My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
3172 Lytton Hall Dr
Zephyrhills
>
Building Department
>
Building Plans
>
3172 Lytton Hall Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 6:58:27 AM
Creation date
2/25/2025 9:39:12 AM
Metadata
Fields
Template:
Building Plans
Street #
3172
Location
Lytton Hall Dr
Contractor
Lennar Homes LLC
Building Plans - Permit #
22502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />i <br />INSULATION — <br />BAFFLE <br />INSULATION PER- <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2x S.P.F. TOP PLATE <br />(1) LAYER TYPE II (#30) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR TYPE II (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR LESS. <br />PRE ENGINEERED HURRICANE ANCHOR @ EACH TRUSS <br />WOOD TRUSS @ 24" <br />O.C. MAX. SHINGLE ROOF <br />-SHINGLE ROOF FOR UNDERLAYMENT REQUIREMENTS SEE R905. <br />15/32" CDX PLYWOOD OR 7/16" <br />O.S.B. (SEE ROOF NAILING <br />SCHEDULE ON SHT SN1) <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />2X SUB FASCIA <br />SEE SOFFIT SHEET <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1X2 NAILER <br />PLYWOOD SHEATHING <br />J <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />N <br />FOR MORE INFO <br />16" O.C. 2X S.P.F. STUDS <br />UJ <br />o <br />W/ (4)16d TOENAILS TO TOP PLATE <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2)10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />w <br />LLI= <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />I <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C I <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREAS 1000 <br />rB R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALS <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />ER PLAN O <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />..A .' <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />�r <br />M <br />6x6 WIAXW1.4 <br />WWF OR FIBEf <br />STD. 90 HOOK (SEE DETAIL) <br />8"X8"X16" CONC. KNOCKOUT <br />BILK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />ce <br />v 4"x4" INSPECTION PORT AT <br />CL EACH FILL CELL TYPICAL <br />w <br />�- <br />AT GARAGE CONTRACTOR <br />N <br />TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />/— NOTE: EXTEND DECO FINISH <br />4-to 6" BELOW GRADE <br />:INISH GRADE c0 <br />"--STD.90*HOOK <br />(3) # 5 REBAR ON 3" CHAIR (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 11-8" <br />TYP 2—STORY WALL SECTION r <br />SCALE:3/4"=l'-0" S6 <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />kTE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2x STUDS @ 1 <br />2"x BOT. PLATI <br />(2)10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSI( <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8)10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />A FLOOR CONNECTION g <br />S6) @ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=1'-O" S6 <br />FOR ADDITIONAL INFORMATION, <br />SIMPSON LSTA24 STRAP w/ (8)1Od x 1 1/2" B.U.C. <br />NAILS TO STUD & (8)10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD PROVIDE CONTINUOUS (8)10d NAILS TO <br />2nd FLOOR WALL-------TO <br />FROM B.U.C. STUD PER STRAP <br />TO MASONRY BELOW k F <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1 St FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" <br />NAILS TO STUD & (8)10d x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />2"x BOT. PLATE W/ <br />(2)1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY, <br />"T" CORNER <br />TYPICAL'IT" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. S6 <br />E <br />S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8)1Odxl 1/2" <br />0/C FOR THE 1ST 2'-0" OF NBLOCKING & MIN. 4"EMBEDMENT <br />AILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=l'-0" <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />R <br />S6 <br />(6)1/4"x21/4"TiTEN �C <br />SCREWS TO MANSONRY <br />WALL PER STRAP <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SYSTEM <br />SIMPSON MSTAM36 <br />MASONRY WALL <br />SCALE: N.T.S. <br />RIBBONS <br />LL <br />S6 <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1/2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SECTION C/S3 FOR <br />ADDITIONAL INFORMATION <br />(1) ROW OF 2x BLOCKING @ MID <br />HGT. FOR WALL HGT.:5 81-611. (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />PTS FOR WALL HGT. > 8'-6" <br />SIMPSON SP1 w/ (10)10d <br />NAILS AT EA. STUD <br />2 x STUDS @ 16" O.C. <br />2X P.T. PLATE <br />di • <br />� 4 <br />:• e <br />SEE SHEATHING <br />SPECS ON FLOOR <br />1/2" GYP. W.B. MIN. @ <br />GARAGE SIDE IF APPLICABLE <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ <br />2"DIA.X 3/16" PLATE WASHER <br />(MIN. SHEAR 3500#. MIN. <br />TYPICAL TENSION 2600#.) <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />—..... : Ta'— <br />' . dam. tG <br />, r- <br />I I I ��I I rl r' C #11 CONT. ON 3" <br />F8" 1'-8" 8" CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=l'-O" S6 <br />ADDITIONAL SLAB INFORMATION. <br />16/3r OSB <br />EXPOSUREI <br />SHEATHING <br />PROVIDE i <br />BLOCKING AS <br />REQUIRED PER <br />SECTION X-X IF <br />NOT FULL <br />HEIGHT SHEET - <br />FLOOR SYSTIM <br />2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING WALL SHEATHING SEE PLAN <br />BETWEEN FLOOR <br />SYSTEM WALL ELEVATION DIAGRAM <br />4 FT. 0 <br />4 FT. <br />O O 0 <br />2 <br />5 FT 4 FT. O O O <br />5 FT 4 FT. 02 - <br />3O 1O O <br />4 FT. <br />4 FT. Q O 0 4 FT. <br />ROOF NAILING ZONE DIAGRAM <br />(2)- 2x TOP PLATE <br />BEYOND I <br />15/32" OSB <br />EXPOSURE <br />F <br />SHEATHING W <br />x <br />SOLID 2x <br />C <br />BLOCKING @ ALL j <br />C <br />SHEATHING y <br />11 <br />EDGES (SEE <br />OPENING <br />SECTION X- <br />d U <br />C <br />x <br />Er W <br />x <br />E <br />2x STUDS W <br />BEYOND. x <br />SEE PLAN o <br />0 <br />ROOF NAILING SCHEDULE: <br />NAILING ZONES (SHINGLE AND TILE) <br />o <br />W <br />ZONE 1: 8d RING SHANK NAILS @ 6" O.C. ON EDGE AND 6" O.0 IN FIELD <br />ZONE 2: 8d RING SHANK NAILS @ 6" O.C. ON EDGE AND 6" O.0 IN FIELD <br />Z <br />ZONE 3 8d RING SHANK NAILS @ 4" O.C. ON EDGE AND 4" O.0 IN FIELD <br />z <br />(NOTE: IF 5/8" PLYWOOD IS USED, CONTRACTOR MUST USE 10d RING <br />SHANK <br />O Q <br />NAILS) <br />x <br />NOTE: <br />ROOF SHEATHING: (APA RATED EXPOSURE 1)1/2" PLYWOOD <br />0 w i <br />(TILE) OR 7/16" OSB MIN. (SHINGLES) SPAN RATED 24/16 <br />W LL�Otr <br />X 1 8 in <br />SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, ATTACH <br />F O $ j <br />PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE ATTACHED TO <br />Z to , O 'Cr <br />STUD AND OR BLOCKING AT ALL EDGES. <br />N W O <br />v W <br />A MINIMUM 1/8" SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES <br />AND END JOINTS TO ALLOW FOR EXPANSIONS FASTENERS SHALL NOT <br />Ir PENETRATE SURFACE MORE THAN 1/8" <br />318" "S" = NAIL 318" <br />SPACING <br />S. 3l4" S 112" <br />1/Z" <br />1 S 1/2" <br />/ SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />O NAIL AT BASE 2 ROWS @ 4" O.C. W/8d COMMON NAIL <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. W/8d COMMON NAIL <br />@ NAIL OPENING PERIMETER @ 3" O.C. W/8d COMMON NAIL <br />@ NAIL INT. AT 3" O.C. W/8d COMMON NAIL <br />Q STAGGER ALL VERT. JOINTS & NAIL @ 4" O.C. <br />W/8d COMMON NAIL <br />Q SHEATHING SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />W/ 8d COMMON NAILS @ 4" O.C. <br />@ (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />MEMBER IF GABLE END <br />NOTE: <br />• 8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 21/2' <br />• DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />I <br />AT ALL PANEL BLOCKING <br />LOCATIONS MIN 2 X 4 #2 SPF <br />TURNED VERTICAL W/ 7/16" <br />OSB FLITCH PLATE TOW/ (2) <br />12d TOENAILS EA. END. NAIL <br />FLITCH PLATE TO VERTICAL <br />W/ (4) 8d NAILS <br />(2) 8d NAILS @ 3 O.C. <br />STAGGERED <br />C WALL SHEATHING INSTALL. AW&LAGM& <br />S6 & NAILING SCHED. SECTION X-X <br />2x CRIPPLES @ — <br />16" O.C. W/ (2)12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />SEE PLAN FOR REQUIRED—"' <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />• INTERIOR HEADER: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6)10d x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN, TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />icj <br />I_I I I_I I A A' <br />d.. <br />-1 i 1=III—III I I •.:�, .. ,:. <br />-1 II— <br />I I—I1 I 1 :: <br />�FrI 111. 111=� <br />(3) # 5 REBAR ON 3" CHAIR 4^ 1'-8' <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />m <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />1'-4' <br />(1) <br />2 <br />(1) <br />2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />3 <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />3 <br />(2) <br />(3) <br />(2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10)10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />FINISH GRADE <br />00 <br />4 z <br />r- <br />@ WOOD 1 ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />r <br />OWN <br />6 <br />p4Qz <br />• \O <br />s <br />•''•.••. <br />�� �Qco <br />\. <br />.. <br />0 S\Oa <br />F E S `\\x <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 <br />Florida Building Code - <br />Residential 61h Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />W <br />g <br />31 E Co <br />0) <br />V <br />goo <br />NNc �6— <br />r'- <br />Y (h <br />� LL � u. <br />(� N <br />N M 0 W W I <br />1 Q <br />ai�LL ado <br />0 <br />z 0 cl Own CoOJ In <br />cc II.- d 2'� o <br />i rn� a <br />Z <br />ILW <br />L <br />130 <br />11C%I z° o <br />U F <br />_ <br />U ❑0�❑ <br />Z N M <br />z <br />J v <br />CZ <br />N <br />Z r. <br />- <br />Cl <br />OW <br />� <br />�N <br />C <br />� <br />'® <br />U <br />„, _ <br />s <br />o <br />M <br />W <br />Z <br />� <br />az <br />�R <br />om <br />QH <br />E <br />9 � <br />t66"' <br />% V <br />oa <br />o a <br />o� <br />z <br />N � <br />L <br />a� <br />'do <br /><O <br />-0< <br />� <br />�o <br />m i <br />z <br />N <br />J <br />a " <br />1z <br />rn <br />a 3 <br />8 <br />2Z <br />�LL <br />�k <br />CD <br />a <br />� <br />il< <br />con 3 <br />J <br />�N <br />L o <br />hi <br />m <br />� <br />,W <br />■= <br />r <br />> <br />M <br />.-. <br />C 4 <br />cu <br />LO <br />O <br />LO <br />CV <br />= T <br />- <br />,— <br />m <br />E <br />' M <br />M CV <br />o <br />Z <br />E O <br />E <br />°' m <br />a <br />a o <br />3 <br />JOB <br />NO : <br />20-0566 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />S6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.