Laserfiche WebLink
fiR <br />QC <br />0.9� <br />C-1 <br />/ C-2 ! - <br />C-3 ;-- - - <br />C-4.6 <br />C-4.7 - - <br />C-4 9 <br />C-5 -- - - <br />C-C.1 ! GC ) (\ 8.8 % t G-B.7 l C-Fi.6) c-�.5) c;-n.3) c-n.z-� <br />REAR <br />LEFT tzT\ RIGHT 1 Plumbing Floor Plan <br />NScale 1/8'=l'-0' <br />FRONT <br />PLUMBING GENERAL NOTES <br />1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND GOVERNING AUTHORITIES. <br />I.E.: FLORIDA BUILDING CODE 2004- PLUMBING. <br />2. ALL SANITARY PIPING SHALL HAVE A 118" PER FOOT SLOPE UNLESS OTHERWISE NOTED. ALL <br />STORM WATER PIPING SHALL HAVE A 1/8" PER FOOT MINIMUM HORIZONTAL SLOPE UNLESS <br />OTHERWISE INDICATED. <br />3. VALVES AND FITTINGS SHALL BE OF SAME SIZE OF LINE ON WHICH THEY ARE LOCATED, <br />UNLESS OTHERWISE INDICATED ON DRAWINGS, <br />4. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING FIRE RATING AND WEATHERPROOFING <br />INTEGRITY OF ALL PIPING AND PENETRATIONS. <br />5. ALL WATER SUPPLY AND SANITARY LINES SHALL RUN AS CLOSE TO PLANS AS POSSIBLE <br />WITH NO CHANGES IN SIZING. <br />6. CHANGES IN THE DIRECTION OF SANITARY AND STORM DRAINAGE PIPING SHALL NOT BE <br />MADE WITH FITTINGS WHICH WILL CAUSE EXCESSIVE REDUCTION IN THE VELOCITY OF FLOW <br />OR CREATE ANY OTHER ADVERSE EFFECT. I.E.: USE OF SANITARY TEE IN A HORIZONTAL <br />CONNECTION, USE OF A DOUBLE SANITARY TEE IN A VERTICAL STACK, USE OF SHORT <br />RADIUS FITTINGS FOR BRANCH TO HOUSE DRAIN OR STACK CONNECTION. <br />7. CONTRACTOR SHALL GIVE 24 HOURS NOTICE TO APPLICABLE UTILITY COMPANY PRIOR TO <br />PERFORMING WORK INVOLVING UTILITIES. <br />8. ALL DRAINAGE PIPING SHALL BE MARKED WITH THE SEAL OF APPROVAL OF THE NATIONAL <br />SANITATION FOUNDATION. <br />9. WHERE SANITARY SEWER LINES CROSS UNDERGROUND WATER SUPPLY LINES WITH LESS <br />THAN 8' MINIMUM VERTICAL CLEARANCE, THE SANITARY SEWER SHALL BE CONSTRUCTED <br />OF DUCTILE IRON PIPE (10' EACH SIDE OF WATER MAIN) OR THE WATER LINES SHOULD BE <br />MODIFIED TO PROVIDE 8' MINIMUM CLEARANCE. <br />10. THE PLUMBING CONTRACTOR MAY BE REQUIRED TO DROP PIPE OUTSIDE OF BUILDING TO <br />REQUIRED DEPTH TO PROVIDE CONNECTION TO AREA DEVELOPMENT UTILITY STUB. ALL <br />DROPS IN DEPTH SHALL BE MADE WITH THE USE OF 450 FITTINGS. <br />11. ROUTE ALL PIPING CONCEALED ABOVE CEILINGS, WITHIN WALLS, OR IN CHASES. EXPOSED <br />PIPING SHALL BE SLOPED AND PAINTED TO MATCH ARCHITECTURAL FINISHES. PIPING IN <br />MECHANICAL ROOMS MAY BE EXPOSED. <br />12. SLEEVE AND FIRE STOP ALL PENETRATIONS (IF ANY) OF RATED WALLS, FLOORS, CEILINGS, <br />ETC., IN ACCORDANCE WITH APPLICABLE UL STANDARDS AND LOCAL CODES TO MAINTAIN <br />RATINGS. REFER TO SPECIFICATIONS AND ARCHITECTURAL DRAWINGS FOR RATED WALLS, <br />CEILINGS AND FLOOR INFORMATION. <br />13. ALL WATER PIPING INSTALLED IN EXTERIOR WALLS SHALL BE PLACED ON