-- I- -- I --- I- L' ! I ' II1 1 I 1 1 1 1 II <br />MECHANICAL SPECIFICATIONS <br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL. <br />ALL WORK SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING CODES SIXTH EDITION (2017), WITH ALL AMENDMENTS, AND LOCAL CODES AND ORDINANCES. INSTALLATION SHALL <br />COMPLY WITH THE CODE REFERENCED STANDARDS SET BY NFPA, ASHRAE, ASPE, SMACNA, NEC AND UL. THE SYSTEMS, EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE <br />INSTALLED, FINISHED, TESTED AND ADJUSTED FOR CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL <br />COORDINATE WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED; BUT <br />ITS EXTREME ACCURACY IS NOT GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF VARIOUS COMPONENTS, <br />EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR SHOULD DISCREPANCIES APPEAR AMOUNG THE <br />CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE MANUFACTURER'S RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST INTERPRETATION BEFORE <br />PROCEDING WITH WORK. CONTRACTOR SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE INSTALLATION <br />WHETHER OR NOT SPECIFIED IN THE DOCUMENTS. <br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND <br />OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. <br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED. <br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR MAINTENANCE SHALL BE LOCATED TO <br />ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF REQUIRED. CONTRACTOR SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO ALLOW ACCESS, EVEN IF <br />NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO OWNER. <br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND LOADS AS DETAILED IN THE BUILDING <br />CODE. <br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS SHALL BE SEALED AIRTIGHT WITH <br />MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED. <br />EQUIPMENT TAGS: ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED ENGRAVED PHENOLIC LABEL CORRESPONDING TO THE EQUIPMENT TAG ON THE ENGINEER'S DRAWINGS. <br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS OR FLOORS. THE RATING OF THE <br />FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM <br />E-84, NFPA-225, UL-723 NOT EXCEEDING: <br />FLAME SPREAD 25 <br />SMOKE DEVELOPED 50 <br />FUEL DISTRIBUTED 50 <br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE. <br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES. <br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE PARTS LIST FOR EACH PIECE OF <br />EQUIPMENT. <br />CONDENSATE DRAIN PIPING: CONDENSATE DRAIN PIPING SHALL BE PVC TYPE DWV. DRAINS SHALL BE PITCHED