Laserfiche WebLink
(2) LAYER TYPE 1(#15) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR <br />TYPE II (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR <br />LESS. <br />12 PRE ENGINEERED <br />WOOD TRUSS @ 24" <br />HURRICANE ANCHOR @ EACH TRUSS <br />'::'Z-1O.C. MAX. <br />SHINGLE ROOF <br />SHINGLE ROOF <br />INSULATIO 4 <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" O/C WALLS I <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP WB <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />1x2 NAILER <br />J ~ PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />w <br />16" O.C. 2X S.P.F. STUDS <br />o = <br />W/ (4)16d TOENAILS TO TOP PLATE <br />o 7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2)10d @ 6" O.C. <br />J METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />� W LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />w = INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA <- 1000 <br />gYR <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALE <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM ETAL SEAT <br />ER PLAN p q OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />a:a <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS STD. 90 HOOK (SEE DETAIL) <br />1/2" GYP WB 8"x8"X16" CONC. KNOCKOUT <br />INSTALLATION PER BLK. W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN SOLID W/GROUT <br />NOTE: LAP SHEATHING TO BOTTOM OF WL <br />BAND JOIST TYPICAL <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />c*> <br />u v 4"x4" INSPECTION PORT AT <br />a EACH FILL CELL TYPICAL <br />w rn <br />1x WD FURRING @ 24" O.C. n AT GARAGE CONTRACTOR <br />BASEBOARD LID TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER NOTE: EXTEND DECO FINISH <br />MUNICIPALITY 411to 6" BELOW GRADE <br />c . <br />"d <br />ON! <br /><... <br />FINISH GRADE 00 <br />Cn <br />LT1 I I I �I I I I <br />6x6 w1.4xw1.4 LEI �I �I I �I I I I a° z a. I I I FEI I I=I I IT o r <br />WWF OR FIBERMESH �� �� <br />II I I=1 I I I I I �I I F <br />(I . , ,I STD. 90'HOOK <br />(3) # 5 REBAR ON 3"CHAIR (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 1'-8" <br />TYP 2—STORY WALL SECTION <br />SCALE: 3/4"=1'-01, S6 <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2 <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1 ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />ATE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6" O.C. <br />NOTES: ` USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS N <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN INSTALLED PER MANUF. <br />61. <br />2'X4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />O/C FOR THE 1ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)1Odx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 202 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION KR <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=1'-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1"" <br />2"x BOT. PLATE <br />(2) 1 Od @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUS; <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 1Odx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" <br />FOR ADDITIONAL INFORMATION. <br />PROVIDE CONTINUOUS <br />BLOCKING FROM B.U.C. <br />TO MASONRY BELOW <br />(6) 1/4" x 2 1/4" TITEN <br />SCREWS TO MANSONRY I� <br />WALL PER STRAP \ <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION <br />B.U.C. <br />(8) 10d NAILS TO <br />STUD PER STRAP <br />SIMPSON MSTAM36 <br />MASONRY WALL <br />SCALE: N.T.S. <br />RIBBONS <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1/2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT.:5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10) 1 Od <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />III, „I l l� i 11 l l l 11 l 11 i 11 I IF, l l- (3) #5 CONT. ON 3" <br />8" 1'-8" 8" CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" S6 <br />ADDITIONAL SLAB INFORMATION. <br />W <br />w <br />03 <br />0 <br />O <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />F <br />x <br />PROVIDE <br />x <br />BLOCKING AS <br />REQUIRED PER <br />D <br />0 SECTION X-X IF <br />Lu NOT FULL <br />HEIGHT <br />FHEIGHT SHEET - <br />z <br />G FLOOR SYST <br />M <br />(2)- 2x TOP PLATE <br />.! BEYOND I <br />15/32" OSB <br />EXPOSURE <br />F <br />SHEATHING w <br />SOLID 2x <br />C <br />BLOCKING @ ALL 0 <br />C <br />SHEATHING W <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />n. 0 <br />C <br />x <br />�w <br />x <br />E <br />2x STUDS LLJ <br />BEYOND. ,n <br />SEE PLAN 0 <br />O <br />III[:[ <br />11111 <br />11 <br />11 <br />1n <br />�2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN BETWEEN FLOOR WALL SHEATHING <br />SYSTEM 1AIAI I r1 r11AT1J-%u n1Ar+nA1A <br />3/3" "S" = NAIL 3/8" <br />SPACING <br />S C/4",S112" <br />"/2 <br />S 