THE INTERIOR SIDE <br />OF THE WALL.THE WALL INSULATION SHALL BE PLACED ON THE EXTERIOR SIDE OF THE PIPE. <br />ANY PIPING INSTALLED IN UNCONDITIONED SPACES SHALL BE INSULATED AND PROTECTED <br />FROM FREEZING TEMPERATURES. <br />14. SPACES SHALL BE INSULATED AND PROTECTED FROM FREEZING TEMPERATURES. SEE <br />RISER DIAGRAMS FOR BRANCH PIPING DETAILS AND SIZES NOT SHOWN ON PLANS. <br />15. COLD AND HOT WATER PIPING SHALL BE COPPER WATER TUBE (ASTM B88) TYPE "L" WITH <br />WROUGHT -COPPER (ANSI B16.22), OR CAST BRASS (ANSI B16.18) PRESSURE FITTINGS AND <br />ALLOY GRADE (ANSI-ASTM B32) 95TA LEAD-FREE SOLDER JOINTS. DISINFECT WATER PIPING <br />AFTER PRESSURE TEST WITH Ci ILORINE SOLUTION 50 MG-L) FOR 24 HOURS. FLUSH LINES <br />CLEAN AFTER COMPLETION. <br />16. SOIL, WASTE AND VENT PIPING SHALL BE PVC. PROVIDE CAST IRON PIPE AND FITTINGS FOR <br />SOIL, WASTE AND VENT PIPING LOCATED IN CEILING PLENUMS. PROVIDE PVC PIPING: ASTM <br />D2665 SCHEDULE 40. FITTINGS: PVC DWV JOINTS: ASTM WELD. <br />17. PROVIDE CLEANOUTS AT BASE OF EACH VERTICAL STACK INCLUDING BACK, AT EACH <br />CHANGE OF DIRECTION OF HORIZONTAL RUNS AND AT 75 FOOT INTERVALS OF HORIZONTAL <br />RUNS. <br />18. METERING AND SITE UTILITY CONNECTIONS SHALL BE PROVIDED ON SITE UTILITY DRAWINGS. ALL <br />SERVICES SHOWN ON THIS SET OF PLANS TERMINATE 5'-0" FROM BUILDING, UNLESS SHOWN <br />OTHERWISE ON DRAWINGS. PLUMBING CONTRACTOR SHALL MAKE FINAL CONNECTIONS TO SITE <br />UTILITIES. <br />19. FURNISH AND INSTALL HOSE BIBBS AND/OR WALL HYDRANTS 24" ABOVE FINISHED GRADEIFLOOR <br />AND PROVIDE VACUUM BREAKERS. <br />20. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ROOF DRAINS, PLUMBING FIXTURE <br />MOUNTING HEIGHTS AND DIMENSIONS. <br />21. CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF EXISTING SEWERS IN WHICH NEW SEWER <br />LINES ARE TO BE CONNECTED PRIOR TO INSTALLATION. <br />22. ALL VENTS THRU ROOF SHALL BE A MINIMUM OF 10'-0' FROM ANY AIR INTAKE. <br />23. CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR METALS. <br />24. CONTRACTOR SHALL ROUGH -IN ALL WASTE AND SUPPLIES TO SPECIAL EQUIPMENT ACCORDING TO <br />MANUFACTURER'S SHOP DRAWINGS AND MAKE FINAL CONNECTIONS. ALL SUPPLIES SHALL BE <br />VALVED. INSTALL VACUUM BREAKERS WHERE REQUIRED BY CODE. <br />25. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (INCLUDING PIPE ROUTING AND EQUIPMENT <br />LOCATIONS) TO ARCHITECT/ENGINEER FOR REVIEW PRIOR TO THE INSTALLATION OR PURCHASING <br />OF ANY PIPING AND/OR EQUIPMENT. <br />26. PROVIDE REDUCED PRESSURE BACKFLOW PREVENTERS FOR DOMESTIC WATER SUPPLY <br />CONNECTIONS AS REQUIRED BY CODE. <br />27. ALL BELOW GRADE/SLAB COPPER PIPE SHALL BE PLACED WITHIN COPPER PIPE SLEEVE (10 MIL) <br />POLYETHYLENE PLASTIC SLEEVING. EXTEND SLEEVING ABOVE GRADEISLAB. <br />28. PRESSURE REDUCING VALVES SHALL