<br />PLUMBING SPECIFICATIONS
<br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A
<br />PROPOSAL. ALL WORK SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING CODES SIXTH EDITION (2017), WITH
<br />AMENDMENTS, AND LOCAL CODES AND ORDINANCES. INSTALLATION SHALL COMPLY WITH THE CODE REFERENCED STANDARDS SET
<br />BY NFPA, ASHRAE, ASPE, SMACNA, NEC AND UL. THE SYSTEMS, EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE INSTALLED,
<br />FINISHED, TESTED AND ADJUSTED FOR CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />HIS WORK FITTING IN PLACE AND SHALL COORDINATE WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR WORK. THE
<br />INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED, BUT ITS EXTREME ACCURACY IS NOT
<br />GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF
<br />VARIOUS COMPONENTS, EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE
<br />FIRST CLASS WORK, OR SHOULD DISCREPANCIES APPEAR AMOUNG THE CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT
<br />DOCUMENTS AND THE MANUFACTURER'S RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST INTERPRETATION BEFORE
<br />PROCEDING WITH WORK. CONTRACTOR SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY
<br />NECESSARY TO COMPLETE THE INSTALLATION WHETHER OR NOT SPECIFIED IN THE DOCUMENTS.
<br />FIXTURE & CONNECTION SCHEDULE
<br />BRANCH SIZE
<br />FIXTURE
<br />TAG
<br />MANUFACTURER/MODEL
<br />REMARKS
<br />DRAINAGE
<br />WATER
<br />WASTE
<br />VENT
<br />COLD
<br />HOT
<br />SINK
<br />S-1
<br />3"
<br />2"
<br />1 /2"
<br />1 /2"
<br />ELKAY # LUSTERTONE LRAD1720
<br />SINK - 14"x14" STAINLESS STEEL BOWL, SINGLE COMPARTMENT SINK,
<br />5-1/2" DEEP, SELF RIM, 3 FAUCET HOLES. FAUCET ZURN NO. Z812C1-XL,
<br />2-1 /2"LEVER HANDLES, GRID STRAINER, AERATOR. PROVIDE STOPS,
<br />SUPPLIES, TRAP, ETC., TO MAKE A COMPLETE INSTALLATION.
<br />WALL CLEANOUT
<br />WCO
<br />SEE
<br />--
<br />--
<br />--
<br />ZURN # Z1468
<br />WALL CLEANOUT - ROUND STAINLESS STEEL WALL ACCESS COVER
<br />PLAN
<br />WITH SECURING SCREW AND BRONZE RAISED HEX HEAD PLUG.
<br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING 3��I
<br />(INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
<br />OWNER.
<br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED.
<br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, CONNECT TO (E)3"SAN
<br />ADJUSTING OR MAINTENANCE SHALL BE LOCATED TO ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF
<br />REQUIRED. CONTRACTOR SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO ALLOW ACCESS, EVEN IF NOT INDICATED ON THE & (E)2 VENT AT CONNECT TO
<br />DRAWINGS AT NO ADDITIONAL COST TO OWNER. / EXISTING LAV ,,��I (E)CW/HW AT
<br />/ 1�2 WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO / EXISTING LAV
<br />RESIST WIND LOADS AS DETAILED IN THE BUILDING CODE. /
<br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS,
<br />CEILINGS OR WALLS SHALL BE SEALED AIRTIGHT WITH MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, C
<br />CEILING OR FLOOR PENETRATED. 2� /
<br />EQUIPMENT TAGS: ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED TAG CORRESPONDING TO THE EQUIPMENT TAG ON THE Zy
<br />ENGINEER'S DRAWINGS.
<br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED
<br />WALLS, CEILINGS OR FLOORS. THE RATING OF THE FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL I
<br />INSULATION SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM E-84, NFPA-225,
<br />UL-723 NOT EXCEEDING: TOTAL DRAINAGE FIXTURE
<br />FLAME SPREAD 25 UNITS PER FBC-P TABLE
<br />SMOKE DEVELOPED 50 WG0 709.1 = 2.0 DFU INCREASE
<br />FUEL DISTRIBUTED 50 i
<br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE.
<br />SERVICE AND PERMITS: CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITY COMPANIES FOR SERVICE AND CONNECTIONS SANITARY ISOMETRIC RISER
<br />AND SHALL PAY FOR PERMITS.
