My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
8346 Wheat Stone Dr
Zephyrhills
>
Building Department
>
Building Plans
>
8346 Wheat Stone Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 5:09:27 PM
Creation date
2/27/2025 1:21:10 PM
Metadata
Fields
Template:
Building Plans
Street #
8346
Location
Wheat Stone Dr
Contractor
D R Horton
Building Plans - Permit #
2843
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID. 5953A008-AD2B-44CB-A263-6A20DCB735DF <br />2020 V1.0 <br />GENERAL FOUNDATION NOTES: <br />70'-0" <br />1'4" _ 8'-0" 59'-10" � 0 <br />I <br />■ L I — — — — — — — — — �- <br />... N� — —— 3" — — — — — — — <br />I ■ I NI T-2.D -1 <br />I I I col 1 Cl) <br />�V I <br />■I I I I <br />g _I <br />■ I�— <br />I -- — — — — — — — — — — — — — — — — —� 2-6' I 011 �I <br />q ■ I I 6 I-- - 0 0„ <br />M <br />`" � •T T-2.D OPT I NI------------J ■ <br />I A I ? I I 1 -I • - — 1' ■ � ■ <br />I <br />I I O I o A o0 <br />IOILL <br />o <br />� <br />I I OPT 64" 5'-0" --- <br />°° <br />I IW � I I � I ■ ■ "v ■ <br />I I - oo co <br />0 I I� ;. I a --I ----------- - I■ N <br />co <br />I 1 1 /2n I I 4 5 I■ <br />— _ ■ I_ 1 I T-2.D T-2.D <br />I T-2.D I o <br />■ ■ ■ I bo <br />_ <br />. <br />I09# I 41 A <br />I� �3 <br />..: UNDER DOOR <br />■ I I ---I- 4 - <br />i o <br />i0 <br />I I I I 9 1 /2" <br />4'-7 1 /2" — —4=6"— _ _2'' 4 — — — — — — 11'-5" — — — — — 2'-4 1 /2" 20'-8 1 /2" <br />IT <br />I <br />T-2.D — — <br />VERIFY AC COND I 29'-6" I 5'-0" 14'-0" I <br />-- <br />SITE PLAN ■ I <br />LOCATION W/ ( I 0}"_ _ <br />3'-0" _0 I 1 r' — I <br />i I � <br />I T-2.101 <br />I <br />5 <br />4 T-2.D <br />N I i I T-2.D I■ - <br />I I �I I ■ C9 <br />c*) L — — — — — — — — — — — — — — — — — — — — — — — — — — -I — — — — J — — — L — — — — — — — — — — — — — — — J — — — — — — — — — — — — — — — — — — — — — — — — — N <br />■ ■ ■ ■ N ■ - I ■ ■ ■ ■ ■ i ■ ■ <br />T-2.D SIM 9" CURB <br />VERIFY AC COND <br />M LOCATION W/ <br />SITE PLAN <br />� 3 <br />70'-0" je <br />FOUNDATION PLAN <br />1/4" = V-0" WHEN PRINTED ON 22"x34" <br />• CONCRETE SLAB ON GRADE SHALL BE MINIMUM 3 1/2" THICK AND <br />O <br />HAVE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 2500 PSI LINO. <br />O <br />• EARTH AND EARTH FILL SUPPORTING SLABS ON GRADE IS <br />N <br />ASSUMED TO HAVE A MINIMUM BEARING CAPACITY OF 2,000 psf, AND <br />SHALL BE FREE OF ORGANIC MATERIAL AND COHESIVE SOILS. <br />N <br />COMPACT THE FILL IN 12" LIFTS TO AT LEAST 95% OF MODIFIED <br />ap <br />PROCTOR MAXIMUM DRY DENSITY. IT IS THE OWNER'S OR <br />CR <br />CONTRACTOR'S RESPONSIBILITY TO CONFIRM THESE ASSUMPTIONS. <br />O <br />• IF CONTRACTOR OR BUILDING OFFICIAL DETERMINES THAT THE <br />O <br />SOIL IS NOT SUITABLE FOR 2,000 PSF BEARING CAPACITY, CONTACT <br />EOR. ADDITIONAL FOUNDATION WORK MAY BE REQUIRED. <br />• SLIDING GLASS DOOR FRAMES MUST BE RECESSED INTO THE SLAB <br />N <br />IN ACCORDANCE WITH THE BUILDING CODE. CONSULT <br />CV <br />ARCHITECTURAL PLANS FOR LOCATION OF SLIDING GLASS DOORS. <br />M <br />• MASONRY STEMWALL AND MONOLITHIC FOOTINGS ARE <br />J <br />INTERCHANGEABLE. SEE SHEET ST-2D FOR