NOT LESS THAN 1" IN 10'. RUNS SHALL BE AS SHORT AS <br />POSSIBLE WITHOUT ANY DIPS TO TRAP WATER AND INTERFERE WITH PROPER DRAINAGE. PROVIDE TRAPS AND CLEANOUTS AT DRAIN PAN CONNECTIONS. RUN CONDENSATE DRAIN <br />PER PLANS. INSULATE CONDENSATE LINE INSIDE BUILDINGS WITH 1" ARMAFLEX. <br />REFRIGERANT PIPING: SHALL BE ACR TUBING, DRIED AND SEALED, HARD TEMPER COPPER WITH WROUGHT COPPER BRAZED JOINTS. ASTM-888. COORDINATE AND VERIFY PROPER <br />REFRIGERANT PIPE SIZES AND CHARGES WITH EQUIPMENT MANUFACTURER PRIOR TO ANY INSTALLATION. INSULATE SUCTION LINE WITH 1" ARMAFLEX. WRAP INSULATION OUTSIDE <br />BUILDING ABOVE GROUND WITH ARMACELL # ARMACHECK 350 SILVER TAPE (UV -RESISTANT). <br />DIMENSIONAL DATA: ALL DUCTWORK DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. <br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND MATERIALS, IN ORDER TO PROVIDE A <br />"VIBRATION -FREE" RIGID INSTALLATION. <br />DUCTWORK - GENERAL: FABRICATE AND INSTALL ALL DUCTWORK AND DUCT ACCESSORIES IN ACCORDANCE WITH THE LATEST EDITION OF APPLICABLE SMACNA STANDARDS, THE <br />LATEST NFPA STANDARDS, AND THIS SPECIFICATION. THE MOST STRINGENT OF THESE SHALL BE THE MINIMUM STANDARD. MINIMUM OF 1" PRESSURE CLASS RATING FOR ALL <br />DUCTWORK. <br />ALL ROUND RIGID SUPPY, RETURN, & ALL FRESH AIR DUCTWORK SHALL BE GALVANIZED SHEET METAL STEEL OF LOCKFORMING GRADE CONFORMING TO ASTM A653 AND ASTM A924. <br />DUCTS THAT ARE COVERED WITH INSULATION SHALL HAVE A G-60 ZINC COATING DESIGNATION. <br />ALL SUPPLY & RETURN RECTANGULAR DUCTWORK TO BE R-6.0 RIGID FIBERGLASS DUCTBOARD (UL-181 AND 181A) WITH CLEANABLE AIRSIDE SURFACE AND EPA -APPROVED BIOCIDE <br />(ANTI -MICROBIAL AGENT) IMPREGNATED IN MATTED AIR -SIDE SURFACE. <br />DUCTWORK INSTALLATION: ALL INTERIOR DUCTWORK SHALL BE SEALED TO SMACNA CLASS (B) REQUIREMENTS. PROVIDE DOUBLE THICKNESS TURNING VANES IN ALL NINETY (90) <br />DEGREE SQUARE ELBOWS. CONTRACTOR SHALL FURNISH AND INSTALL ALL DUCT OFFSETS AS REQUIRED TO CLEAR INTERFERENCES WITH EXISTING BUILDING STRUCTURE, PIPES AND <br />ELECTRICAL CONDUITS. FURNISH AND INSTALL ALL MISCELLANEOUS STEEL SUPPORTS REQUIRED FOR HANGING AND SUPPORTING DUCTWORK UNLESS OTHERWISE NOTED. <br />VOLUME DAMPERS: DAMPERS SHALL BE PROVIDED IN THE BRANCHES OF THE DUCT SYSTEMS WHERE SHOWN ON DRAWINGS AND AS REQUIRED TO PROPERLY REGULATE THE VOLUME <br />OF AIR DELIVERED TO OR WITHDRAWN FROM THE OUTLETS. <br />FLEXIBLE DUCTWORK: FLEXIBLE DUCTWORK MAY BE USED FOR THE FINAL RUNOUTS TO AIR OUTLETS, AND SHALL BE SIZED TO MATCH AIR OUTLET NECK. FLEXIBLE DUCTS SHALL <br />NOT EXCEED 8-FEET LENGTHS. NO FLEXIBLE DUCTS SHALL PENETRATE FIRE -RATED WALLS OR CEILINGS. FLEXIBLE DUCTS SHALL COMPLY