<br />NOT TO SCALE
<br />SHOP DRAWINGS: EACH TRADE SHALL PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH PROCEDURES OUTLINED IN
<br />DIVISION 1. RESPONSIBILITY FOR ERRORS OR OMISSIONS IN THE SUBMITTALS SHALL NOT BE RELIEVED BY THE ARCHITECT'S OR - - -
<br />- - - -
<br />ENGINEER'S REVIEW. ENGINEER'S PROCESSING WILL NOT CONSTITUTE A COMPLETE CHECK BUT WILL INDICATE ONLY THAT A -
<br />--- --
<br />GENERAL METHOD OF CONSTRUCTION AND DETAILING IS SATISFACTORY. AT A MINIMUM SUBMITTALS SHALL INCLUDE FIXTURES, ;
<br />VALVES, PIPING, INSULATION AND ACCESSORIES. 4'
<br />.`
<br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES. j
<br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS
<br />UTILITY
<br />1os
<br />AND SPARE PARTS LIST FOR EACH PIECE OF EQUIPMENT.
<br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL
<br />EQUIPMENT AND MATERIALS, IN ORDER TO PROVIDE A "VIBRATION -FREE" RIGID INSTALLATION. j
<br />DIELECTRIC UNIONS: PROVIDE DIELECTRIC UNIONS OR FLANGES AT CONNECTIONS OR CONTACT BETWEEN PIPES OF DISSIMILAR
<br />METALS.
<br />^
<br />WATER PIPING: WATER PIPING SHALL BE CPVC TUBING. TUBING, FITTINGS AND CEMENT SHALL MEET ASTM D-2846, 100 PSI 0 '
<br />1807 CONTINUOUS RATING. CPVC TUBING AND FITTINGS SHALL MEET 25/50 FLAME SPREAD/SMOKE DEVELOPED REQUIREMENTS
<br />FOR PLENUMS. CONTRACTOR SHALL INSTALL CPVC IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL
<br />- -- --
<br />PROVIDE FOR EXPANSION AND CONTRACTION OF TUBING. TUBING SHALL BE SLEEVED AT PENETRATION OF CONCRETE SLABS OR
<br />-
<br />WALLS. CPVC TUBING SHALL BE BFGOODRICH FLOWGUARD GOLD OR APPROVED EQUAL. INSTALL PIPE SUPPORTS AT 3-FOOT
<br />INTERVALS FOR SIZES 1" OR SMALLER; INSTALL PIPE SUPPORTS AT 4-FOOT INTERVALS FOR 1-1 /4" AND LARGER.
<br />WATER HAMMER ARRESTORS: INSTALL WATER HAMMER ARRESTERS AT EACH HOT AND COLD FIXTURE SUPPLY.
<br />EXPOSED PIPING: EXPOSED PIPING SHALL BE POLISHED CHROMIUM ON EITHER BRASS OR BRONZE. PROVIDE ADA INSULATED
<br />WATER AND WASTE LINE COVERINGS FOR WALL HUNG SINKS AND LAVATORIES. '..
<br />EXAM
<br />VALVES: ALL VALVES SHALL HAVE A MINIMUM OF 125 PSIG WORKING PRESSURE. VALVES AND COCKS MAY NOT BE INDICATED 1 -
<br />104
<br />IN EVERY INSTANCE ON THE DRAWINGS, BUT WHETHER OR NOT SHOWN, ALL VALVES, COCKS AND CHECK VALVES NECESSARY
<br />FOR THE PROPER OPERATION OF THE SYSTEM SHALL BE FURNISHED AND INSTALLED. INSTALL ISOLATION/SHUT-OFF VALVES AT
<br />ALL MAIN RISERS, AND MAIN BRANCH TAKEOFFS. INSTALL ISOLATION/SHUT-OFF VALVES ON EACH INLET AND OUTLET OF EACH
<br />PIECE OF EQUIPMENT. PROVIDE A FLANGE OR UNION BETWEEN THE VALVE AND THE EQUIPMENT TO PERMIT DISCONNECTION,
<br />REMOVAL AND SERVICE.