ALTERNATE STEMWALL <br />L L <br />SECTIONS. <br />• 24" LONG #4 BAR IS RECOMMENDED TO BE INSTALLED AT ALL <br />J <br />RE-ENTRANT CORNERS, SEE "RE-ENTRANT CORNER DETAIL" ON <br />.J <br />SHEET ST-21D. <br />5; <br />z <br />O <br />FOUNDATION KEYNOTES: DC1 <br />Q <br />NOTES APPLICABLE ONLY WHERE SPECIFIED ON PLAN <br />-� <br />A <br />8"x8" DEEP THICKENED <br />B <br />❑ <br />12" DEEP FTG UNDER BOX <br />COLUMN, FTG TO BE <br />Q <br />EDGE w/ (1) #4 CONT <br />PROJECTED MIN 6" AS SHOWN <br />LU <br />1C <br />16"SQx12" DEEP FTG <br />[:Dj <br />FTG <br />w/ (3) #4 EWEEP <br />❑E <br />30"SQx20" DEEP FTG <br />F <br />36"SQx20" DEEP FTG <br />w/ (4) #4 EW <br />w/ (4) #4 EW <br />00 <br />G <br />48"SQx24" DEEP FTG <br />H <br />#5 VERTICAL DOWEL TYP <br />AS SHOWN, SEE MASONRY <br />W <br />w/ (5) #4 EW, T&B <br />x <br />NOTES ON ST-1 <br />Q <br />1 1/2" SLAB EXTENSION <br />Z) <br />AT FULL ROUGH <br />OPENING WIDTH <br />z <br />W <br />W <br />x <br />O <br />O <br />O <br />"""NOTE TO CONTRACTOR"" 07 <br />DR HORTON DOES NOT ALLOW FIBERMESH AS AN <br />ALTERNATIVE TO WWF AS SPECIFIED IN THIS PLAN SET to <br />n <br />BORA-CARE OR OTHER DR HORTON APPROVED WOOD DESTROYING z <br />ORGANISM TREATMENT TO BE APPLIED AS DIRECTED BY PRODUCT 07 <br />MANUFACTURER AND DR HORTON. U) <br />Im <br />W <br />W <br />z <br />z <br />W <br />0 <br />O <br />J <br />O <br />a <br />of <br />Q <br />O <br />LL <br />z <br />0 <br />z <br />i <br />I <br />U <br />LU <br />X <br />W <br />�J <br />0_ <br />Q <br />5p� <br />TO <br />m <br />W <br />z <br />O <br />W <br />z <br />r1 11 <br />� <br />1 <br />0 <br />10 <br />1 <br />- � <br />U <br />ti <br />C� <br />SANITARY ISOMETRIC - LH ° <br />O <br />z <br />U <br />W <br />H <br />X <br />W <br />C_ <br />APEX <br />tds <br />true design studios <br />9000 REGENCY SQUARE BLVD. <br />SUITE 100, JACKSONVILLE, FL 32211 <br />Ir <br />This item has been electronically <br />signed and sealed by Justin M Lanier, <br />PE on the date and/or time stamp <br />shown using a digital signature. <br />Printed copies of this document are <br />>,,not considered signed and sealed <br />nd the signature must be verified <br />y a 3rd Party Certificate Authority <br /><n any electronic copy Iv / <br />LU <br />J <br />Z � LIJ <br />LLJ O U) <br />Q � G <br />> <br />U0 <br />G <br />W <br />LLJ <br />aLL <br />PROJECT NO: <br />DRAWN: <br />CHKD: <br />Abbott Park <br />LOT 028-02 <br />- 2021.009237 - - - <br />JAR <br />MJP <br />0r»ti111111"',$ <br />LAN11 <br />i <br />No 85166 <br />k :• DocuSigned by: k '" <br />•,IFS .,< O R 10.N • <br />08-03-2021 <br />REVISIONS: <br />I No. 1 Description I Date <br />ST=2 <br />N <br />Q <br />W <br />X <br />O <br />W <br />z <br />LL <br />W <br />.J <br />Q <br />0 <br />W <br />Q <br />(D <br />t!) <br />W <br />0 <br />LL <br />0 <br />0 <br />LID <br />W <br />J <br />U <br />W <br />z_ <br />U) <br />zLU <br />w <br />W <br />J <br />Q <br />0 <br />z <br />O <br />0 <br />CMUIMETAL CONNECTOR ENGINEERINGa <br />
The URL can be used to link to this page
Your browser does not support the video tag.