-- I- -- I --- I- L' ! I ' II1 1 I 1 1 1 1 II
<br />MECHANICAL SPECIFICATIONS
<br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL.
<br />ALL WORK SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING CODES SIXTH EDITION (2017), WITH ALL AMENDMENTS, AND LOCAL CODES AND ORDINANCES. INSTALLATION SHALL
<br />COMPLY WITH THE CODE REFERENCED STANDARDS SET BY NFPA, ASHRAE, ASPE, SMACNA, NEC AND UL. THE SYSTEMS, EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE
<br />INSTALLED, FINISHED, TESTED AND ADJUSTED FOR CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL
<br />COORDINATE WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED; BUT
<br />ITS EXTREME ACCURACY IS NOT GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF VARIOUS COMPONENTS,
<br />EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR SHOULD DISCREPANCIES APPEAR AMOUNG THE
<br />CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE MANUFACTURER'S RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST INTERPRETATION BEFORE
<br />PROCEDING WITH WORK. CONTRACTOR SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE INSTALLATION
<br />WHETHER OR NOT SPECIFIED IN THE DOCUMENTS.
<br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND
<br />OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
<br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED.
<br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR MAINTENANCE SHALL BE LOCATED TO
<br />ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF REQUIRED. CONTRACTOR SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO ALLOW ACCESS, EVEN IF
<br />NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO OWNER.
<br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND LOADS AS DETAILED IN THE BUILDING
<br />CODE.
<br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS SHALL BE SEALED AIRTIGHT WITH
<br />MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED.
<br />EQUIPMENT TAGS: ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED ENGRAVED PHENOLIC LABEL CORRESPONDING TO THE EQUIPMENT TAG ON THE ENGINEER'S DRAWINGS.
<br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS OR FLOORS. THE RATING OF THE
<br />FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM
<br />E-84, NFPA-225, UL-723 NOT EXCEEDING:
<br />FLAME SPREAD 25
<br />SMOKE DEVELOPED 50
<br />FUEL DISTRIBUTED 50
<br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE.
<br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES.
<br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE PARTS LIST FOR EACH PIECE OF
<br />EQUIPMENT.
<br />CONDENSATE DRAIN PIPING: CONDENSATE DRAIN PIPING SHALL BE PVC TYPE DWV. DRAINS SHALL BE PITCHED NOT LESS THAN 1" IN 10'. RUNS SHALL BE AS SHORT AS
<br />POSSIBLE WITHOUT ANY DIPS TO TRAP WATER AND INTERFERE WITH PROPER DRAINAGE. PROVIDE TRAPS AND CLEANOUTS AT DRAIN PAN CONNECTIONS. RUN CONDENSATE DRAIN
<br />PER PLANS. INSULATE CONDENSATE LINE INSIDE BUILDINGS WITH 1" ARMAFLEX.
<br />REFRIGERANT PIPING: SHALL BE ACR TUBING, DRIED AND SEALED, HARD TEMPER COPPER WITH WROUGHT COPPER BRAZED JOINTS. ASTM-888. COORDINATE AND VERIFY PROPER
<br />REFRIGERANT PIPE SIZES AND CHARGES WITH EQUIPMENT MANUFACTURER PRIOR TO ANY INSTALLATION. INSULATE SUCTION LINE WITH 1" ARMAFLEX. WRAP INSULATION OUTSIDE
<br />BUILDING ABOVE GROUND WITH ARMACELL # ARMACHECK 350 SILVER TAPE (UV -RESISTANT).
<br />DIMENSIONAL DATA: ALL DUCTWORK DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS.
<br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND MATERIALS, IN ORDER TO PROVIDE A
<br />"VIBRATION -FREE" RIGID INSTALLATION.
<br />DUCTWORK - GENERAL: FABRICATE AND INSTALL ALL DUCTWORK AND DUCT ACCESSORIES IN ACCORDANCE WITH THE LATEST EDITION OF APPLICABLE SMACNA STANDARDS, THE
<br />LATEST NFPA STANDARDS, AND THIS SPECIFICATION. THE MOST STRINGENT OF THESE SHALL BE THE MINIMUM STANDARD. MINIMUM OF 1" PRESSURE CLASS RATING FOR ALL
<br />DUCTWORK.
