My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6457 Beverly Hills Dr
Zephyrhills
>
Building Department
>
Building Plans
>
6457 Beverly Hills Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:22:56 PM
Creation date
2/19/2025 11:41:25 AM
Metadata
Fields
Template:
Building Plans
Street #
6457
Location
Beverly Hills Dr
Contractor
Lennar Homes LLC
Building Plans - Permit #
4639
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIMPSON HGAMV <br />W/ <br />(4)1/4"x1 1/2" SDS <br />SCREWS <br />TO BLOCKING & (� <br />1 /4"x2 314" <br />TITEN TO CMU <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) — MAX 9" <br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/ UNSUPPORTED, <br />SCHEDULE FOR SHEATHING DETAILS (2) 16d NAILS IF >9" SEE 10/S6 <br />2x4 #2 SYF BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />45°± <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />MAX. 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) <br />IF >9" SEE 10/S6 <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING <br />SCHEDULE FOR SHEATHING DETAIL <br />45° ± SEE STRUCTURAL <br />NOTES AND NAILING <br />2x4 CRO BRACE SCHEDULE FOR <br />APPROX. 8" FROM SHEATHING DETAIL 2x4 KICKER 2x8 SYP#2 "L" BRACE TO <br />RIDGE FASTENED AT @ 8'-0" O/C. EXTEND AT LEAST 90% OF • <br />EACH JOINT W/ (3) 10d <br />"L" BRACE TO EXTEND <br />2x4 CROSS BRACE <br />WEB LENGTH & NOTCH AT <br />' <br />& (2)10d TOE NAILS @ <br />.� <br />AT LEAST 90% OF WEB <br />APPROX. 8" FROM <br />BOTTOM CHORD (SEE TABLE) <br />EA. END @ 48" O.C. <br />LENGTH (SEE TABLE) <br />RIDGE FASTENED AT <br />SIMPSON H2.5A w/ (10) 8d <br />2x8 P.T. <br />GABLE TRUSS <br />EACH JOINT w/ (3) 10d & <br />FROM LEDGER TO <br />SILL <br />1/2" CDX PLYWOOD OR <br />(2)10d TOE NAILS @ EA. <br />BLOCKING <br />• <br />' <br />7/16" OSB SHEATHING <br />END <br />ATTACHED W/ 10d <br />GYPSUM WALL BOARD <br />GABLE TRUSS <br />NAILS @ 6" O.C. EDGES <br />2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST <br />CDX PLYWOOD 7 <br />AND 12" O.C. FIELD <br />(4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM <br />CORD ATTACHED W/ (2) 16d TOENAILS <br />O S SHEATHING ATTACHED <br />D <br />10dX3" @ 3" O/C <br />THROUGH CHORD <br />2"x4" LEDGER (MATCH BOTTOM CHORD <br />w/ 10d NAILS @ 6" O.C. <br />w/ 1 <br />EDGES AND 12" O.C. FIELD <br />INTO 2"x6" P T PLATE <br />SLOPE OF ADJACENT SCISSOR TRUSS) <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />DOUBLE TOP PLATE <br />2x4 CROSS BRACE APPROX. 8" <br />FROM RIDGE FASTENED AT <br />EACH JOINT w/ (3)1 Od & (2) 1 Od <br />TOE NAILS @ EA. END <br />2x FRAME WALL (SEE WALL <br />SECTION FOR SIZE &SPACING) <br />1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 10d NAILS @ 6" O.C. EDGES <br />AND 12" O.C. FIELD <br />(2)16d NAILS <br />2x4 "T' ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL <br />NOTCH "L" BRACE HERE 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING <br />FASTEN WITH 10dx3" @ 4" O/C SPACED WEEP SCREED THE FIRST (4) ROWS OF TRUSSES <br />INSTALLED PER MANUF. 