<br />STERILIZATION OF DOMESTIC WATER SYSTEM: THE ENTIRE DOMESTIC WATER DISTRIBUTION SYSTEM SHALL BE THOROUGHLY
<br />STERILIZED AS REQUIRED BY THE HEALTH AUTHORITY OR WATER PURVEYOR HAVING JURISDICTION, OR IN THE ABSENCE OF A -
<br />PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652, OR AS DESCRIBED IN SECTION 610 '
<br />FBC-P.
<br />VENTING: THE STACKS SHALL BE EXTENDED THROUGH ROOF OF BUILDING TO POINTS NOT LESS THAN 12" ABOVE ROOF.
<br />VENTS SHALL BE OFFSET AS REQUIRED TO PENETRATE ROOFS AT LEAST 3 FEET FROM THE RIDGE OR EDGE OF BUILDING AND
<br />10 FEET FROM ANY FRESH AIR INTAKE OR OPERABLE WINDOW OR DOOR.
<br />SANITARY, WASTE, AND VENT PIPING: ALL BURIED AND UNBURIED PIPING AND FITTINGS SHALL BE SCHEDULE 40 PVC-DWV. -
<br />EXAM
<br />(SOLID CORE) SLOPE OF SANITARY OR DRAINAGE PIPING 2-1/2" AND SMALLER SHALL BE A MINIMUM OF 1/4" PER FOOT; Z103
<br />PIPING 3" AND LARGER SHALL BE SLOPED A MINIMUM OF 1 /8" PER FOOT. CLEANOUTS WILL BE LOCATED NOT MORE THAN 100
<br />3;
<br />FEET APART AND AT EACH CHANGE OF DIRECTION GREATER THAN 45' ALONG THE HORIZONTAL DRAIN. CLEANOUTS SHALL BE
<br />INSTALLED AT BASE OF EACH STACK. CONCEALED CLEANOUTS SHALL HAVE CAST BRASS CHROMIUM PLATED FLAT ACCESS COVER
<br />PLATE. }
<br />PLUMBING FIXTURES AND TRIM: PLUMBING FIXTURES SHALL BE FURNISHED AND INSTALLED IN A NEAT AND WORKMANLIKE
<br />MANNER WITH PROPER CONNECTIONS TO SUPPLY AND DRAINAGE PIPING. ALL FIXTURES SHALL BE FREE OF FLAWS AND
<br />DEFECTS OF ANY SORT IN MATERIAL AND WORKMANSHIP AND SHALL OPERATE PERFECTLY WHEN INSTALLED IN ACCORDANCE WITH
<br />MANUFACTURER'S DIRECTIONS. CONTRACTOR SHALL PROVIDE ROUGH -IN, AND SHALL CONNECT ALL FIXTURES TO THE PLUMBING
<br />SYSTEMS. ALL FIXTURES TO BE PROVIDED WITH CHROME -PLATED SUPPLIES AND STOPS. PROVIDE 17 GAUGE CHROME -PLATED
<br />BRASS TRAPS FOR ALL FIXTURES WITHOUT INTEGRAL TRAPS. PROVIDE CONCEALED ARM CARRIERS AND SUPPORTS FOR ALL
<br />FIXTURES REQUIRING SAME.
<br />PIPE INSULATION: INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN ACCORDANCE
<br />WITH RECOGNIZED INDUSTRY PRACTICES. SEAL ALL JOINTS, BREAKS, TEARS AND PENETRATIONS WITH FIRE RETARDENT, VAPOR
<br />BARRIER MASTIC. COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEMS. INSULATE ALL DOMESTIC HOT WATER
<br />WITH 1 " THICK FIBERGLASS SECTIONAL PIPE COVERING WITH CANVAS JACKET OR ARMAFLEX AP (ASTM E-84). 3
<br />3
<br />TESTING:
<br />TEST ALL WASTE AND VENT PIPING FOR A PERIOD OF NOT LESS THAN 8 HOURS BY CAPPING OR PLUGGING. ALL JOINTS TO A i
<br />LEVEL OF THE HIGHEST FIXTURE OR FITTINGS. FILLING THE SYSTEM WITH WATER, AND OBSERVING FOR LEAKS. TEST WATER,
<br />PIPING AT 100 PSIG FOR A PERIOD OF 8 HOURS, OBSERVING FOR ANY VISIBLE LEAKS. TEST PIPING AGAIN WITH FIXTURES
<br />INSTALLED. REPAIR ANY LEAKS FOUND BY REMAKING JOINT. DO NOT USE CAULKING OR SIMILIAR METHODS TO CORRECT LEAKS.
