SPRINKLER & DOMESTIC WATJALL
<br />MAIN ENTRANCE SHALL MEETLOCAL CODE REQUIREMENTS
<br />RISER VERTICAL BE
<br />SHOWN
<br />- ®OVERHEAD SYSTEM FIRE PROTECTION SYMBOL LEGEND GENERAL NOTES 0 o
<br />VERTICAL POSITION AS SHOWN 00
<br />O O
<br />SYMBOL DESCRIPTION
<br />�-�- MAXIMUM 1 ° DEFLECTION 1. THE FIRE PROTECTION SYSTEMS SHALL COMPLY WITH NFPA 13 - 2004 EDITION, THE FLORIDA z
<br />FROM VERTICAL FIRE PREVENTION CODE AND ALL LOCAL CODES AND REQUIREMENTS.;
<br />- CONTROL VALVE W(IAMPER SWITCH °°
<br />at N
<br />LE
<br />2. FINAL SYSTEM ACCEPTANCE AND APPROVAL SHALL BE CONDUCTED BY STATE FIRE MARSHAL a a
<br />4" CHECK VALVE _ WATER FLOW SWITCH(ES) N - CHECK VALVE �., w Q-
<br />TO F.D.C. AND ARCHITECT/ENGINEER. U � G
<br />SYSTEM GAUGES o-O - FLOW SWITCH 0 1�
<br />�° ° ° 3. THE CONTRACTOR SHALL PREPARE SYSTEM LAYOUT DRAWINGS PER CHAPTER 14, OF NFPA 13 -
<br />2 MAIN DRAIN VALVE �--•-�,-4� • r-+ P� O
<br />DRAIN TO EXTERIOR WALLSPRINKLER AND DRAIN RISER 2004 EDITION. THE CONTRACTOR SHALL PERFORM HYDRAULIC CALCULATIONS. CONTRACTOR'SA
<br />° SPRINKLER SYSTEM LAYOUT (SHOP DRAWINGS), HYDRAULIC CALCULATIONS AND MATERIAL �+ A
<br />CHECK VALVE-®- - - NEW SPRINKLER PIPING DATA SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER AND AUTHORITY HAVING � � o > o
<br />JURISDICTION FOR APPROVAL PRIOR TO SYSTEM INSTALLATION. l w v o
<br />o °
<br />WALL POST INDICATOR 1 -REVISION REFERENCE C.ds
<br />cd
<br />VALVE (THROUGH WALL) 1 -DETAIL REFERENCE: "TOP -DETAIL, 4• THE CONTRACTOR SHALL PERFORM HYDRANT -FLOW TEST TO VERIFY WATER PRESSURE a Y
<br />O WITH TAMPER SWITCH FP-1 BOTTOM -DRAWING# SHOWN ON REQUIRED FOR HYDRAULIC CALCULATIONS. • `n
<br />6" DOUBLE CHECK (OR AS REQUIRED BY U a
<br />ROCKWOOL PIPE LOCAL AUTHORITY HAVING JURISDICTION) 5. THE FIRE PROTECTION SYSTEMS SHOWN REPRESENT THE DESIGN INTENT OF THE ENGINEER OF
<br />INSULATION THROUGH BACKFLOW PREVENTION ASSEMBLY NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT RECORD, IN ACCORDANCE WITH STATE REGULATION 61G15-32. IT IS THE RESPONSIBILITY OF THE
<br />PARTITION OR WALL -
<br />PENETRATION APPROVED FOR VERTICAL INSTALLATON ---� 0 CONTRACTOR TO COORDINATE INSTALLATION WITH ALL OTHER TRADES. THE CONTRACTOR
<br />(INSULATED PIPE ONLY) SHALL PROVIDE COMPLETE SPRINKLER SYSTEM LAYOUT DRAWINGS WITH ANY ADDITIONAL
<br />6" 6" WALL POST INDICATOR STAPLES UTILITY REQUIREMENTS OFFSETS, SPRINKLERS OR SYSTEM COMPONENTS AS REQUIRED FOR A COMPLETE AND
<br />PIPE INSULATION VALVE (THROUGH WALL) OPERABLE SYSTEM AND TO AVOID CONFLICTS WITH OTHER TRADES.