WITH THE PROVISIONS OF UL-181 CLASS <br />1 AIR DUCT MATERIAL. DUCTS SHALL BE FACTORY MADE AND COMPOSED OF: AN INNER FIBERGLASS WOVEN LINER, ENCAPSULATED HELIX COIL, A FIBERGLASS INSULATING BLANKET <br />AND OUTER VAPOR BARRIER OF FIBERGLAS REINFORCED METALIZED FILM LAMINATE. PROVIDE THERMAFLEX MK-C FLEXIBLE DUCT OR APPROVED EQUAL (MIN. OF R-6.0). CARE IS <br />TO BE TAKEN THAT ALL RUNOUTS OF FLEXIBLE DUCTS ARE INSTALLED AS STRAIGHT AS PRACTICAL AND FASTENED SO AS TO ELIMINATE AIR LEAKAGE. THE INSTALLATION SHALL <br />CONFORM TO THE TECHNIQUES SHOWN IN THE UL APPROVED AND FACTORY -SUPPLIED INSTRUCTIONS. <br />INSULATION: ASSURE ALL DUCTWORK IS SEALED PRIOR TO INSTALLING INSULATION. <br />ALL ROUND RIGID METAL SUPPLY AND RETURN AND ALL FRESH AIR DUCTWORK SHALL BE WRAPPED WITH 2" THICK FIBERGLASS BLANKET INSULATION WITH FSK (ASJ) FACING, <br />MINIMUM INSTALLED R VALUE OF 6.0, AND FLAME SPREAD/SMOKE DEVELOPED RATINGS OF 25/50 BY ASTM E-84. INSTALL INSULATION ON DUCTWORK USING ADHESIVE AND/OR <br />WELD PINS WITH WASHERS. SEAL ALL INSULATION JOINTS, SEAMS AND FASTENER PIN PENETRATIONS WITH VAPOR RETARDING PRESSURE SENSITIVE TAPE OR WITH GLASS FABRIC AND <br />MASTIC. INSTALL TAPERED INSULATION TO THE TOP OF ALL EXTERIOR HORIZONTAL RECTANGULAR DUCTS WIDER THAN 24" BEFORE APPLYING THE FINISH INSULATION TO CAUSE A <br />1 /2" PER FOOT SLOPE OF FINISH INSULATION TO SHED WATER. <br />BRANCH DUCT RUNOUTS: SHALL BE GALVANIZED ROUND (SNAPLOCK) SEAM LOCKED DUCTWORK WITH EXTERNAL FIBERGLASS WRAP INSULATION (R-6.0). <br />NOTE: BRANCH DUCT RUNOUTS & FLEXIBLE DUCTS SHALL BE THE SAME SIZE DUCT AS THE DIFFUSER NECK CONNECTED TO, AS LISTED ON THE FLOOR PLAN. <br />GRILLES AND DIFFUSERS: ALL GRILLES AND DIFFUSERS SHALL BE INSTALLED WITH AN INSULATED BOOT OR BLANKET. PROVIDED A METHOD OF VOLUME CONTROL BY DEVICE <br />ADJUSTABLE AT DIFFUSER FACE OR MANUAL VOLUME DAMPERS AT TAKEOFF BRANCHES. COORDINATE DIFFUSER AND GRILLE LOCATIONS WITH ELECTRICAL LIGHTING LAYOUT AND <br />ARCHITECTURAL REFLECTED CEILING PLAN. <br />DUCT SMOKE DETECTORS: DUCT SMOKE DETECTORS ARE EXISTING AND SHALL BE TESTED & MODIFIED AS NEEDED TO SHUTOFF UNIT WITH THE DETECTION OF SMOKE. <br />CONTROLS: PROVIDE CONTROLS COMPLETE TO SUIT THE EQUIPMENT PROVIDED AND TO ACCOMPLISH THE SEQUENCE OF OPERATION AS REQUIRED BY PLANS AND SYSTEMS. LOCATE <br />THERMOSTATS 48" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. THERMOSTATIC CONTROLS SHALL BE PROGRAMMABLE TO INCLUDE ALL ITEMS REQUIRED BY FBC-ENERGY <br />CODE FIFTH EDITION AND SHALL HAVE LOCKOUT FUNCTION WITH PASSWORD. <br />MINIMUM FUNCTIONALITY SHALL INCLUDE: 7-DAY A WEEK PROGRAMMABLE CONTROLLER WITH SETBACKS UP TO 85-F AND DOWN TO 55-F, 10-HOUR