<br />ALL ROUND RIGID SUPPY, RETURN, & ALL FRESH AIR DUCTWORK SHALL BE GALVANIZED SHEET METAL STEEL OF LOCKFORMING GRADE CONFORMING TO ASTM A653 AND ASTM A924.
<br />DUCTS THAT ARE COVERED WITH INSULATION SHALL HAVE A G-60 ZINC COATING DESIGNATION.
<br />ALL SUPPLY & RETURN RECTANGULAR DUCTWORK TO BE R-6.0 RIGID FIBERGLASS DUCTBOARD (UL-181 AND 181A) WITH CLEANABLE AIRSIDE SURFACE AND EPA -APPROVED BIOCIDE
<br />(ANTI -MICROBIAL AGENT) IMPREGNATED IN MATTED AIR -SIDE SURFACE.
<br />DUCTWORK INSTALLATION: ALL INTERIOR DUCTWORK SHALL BE SEALED TO SMACNA CLASS (B) REQUIREMENTS. PROVIDE DOUBLE THICKNESS TURNING VANES IN ALL NINETY (90)
<br />DEGREE SQUARE ELBOWS. CONTRACTOR SHALL FURNISH AND INSTALL ALL DUCT OFFSETS AS REQUIRED TO CLEAR INTERFERENCES WITH EXISTING BUILDING STRUCTURE, PIPES AND
<br />ELECTRICAL CONDUITS. FURNISH AND INSTALL ALL MISCELLANEOUS STEEL SUPPORTS REQUIRED FOR HANGING AND SUPPORTING DUCTWORK UNLESS OTHERWISE NOTED.
<br />VOLUME DAMPERS: DAMPERS SHALL BE PROVIDED IN THE BRANCHES OF THE DUCT SYSTEMS WHERE SHOWN ON DRAWINGS AND AS REQUIRED TO PROPERLY REGULATE THE VOLUME
<br />OF AIR DELIVERED TO OR WITHDRAWN FROM THE OUTLETS.
<br />FLEXIBLE DUCTWORK: FLEXIBLE DUCTWORK MAY BE USED FOR THE FINAL RUNOUTS TO AIR OUTLETS, AND SHALL BE SIZED TO MATCH AIR OUTLET NECK. FLEXIBLE DUCTS SHALL
<br />NOT EXCEED 8-FEET LENGTHS. NO FLEXIBLE DUCTS SHALL PENETRATE FIRE -RATED WALLS OR CEILINGS. FLEXIBLE DUCTS SHALL COMPLY WITH THE PROVISIONS OF UL-181 CLASS
<br />1 AIR DUCT MATERIAL. DUCTS SHALL BE FACTORY MADE AND COMPOSED OF: AN INNER FIBERGLASS WOVEN LINER, ENCAPSULATED HELIX COIL, A FIBERGLASS INSULATING BLANKET
<br />AND OUTER VAPOR BARRIER OF FIBERGLAS REINFORCED METALIZED FILM LAMINATE. PROVIDE THERMAFLEX MK-C FLEXIBLE DUCT OR APPROVED EQUAL (MIN. OF R-6.0). CARE IS
<br />TO BE TAKEN THAT ALL RUNOUTS OF FLEXIBLE DUCTS ARE INSTALLED AS STRAIGHT AS PRACTICAL AND FASTENED SO AS TO ELIMINATE AIR LEAKAGE. THE INSTALLATION SHALL
<br />CONFORM TO THE TECHNIQUES SHOWN IN THE UL APPROVED AND FACTORY -SUPPLIED INSTRUCTIONS.
<br />INSULATION: ASSURE ALL DUCTWORK IS SEALED PRIOR TO INSTALLING INSULATION.