<br />(WHERE REQUIRED) WITH TAMPER SWITCH
<br />a FIRE PROTECTION WATER SERVICE: 6" 6. SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING TYPES, HEIGHTS AND ALL
<br />FINISHED FLOOR 8" FLANGED SPIGOT MINIMUM HYDRAULIC INFORMATION REQUIRED: ASSOCIATED DATA.
<br />14" STEEL SLEEVE. 788.3 GPM OVERHEAD 7. ALL DRAIN AND DRY PIPE SYSTEM PIPING AND FITTINGS SHALL BE GALVANIZED BOTH INSIDE AND
<br />G.C. SHALL COORDINATE WITH CIVIL EXTEND TO 3" AFF 500 GPM HOSE STREAM OUTSIDE.
<br />N� ENGINEER OF RECORD AND FIRE 1288.3 GPM WITH 40.4 PSI @ B.Q.R.
<br />/ PROTECTION CONTRACTOR FOR LEAD 8. INSTALL ADDITIONAL SPRINKLERS UNDER ALL EXPOSED DUCTWORK OR OBSTRUCTIONS
<br />PIPE SLEEVE (CONIC. OR / FIRESTOP MATERIAL IN TO FIRE PROTECTION RISER. --� EXCEEDING 48" IN WIDTH. PROVIDE ADDITIONAL SPRINKLERS AS REQUIRED FOR PROPER
<br />MASONRY WALL ONLY -/ 4FL\� COVERAGE OF OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13.
<br />3
<br />-.)C
<br />9. ALL SPRINKLERS INSTALLED WITHIN MECHANICAL ROOMS, STORAGE ROOMS, JANITORS
<br />ELEVATION - WALL PENETRATION REFER TO DRAWING T-2 FOR ADDITIONAL FIRE PROTECTION CLOSETS OR AREAS SUBJECT TO MECHANICAL INJURY SHALL BE PROTECTED WITH LISTED
<br />NOTES AND PERFORMANCE SPECIFICATIONS. GUARDS.
<br />10. COORDINATE PIPE ROUTING WITH DUCT ROUTING, EQUIPMENT LOCATIONS, ELECTRICAL
<br />Firestopping of Penetrations Through Walls Detail - Fire Riser-u fT 2 �( s-1 INSTALLATIONS AND BUILDING STRUCTURAL MEMBERS. DO NOT ROUTE PIPING OVER
<br />1 Scale: None 2Scale: None ELECTRICAL PANELS. PIPING ROUTED OVER ELECTRICAL PANELS SHALL BE REROUTED AT NO
<br />j I ADDITIONAL COST.
<br />I II
<br />I 11. PROVIDE TAMPER SWITCHES ON ALL CONTROL VALVES. _
<br />12. SLOPE ALL PIPING TO THE SYSTEM MAIN DRAIN AS REQUIRED TO INSURE PROPER DRAINAGE. IT -
<br />-� IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL PIPING IS DRAINABLE. ADDITIONAL
<br />11 C-0.5 1 [ C-0 C-1 j CC-1,6) C- 1 C-3 ' 11.5 DRAINS AND PLUGS SHALL BE INSTALLED WHERE REQUIRED TO COMPLY WITH THE ABOVE
<br />\`- ` ti f� ! ` REFERENCED CODES.
<br />- -`'-�
<br />IN
<br />= I j 13. ALL ROLL GROOVED AND CUT GROOVED COUPLINGS AND FITTINGS SHALL BE PROVIDED BY A
<br />- -- ---- - - T-A SINGLE MANUFACTURER.
<br />EA TING INSPECTORS TEST AND DRAIN - - V
<br />tl- 14, SPRINKLERS SHALL BE CENTERED IN CEILING TILES iN AREAS WITH LAY -IN TILES AND VISUALLY
<br />I ! \\ ALIGNED IN AREAS WITH SMOOTH CEILINGS.