<br />UPON REPAIRING ANY LEAKS FOUND. AGAIN TEST THAT PORTION OF THE SYSTEM AS DESCRIBED ABOVE.
<br />EQUIPMENT FURNISHED BY OTHERS: WHERE SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL MAKE ALL PIPING
<br />CONNECTIONS TO EQUIPMENT FURNISHED BY OTHERS. THIS WORK SHALL INCLUDE FURNISHING AND INSTALLATION OF ALL WATER
<br />AND DRAIN PIPING. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH RECOMMENDATIONS OF EQUIPMENT MANUFACTURER.
<br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE
<br />CONTRACTOR HAS RECEIVED THE FINAL PAYMENT AND CERTIFICATION OF COMPLETION. ALL EQUIPMENT AND ALL WORK SHALL BE
<br />� ,� � _ . � TOILET
<br />FULLY GUARANTEED, PARTS AND LABOR, FOR ONE YEAR FROM THE DATE OF THE CERTIFICATE OF COMPLETION. REPAIRS MADE F,o1
<br />DURING THIS PEROID MUST BE FULLY GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN
<br />ADDITION, THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR
<br />OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER INSTALLATION OF EQUIPMENT OR MATERIAL INSTALLED.
<br />SUBSTITUTIONS: CONTRACTOR SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING
<br />_ ;-
<br />SUBSTITUTIONS THAT REQUIRE CHANGES TO THE OTHER BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING,
<br />CEILINGS, WALLS, ROOFS, ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL RE -DESIGN COSTS AS A RESULT OF SAID
<br />SUBSTITUTION. THESE COSTS SHALL NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF
<br />ACCEPTABILITY OF SUBSTITUTION. ENGINEER RESERVES THE RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT
<br />DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL PROVIDE SPECIFIED OR EQUIVALENT MATERIALS/EQUIPMENT AT NO ADDITIONAL
<br />COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED.
<br />TOTAL WATER FIXTURE UNITS
<br />S�1 PER FBC-P TABLE E103.3(2)
<br />= 1.4 WFU INCREASE
<br />WATER ISOMETRIC RISER
<br />NOT TO SCALE
<br />SUPPLIES
<br />_ 117
<br />LOBBY
<br />100
<br />HALL
<br />121
<br />MAY EXTEND AS A WASTE OR
<br />VENT. REFER TO PLANS.
<br />r�
<br />I
<br />I I
<br />UHKUML WALLUUVtK WALL
<br />& SCREW
<br />PLUGGED TEE
<br />W/CLEANOUT
<br />FLOOR LINE
<br />BALANCE OF PIPING SAME
<br />AS CLEANOUT TO GRADE 1/8" BEND
<br />WALL CLEANOUT
<br />NOT TO SCALE
<br />NURSE
<br />113
<br />WALL -SEE FLOOR PLANS
<br />SUPPLY PIPE -SEE PLUMB
<br />BLOCKING BETWEEN STUDS
<br />PIPE TO EQUIP. FIXTURE
<br />SILICON CAULK-FSE AREAS
<br />QUARTER -TURN
<br />ANGLE STOP (TYP)
<br />CHROME TRIM
<br />ELBOW W/ANCHOR FLANGE
<br />SHUT-OFF VALVE
<br />NOT TO SCALE
<br />PLUMBING LEGEND
<br />DESCRIPTION
<br />ABBREV.
<br />SYMBOL
<br />SANITARY PIPING
<br />SAN
<br />VENT PIPING
<br />V
<br />-------
<br />DOMESTIC COLD WATER
<br />CW
<br />—
<br />DOMESTIC HOT WATER
<br />HW
<br />BALL/ISOLATION VALVE
<br />BV
<br />PIPE TURNING UP
<br />PIPE TURNING DOWN
<br />C
<br />CAPPED PIPING
<br />TYPICAL ITEM
<br />TYP
<br />CONNECTION BETWEEN
<br />NEW & EXISTING
<br />EXISTING
<br />(E)
<br />NEW
<br />N
<br />NOTE ON EXISTING UTILITIES:
<br />CONTRACTOR SHALL FIELD VERIFY LOCATIONS & INVERTS
<br />OF ALL EXISTING UTILITY MAINS INSIDE BUILDING (I.E.