1/2" <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2)12d <br />TOENAILS EA- END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />SECTION X-X <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM Ye" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />0 <br />Lu <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />J <br />PENETRATE SURFACE MORE THAN Ya'. <br />? <br />OA NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />O <br />@ NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />z <br />LL = <br />@ NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMM <br />O <br />QD NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />of <br />@ STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />8d COMMON NAIL <br />J � <br />W LL O <br />PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADEF <br />O <br />> C O to <br />Cr OOm <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />z LL fr <br />© (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @VERTICAL <br />- co N W O O <br />MEMBER IF GABLE END <br />(" <br />NOTE: <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2x CRIPPLES @ <br />2"x10" OR GREATER HEADER <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />1 <br />(2) 2x HEADER SEE PLAN <br />S4 <br />10d NAILS @ <br />INTERIOR HEADER: <br />8" O/C TYP. <br />BOX HEADER (1) 2x SILL PLATE W/ (2) <br />ONLY 12d TOENAILS <br />DOUBLE 2x <br />• EXTERIOR HEADERS: <br />CRIPPLE STUD <br />(1) 2x SILL PLATE W/ (2) <br />TYPICAL (U.N.O.) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 10d x 1 1/2" EACH SIDE <br />op NFRi0R <br />N� <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL 0 <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />a. <br />° <br />' <br />" <br />IIIIIIIIIIII IIIIIV141a <br />'Il,;IIII <br />I III-1 I ►_� <br />(3) # 5 REBAR ON 3" CHAIR 4" 1'_8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />M <br />S6 <br />8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 21/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />EA END <br />EA END <br />EA END <br />EA END <br />SIMPSON <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />1 (3) <br />1 (3) <br />(2) <br />(3) <br />(2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" 0/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />00 <br />FINISH GRADE <br />00 <br />;III„II o <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=1'-O" <br />ADDITIONAL INFORMATION. <br />V <br />S6 <br />JUN 1 1 2ti22 <br />�A <br />VIRTUAL REVIEW ASSIST <br />virtual Review Assist, Inc. <br />rcompleted an approved <br />to c or, 1)1. \A-/ith the 2020 FBC 7th <br />Edition by Uepra Anne Klahr PX2300 <br />" <br />04 <br />CV <br />C2 <br />,4LID <br />' <br />� <br />® , <br />• <br />oD <br />LID <br />AR 15 <br />4t <br />Uj <br />0 <br />W <br />Q <br />�I E <br />OU <br />�0 M <br />CM A d <br />} Sri U �� <br />N t ' 'CIO, <br />cn <br />A� E >_ t p <br />W p �o <br />_ <br />VJ 0. O o^ N Q <br />S <br />"N Lu O� <br />N = <br />N o EM <br />>` <br />a <br />W <br />�' W <br />w <br />w�Q it UJ =gYz� z <br />¢: J p� V 0 u- 0 <br />Q Q <br />V <br />F- <br />Q000 Zu-u—ow z2��H¢Q <br />Oun0f§OzOROOmzj <br />w w— w—� <br />0 <br />�0Z <br />a cnww W¢ <br />Q<< Uj< zWzo��oa <br />LL- <br />ow �H� two ¢ ¢ <br />O� o pQz <br />u-¢ o �¢L� <br />s� <br />0! <br />O <br />O <br />N <br />Z <br />0� <br />4 <br />(n O <br />z <br />0 CM O <br />Q U) CM <br />LO <br />II- <br />U) LL <br />QWQu? <br />�WIZM <br />Q >- Q 40 <br />Z 0 <br />W <br />W <br />-.1 C:) <br />CD <br />N <br />N <br />O <br />CV <br />, <br />; <br />1 <br />N <br />1 <br />0 <br />I. <br />O <br />aD <br />M <br />CD <br />� <br />00 <br />� <br />O <br />N <br />C) <br />N <br />C)00 <br />N <br />N <br />r- <br />N <br />C)C)O <br />N <br />N <br />O <br />N <br />CD <br />N <br />N <br />C)O <br />CV <br />N <br />N <br />O <br />1 <br />O <br />r- <br />N <br />M <br />M <br />I <br />� <br />0 <br />1 <br />� <br />0 <br />1 <br />O <br />0 <br />1 O <br />1 <br />O <br />0 <br />(6 <br />CD <br />C <br />U) <br />,^ <br />CD <br />> <br />C) <br />CDO <br />N <br />CM <br />C) <br />4 <br />CD <br />Ln <br />6 <br />CDL, <br />f-� <br />1- <br />' <br />♦♦ ^^- <br />VJ <br />Z <br />z O <br />W <br />O�-' <br />WUr- <br />U <br />O <br />Uu <br />< <br />F- <br />a <br />LO <br />^ <br />i� <br />V1 <br />OWHQ <br />H <br />Q <br />Z� <br />m Q Z <br />J <br />(V <br />v <br />z <br />Z > <br />M <br />W <br />>- <br />M <br />aZZW <br />CO <br />W N <br />O�2z <br />�— <br />Q <br />VU)Zz <br />. <br />Z <br />Z <br />�QO <br />U <br />OU <br />oa <br />m <br />Z <br />z <br />z <br />W <br />J <br />W <br />/o <br />N <br />O <br />LAST PLOT DATE <br />>0 <br />" . <br />Apr. 11,' 22 <br />z <br />-4-0 <br />O <br />STRUCTURAL <br />DETAILS —MONO <br />