<br />EXISTING SPRINKLER AND DRAIN RISER.
<br />SE jDETAIL ON THIS SHEET
<br />I (€ T_B I 15. THIS BUILDINGS STRUCTURAL SYSTEM HAS BEEN DESIGNED TO SUPPORT THE ADDITIONAL Q�
<br />IRE PROTECTION f f _
<br />WEIGHT ASSOCIATED WITH THE SPRINKLER SYSTEM.
<br />SE
<br />CONTRACTOR DOCUMENTS i ( ! \1 16. PIPING IN AREAS WITH EXPOSED STRUCTURE SHALL BE INSTALLED AS HIGI I AS POSSIBLE TO O
<br />j FOd CONTINUATION C
<br />EXISTING UNDERGROUND FIRE ALLOW THE OWNER MAXIMUM USE OF THE SPACE.
<br />MAIN. SEE CIVIL DRAWINGS
<br />FOR EXACT LOCATION, SIZE ` \ I T 1 17. SPRINKLERS IN AREAS WITH EXPOSED STRUCTURE (OBSTRUCTED CONSTRUCTION) SHALL BE
<br />AND CONTINUATION \ INSTALLED WITH DEFLECTOR 1" BELOW THE BOTTOM OF THE BEAM MAXIMUM 22" BELOW ROOF
<br />2_ . _- .. __ __-.-__._.._ _ _,.; T_D DECK). EXPOSED BAR JOISTS THAT HAVE SPRAY -ON FIRE PROOFING THAT MAKES THE JOIST O
<br />r
<br />�- e--. LID HALL B TREATED I ,� A r « �. � _ �,,�� SO S E BATED LIKE A BEAM WITH THE SPRINKLERS 1 BELOW THE BOTTOM OF THE
<br />\ \
<br />- FIRE PROOFING.
<br />i
<br />I
<br />I
<br />� I
<br />,% ...I -._. / I.. .,.._._1_..._.,....._-.. _A .. ..... ..... __.. .A...._... ... ..-. ,..,._.._._._...... {, _ .. ...-.,._J. __..., .I. .......___......_l__, »_1_...."'__, ,. ,._4.,....., .. _..I...._.--__..._1____._,__.__-1_...__..,._..__J_ ..._!_.....,__.. , ...___l_ _....._..... __1......_... .._..._ A ...._.._.._.__.........._-. / 1cu
<br />00
<br />,� 18. SLEEVE AND/OR FIRESTOP ALL PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND FLOORS V N �-
<br />L - - r ! WITH U/L LISTED ASSEMBLIES. FIRESTOP ASSEMBLIES SHALL BE EQUAL OR EXCEED THE RATING J cCO
<br />o
<br />J -- -._ - _ - ..-_ - \- - Cu M
<br />A � I � r r ' - �\, OF THE WALL, CEILING OR FLOOR. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. SEE
<br />, _ y FIRE RATED PIPE PENETRATION DETAILS. J O
<br />LLCu
<br />1. T� I - - - tL - - j 19. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE NON -ACCESSIBLE CEILINGS AND CHASES. w _ Cu O
<br />;cj .� z (D CD � co I- fJ)
<br />Fr/1
<br />-r:
<br />i
<br />q FLORIDA ADMINISTRATIVE CODE
<br />I ; r ,,, CHAPTER 61 G15 32 NOTES
<br />I
<br />CA, € I I a ,
<br />I f
<br />1. THE FIRE PROTECTION SYSTEM SCOPE OF WORK SHALL INCLUDE THE PREPARATION AND DESIGN OF _ O_
<br />t
<br />.PROVIDE ALL EQUIPMENT, QU PMENT O
<br />( THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS ( )
<br />t
<br />L
<br />V
<br />MATERIALS, COMPONENTS ,
<br />I ` , ASSEMBLIES AND SUPPORT SYSTEMS REQUIRED, AS DESCRIBEDIN $ � Cu
<br />NFPA 13. THE FIRE PROTECTION CONTRACTOR SHALL CONDUCT A HYDRANT FLOW TEST AND
<br />PERFORM HYDRAULIC CALCULATIONS FOR THE DESIGN OF THE FIRE PROTECTION SYSTEM. LL