1/2" x 8" "J" BOLT @ 48" O.C. WEEP SCREED FROM EA. END TYP. TOP &BOTTOM 2x4 "T' ON TOP OF PANEL <br />@ 48" O.C. BLOCKING, FASTEN WITH <br />" MOISTURE BARRIER SIMPSON META12 w/ (7) 1Odxl 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2) 16d TOENAILS 10d 3" 4" O/C <br />„ �, <br />1/2 x 8 J BOLT @ 32 O.C. MINIMUM 6 FROM O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK - MOISTURE BARRIER <br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER SIMPSON META12 w/ (7) ALTERNATE SIMPSON MSTAM24 w/ (7) 10d NAILS <br />NOTE: IF EMBEDDED 1Odxl 1/2" NAILS AT EA. & (4) 1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH <br />STRAP MISSED VERTICAL SECTION TRUSS VERTICAL WEB (24" GABLE WEB SECTION <br />WEB, USE MSTAM36 w/ (7) 1 O.C. MAX) w/ MIN. 4" 2 <br />10d NAILS & (4) 1/4"x2 1/4" SCALE: N.T.S. EMBEDMENT IN KO BLOCK <br />TITEN ON OUTSIDE S5 SCALE: N.T.S. S5 <br />REFER TO DETAIL J <br />ON SHEET S5 FOR <br />X-BRACING, AND TOP <br />CHORD BLOCKING <br />INFORMATION <br />n•Z•yly".' 11113�� <br />2x4 RAT RUN BRACING <br />AT 24" O.C. ON TOP OF <br />BOTT. CHORD FOR 4 <br />TRUSS SPANS <br />ATTACHED W/ 2 -16d <br />AT EA. TRUSS JOINT <br />2x4 BLOCKING @ 24" <br />O/C w/(2)16d <br />TOENAILS @ EA. END <br />MASONRY WALL <br />ARCHITECTURAL FINISH I <br />EXT. WALL CONN. <br />NON - LOAD BEARI G LOCATION rD <br />SEE TYP. WALL SECTION FOR SCALE: 3/4" = 1'-0" �'S5 <br />ADDITIONAL INFORMATION. <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />N <br />N <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />`'' <br />" <br />SEE STRUCTURAL <br />NOTES AND NAILING <br />00 <br />00 <br />SCHEDULE FOR <br />x <br />SHEATHING DETAIL <br />BACKNAIL w/ <br />1 <br />1 <br />1/ " <br />(2) 16d NAILS <br />`° <br />oo <br />00 <br />2"x4" CROSS BRACE <br />APPROX.8"FROM <br />1 <br />1 2" <br />1 <br />12" " <br />RIDGE FASTENED AT <br />EACH JOINT w/ (3) <br />10d & (2) 10d TOE <br />NAILS @ EA. END <br />2) 2" x 4" LAMINATIONS W/ (1) ROW <br />(3) 2" x 4" LAMINATIONS W/ (1) ROW <br />(3) 2" x 6" LAMINATIONS W/ (2) ROWS OF <br />2x4 PANEL BLOCKING <br />)F STAGGERED 10d COMMON WIRE NAILS <br />OF STAGGERED 30d COMMON WIRE NAILS <br />STAGGERED 30d COMMON WIRE NAILS <br />FI 48" FOR THE <br />(2) 16d NAILS <br />D = 0.148", L = 3") OR EQUAL <br />(D = 0.207", L = 4 1/2") OR EQUAL <br />(D = 0.207", L = 41/2") OR EQUAL <br />FIRST ROWS OF <br />(4) <br />(4) <br />• <br />TRUSSES FROM EA. <br />DOTES: <br />END TYP. TOP & <br />ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 51/2" LAG SCREWS OR EQUAL <br />BOTTOM ATTACHED <br />)F THE COLUMN <br />(SPACE AS SHOWN FOR 3-PLY) <br />w/ (2) 16d TOENAILS <br />?) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />)F THE LAST LAMINATION (SPACE AS SHOWN FOR 3-PLY) <br />x @ <br />2x4 LEDGER (MATCH BOTTOM CHORD <br />SLOPE OF ADJACENT TRUSS) <br />SECTION 3 <br />SCALE: N.T.S. S5 <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 1 O/S6 <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 1 Od NAILS @ 6" O.C. <br />E ES AND 12" O.C. FIELD <br />JACK TRUSS <br />/ SEE PLAN FOR <br />2x4 "T" ON TOP OF PANEL- <br />1) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2) 16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION BLOCKING, FASTEN WITH 2x4 BLOCKING W/ <br />;OMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF 10dx3" @ 4" O/C (2) 12d TOENAILS =. <br />3.U.C., SAME NUMBER OF ROWS, SAME SPACING) SECTION <br />TYPICAL NAILING SCHEDULES FOR BUILT-UP COLUMNS 8 9 <br />SCALE: N.T.S. S5 SCALE: N.T.S. S5 <br />IINIMUM 2x <br />'ROSS BRACING <br />3EE PLAN FOR <br />OCATIONS) TOENAIL 1 <br />(2)16d NA <br />(2) 16d PER <br />JOINT <br />2"x4" MIN. SEE M/S5 <br />CROSS BRACING DETAIL J <br />SCALE: N.T.S. S5 <br />GABLE END BRACING DETAIL <br />12" <br />ISH SCHEDULE <br />kTTACHMENT <br />2 SYP BLK'G @ 16" O.C. <br />i x O.131" <br />AILS EA. SIDE <br />2x4 #2 SYP w/ 1 Od <br />X0.131" @ 8" O.C. <br />ALTERNATE NON -DROP <br />GABLE END DETAIL ri0 <br />SCALE: N.T.S. S5 <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S. <br />PRE-ENGINEERE <br />WOOD TRUSSES <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES <br />`-MINIMUM (2) 16d PER JOINT \-MINIMUM 2x4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL <br />SCALE: N.T.S <br />6" OVERLAP <br />M <br />S5 <br />"L" BRACE W/ 10d @ 4" O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2)16d NAILS <br />SEE STRUCTURAL NOTES AND <br />NAILING SCHEDULE FOR SHEATHING <br />DETAIL <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />RIDGE FASTENED AT <br />EACH JOINT w/ (3) <br />10d & (2) 10d TOE <br />NAILS @ EA. END <br />2x4 PANEL BLOCKING <br />@ 48" O/C FOR THE <br />FIRST (4) ROWS OF <br />TRUSSES FROM EA. <br />END TYP. TOP & <br />BOTTOM ATTACHED <br />W/ (2) 16d TOENAILS <br />(2)16d <br />NAILS <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 1 O/S6 <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR <br />7/16" OSB SHEATHING <br />ATTACHED w/ 1 Od NAILS <br />@ 6" O.C. EDGES AND 12" <br />O.C. FIELD <br />2x4 '7 ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />1Odx3" @ 4" O/C <br />SIMPSON HGAIOKT w/ (4) 1/4"x1 1/2" SDS SCREWS TO <br />TRUSS & (4)1/4"x3" SDS SCREWS TO PLATES AT 24" O.C. <br />DBL. TOP PLATE SIMPSON SP2 w/ (12) 10d <br />NAILS AT EACH STUD <br />STUD WALL (SEE TYP. SEC.) <br />SECTION 4 <br />SCALE: N.T.S. SCJ <br />8d @ 6"O/C <br />WOOD TRUSSES <br />SIMPSON HGAM1OKTA w/ (4) <br />1/4"x1 1/2" SDS SCREWS TO <br />BLOCKING & (4) 1/4"x2 3/4" <br />TITEN TO CMU <br />2 x 4 BLOCKING w/ (2)10d <br />TOE NAILS AT EACH END @ <br />24" O/C (TYP) <br />• <br />0 <br />z <br />w <br />\-BRACING w/ (3)10d x 3" AT <br />EACH CONN. @ 24" O/C <br />\-MOISTURE BARRIER <br />-BOND BEAM <br />MASONRY WALL <br />ARCHITECTURAL FINISH <br />EXT. WALL CONN. @ NON - LOAD <br />BEARING LOCATION (UNEVEN CLG.) E <br />SEE TYP. WALL SECTION FOR SCALE: N.T.S. S5 <br />ADDITIONAL INFORMATION. <br />"L" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />"L" BRACE <br />(1) 2"x4" (U.N.O.) <br />"L" BRACE <br />2"x6" (U.N.O.) <br />"L" BRACE <br />24" <br />0'0" - T-0" <br />T-O" - 6-0" <br />6'-0' & GREATER <br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 10dx3" NAILS @ 4" O/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />SIMPSON HGA10KT w/ (4)1/4"xi 1/2" SDS <br />SCREWS TO TRUSS & (4) 1/4"x3"SDS SCREWS <br />TO PLATES (TYP.) <br />`-STUDS @ 16" O.C. <br />GABLE END BRACING DETAIL SCALE:3/4"=l'-0" <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SIMPSON SP2 w/ (12) <br />10d NAILS AT EACH <br />STUD <br />HIP FRAMING REFERENCE PLAN <br />2x4 BLOCKING 2x4'7" BLOCKING <br />@ 48" O.C. 16d NAIL <br />"L" BRACE <br />ATTACHED W/ <br />1Od NAILS @ 4" <br />O.C. TYPICAL <br />GABLE TRUSS WEB <br />DOUBLE "L" BRACING DETAIL 5 <br />SCALE: N.T.S. S5 <br />2x4 7' BLOCKING <br />2x4 BLOCKING @ <br />48" O.C. <br />"L" BRACE ATTACHED 16d NAIL <br />W/ 10d NAILS @ 4" O.C. <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL 6 <br />SCALE: N.T.S. S5 <br />DIAPHRAGM <br />BLOCKING @ <br />48" 0/C GABLE TRUSS <br />TRUSS VERTICAL <br />(2) 2"x8" "L" BRACE <br />FASTENED WITH (3) <br />16d PER SIDE <br />SCISSOR GABLE "T" BRACE <br />AS PER HIB 91 SCALE: N.T.S. S5 <br />20'-0" MAX 20'-0" MAX <br />"X" BRACE SEE DET. J/S5 CONTINUOUS BOTTO CHORD BRACING 2X4 MIN. <br />INS <br />NOTE: /-TOP CHORD 2X4 #2 SYP BRACING <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING <br />ZBOTTOM <br />@ 16" O.C. MAX. FOR FIRST (4) <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING <br />BAYS <br />THAT MY BE REQUIRED <br />CHORD GABLE END BRACIN( <br />2)'T' BRACING MAY BE USED IN PLACE OF PERMANENT <br />@ 4'-0" O.C. MAX. FOR FIRST (4) BAYS <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN <br />�� <br />AS PER BCSI <br />SCISSOR TRUSS <br />SCISSOR TRUSS <br />W/ DROP CEILING BRACING DETAIL <br />SCALE: N.T.S. <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />FIXED LOCATION ATTACHED W/ (2) 10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />COSMETIC DROP CEILING FRAMING <br />MEAN ROOF HEIGHT UP TO 30'-0" SCALE: NTS <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES <br />FOR WIND SPEED SPECIFICATION <br />SCALE: N.T.S. <br />JUN 1 1 20 <br />VIRTUAL REVIEW ASSIST <br />`Jfrt�a; Review Assist, Inc. <br />ICA�,, Revie,,, completed and approved <br />to compk"Ir"o v�/ith the K ahr PX2300 <br />dition by Debra Anne <br />y' C�I"a�r^m <br />N <br />O <br />J <br />'t <br />— * <br />o <br />00 <br />• <br />00158 <br />LO <br />✓ <br />O <br />0 <br />w <br />0 <br />z <br />Q <br />^, n' I,-) E <br />'M O <br />W i <br />w 3 Q 4 di <br />M4 <br />V) V °� M <br />A� c r o <br />C V/ p B 0, <br />O <br />U < <br />pg <br />e <br />. N w C) N <br />V Cli c <br />E� 2) <br />TO s` o <br />v ^ a <br />w <br />W <br />C7 w <br />w <br />0 I- _j Q o <br />w�¢ Irm-i it jYZx z <br />Q:2_j",O���wUO'0 J0 <br />Q Q <br />C.) <br />=aX zxwOzMpO~QI" <br />a o�Oz0o 00mZ� U <br />cnwawinwwwv51Y z <br />U) <br />Q~Wp�IYQ-v5 WZ6200a- <br />LL <br />oQ o 0 o<<LL <br />w <br />�- <br />sl <br />O <br />O <br />Z <br />0� <br />W <br />> (n O <br />i <br />Q <br />U)Mti <br />LL. It <br />�WD_cy) <br />EL V <br />Q > Q 00 <br />Z U H <br />W <br />W <br />JC:) <br />O <br />co <br />N <br />0 <br />N <br />t <br />N <br />0 <br />0 <br />06 <br />— <br />N <br />N <br />N <br />N <br />N <br />O <br />CD <br />N <br />0 <br />(V <br />0 <br />(V <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />CV <br />O <br />CO <br />9� <br />- <br />9 <br />th <br />04 <br />N <br />0 <br />M <br />M <br />t <br />0 <br />0 <br />0 <br />t <br />t <br />o <br />t <br />0 <br />r� <br />c <br />'v0i <br />'^ <br />L , <br />> <br />o <br />0 <br />N <br />0 <br />M <br />00 <br />to <br />0 <br />(O <br />0 <br />I- <br />1- <br />Cr <br />CO <br />�^ <br />VJ <br />Z Z <br />O <br />O� <br />W�r> <br />Wwin <br />0' <br />Uo�o <br />E— <br />0�a <br />V J <br />O <br />of W <br />w H Q <br />1.2 <br />Q <br />Z� <br />�m0Z <br />=�--=z <br />�z <br />tz <br />N <br />3� <br />}f� <br />rn <br />Z of <br />Z Z D- <br />M <br />w N <br />O< <br /><z <br />Q <br />VLnzz <br />z <br />F_ Q o <br />LL <br />U <br />-seZ <br />OU <br />_o <br />W <br />Q <br />Z <br />z <br />z <br />J <br />W <br />N <br />N <br />0 <br />LAST PLOT DATE <br />0 <br />Apr. 11, 22 <br />Z <br />O <br />STRUCTURAL <br />— <br />—� <br />DETAILS <br />
The URL can be used to link to this page
Your browser does not support the video tag.