BATTERY BACKUP, MANUAL <br />OVERRIDE FOR 2-HOURS, AND AUTOMATIC STARTING (OPTIMUM START) ADJUSTABLE DAILY START TIMES. <br />TESTING AND BALANCING: THE CONTRACTOR SHALL ENSURE THAT ALL DEVICES AND SYSTEMS ARE COMPLETE, TESTED AND BALANCED, AND READY FOR OPERATION WHEN THE FACILITY <br />IS HANDED OVER THE OWNER. THE AIR CONDITIONING SYSTEM SHALL BE TESTED IN ACCORDANCE WITH CURRENT AABC OR NEBB OR NBC PROCEDURES. A CERTIFIED, WRITTEN <br />REPORT SHALL BE SUBMITTED TO MECHANICAL ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL RECTIFY DISCREPANCIES BETWEEN THE ACTUAL INSTALLATION AND CONTRACT <br />DOCUMENTS WHEN IN THE OPINION OF THE T&B AGENCY OR THE ENGINEER, THAT THE DISCREPANCIES WILL AFFECT SYSTEM BALANCE AND PERFORMANCE. <br />SUBMITTALS REQUIRED: <br />SUBMIT SHOP DRAWINGS FOR ALL MATERIALS, EQUIPMENT, AND SYSTEMS REQUIRED BY THESE DOCUMENTS (SEE ARCH. PLANS/SPECS FOR SPECIFIC FORMATTING), INCLUDING: <br />TEST/BALANCE REPORT <br />DIFFUSERS AND GRILLES <br />DUCTWORK, INSULATION AND ACCESSORIES (CONNECTIONS, MASTICS, ETC.) <br />THERMOSTATS & CONTROLS <br />SUBSTITUTIONS: CONTRACTOR SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS THAT REQUIRE CHANGES TO THE OTHER <br />BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS, ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL RE -DESIGN COSTS <br />AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF ACCEPTABILITY OF SUBSTITUTION. <br />ENGINEER RESERVES THE RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL PROVIDE SPECIFIED OR EQUIVALENT <br />MATERIALS/EQUIPMENT AT NO ADDITION COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED. <br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS RECEIVED THE FINAL PAYMENT AND <br />CERTIFICATION OF OCCUPANCY. ALL EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND LABOR, FOR ONE YEAR FROM THE DATE OF THE CERTIFICATE OF <br />COMPLETION. REPAIRS MADE DURING THIS PEROID MUST BE FULLY GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN ADDITION, THE <br />CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER INSTALLATION <br />OF EQUIPMENT OR MATERIAL INSTALLED. <br />VENTILATION AIR SCHEDULE <br />REQUIRED O1 <br />ZONE 0 <br />SYSTEM <br />REQUIRED 0 <br />REQUIRED 1 <br />PROVIDED <br />SPACE <br />AREA <br />REQUIRED <br />OUTSIDE AIR <br />NUMBER <br />AIR DISTRIB. <br />VENT.