<br />_ --
<br />-�-: I` I Cis Q
<br />ul
<br />2. THE FIRE PROTECTION DESIGN, CALCULATIONS, INSTALLATION AND THE ACCEPTANCE TESTING OF S
<br />THE FIRE PROTECTION SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13, 2004 EDITION; NFPA24, a
<br />2002 EDITION; THE FLORIDA BUILDING CODE AND THE FLORIDA FIRE PREVENTION CODE 2004
<br />- _ - EDITION AND ALL LOCAL CODES RE E Cu
<br />C 0 S REQUIRED BY THE AUTHORITY HAVING JURISDICTION.Cu
<br />I
<br />II
<br />\ ' I 3 AREA OCCUPANCIES AND AZARD CLASSIFICATIONS ARE LISTED IN THE DESIGN CRITERIA NOTE
<br />/ I LOCATED ON THIS SHEET. H , I .
<br />Cn
<br />\\ - - - - - _' ___.- . ___ .._. HE
<br />.__.-,.. ...._.. __._.__-.a__ ._ - �� 4. ALL SYSTEM CONTROL VALVES SHALL BE PROVIDED WITH TAMPER SWITCHES AND INTERFACE �n
<br />C'B ,�- ",_ \ - WITH THE FACP ON THE SUPERVISORY CIRCUIT, ALL FLOW SWITCHES SHALL INTERFACE WITH THE
<br />- ------ V
<br />E
<br />- \ FACP ON THE ALARM CIRCUIT. E 06
<br />CB
<br />5. THE FIRE PROTECTION CONTRACTOR SHALL PREPARE AND PROVIDE SIGNED AND SEALED FIRE
<br />\ j O
<br />PROTECTION SYSTEM LAYOUT DOCUMENTS WITH HYDRAULIC CALCULATIONS AND SHALL BE THE O Cu
<br />ENGINEER OF RECORD. SIGNED AND SEALED FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS
<br />[ WITH HYDRAULIC CALCULATIONS SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER AND THE CU
<br />�C-B 2 LOCAL AHJ FOR ACCEPTANCE PRIOR TO PERMITTING. L L
<br />-
<br />6. ALL FIRE PROTECTION EQUIPMENT AND COMPONENTS SHALL BE LISTED AND TESTED FOR FIRE O
<br />--
<br />fill i1r�
<br />ulu u u PROTECTION USE AND IN ACCORDANCE WITH NFPA 13. ALL FIRE PROTECTION EQUIPMENT AND
<br />E AL E THEU.L.LISTED D FM APPROVED.
<br />a
<br />-
<br />B` 7 THE POINT OF SERVICE AND THE WATER SUPPLY CHARACTERISTIC'S FOR THE FIRE PROTECTION
<br />3
<br />- N�
<br />- VED
<br />- -
<br />\ __1 .._:-i-.-._,_ _ --: , _� . r _._.....__._ , ...-. _, _.__ ,_..,,.. --- �_..... SYSTEM IS SHOWN ON THE CIVIL SITE PLAN.CU
<br />- ♦--� M
<br />aaFoul
<br />8. THE WATER SUPPLY FOR THE FIRE PROTECTION SYSTEM HAS NOT SHOWN ANY EVIDENCE OF
<br />oa
<br />- =- MICROBIAL INDUCED CORROSION (MIC). THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY THE M J
<br />ARCHITECT/ENGINEER OF ANY EVIDENCE OF MIC AND PROVIDE NECESSARY WATER TREATMENT LL
<br />U
<br />' 7 I AS NEEDED TO REDUCE OR ELIMINATE MIC. ? co a
<br />_ -
<br />'3C-B.5
<br />9 D BACK FLOW PRVENTION DEVICES SHALL MEET WITH ALL WATER PURVEYORS "'
<br />REQUIREMENTS.= -
<br />--(C-)B6 CD
<br />- x
<br />0 L.... °°
<br />w w _
<br />m Y
<br />N
<br />i $ O O Na LL
<br />w
<br />FIRE PROTECTION SPRINKLER LEGEND
<br />F MP
<br />FINISH
<br />STYLE PLATE MFG.