<br />SEWER, GAS, DOMESTIC WATER, ETC.) PRIOR TO ANY
<br />DEMOLITION OR CONSTRUCTION. ADVISE ENGINEER OF
<br />ANY DISCREPANCIES BEFORE PROCEEDING ANY FURTHER.
<br />** CCTV VIDEO CAMERA INVESTIGATION REQUIRED BY PLUMBER
<br />(PRIOR TO ANY WORK) TO VERIFY INVERT ADEQUATE AT MOST
<br />REMOTE AREA OF NEW SANITARY UNDERGROUND CONNECTION.
<br />NOTIFY ENGINEER OF RESULTS OF CAMERA WORK.
<br />NOTE TO CONTRACTOR
<br />ON EXISTING CONDITIONS:
<br />1. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND
<br />SURVEY ALL EXISTING CONDITIONS AND EQUIPMENT
<br />PRIOR TO SUBMITTING BID FOR WORK REQUIRED BY
<br />THESE DOCUMENTS. THIS INCLUDES ABOVE THE
<br />CEILING AND ON TOP OF THE ROOF.
<br />2. CONTRACTOR SHALL REFER TO AND READ THROUGH
<br />ALL OF THE "CONTRACTOR'S SCOPE OF WORK" AS
<br />DEFINED IN THE BID SPECIFICATIONS AND DOCUMENTS
<br />AS PART OF THE BID PROCESS.
<br />3. IF AT ANY TIME. THERE IS DISCREPANCY BETWEEN THE
<br />PLANS & SPECS. OR CONFUSION/CONCERN OVER
<br />REQUIRED WORK. CONTRACTOR SHALL IMMEDIATELY
<br />NOTIFY ARCHITECT, ENGINEER, &/OR OWNER AND GET
<br />DIRECTION BEFORE PROCEEDING WITH WORK IN
<br />QUESTION,
<br />4• FOR ALL EXISTING EQUIPMENT TO BE DEMOLISHED (I.E.
<br />DEMO) CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />DISCONNECTION, REMOVAL, & DISPOSAL OFF -SITE PER
<br />CODE, OF SAID EQUIPMENT COMPLETELY.
<br />�. •'�(,E�IVCy'•
<br />Na 56189
<br />STATE 0
<br />0
<br />%
<br />STEPANEK-LEWIS
<br />1AND ASSOCIATES
<br />29257 TWELVE OAKS WAY, SUITE 103
<br />WESLEY CHAPEL, FL 33544
<br />PH (813) 991-1248
<br />CERT. AUTH. # 8397 18-31
<br />_)
<br />GROUPTHE
<br />imUNZ
<br />585 Main Street, Suite 201
<br />Dunedin, A 34698
<br />p 727.733.9400
<br />f 727.733.9555
<br />Iic. AAC001580
<br />lunz.com
<br />N
<br />N
<br />N
<br />Z
<br />U rx�w
<br />:D Apo
<br />z�
<br />Z Wad;
<br />0 �¢
<br />u o z
<br />x
<br />w
<br />~
<br />4
<br />�4 J
<br />Q
<br />W
<br />0
<br />w
<br />W
<br />U)
<br />W
<br />J
<br />0
<br />W
<br />C)
<br />z
<br />O
<br />Q
<br />U_
<br />LL
<br />U
<br />W
<br />o Z
<br />w w Q
<br />� C, J
<br />w "
<br />J
<br />—1 cn
<br />O
<br />LLJ= O
<br />o a J
<br />co N LL
<br />REVISION®. • • • • • •
<br />REVISION©. . . . . . . . . . --
<br />REVISION&••.•.•.• •. --
<br />ISSUED FOR CONSTRUCTION: --
<br />ISSUED FOR PERMIT: 09.05.18
<br />ISSUED FOR BID: --
<br />ISSUED FOR APPROVAL: --
<br />DRAWN BY: T.J.
<br />REVIEW BY: M. LEWIS
<br />THE LUNZ GROUP
<br />®COPYRIGHT 2018 ALL RIGHTS RESERVED
<br />1812.01
<br />P-1 01
<br />SCALE:114" =1'-0"
<br />MATTHEW D. LEWIS, P.E. FL LIC#56189