My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7910 Gall Blvd (4)
Zephyrhills
>
Building Department
>
Building Plans
>
7910 Gall Blvd (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 1:00:17 PM
Creation date
2/19/2025 11:51:44 AM
Metadata
Fields
Template:
Building Plans
Street #
7910
Location
Gall Blvd
Contractor
Hawkins Construction
Building Plans - Permit #
8439
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 VES_ <br />A-10 SCALE <br />EXISTING STUCCO OVER <br />SHEATHING <br />EXISTING R-19 BATT <br />INSULATION AS REQ'D <br />EXISTING SEALANT COLOR <br />TO MATCH MT'L SOFFIT <br />EXISTING FIRE RET. TREATED <br />WD BLOCKING AS REQ'D <br />EXISTING STOREFRONT <br />AS SCHEDULED <br />I /'J" CI CVTQI C <br />TL. <br />GA <br />" TSB 16 GA. <br />RACK <br />OP MTL. TRACK <br />OR 6" MTL. <br />TUD WALL. <br />A"VG" AA=AI c`TI Irl <br />VESTIB LE CORNER D <br />A-10 SCALE. 3"=1'-,O" <br />g SECTION @ STOR <br />A-10 SCALE: 1 1/2"=1'-0" <br />EXISTING 5/8" GYP. BD. ON 6" <br />MTL. STUDS @ 16" O.0 W/ <br />BATT INSULATION AS REQ'D. <br />EXISTING FIRE RET. TREATED <br />WD BLOCKING AS REQ'D <br />NEW 5/8" GYP. BD. <br />[(2) 4" CSJ 16GA MTL STUD <br />- - - TOP OF VESTIBULE WALL <br />EL. 10'-4 5/8"-,W <br />BOTTOM OF STEEL <br />EL. 10'-1 1 /2" <br />TOP OF STORE FRONT <br />EL. 10'-0" <br />HOLD <br />BREAK METAL FINISH TO MATCH <br />STOREFRONT <br />EXISTING MANUAL PULL —DOWN <br />SUN SHADE AND ENDCAPS— <br />SEE STAPLES SPEC. <br />EXISTING SECURITY FILM <br />LINE OF EXISTING WALL <br />BEYOND <br />EFRONT <br />(2) 4" CSJ— 16 <br />GA MTL. STUDS <br />TOP AND BOTTOM MTL. <br />TRACK 4" 16 GA <br />EXISTING STUCCO OVER <br />SHEATHING <br />EXISTING R-19 BATT <br />INSULATION AS REQ'D <br />EXISTING SEALANT COLOF <br />TO MATCH MT'L SOFFIT <br />EXISTING FIRE RET. TRE) <br />WD BLOCKING AS REQ'D <br />EXISTING STOREFRONT <br />AS SCHEDULED <br />'2 COLUMN DETA <br />A-10 SCALE: 3"=1'-0" <br />6" WIDE METAL STUD <br />BOXED BEAM <br />6" TSB 16 GA. TRACK <br />4"X6" METAL STUD <br />BOXED COLUMN 16 GA <br />MTL. STUDS <br />4" TSB 16 GA. TRACK <br />"Z" CHANNELS <br />5/8" GYP. BD <br />IL AT BESAM DOOR <br />VESTIBULE <br />CORNER <br />DETAIL_ <br />A-10 <br />SCALE: 3"=I'-0" <br />10 SECTION a@ STOR <br />A-10 SCALE: 1 1/2"=1'-0" <br />EFRONT <br />A"VC" 1ArTAl C_TI Irl <br />OTTO M D <br />A-10�,/ SCALE: 3"=1'-0" <br />_ SECTION <br />A-10 SCALE: 1 1/2"=1'-0" <br />(2) 4" CSJ— 16 GA MTL. <br />STUDS BOXED BEAM <br />CLIP ANG <br />TOP MTL. TRAC <br />16 GA <br />5/8" GYP. BD <br />6" MTL. STUD WALL <br />6" MTL. TRACK <br />C8 CHANNEL <br />W 18X35 BEAM <br />MC 12X31 CHANNEL <br />2X12 WOOD NAILER <br />(2) 4" CSJ— 16 GA <br />MTL. STUDS BOXED <br />COLUMN <br />6" MTL. STUD WALL <br />�3_� VESTIBULE DETAIL AT FRONT WALL <br />EXISTING 8" CMU WALL — <br />INSULATED AS REQ'D. <br />L4x6x3/8 <br />FIRE RET. TREATED SOLID <br />WD BLOCKING AS REQ'D <br />PAINT AS SCHEDULED PT-1 <br />BOTTOM OF STEEL <br />EL. 10'-1 1 /2" <br />M OF SOLID WOOD BLOCK <br />EL. 10'-0" <br />HOLD <br />BREAK METAL TO MATCH <br />STOREFRONT <br />SECURITY GRILLE <br />A ""c" METAL <br />3OXED <br />16 <br />4"X6" METAL <br />STUD BOXED <br />COLUMN 16 <br />GA MTL. <br />STUDS <br />OU I I VIVI IVI I L_ I tCNI.r\ <br />6" 16 GA <br />A--10) <br />SCALE: <br />3"=1'-0" <br />r (2) <br />4" <br />CSJ— 16 GA <br />LIP ANGLE <br />y <br />E <br />2 <br />E <br />2 <br />3" MTL. STUD <br />NALL <br />0. <br />WJ <br />30TTOM MTL. <br />(RACK 6" 16 GA <br />A � m <br />O/� <br />O <br />fyV.IJ�'cd <br />.--I <br />oc <br />�q�a <br />w <br />M o <br />>o <br />•� <br />o <br />Qo <br />8 <br />c U <br />R ,� <br />U <br />u� <br />5 <br />� <br />U <br />C <br />0 <br />O <br />(Ln <br />V <br />c cco <br />co <br />.L coco=j <br />V <br />W co_j <br />> <br />Eco co <br />2 ce u- <br />z <br />m CLa <br />Iz <br />J <br />co 1 co � — <br />co �"" v) I..,..' <br />C) <br />�. <br />� <br />III <br />0 <br />U) <br />i <br />_(D <br />I <br />I <br />i <br />�I <br />0 <br />E <br />L <br />I <br />i <br />d � � <br />� <br />I <br />—+r 0 <br />m3 <br />i <br />�Lfz <br />; <br />C Z) <br />LLJ_0 <br />ch 1 <br />E() <br />? <br />U _� fn <br />L <br />CL W <br />o <br />z m o <br />S2 z <br />O N 1— UJ u') � U U C7 <br />d O U <br />A-1 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.