<br />ALL ROUND RIGID METAL SUPPLY AND RETURN AND ALL FRESH AIR DUCTWORK SHALL BE WRAPPED WITH 2" THICK FIBERGLASS BLANKET INSULATION WITH FSK (ASJ) FACING,
<br />MINIMUM INSTALLED R VALUE OF 6.0, AND FLAME SPREAD/SMOKE DEVELOPED RATINGS OF 25/50 BY ASTM E-84. INSTALL INSULATION ON DUCTWORK USING ADHESIVE AND/OR
<br />WELD PINS WITH WASHERS. SEAL ALL INSULATION JOINTS, SEAMS AND FASTENER PIN PENETRATIONS WITH VAPOR RETARDING PRESSURE SENSITIVE TAPE OR WITH GLASS FABRIC AND
<br />MASTIC. INSTALL TAPERED INSULATION TO THE TOP OF ALL EXTERIOR HORIZONTAL RECTANGULAR DUCTS WIDER THAN 24" BEFORE APPLYING THE FINISH INSULATION TO CAUSE A
<br />1 /2" PER FOOT SLOPE OF FINISH INSULATION TO SHED WATER.
<br />BRANCH DUCT RUNOUTS: SHALL BE GALVANIZED ROUND (SNAPLOCK) SEAM LOCKED DUCTWORK WITH EXTERNAL FIBERGLASS WRAP INSULATION (R-6.0).
<br />NOTE: BRANCH DUCT RUNOUTS & FLEXIBLE DUCTS SHALL BE THE SAME SIZE DUCT AS THE DIFFUSER NECK CONNECTED TO, AS LISTED ON THE FLOOR PLAN.
<br />GRILLES AND DIFFUSERS: ALL GRILLES AND DIFFUSERS SHALL BE INSTALLED WITH AN INSULATED BOOT OR BLANKET. PROVIDED A METHOD OF VOLUME CONTROL BY DEVICE
<br />ADJUSTABLE AT DIFFUSER FACE OR MANUAL VOLUME DAMPERS AT TAKEOFF BRANCHES. COORDINATE DIFFUSER AND GRILLE LOCATIONS WITH ELECTRICAL LIGHTING LAYOUT AND
<br />ARCHITECTURAL REFLECTED CEILING PLAN.
<br />DUCT SMOKE DETECTORS: DUCT SMOKE DETECTORS ARE EXISTING AND SHALL BE TESTED & MODIFIED AS NEEDED TO SHUTOFF UNIT WITH THE DETECTION OF SMOKE.
<br />CONTROLS: PROVIDE CONTROLS COMPLETE TO SUIT THE EQUIPMENT PROVIDED AND TO ACCOMPLISH THE SEQUENCE OF OPERATION AS REQUIRED BY PLANS AND SYSTEMS. LOCATE
<br />THERMOSTATS 48" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. THERMOSTATIC CONTROLS SHALL BE PROGRAMMABLE TO INCLUDE ALL ITEMS REQUIRED BY FBC-ENERGY
<br />CODE FIFTH EDITION AND SHALL HAVE LOCKOUT FUNCTION WITH PASSWORD.
<br />MINIMUM FUNCTIONALITY SHALL INCLUDE: 7-DAY A WEEK PROGRAMMABLE CONTROLLER WITH SETBACKS UP TO 85-F AND DOWN TO 55-F, 10-HOUR BATTERY BACKUP, MANUAL
<br />OVERRIDE FOR 2-HOURS, AND AUTOMATIC STARTING (OPTIMUM START) ADJUSTABLE DAILY START TIMES.
<br />TESTING AND BALANCING: THE CONTRACTOR SHALL ENSURE THAT ALL DEVICES AND SYSTEMS ARE COMPLETE, TESTED AND BALANCED, AND READY FOR OPERATION WHEN THE FACILITY
<br />IS HANDED OVER THE OWNER. THE AIR CONDITIONING SYSTEM SHALL BE TESTED IN ACCORDANCE WITH CURRENT AABC OR NEBB OR NBC PROCEDURES. A CERTIFIED, WRITTEN
<br />REPORT SHALL BE SUBMITTED TO MECHANICAL ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL RECTIFY DISCREPANCIES BETWEEN THE ACTUAL INSTALLATION AND CONTRACT
<br />DOCUMENTS WHEN IN THE OPINION OF THE T&B AGENCY OR THE ENGINEER, THAT THE DISCREPANCIES WILL AFFECT SYSTEM BALANCE AND PERFORMANCE.
