Laserfiche WebLink
DEMOLITION PLAN <br />)EMOLITION NOTES: <br />PRIOR TO DEMOLITION, MEASURE AND RECORD <br />AIR & WATER QUANTITIES IN UTILITIES REQUIRED <br />TO MAINTAIN OPERATION WITH -IN AND BEYOND <br />EACH DEMOLITION PHASE UNTIL AFFECTED <br />AREAS ARE DEMOLISHED. MAINTAIN THESE <br />QUANTITES THROUGHOUT EACH DEMOLITION <br />PHASE. <br />MAINTAIN EXISTING AIR HANDLING UNIT AHU-2 <br />IN OPERATION UNTIL ITS DEMOLITION PHASE IS <br />COMPLETE. BLANK -OFF AND SEAL RETURN AIR <br />INTAKES SERVING EACH DEMOLISHED AREA IN <br />ORDER TO PREVENT GENERATED CONSTRUCTION <br />DEBRIS FROM BEING RECIRCULATED TO OCCUPIEI <br />SPACES DURING DEMOLITION / CONSTRUCTION <br />PHASE. BLANK -OFF AND SEAL ANY SA, RA AND/OR <br />EA DUCTS BEING DEMOLISHED AND REMAINING <br />WITHIN THE CONSTRUCTION AREA. <br />MAINTAIN NEGATIVE RELATIVE AIR PRESSURE <br />IN DEMOLITION PHASE AREA. MINIMUM, HEPA- <br />-FILTERED EXHAUST AIR QUANTITY SHALL BE <br />0.5 TO 0.75 CFM/SQ. FT. UTILIZE MULTIPLE <br />NEGATIVE AIR UNITS, AS NECESSARY, TO <br />MAINTAIN NEGATIVE PRESSURE. PROVIDE <br />REQUIRED MAKE-UP AIR FROM A SEPARATE <br />SOURCE. FANS IDENTIFIED TO BE DEMOLISHED, <br />IN DEMOLITION AREA, AND/OR EXISTING ROOF <br />EXHAUST FANS AND THEIR ROOF OPENINGS MAY E <br />UTILIZED FOR AIR DISCHARGE UNTIL DEMOLITION <br />PHASE IS COMPLETE. DO NOT UTILIZE EXISTING <br />EXHAUST RISERS THAT SERVE OTHER SPACES OR <br />OTHER LEVELS IN BUILDING. NEW ROOF OR WALL <br />OPENINGS BEING CREATED FOR CONSTRUCTION <br />MAY BE UTILIZED FOR AIR DISCHARGE. <br />VERIFY NEGATIVE RELATIVE AIR PRESSURE IN <br />THE CONSTRUCTION SPACE BY MAINTAINING A <br />WRITTEN LOG, TAKEN AT REGULAR INTERVALS, <br />POSTED FOR REVIEW, AT SITE OF CONSTRUCTION <br />DEMOLISH ALL DUCTWORK, PIPING AND <br />ANCILLARY DEVICES WITHIN AREA OF DEMOLITION <br />UNLESS OTHERWISE NOTED. ALL BRANCH DUCTS <br />BEING DEMOLISHED FROM MAIN TRUNK DUCTS <br />SHALL HAVE BRANCH CONNECTION OPENINGS <br />PATCHED, SEALED AND INSULATED TO MATCH <br />EXISTING DUCTWORK. <br />DEMOLISH ALL ABANDONED DUCTWORK, DAMPER; <br />PIPING AND ANCILLARY DEVICES IN DEMOLITION <br />AREA UNLESS OTHERWISE NOTED. PATCH <br />AFFECTED WALLS TO MATCH EXISTING OR NEW <br />CONSTRUCTION, AS PROJECT DICTATES. <br />CAP BRANCH PIPING AT RISER ISOLATION VALVES. <br />IF VALVES ARE NOT INSTALLED, PROVIDE GATE <br />VALVE AND BLIND FLANGE. <br />NEW WORK PLAN <br />RELOCATED AIR DEVICES TO <br />(102�AND ANTE ROOM (101)- <br />CTI N INC. BAULIN TUBE <br />)NT AT ABOVE DOOR LEVEL. <br />- PROVIDE AIRFLOW <br />TUBE MODEL <br />BOVE DOOR LEVEL. <br />f0 BE RELOCATED. REFER <br />i FOR DETAILS. <br />polvROUS <br />Project No. 10003.00 <br />M201 <br />SCALE 4" =1'-0" <br />$DATE$ $TIME$ $FILEA$ <br />SCALE %" =1'-ON <br />© 2009 BH/PK Architects, Inc. <br />