Laserfiche WebLink
I )ocuSign Envelope ID: OOCCED92-FD82-41DF-BBOB-9A1B2DCB5D17 <br />2020 V1.0 <br />i� <br />M <br />70'-0" <br />1'-4" 4 8'-0" <br />59'-10" <br />A I z �1 I 1 -I • - — ■ ■ - <br />I�� I o T-2.1. <br />D I -4 <br />I}--- I <br />I Iwp I I A <br />I 1025 6 <br />OPT 64' <br />U) g I I I <br />I I <br />F— - - -I - ■ ■ "v ■ <br />- - - - - - - - - - - <br />I \ I r- I I I I I■ <br />1 1/2" I I I 4 5 I■ <br />I <br />— ■ I 1 I I T-2.D T-2.101 <br />- — - <br />00 <br />I <br />r------- - - - - — <br />� <br />I0,f I .4" <br />I ...... ...... ..... <br />..... -... ....... ........... I I UNDER DOOR ■ 1 I ---� 4 <br />I T-2.D <br />- <br />I � <br />I _ 4-71/2 — _ —4'=6— — *2'_1 — — — — — —11-5 <br />_ _ _ _ I 2'-4 1 /2" 9 1 /2" 20'-8 1 /2" <br />I T-2.D I <br />I I 4 � - - <br />T-2.D <br />29'-6" 5'-0" J. 14'-0" <br />■I <br />I 1 <br />- <br />I <br />o <br />�I <br />ML — — — — — — — — — — — — — — — — — — — — — — — — — — J <br />_,\_ . -- - <br />VERIFY AC COND <br />LOCATION W/ <br />SITE PLAN <br />T-0" 1'-0' <br />FOUNDATION PLAN <br />1/4" = V-0" WHEN PRINTED ON 22"x34" <br />011 <br />L - <br />_ 4 5 <br />T-2.D T-2.11) I ■ <br />I■ <br />— — — — — — — — — — — — — -I <br />-v <br />00 <br />N <br />5 I <br />SIM 9" CURB I <br />T-2.D VERIFY AC COND <br />o LOCATION W/ <br />SITE PLAN <br />3'-0" <br />70'-0" <br />GENERAL FOUNDATION NOTES: <br />E <br />a <br />• CONCRETE SLAB ON GRADE SHALL BE MINIMUM 3 1/2" THICK AND <br />O <br />} <br />HAVE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 2500 PSI UNO. <br />O <br />0 <br />• EARTH AND EARTH FILL SUPPORTING SLABS ON GRADE IS <br />� <br />ASSUMED TO HAVE A MINIMUM BEARING CAPACITY OF 2,000 psf, AND <br />APEX <br />C <br />SHALL BE FREE OF ORGANIC MATERIAL AND COHESIVE SOILS. <br />N <br />-� <br />COMPACT THE FILL IN 12" LIFTS TO AT LEAST 95% OF MODIFIED <br />00 <br />PROCTOR MAXIMUM DRY DENSITY. IT IS THE OWNER'S OR <br />CONTRACTOR'S RESPONSIBILITY TO CONFIRM THESE ASSUMPTIONS. <br />O <br />(D <br />• IF CONTRACTOR OR BUILDING OFFICIAL DETERMINES THAT THE <br />O <br />SOIL IS NOT SUITABLE FOR 2,000 PSF BEARING CAPACITY, CONTACT <br />' <br />�? <br />EOR. ADDITIONAL FOUNDATION WORK MAY BE REQUIRED. <br />• SLIDING GLASS DOOR FRAMES MUST BE RECESSED INTO THE SLAB <br />� <br />IN ACCORDANCE WITH THE BUILDING CODE. CONSULT <br />N <br />ARCHITECTURAL PLANS FOR LOCATION OF SLIDING GLASS DOORS. <br />cM <br />• MASONRY STEMWALL AND MONOLITHIC FOOTINGS ARE <br />- <br />INTERCHANGEABLE. SEE SHEET ST-21D FOR ALTERNATE STEMWALL <br />SECTIONS.td <br />LL. <br />J <br />S <br />s <br />• 24" LONG #4 BAR IS RECOMMENDED TO BE INSTALLED AT ALL <br />a) <br />RE-ENTRANT CORNERS, SEE "RE-ENTRANT CORNER DETAIL" ON <br />J <br />a) <br />SHEET ST-2D. <br />true design studios <br />Z <br />O <br />U) <br />Y <br />FOUNDATION KEYNOTES: DC1 Q 9000 REGENCY SQUARE BLVD. N <br />SUITE 100, JACKSONVILLE, FL 32211 <br />NOTES APPLICABLE ONLY WHERE SPECIFIED ON PLAN p <br />8"x8" DEEP THICKENED <br />12" DEEP FTG UNDER BOX <br />O <br />EDGE w/ (1) #4 CONT <br />COLUMN, FTG TO BE <br />PROJECTED MIN 6" AS SHOWN <br />LU <br />C J <br />16"SQx12" DEEP FTG <br />�� <br />24"SQx20" DEEP FTGa) <br />_- <br />01,109ON' <br />w/ (3) #4 EW <br />fA <br />I E 1 <br />1 <br />30"SQx20" DEEP FTG <br />J <br />36"SQx20" DEEP FTG <br />> <br />� <br />�p <br />w/ (4) #4 EW <br />w/ (4) #4 EW <br />+' <br />l GJ48"SQx24" <br />DEEP FTG <br />#5 VERTICAL DOWEL TYP <br />AS SHOWN, SEE MASONRY <br />W <br />- <br />w/ (5) #4 EW, T&B <br />NOTES ON ST-1 <br />Q <br />Q <br />u <br />1 1/2" SLAB EXTENSION <br />AT FULL ROUGH <br />U) <br />OPENING WIDTH <br />} <br />N <br />Z <br />w <br />W <br />w <br />O <br />O <br />O <br />NOTE TO CONTRACTOR... <br />DR HORTON DOES NOT ALLOW FIBERMESH AS AN <br />r <br />>= <br />ALTERNATIVE TO WWF AS SPECIFIED IN THIS PLAN SET <br />u <br />a <br />� <br />BORA-CARE OR OTHER DR HORTON APPROVED WOOD DESTROYING <br />Z <br />W <br />ORGANISM TREATMENT TO BE APPLIED AS DIRECTED BYPRODUCT <br />MANUFACTURER AND DR HORTON. <br />U <br />U <br />— w L.L <br />Z <br />U) Z W <br />m <br />Uj O <br />w <br />w p <br />w O <br />z <br />> <br />w LU w <br />o <br />o Q J LU � <br />LU U LU <br />d• J X <br />z <br />Z <br />O Z <br />O <br />w <br />W <br />O H <br />Z <br />O Q- <br />U LL <br />p w <br />ABBOTT PARK Q <br />O <br />U- LOT 012-03 W <br />w <br />_ _Z Z <br />} O <br />co W <br />r 1 AO�� O PROJECT NO. w <br />J 2021.006616 0 <br />O w <br />Z O <br />DRAWN: -- <br />U KME o <br />0 <br />CHKD: Uj <br />U') <br />MJP U) <br />w w <br />d J <br />Q Q <br />QU ill��iIn <br />m ,`�� �••\ \ C E N sc, R ���� Z <br />No 85166 <br />Uj <br />Q <br />Z � .�*I • DocySignad by: ' <br />L4,T6PDAQFF435 <br />Lij <br />Q•O R G � Z_ <br />Z <br />�';� S�0 N A1- <br />U) <br />_O 05-17-2021 <br />H w <br />REVISIONS: <br />L m <br />Q No. Description Date w <br />U <br />SANITARY ISOMETRIC o - --- z <br />z — - O <br />= o <br />U <br />W <br />H <br />x ST=2 <br />w <br />a <br />Q <br />CMU/METAL CONNECTOR ENGINEERING <br />