<br />SUBMITTALS REQUIRED:
<br />SUBMIT SHOP DRAWINGS FOR ALL MATERIALS, EQUIPMENT, AND SYSTEMS REQUIRED BY THESE DOCUMENTS (SEE ARCH. PLANS/SPECS FOR SPECIFIC FORMATTING), INCLUDING:
<br />TEST/BALANCE REPORT
<br />DIFFUSERS AND GRILLES
<br />DUCTWORK, INSULATION AND ACCESSORIES (CONNECTIONS, MASTICS, ETC.)
<br />THERMOSTATS & CONTROLS
<br />SUBSTITUTIONS: CONTRACTOR SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS THAT REQUIRE CHANGES TO THE OTHER
<br />BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS, ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL RE -DESIGN COSTS
<br />AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF ACCEPTABILITY OF SUBSTITUTION.
<br />ENGINEER RESERVES THE RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL PROVIDE SPECIFIED OR EQUIVALENT
<br />MATERIALS/EQUIPMENT AT NO ADDITION COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED.
<br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS RECEIVED THE FINAL PAYMENT AND
<br />CERTIFICATION OF OCCUPANCY. ALL EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND LABOR, FOR ONE YEAR FROM THE DATE OF THE CERTIFICATE OF
<br />COMPLETION. REPAIRS MADE DURING THIS PEROID MUST BE FULLY GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN ADDITION, THE
<br />CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER INSTALLATION
<br />OF EQUIPMENT OR MATERIAL INSTALLED.
<br />VENTILATION AIR SCHEDULE
<br />REQUIRED O1
<br />ZONE 0
<br />SYSTEM
<br />REQUIRED 0
<br />REQUIRED 1
<br />PROVIDED
<br />SPACE
<br />AREA
<br />REQUIRED
<br />OUTSIDE AIR
<br />NUMBER
<br />AIR DISTRIB.
<br />VENT.(Ev)
<br />OUTSIDE (Vbz)
<br />EXHAUST
<br />EXHAUST
<br />(SQFT.)
<br />PEOPLE (Pz)
<br />EFFECTIVE.
<br />EFFICIENCY
<br />AIR (CFM)
<br />AIR (CFM)
<br />AIR (CFM)
<br />LOBBY
<br />404
<br />5 CFM + 0.06 CFM
<br />4 (10-PERSONS)
<br />1.0
<br />1.0
<br />44
<br />--
<br />--
<br />PERSON SQFT
<br />1,000-SQFT
<br />OFFICES
<br />1081
<br />5 CFM + 0.06 CFM5.4
<br />( 5-PERSONS)
<br />1.0
<br />1.0
<br />92
<br />--
<br />--
<br />PERSON SQFT
<br />1,000-SQFT
<br />BREAKROOM
<br />225
<br />7.5 CFM + 0.18 CFI"
<br />14 (70-PERSONS)
<br />1.0
<br />0.7
<br />141
<br />--
<br />--
<br />PERSON SOFT
<br />1,000-SQFT
<br />RESTROOMS
<br />0
<br />70 CFM
<br />TOILET
<br />3-TOILETS
<br />--
<br />--
<br />--
<br />210
<br />210
<br />HALLWAYS
<br />123
<br />0.06 QFT
<br />--
<br />1.0
<br />1.0
<br />7
<br />--
<br />--
<br />STORAGE
<br />167
<br />0.06 CFM
<br />--
<br />1.0
<br />1.0
<br />20SQFT
<br />--
<br />--
<br />SYSTEM POPULATION, Ps:
<br />23
<br />TOTAL ZONE POPULATION, E Pz
<br />23.4
<br />REQU. OUTSIDE AIR INTAKE,(Vot) (=Vou / MAX Ev) (CFM)
<br />305
<br />OUTSIDE AIR INTAKE UNCORRECTED,(Vou) (=DxY-RpPz+FRaAz)
<br />305
<br />PROVIDED OUTSIDE AIR INTAKE (CFM)
<br />310
<br />-7 OCCUPANT DIVERSITY, D (=Ps/ I Pz)
<br />0.98
<br />TOTAL PRESSURE = PROVIDED INT.- PROVIDED EXH. (CFM)
<br />100
<br />NOTES: O REQUIREMENTS IN ACCORDANCE WITH SECTION TABLE 403.3, IN THE SIXTH ED. FLORIDA BUILDING CODE 2017 - MECHANICAL
<br />AIR DEVICE SCHEDULE
<br />GENERAL
<br />CONSTRUCTION
<br />MARK
<br />TYPE
<br />FUNCTION
<br />FRAME SIZE
<br />PATTERN
<br />MATERIAL
<br />FINISH
<br />MFG.