BE INSTALLED ON BRANCH LINES SERVING FIXTURES AND/OR <br />EQUIPMENT WHEN THE PRESSURE IN THE LINE EXCEEDS 80 P.S.I. <br />29. ROUTE WATER LINES TIGHT TO STRUCTURE. COORDINATE ROUTING TO AVOID CONFLICTS WITH <br />OTHER DISCIPLINES. <br />30. IF THE INTENT OF THE DRAWINGS AND/OR SPECIFICATIONS IS UNCLEAR OR HAS MORE THAN ONE <br />INTERPRETATION, IT SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER IN <br />WRITING BEFORE THE SUBMISSION OF BIDS. THE ARCHITECT/ENGINEER SHALL MAKE <br />CORRECTIONS AND/OR PROVIDE EXPLANATION IN WRITING. <br />31. PLANS AND SPECIFICATIONS ARE INTENDED AS A GENERAL DESCRIPTION OF THE WORK TO BE <br />PERFORMED. ALL ITEMS NOT SPECIFICALLY MENTIONED OR SHOWN, BUT NECESSARY FOR THE <br />COMPLETION OF THE INSTALLATION, SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR. <br />THE CONTRACTOR SHALL ACQUAINT HIMSELF WITH THE MECHANICAL, ARCHITECTURAL, <br />STRUCTURAL AND ELECTRICAL PLANS PRIOR TO SUBMITTING HIS FINAL BID. NO ADDITIONAL <br />COMPENSATION WILL BE ALLOWED DUE TO CONTRACTORS FAILURE TO FAMILIARIZE HIMSELF <br />WITH THE PLANS. <br />32. THE CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE EQUIPMENT AS SCHEDULED OR <br />SPECIFIED, USING THE MANUFACTURERS AND EQUIPMENT SPECIFIED ON THE DRAWINGS. IF MORE <br />THAN ONE MANUFACTURER IS SPECIFIED FOR ONE ITEM, ANY ONE OF THE MANUFACTURERS <br />LISTED MAY BE USED IN THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR WISHES TO USE <br />EQUIPMENT NOT SPECIFIED, HE MUST AT THE TIME OF BIDDING SUBMIT SEPARATELY ON <br />LETTERHEAD STATIONARY OF THE BIDDER, THE EQUIPMENT HE WOULD SUBSTITUTE AND THE <br />COST TO BE ADDED OR TO BE DEDUCTED FROM HIS PROPOSAL. <br />33. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME TO AVOID <br />DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERY WILL NOT BE CONSIDERED A <br />JUSTIFIABLE REASON FOR SUBMISSION OF SUBSTITUTE MATERIALS. <br />34. DO NOT PENETRATE WALL FOOTINGS WITH PIPING. COORDINATE WITH GENERAL CONTRACTOR TO <br />DROP FOOTINGS AS REQUIRED TO CLEAR PLUMBING SERVICES WHERE ABSOLUTELY NECESSARY. <br />ALL PIPING PENETRATING A BEARING WALL OR FOOTING MUST BE SLEEVED AND LOCATION <br />APPROVED BY STRUCTURAL ENGINEER. <br />FIXTURE SPECIFICATIONS <br />PIPE SIZE <br />FIXTURE <br />MANUFACTURER <br />MODEL # <br />DESCRIPTION <br />CW <br />HW <br />SAN <br />VENT <br />EXTERIOR CLEANOUT <br />ZURN <br />Z-1400-HD <br />- <br />- <br />_ <br />_ <br />HEAVY TRAFFIC AREA EXTERIOR CLEANOUT WITH ACCESS COVER AND TWO-WAY FITTING. SEE PLANS FOR PIPE <br />SIZE CONNECTION. <br />FREEZE PROOF ENCLOSED WALL ANTI -SIPHON WALL HYDRANT COMPLETE COMPLETE WITH BRONZE CASING, <br />WALL HYDRANT <br />WOODFORD <br />B65 <br />3/4' <br />- <br />_ <br />_ <br />VACUUM BREAKER, ALL BRONZE INTERIOR PARTS AND NON TURNING OPERATING