Laserfiche WebLink
ABBREVIATIONS <br />AB or A.B. <br />Anchor Bolt <br />FIX or FXD <br />Fixed <br />PWDR or Pwd. <br />Powder Room <br />ABV or Abv. <br />Above <br />FLR or Fir. <br />Floor <br />RA or R/A or R.A. <br />Return Air <br />AC or A/C <br />Air -Conditioner <br />FLR SYS or Fir Sys <br />Floor System <br />RAD or Red. <br />Radius <br />ADJ or ADJ. <br />Adjustable <br />FOM or F.O.M. <br />Face Of Masonry <br />RAG or Rag. <br />Return Air Grill <br />AFF or A.F.F. <br />Above Finished Floor <br />FP or F.P. <br />Fireplace <br />REC or Rec. <br />Recessed <br />AHU or A.H.U. <br />Air Handler Unit <br />FR DR <br />French Door <br />RECEPT <br />Receptacle <br />ALT or ALT. <br />Alternate <br />FRT <br />Front <br />REF or Ref. <br />Refrigerator <br />BC <br />Base Cabinet <br />FT or Ft. <br />Foot/ Feet <br />REINF <br />Reinforcing <br />BF <br />Biifold Door <br />FTG or Ftg. <br />Footing <br />REQD or Req'd. <br />Required <br />BK SH or Bk Sh <br />BookShelf <br />FXD GL <br />Fixed Glass <br />RM or Rm. <br />Room <br />BLK or BLK. <br />Block <br />GALV or Galy. <br />Galvanized <br />RND or Rnd. <br />Round <br />BLW or BLW <br />Below <br />GC or G.C. <br />General Contractor <br />RO or R.O. <br />Rough Opening <br />BM or Bm. <br />Beam <br />GFI or G.F.I. <br />Ground Fault Interrupter <br />RS, R/S, R/SH or R&S <br />Rod and Shelf <br />BOT or Bot <br />Bottom <br />GT or G.T. <br />Girder Truss <br />SD or SD. <br />Smoke Detector <br />BP or B.P. <br />Bypass (door) <br />GYP BD or Gyp. Bd. <br />Gypsum Board <br />SGD <br />Sliding Glass Door <br />BRG or BRG. <br />Bearing <br />HB <br />Hose Bibb <br />SH or Sh. <br />Shelves <br />C <br />Carpet <br />HDR or Hdr. <br />Header <br />SHT <br />Sheet <br />CAB <br />Cabinet <br />HGT or Hgt. <br />Height <br />SHWR or Shwr. <br />Shower <br />CIR or Cir. <br />Circle <br />HH or H.H. <br />Hand Held (plumbing faucet) <br />SL or S.L. <br />Side Lights <br />CJ or C/J <br />Control Joint <br />HORIZ <br />Horizontal <br />SPECS or SPECS. <br />Specifications <br />CLG or Clg. <br />Ceiling <br />HS <br />Hard Surface (flooring) <br />SPF or S.P.F. <br />Spruce Pine Fir <br />CMU <br />Concrete Masonry Unit <br />ILO <br />In Lieu Of <br />SQ FT or SF or S.F. <br />Square Foot (feet) <br />COFF or Coff. <br />Coffered or Tray Ceiling <br />INSUL or Insul. <br />Insulation <br />SQ or Sq. <br />Square <br />COL or Col. <br />Column <br />INT or Int. <br />Interior <br />STO <br />Storage <br />COMM or Comm. <br />Community <br />K/WALL or K/Wall <br />Kneewall <br />SW or S.W. <br />Shear Wall <br />COMP or Comp. <br />Compressor <br />KS or K.S. <br />Knee Space <br />SYP or S.Y.P. <br />Southern Yellow Pine <br />CONN or CONN. <br />Connection <br />LAUN or Laun. <br />Laundry <br />TB <br />Towel Bar <br />CONT or Cont. <br />Continuous <br />LAV or Lay. <br />Lavatory <br />TEMP or Temp. <br />Tempered <br />CT or C.T. <br />Ceramic Tile <br />LF or L.F. <br />Linear Ft. <br />THIKN or Thik'n. <br />Thicken <br />D or D. <br />Dryer <br />LL <br />Lintel Length <br />TOB or T.O.B. <br />Top of Block <br />DB <br />Door Bell <br />LT <br />Laundry Tub <br />TOM or T.O.M. <br />Top of Masonry <br />DBL or Dbl. <br />Double <br />MAS or Mas. <br />Masonry <br />TOP or T.O.P. <br />Top of Plate <br />DCF <br />Decorative Cementitious Finish <br />MAX or Max <br />Maximum <br />TP <br />Toilet Paper Holder <br />DEC or Dec. <br />Decorative <br />MC <br />Medicine Cabinet <br />TR <br />Towel Ring <br />DED or Ded. <br />Dedicated (outlet) <br />MFR or Mfr. <br />Manufacturer <br />TRANS WDW or Trans. <br />Transom Window <br />DIA or Dia. <br />Diameter <br />MGT <br />Management (room) <br />TYP or Typ. <br />Typical <br />DISP or Disp. <br />Disposal <br />MIN or Min <br />Minimum <br />UC or u.c. <br />Under Counter <br />DIST or Dist. <br />Distance <br />MIR or Mir. <br />Mirror <br />UCL <br />Under Cabinet Lighting <br />DMF <br />Decorative Masonry Finish <br />ML or M.L. <br />Microlam <br />LINO or U.N.O. <br />Unless Noted Otherwise <br />DS or D.S. <br />Drawer Stack <br />MONO or Mono <br />Monolithic <br />V or v. <br />Valve (shower or tub/shower) <br />DTL <br />Detail <br />MIN or MICRO or Micro. <br />Microwave <br />VB <br />Vanity Base <br />DV or D.V. <br />Dryer Vent <br />NTS or N.T.S. <br />Not to Scale <br />VERT or Vert. <br />Vertical <br />DVP or D.V.P. <br />Diverter Valve (plumbing) <br />OE or O.E. <br />Owner's Entry <br />VL or V. L. <br />Versalam <br />DW or D.W. <br />Dishwasher <br />OPNG or Opn'g. <br />Opening <br />VTR orVTE <br />Vent through Roof / Exterior <br />EA or Ea. <br />Each <br />OPT or Opt. <br />Optional <br />W or w <br />Washer <br />ELEC or Elec. <br />Electrical <br />PC <br />Pull Chain <br />W/ or w/ <br />With <br />ELEV or Elev. <br />Elevation <br />PED or Ped. <br />Pedestal <br />WA or W.A. <br />Wedge Anchor <br />EQ <br />Equal <br />PH <br />Phone <br />WC or W/C or W.C. <br />Water Closet (toilet) <br />EW or E.W. <br />Each Way <br />PKT or Pkt <br />Pocket (Door) <br />WD or Wd <br />Wood <br />EXP or Exp. <br />Expansion <br />PL or P.L. <br />Parallam <br />WDW HDR or WDW. HDR. <br />Window Header <br />EXT or Ext <br />Exterior <br />PLF <br />Pounds per linear foot <br />WH or W.H. <br />Water Heater <br />FBC <br />Florida Building Code <br />PLNT SHLF or Pit. Sh. <br />Plant Shelf <br />WIC or W.I.C. <br />Walk-in Closet <br />FDN or Fdn. <br />Foundation <br />PLT HT or Pit. Ht. <br />Plate Height <br />WM or W.M. <br />Wall Mounted (plumbing fixture) <br />FG <br />Fiberglass (Shower Pan) <br />PSF <br />Pounds per square foot <br />WP <br />Water Proofing) <br />FIN <br />Finished <br />PT or P.T. <br />Pressure Treated <br />WS <br />Water Softener <br />FIN FLR or FF or Fin. Fir. Finished Floor <br />PW or P.W. <br />Pre -wire <br />WWF <br />Welded Wire Fabric (Mesh) <br />PLAN <br />REVISIONS <br />DATE <br />VERSION <br />DESCRIPTION <br />08-20-15 1.0 NEW BASE PLAN <br />12-8-15 2.0 FRAME -WALK REVISIONS <br />12-28-17 3.0 2017 FBC UPDATES <br />02-21-18 4.0 ADDED GRADE BEAM 150 MPH ENG. <br />08-27-19 4.1 ENG. REVIEW FOR 150-C MPH <br />09-20-19 4.2 ADD 8'-8" ELEV. FOR TREVESTA <br />ININININININININI <br />MININININININ101 <br />ININININ[MINIFENIFE-111 <br />ALL WORK SHALL COMPLY WITH PREVAILING <br />CODES FLON12A BUILDING CODE, <br />NATIONAL ELECTRIC CODE, <br />AND TTHAEN'CITy c)t- ZEP"lyRHILLS <br />ORDiNOES <br />REVIEW flnry <br />.-CITY QF FEB I a, talc <br />ZEPHV <br />PLAN 8XIIMINE <br />LmENN/�R� <br />1791 <br />INDEX OF DRAWINGS <br />SHEET DESCRIPTION <br />SHEET <br />No. <br />CS <br />COVER SHEET <br />1 <br />FLOOR PLAN <br />2 <br />INTERIOR ELEVATIONS <br />3.1 <br />EXTERIOR ELEVATIONS <br />3.2 <br />EXTERIOR ELEVATIONS <br />F1 <br />FOAM DETAILS <br />4 <br />ELECTRICAL PLAN <br />5 <br />ROOF PLAN <br />6 <br />FOUNDATION PLAN <br />7 <br />ROOF FRAMING PLAN <br />8 <br />LINTEL DETAILS <br />SN <br />STRUCTURAL NOTES <br />SN1 <br />DETAILS <br />S3M <br />MONO DETAILS <br />S4 <br />DETAILS <br />S5 <br />DETAILS <br />SS <br />RETROFIT DETAILS <br />D1 <br />SECTIONS & DETAILS <br />WP <br />WATERPROOFING DETAILS <br />PA1.0 <br />PRODUCT APPROVAL NUMBERS <br />PA1.1 <br />PRODUCT APPROVAL NUMBERS <br />PA1.2 <br />PRODUCT APPROVAL NUMBERS <br />MEAN ROOF 15 FT. HIGH TYPICAL <br />FOR SINGLE STORY HOMES <br />MEAN ROOF 30 FT. HIGH TYPICAL <br />FOR 2 STORY HOMES <br />THIS DRAWING AND DESIGN IS VALID <br />FOR 12 MONTHS AFTER THE DATE IT <br />IS SIGNED AND SEALED OR WHILE <br />CURRENT CODE IS VALID <br />CODE REFERENCES ARE SUMMARIES <br />OF CODE SECTIONS. <br />SEE FBCR (CURRENT VERSION) FOR <br />COMPLETE CODE INFORMATION. <br />Notice to Builder & All Subcontractors <br />It is the intent of Designer/Engineer listed in the titleblock of these <br />documents that these documents be accurate, providing Licensed <br />Professionals clear information. Every attempt has been made to <br />prevent error. The Builder and all subcontractors are required to <br />review all the information contained in these documents, prior to <br />the commencement of any work. The Designer/Engineer are not <br />responsible for any plan errors, omissions,or misinterpretations <br />undetected and not reported to the Designer / Engineer prior to <br />construction. All construction MUST be in accordance to the <br />information found in these documents. Any questions regarding <br />the information found in these plans should be directed to our <br />Office at (407) 880-2333 immediately. No backcharges will be <br />considered for reimbursement by the Designer/Engineer without <br />advanced notification and approval by the Designer/Engineer. <br />Payments will be made in accordance to the terms of the <br />agreement. <br />Control of Construction Site: <br />The Designer/Architect and engineer of record (EOR) have no <br />control over the construction site and shall not be responsible in <br />any manner for control of the construction site including, but not <br />limited to, scheduling and sequencing of work, jobsite safety, and <br />ventilation of the building and thereby shall not be responsible for <br />the indoor air quality, or the effects thereof, for any reason <br />whatsoever. The Designer/Architect and FOR has no duty to <br />protect, without limitation, the residence, construction site, <br />materials, or equipment, from moisture, mold, fungus, fire, theft, <br />vandalism, trespass, or any other peril or condition, at any time, <br />expressly including, but not limited to, the period of time before <br />construction, during the construction of the project, or after <br />construction and the Designer/Architect and FOR has no duty to <br />take any action or preventive measures to protect such property <br />against any such peril at any time for any reason. <br />x� ?,OWN�� <br />r <br />•. <br />-NSE00 <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained <br />within these <br />drawings comply with the 2017 <br />Florida Building Code - <br />Residential eth Edition. Engineers signature and seal Is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />F� <br />E <br />8 <br />38 <br />Co <br />IDa19 <br />t.I <br />D O <br />fMN04 n C <br />(rp <br />KJ N LL LL <br />07 <br />10 <br />g_U.J— <br />N <br />LLLLWiza <br />y M <br />> ' LL <br />CrQ <br />d W W M <br />IL 0 <br />Z <br />°' <br />0�° <br />4 <br />Xm °c <br />W <br />W <br />'Fao rn <br />2 Ern <br />J c <br />LLLeg <br />Z0) <br />C; <br />N M Z <br />Qqq' 0 y <br />U J <br />Z <br />° 0 <br />❑OD❑ <br />W <br />R <br />Z N M <br />Z <br />¢ M <br />d N <br />N <br />z U_ <br />� o <br />LL <br />N <br />V o <br />O <br />Ul <br />c <br />CQ <br />�— <br />U_ 00 <br />U <br />• <br />o <br />W <br />M <br />W <br />ZC") <br />N <br />a <br />E ° <br />s <br />'0 <br />zR <br />a <br />� <br />I— C <br />Ro�i � <br />8 <br />Z <br />o Es <br />N r0 <br />°d <br />wo <br />0: <br />�Z <br />w Z <br />¢� <br />CO C: <br />v <br />�ow <br />Nm <br /><W <br />Z <br />a°° <br />8 <br />sI <br />W <br />-) <br />;Z <br />z <br />hw <br />CD <br />,y6y <br />o <br />IIIIIIIIII' <br />� <br />W <br />¢W¢ <br />Z< <br />� H <br />U� <br />or <br />120 <br />O <br />W <br />.>_ <br />a <br />(o <br />cc <br />J <br />O <br />.� <br />Cio <br />R <br />n <br />c O) <br />r <br />O <br />3 N <br />r <br />(0 <br />E <br />W <br />c CN <br />C) T <br />y <br />c <br />Z <br />c <br />E p <br />cc <br />C <br />a <br />U _ <br />¢ pre 1 <br />3 <br />JOB <br />NO: <br />20-0556 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />C S <br />