<br />MODEL
<br />NOTES
<br />CD
<br />CEILING DIFFUSER
<br />SUPPLY
<br />18X18
<br />LOUVERED FACE
<br />ALUMINUM
<br />WHITE
<br />PRICE
<br />AMD
<br />0O
<br />CD2
<br />CEILING DIFFUSER
<br />SUPPLY
<br />24X24
<br />LOUVERED FACE
<br />ALUMINUM
<br />WHITE
<br />PRICE
<br />AMD
<br />0 O
<br />RGC
<br />RETURN GRILLE
<br />RETURN
<br />24X24
<br />BLADES
<br />ALUMINUM
<br />WHITE
<br />PRICE
<br />630DAL
<br />01 (
<br />RGC2
<br />RETURN GRILLE
<br />RETURN
<br />18X18
<br />BLADES
<br />ALUMINUM
<br />WHITE
<br />PRICE
<br />630DAL
<br />O@
<br />LVR
<br />INTAKE LOUVER
<br />FRESH AIR
<br />18X18
<br />BLADES
<br />ALUMINIUM
<br />MILL
<br />GREENHECK
<br />EVH-501 D
<br />( 3)j
<br />NOTES: 1 PROVIDE WITH OPPOSED BLADE DAMPER.
<br />2 PROVIDE WITH SQUARE TO ROUND ADAPTER.
<br />3 FLORIDA PRODUCT APPROVED AND ACMA 540/550 CERTIFIED.
<br />P�11
<br />00� TOR (o5 GT
<br />IS1�G ETEc '�yJ l Otjp '
<br />E� r
<br />OK I
<br />IC`'
<br />�RAPOTOR I ,,Y,, )ANU
<br />E
<br />RAID TO
<br />D I
<br />2NDARy 0RE D (PING OR
<br />FRIG P� FAO
<br />RE BE�O I �I
<br />TO J� !
<br />RAGK—
<br />LJ STA
<br />��G A�
<br />E��S
<br />GR���E
<br />NR�
<br />�E�y WALL
<br />SIDE
<br />EXISTING A/C SCHEDULE
<br />UNIT TAG
<br />TONS
<br />MANUFACTURER
<br />SUPPLY
<br />CFMCFM
<br />RETURN
<br />0/A (CFM)
<br />FILTER
<br />HEAT(KW)
<br />(E)AHU-1
<br />4.0
<br />TRANE
<br />1,500
<br />1,345
<br />155
<br />MERV-8
<br />10.0
<br />(E)AHU-2
<br />4.0
<br />TRANE
<br />1 1,500
<br />1 1,345
<br />1 155
<br />1MERV-8
<br />10.0
<br />NOTES: REPLACE THERMOSTAT WITH 7-DAY PROGRAMMABLE TYPE, PER SPECIFICATIONS.