<br />0 OC-B.7
<br />ON
<br />e
<br />E • SYMBOL 0112" 1550 RESPONSE QUICKK 5.6 CHROME F0IDFRL RECESSED CHROME RELIABLELu
<br />Lu
<br />- 112" 1550 d Lu
<br />_
<br />1/2" 155° a u
<br />F1FR HDIGD ABLE
<br />O QUICK 5.6 BRASS F1FR UPRIGHT NONE RELIABLE
<br />ui
<br />E � w
<br />- - - AWING CRITERIA
<br />€
<br />THE FOLLOWING PUBLICATIONS SHALL BE USED AS A REFERENCE FOR E
<br />(C-C
<br />DESIGN OF THE FIRE SUPPRESSION SYSTEM ON THIS PROJECT.
<br />/ - - \ I 1. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS
<br />f I 2. NFPA 24, PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES
<br />- - - - 3. FLORIDA FIRE PREVENTION CODE-2004 EDITION m
<br />' � a
<br />- ENTIRE BUILDING (EXCEPT AS NOTED):
<br />OCCUPANCY CLASSIFICATION: ORDINARY HAZARD GROUP 2
<br />SYSTEM TYPE: WET PIPE �
<br />0 0 o DESIGN DENSITY: .20 GPM/SQ. FT.
<br />_ HYDRAULIC REMOTE AREA: 1,500 SQ. FT. k
<br />a
<br />asuj
<br />F_ ( SPRINKLER ORIFICE SIZE: 1/2"
<br />3 SPRINKLER TEMPERATURE RATING: 155°F •!�• co
<br />�� DURATION OF SUPPLY: 60 - 90 MIN. ����e o
<br />MAXIMUM COVERAGE/SPRINKLER HEAD: 130 SQ. FT./QUICK RESPONSE TYPE �`� cn
<br />HOSE STREAM ALLOWANCE: 250 GPM
<br />r _ BATHROOMS:
<br />' % a OCCUPANCY CLASSIFICATION: LIGHT HAZARD w O.
<br />0 0 0 0 4 0 1 U 9 0 0 0 0 0 0 1 '
<br />SYSTEM TYPE: WET PIPE W z
<br />\ l DESIGN DENSITY: .10 GPM/SQ. FT. g A! Q �' �'rt•
<br />HYDRAULIC REMOTE AREA: 1,500 SQ. FT. z uj G
<br />LCSPRINKLER ORIFICE SIZE: 1/2" m I �'
<br />�Lnj I SPRINKLER TEMPERATURE RATING: 155°F o
<br />LL
<br />/ I - DURATION OF SUPPLY: 30 MIN. ii U) co
<br />C, 0
<br />MAXIMUM COVERAGE/SPRINKLER HEAD: 225 SQ. FT./QUICK RESPONSE TYPE E uQJ oI oI
<br />HOSE STREAM ALLOWANCE: 100 GPM $ „; N N
<br />0 --
<br />° °a a
<br />_ -' DRAWING LISTC-D C-D
<br />_.,,,._.. NO. TITLE a
<br />I � z m o
<br />n
<br />\ FP001 Fire Protection Floor Plan & General Information © w o
<br />w Lu
<br />Fire Protection Floor Plan c $ a
<br />SCALE: 1 /8"=1'-V'
<br />y FP-1
<br />CC 0.� C-1� /
<br />C-2 C-3) � -4� � C�4.6 G- �� (C-4.9�`C-5� (C-6 }
<br />
|