ROD WITH FREE FLOATING <br />COMPRESSION CLOSURE VALVE. WATER BOX DOOR SHALL BE BRASS CASTING WITH CHROME FINISH AND <br />EXTERIOR CLEANOUT <br />ZURN <br />Z-1400-HD <br />- <br />_ <br />_ <br />_ <br />HEAVY TRAFFIC AREA EXTERIOR CLEANOUT WITH ACCESS COVER AND TWO-WAY FITTING. SEE PLANS FOR PIPE <br />SIZE CONNECTION. <br />FLOOR DRAIN <br />JOSAM <br />32100 <br />- <br />- <br />- <br />- <br />WITH GRATE <br />REFER TO ARCHITECTURAL DRAWINGS FOR ALL FINAL LOCATIONS AND MOUNTING DIMENSIONS OF ALL PLUMBING FIXTURES. PROVIDE ADA CONFORMING FACTORY INSULATION KIT ON HOT, COLD AND P-TRAP WASTE <br />PIPING AT HANDICAP DESIGNATED LAVATORIES. <br />PIPING MATERIAL SCHEDULE <br />SERVICE <br />SIZE <br />MATERIAL <br />SCHEDULE/TYPE <br />INSULATION <br />REMARKS <br />TYPE <br />THICKNESS <br />:OLD WATER <br />ALL <br />COPPER <br />TYPE L <br />FG <br />1" <br />ALL SERVICE JACKETS <br />BELOW GRADE <br />ALL <br />C.I.OR PVC <br />SERVICE WEIGHT <br />NONE <br />- <br />NO HUB <br />ABOVE GRADE <br />ALL <br />C.I.OR PVC <br />SERVICE WEIGHT <br />FG <br />1" <br />NO HUB <br />S B E <br />C , <br />BRONZE CLEANOUT PLUG <br />W/COUNTER SUNK HEAD <br />FINISHED GRADE <br />16' SQUARE CONCRETE PAD <br />PVC WASTE LINE <br />LENGTH TO SUIT TWO WAY CLEANOUT R&G <br />SLOAN PVC PART NO.3724 <br />WASTE LINE -7 <br />1 Exterior Cleanout Detail (ECO) <br />Scale: None <br />SYMBOLS AND ABBREVIATIONS <br />IPTION <br />ABBR. <br />SYMBOL <br />ABOVE GRADE <br />SAN <br />BELOW GRADE <br />SAN <br />PIPE <br />r <br />V <br />------------ <br />TER PIPE <br />CWER <br />PIPE <br />HW <br />FLOOR CLEANOUT <br />CO <br />-0 <br />EXTERIOR CLEANOUT <br />ECO <br />WALL CLEANOUT <br />WCO <br />HOSE BIBB <br />HB <br />-i iC <br />VENT THRU ROOF <br />VTR <br />J iI L I <br />DIRECTION OF FLOW <br />SHUT OFF VALVE <br />CAP <br />C <br />TEE UP <br />TEE DOWN <br />ELBOW UP <br />0 <br />ELBOW DOWN <br />C <br />REVISION REFERENCE <br />Q <br />TYPICAL <br />TYP <br />'SOME SYMBOLS SHOWN MAY NOT PRETAIN TO THIS PROJECT <br />DRAWING INDEX <br />SHEET <br />TITLE <br />P001 <br />Plumbing Floor Plan, Notes, Schedules & Details <br />�V [ �Kossik Rd <br />_-5�71IIIIn <br />U <br />W <br />C <br />0 <br />Q- <br />0 <br />r� <br />V <br />ICU c C0 <br />VJM <br />CD <br />WSJ U <br />LU <br />cc <br />E 2 ce u- <br />z <br />> <br />w <br />�MI-Ui <br />J <br />U <br />V/ <br />O <br />E <br />E <br />0 <br />U <br />�-O <br />M <br />N� <br />iQ Cn l� c <br />Ucy)�£0 <br />N <br />U CL CO)mYNa <br />n. <br />ui <br />.CU <br />0 <br />06 <br />U <br />U) <br />Ww <br />♦--0 <br />0 <br />z <br />w <br />cU <br />L <br />0 <br />_O <br />L.L <br />J E <br />H <br />H _ <br />w <br />w <br />x <br />co <br />ui <br />A W <br />w M <br />O Y o <br />u: CO <br />,,mom. a i <br />w <br />0 <br />