<br />EXISTING AIR_ HANDLING & CONDENSING UNITS — SERVICE WORK REQUIRED:
<br />CONTRACTOR SHALL SERVICE EXISTING (TO REMAIN) AIR HANDLERS AND CONDENSING UNITS COMPLETELY AND
<br />REPLACE ANY DEFECTIVE PARTS AS NEEDED. PROVIDE SERVICE REPORT TO PROJECT MANAGER. SERVICE WORK
<br />SHALL INCLUDE AT A MINIMUM: LUBRICATE ALL BEARINGS, REPLACE ALL BELTS, RE -CHARGE CIRCUITS OR REPAIR
<br />REFRIGERANT LEAKS (RE-CLAIM / RE -CHARGE CIRCUITS IF NEEDED), REPLACE FILTERS, CLEAN EVAPORATOR COILS,
<br />CLEAN DRAIN PAN, AND CLEAN/REPAIR INSULATION ON INSIDE OF UNITS (CU-1,2). INCLUDE THE COST OF A NEW
<br />COMPRESSOR FOR EACH OF THE (2) EXISTING CONDENSING UNITS (CU-1,2). CONDENSATE PIPING SHALL BE
<br />RE -INSULATED, AND REFRIGERANT PIPING SETS SHALL BE RE -INSULATED.
<br />VOLUME DAMPER
<br />GRAVITY BACKDRAFT
<br />DAMPER
<br />VERTICAL AHU MOUNTING DETAIL
<br />NOT TO SCALE
<br />HANGERS AT MAX.
<br />5-FT SPACING WITH
<br />MAX. SAG OF 1/2-
<br />PER FOOT OF
<br />SUPPORT SPACING
<br />1-1 /2" x 22 GA. SADDLE
<br />1-1/2"x22 GA. WIDE BAND CLAMP
<br />1-1/2" X 22-GAUGE
<br />-GALVANIZED STEEL STRAP
<br />MAX. SPACING 10-FT
<br />RATED FASTENERS
<br />HANGER AND SUPPORT FOR
<br />ROUND METAL + ROUND FLEXIBLE DUCTS
<br />STANDARDS SET BY SMACNA
<br />ROUND AIR DUCT
<br />y No 56189
<br />�.STATE OF
<br />© AC R
<br />-
<br />STEPANEK— LEWIS
<br />AND ASSOCIATES
<br />2257 TWELVE OAKS WAY, SUITE 103
<br />WESLEY CHAPEL, FL 33544
<br />PH (813) 991-1248
<br />CERT. AUTH. # 8397 18-31
<br />THE
<br />L U N Am
<br />GROUP
<br />585 Main Street, Suite 201
<br />Dunedin, FI 34698
<br />p 727.733.9400
<br />f 727.733.9555
<br />Iic. AAC001580
<br />lunz.com
<br />V
<br />0
<br />_J
<br />0
<br />cQ
<br />G
<br />W
<br />0
<br />J
<br />J_
<br />CL
<br />w
<br />N
<br />z
<br />0
<br />U)
<br />Q
<br />7
<br />w to
<br />CV
<br />Wcr)
<br />J
<br />>LL
<br />U J
<br />LU Of
<br />r =
<br />a
<br />Co
<br />coo N
<br />U)
<br />J
<br />F—
<br />LU
<br />0
<br />06
<br />cri
<br />J
<br />0
<br />W
<br />CU
<br />L�J
<br />Q
<br />CU
<br />U_
<br />REVISION©• • . .
<br />REVISIONQ• • • • • • • • • • --
<br />REVISION& • • . . . . . • • . --
<br />ISSUED FOR CONSTRUCTION: --
<br />ISSUED FOR PERMIT: 09.05.18
<br />ISSUED FOR BID: --
<br />ISSUED FOR APPROVAL: --
<br />DRAWN BY: T.J.
<br />REVIEW BY: M. LEWIS
<br />THE LUNZ GROUP
<br />©COPYRIGHT 2018 ALL RIGHTS RESERVED
<br />1812.01
<br />M-001
<br />N
<br />N
<br />MATTHEW D. LEWIS, P.E. FL LIC#56189
<br />
|