE -DESIGN COSTS AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL
<br />NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF ACCEPTABILITY OF SUBSTITUTION. ENGINEER RESERVES THE
<br />RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL PROVIDE SPECIFIED OR
<br />EQUIVALENT MATERIALS/EQUIPMENT AT NO ADDITIONAL COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED.
<br />PROPOSED
<br />SCALE: 1 /4" = 1'-0"
<br />TARY
<br />NECT NEW WC-1
<br />;E)4"STUB-UP
<br />NECT NEW LAV-1 TO
<br />-1 /4 BRANCH & EXISTING
<br />,TACK (NOTE THAT
<br />TING STACK IS OUTSIDE
<br />TENANT DEMISING WALL
<br />PLUMBING PLAN
<br />PLUMBING LEGEND
<br />DESCRIPTION
<br />ABBREV.
<br />SYMBOL
<br />SANITARY PIPING
<br />SAN
<br />VENT PIPING
<br />V
<br />----- ---------------
<br />DOMESTIC COLD WATER
<br />CW
<br />-------
<br />DOMESTIC HOT WATER
<br />HW
<br />----------
<br />BALL/ISOLATION VALVE
<br />BV
<br />---D�Ja---
<br />GRADE CLEAN OUT
<br />COTG
<br />COTG�
<br />FLOOR CLEAN OUT
<br />FCO
<br />FCO
<br />PIPE TURNING UP
<br />PIPE TURNING DOWN
<br />C.
<br />CAPPED PIPING
<br />TYPICAL ITEM
<br />TYP
<br />CONNECTION BETWEEN
<br />NEW & EXISTING
<br />(E)
<br />(E)
<br />EXISTING
<br />NOTE ON EXISTING UTLITIES:
<br />CONTRACTOR SHALL FIELD VERIFY LOCATIONS & INVERTS OF
<br />ALL EXISTING UTILITY MAINS INSIDE BUILDING (I.E. SEWER,
<br />DOMESTIC WATER, ETC.) PRIOR TO ANY DEMOLITION OR
<br />CONSTRUCTION. ADVISE ENGINEER OF ANY DISCREPANCIES
<br />BEFORE PROCEEDING ANY FURTHER.
<br />** USE OF CCTV CAMERA INTO EXISTING SANITARY REQUIRED
<br />TO VERIFY PIPE ROUTING AND INVERT UNDER SLAB PRIOR TO
<br />ANY SLAB CUTTING OR DEMOLITION/INSTALLATION.
<br />NOTE TO CONTRACTOR
<br />ON EXISTING CONDITIONS:
<br />1, CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND
<br />SURVEY ALL EXISTING CONDITIONS AND EQUIPMENT PRIOR
<br />TO SUBMITTING BID FOR WORK REQUIRED BY THESE
<br />DOCUMENTS. THIS INCLUDES ABOVE THE CEILING AND ON
<br />TOP OF THE ROOF.
<br />2. CONTRACTOR SHALL REFER TO AND READ THROUGH ALL
<br />OF THE "CONTRACTOR'S SCOPE OF WORK" AS DEFINED IN
<br />THE BID SPECIFICATIONS AND DOCUMENTS AS PART OF
<br />THE BID PROCESS.
<br />�.\� a �■ � � ► � �.\ � ��ja
<br />JJCAf [26254
<br />STRUCTURAL DESIGN BY:
<br />FERLITA ENGINEERING
<br />CIVIL ENGINEERING
<br />4221 N. Florida Av.
<br />TAMPA, FLORIDA 33603
<br />PHONE (813) 234-5004
<br />_3E� C/)
<br />N
<br />a o V Z m
<br />DD
<br />mmro Z
<br />uNp can
<br />0 I
<br />c m
<br />m
<br />w I) N
<br />0
<br />r�
<br />LLJ
<br />N
<br />C CD CD
<br />z (n O
<br />00
<br />LLJ o �
<br />3:
<br />� N
<br />O
<br />Uj
<br />Q _J
<br />J — �
<br />0 Q= �
<br />(D W O
<br />O
<br />C� N 0
<br />ENGINEERS SEAL
<br />`,,' ,''��
<br />W % �I
<br />.��E
<br />���� �� • � C•E•N S ;c���i
<br />No 56189
<br />,STATE OF •:IJJ
<br />44/
<br />It 100%
<br />SHEET
<br />PLUMBING
<br />FLOOR PLAN &
<br />SPECIFICATIONS
<br />DRAWING SETS
<br />SHEET NUMBER
<br />p I
<br />ENGINEERING
<br />Designer.
<br />MATTHEW LEWIS, PE
<br />Drown By.
<br />�ofu
<br />Q.
<br />N
<br />N
<br />c
<br />to
<br />
|