(Ev) <br />OUTSIDE (Vbz) <br />EXHAUST <br />EXHAUST <br />(SQFT.) <br />PEOPLE (Pz) <br />EFFECTIVE. <br />EFFICIENCY <br />AIR (CFM) <br />AIR (CFM) <br />AIR (CFM) <br />LOBBY <br />404 <br />5 CFM + 0.06 CFM <br />4 (10-PERSONS) <br />1.0 <br />1.0 <br />44 <br />-- <br />-- <br />PERSON SQFT <br />1,000-SQFT <br />OFFICES <br />1081 <br />5 CFM + 0.06 CFM5.4 <br />( 5-PERSONS) <br />1.0 <br />1.0 <br />92 <br />-- <br />-- <br />PERSON SQFT <br />1,000-SQFT <br />BREAKROOM <br />225 <br />7.5 CFM + 0.18 CFI" <br />14 (70-PERSONS) <br />1.0 <br />0.7 <br />141 <br />-- <br />-- <br />PERSON SOFT <br />1,000-SQFT <br />RESTROOMS <br />0 <br />70 CFM <br />TOILET <br />3-TOILETS <br />-- <br />-- <br />-- <br />210 <br />210 <br />HALLWAYS <br />123 <br />0.06 QFT <br />-- <br />1.0 <br />1.0 <br />7 <br />-- <br />-- <br />STORAGE <br />167 <br />0.06 CFM <br />-- <br />1.0 <br />1.0 <br />20SQFT <br />-- <br />-- <br />SYSTEM POPULATION, Ps: <br />23 <br />TOTAL ZONE POPULATION, E Pz <br />23.4 <br />REQU. OUTSIDE AIR INTAKE,(Vot) (=Vou / MAX Ev) (CFM) <br />305 <br />OUTSIDE AIR INTAKE UNCORRECTED,(Vou) (=DxY-RpPz+FRaAz) <br />305 <br />PROVIDED OUTSIDE AIR INTAKE (CFM) <br />310 <br />-7 OCCUPANT DIVERSITY, D (=Ps/ I Pz) <br />0.98 <br />TOTAL PRESSURE = PROVIDED INT.- PROVIDED EXH. (CFM) <br />100 <br />NOTES: O REQUIREMENTS IN ACCORDANCE WITH SECTION TABLE 403.3, IN THE SIXTH ED. FLORIDA BUILDING CODE 2017 - MECHANICAL <br />AIR DEVICE SCHEDULE <br />GENERAL <br />CONSTRUCTION <br />MARK <br />TYPE <br />FUNCTION <br />FRAME SIZE <br />PATTERN <br />MATERIAL <br />FINISH <br />MFG. <br />MODEL <br />NOTES <br />CD <br />CEILING DIFFUSER <br />SUPPLY <br />18X18 <br />LOUVERED FACE <br />ALUMINUM <br />WHITE <br />PRICE <br />AMD <br />0O <br />CD2 <br />CEILING DIFFUSER <br />SUPPLY <br />24X24 <br />LOUVERED FACE <br />ALUMINUM <br />WHITE <br />PRICE <br />AMD <br />0 O <br />RGC <br />RETURN GRILLE <br />RETURN <br />24X24 <br />BLADES <br />ALUMINUM <br />WHITE <br />PRICE <br />630DAL <br />01 ( <br />RGC2 <br />RETURN GRILLE <br />RETURN <br />18X18 <br />BLADES <br />ALUMINUM <br />WHITE <br />PRICE <br />630DAL <br />O@ <br />LVR <br />INTAKE LOUVER <br />FRESH AIR <br />18X18 <br />BLADES <br />ALUMINIUM <br />MILL <br />GREENHECK <br />EVH-501 D <br />( 3)j <br />NOTES: 1 PROVIDE WITH OPPOSED BLADE DAMPER. <br />2 PROVIDE WITH SQUARE TO ROUND ADAPTER. <br />3 FLORIDA PRODUCT APPROVED AND ACMA 540/550 CERTIFIED. <br />P�11 <br />00� TOR (o5 GT <br />IS1�G ETEc '�yJ l Otjp ' <br />E� r <br />OK I <br />IC`' <br />�RAPOTOR I ,,Y,, )ANU <br />E <br />RAID TO <br />D I <br />2NDARy 0RE D (PING OR <br />FRIG P� FAO <br />RE BE�O I �I <br />TO J� ! <br />RAGK— <br />LJ STA <br />��G A� <br />E��S <br />GR���E <br />NR� <br />�E�y WALL <br />SIDE <br />EXISTING A/C SCHEDULE <br />UNIT TAG <br />TONS <br />MANUFACTURER <br />SUPPLY <br />CFMCFM <br />RETURN <br />0/A (CFM) <br />FILTER <br />HEAT(KW) <br />(E)AHU-1 <br />4.0 <br />TRANE <br />1,500 <br />1,345 <br />155 <br />MERV-8 <br />10.0 <br />(E)AHU-2 <br />4.0 <br />TRANE <br />1 1,500 <br />1 1,345 <br />1 155 <br />1MERV-8 <br />10.0 <br />NOTES: REPLACE THERMOSTAT WITH 7-DAY PROGRAMMABLE TYPE, PER SPECIFICATIONS. <br />EXISTING AIR_ HANDLING & CONDENSING UNITS — SERVICE WORK REQUIRED: <br />CONTRACTOR SHALL SERVICE EXISTING (TO REMAIN) AIR HANDLERS AND CONDENSING UNITS COMPLETELY AND <br />REPLACE ANY DEFECTIVE PARTS AS NEEDED. PROVIDE SERVICE REPORT TO PROJECT MANAGER. SERVICE WORK <br />SHALL INCLUDE AT A MINIMUM: LUBRICATE ALL BEARINGS, REPLACE ALL BELTS, RE -CHARGE CIRCUITS OR REPAIR <br />REFRIGERANT LEAKS (RE-CLAIM / RE -CHARGE CIRCUITS IF NEEDED), REPLACE FILTERS, CLEAN EVAPORATOR COILS, <br />CLEAN DRAIN PAN, AND CLEAN/REPAIR INSULATION ON INSIDE OF UNITS (CU-1,2). INCLUDE THE COST OF A NEW <br />COMPRESSOR FOR EACH OF THE (2) EXISTING CONDENSING UNITS (CU-1,2). CONDENSATE PIPING SHALL BE <br />RE -INSULATED, AND REFRIGERANT PIPING SETS SHALL BE RE -INSULATED. <br />VOLUME DAMPER <br />GRAVITY BACKDRAFT <br />DAMPER <br />VERTICAL AHU MOUNTING DETAIL <br />NOT TO SCALE <br />HANGERS AT MAX. <br />5-FT SPACING WITH <br />MAX. SAG OF 1/2- <br />PER FOOT OF <br />SUPPORT SPACING <br />1-1 /2" x 22 GA. SADDLE <br />1-1/2"x22 GA. WIDE BAND CLAMP <br />1-1/2" X 22-GAUGE <br />-GALVANIZED STEEL STRAP <br />MAX. SPACING 10-FT <br />RATED FASTENERS <br />HANGER AND SUPPORT FOR <br />ROUND METAL + ROUND FLEXIBLE DUCTS <br />STANDARDS SET BY SMACNA <br />ROUND AIR DUCT <br />y No 56189 <br />�.STATE OF <br />© AC R <br />- <br />STEPANEK— LEWIS <br />AND ASSOCIATES <br />2257 TWELVE OAKS WAY, SUITE 103 <br />WESLEY CHAPEL, FL 33544 <br />PH (813) 991-1248 <br />CERT. AUTH. # 8397 18-31 <br />THE <br />L U N Am <br />GROUP <br />585 Main Street, Suite 201 <br />Dunedin, FI 34698 <br />p 727.733.9400 <br />f 727.733.9555 <br />Iic. AAC001580 <br />lunz.com <br />V <br />0 <br />_J <br />0 <br />cQ <br />G <br />W <br />0 <br />J <br />J_ <br />CL <br />w <br />N <br />z <br />0 <br />U) <br />Q <br />7 <br />w to <br />CV <br />Wcr) <br />J <br />>LL <br />U J <br />LU Of <br />r = <br />a <br />Co <br />coo N <br />U) <br />J <br />F— <br />LU <br />0 <br />06 <br />cri <br />J <br />0 <br />W <br />CU <br />L�J <br />Q <br />CU <br />U_ <br />REVISION©• • . . <br />REVISIONQ• • • • • • • • • • -- <br />REVISION& • • . . . . . • • . -- <br />ISSUED FOR CONSTRUCTION: -- <br />ISSUED FOR PERMIT: 09.05.18 <br />ISSUED FOR BID: -- <br />ISSUED FOR APPROVAL: -- <br />DRAWN BY: T.J. <br />REVIEW BY: M. LEWIS <br />THE LUNZ GROUP <br />©COPYRIGHT 2018 ALL RIGHTS RESERVED <br />1812.01 <br />M-001 <br />N <br />N <br />MATTHEW D. LEWIS, P.E. FL LIC#56189 <br />