Laserfiche WebLink
CROSS BRACING DETAIL (TYP.) <br />SCALE:NTS <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY <br />B FRAMED RIDGE <br />NALED <br />TRUSS PLATE INSTITUTE NOTE THAT THE COMBINED WIND AREA IS GREATER MMAY Bw/MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST IT LANDPRE-EG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0' <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. pg <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />rri c- 1 vv ­1 1 f I— r r uu <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />`3 <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />MAX & EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP - <br />^ CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />-Z-WOOD TRUSS J <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL <br />SCALE:NTS <br />DIAGONAL <br />AT 8'-0" <br />MAX <br />2X4 CON <br />T&BCF <br />WOOD <br />TRUSS <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />CL OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�'A TRUSS <br />(2) 2x8 #2 SYP w, <br />O.S.B. FLITCH PI <br />TOP @ TRUSS E <br />U.N.O. ON ROOF <br />PLAN <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 1 Od x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 1Od <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />(2) SIMPSON HETA20 w/ (8) 1 Od ATTACHED PER NAILING <br />TYPICAL BLOCK x 1 1/2" NAILS EACH - OR (2) SCHEDULE <br />�K WALL SIMPSON MSTAM36 w/ (7) 1 Od 2x SPF #2 <br />USSES GIP & (4) 1/4"x2 1/4" TITENS EACH AT 16" O.C. <br />(2) 12D NAILS AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />1 Od TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />• 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 1 Od <br />COMMON TOENAILS TO TIE BEAM <br />CONC.MASONRY <br />STEEL OR WOOD <br />BEARING SUPPORT <br />A —A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING 3 <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />ik VARIES <br />2x4 #2 SPF BRACING @ <br />16" O.C. W/ (4) 12d <br />TOENAILS TO TOP <br />PLATE & (2) 12d END - <br />NAILS TO TRUSS <br />BOTTOM CHORD <br />ROOF SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />COMMON TRUSSES. <br />SEE TRUSS PLAN <br />MIN. (2) 2x4 FOR CONNECTION <br />SPF TOP INFORMATION. <br />PLATE <br />OILVARIES SEE PLAN <br />FOR WALL LOCATION <br />�— MIN. 2x4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />MIN. 2X4 #2 SYP P.T. PLATE <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />16" O.C. MAX. <br />INFO. <br />° <br />SECTION <br />@ ENTRY <br />$ <br />SCALE:NTS <br />SIMPSON LSTA18 <br />w/ (12) 10d NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />SCALE: NITS <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />MASONRY WALL r4 <br />SCALE:NTS <br />iIMPSON HUC410 w/ (14) L.SEE PLAN L. <br />I OR CANT. <br />6d INTO HEADER & (6) <br />Od INTO BEAM - SEE <br />2OOF PLAN FOR MORE <br />NFO <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE 7/16" OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SCHEDULDE/PLANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON MTS18 w/ (14) <br />10d NAILS TYP. U.N.C. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A A <br />SEE PLAN FOR <br />SEE PLAN FOR <br />CANTILEVER IF <br />INDICATED <br />CORNER SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />Z/ <br />COMMON BM. ATTACHMENT <br />SCALE:NTS <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 1 Od NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 1 Od NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION 22 <br />SCALE:NTS <br />SCALE: 3/4"=V-0" <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />GABLE <br />TRUSS <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />MIDDLE <br />8d NAILS AT <br />4" O.C. <br />BM. SPLICE OVER <br />CENTER OF POST <br />SEE PLAN FOR <br />VALLEY TRUSS <br />INFO. <br />—• MASONRY WALL BELOW: SIMPSON <br />°°. HETA16 w/ (9) 1 Od x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM • BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN a (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />TO GABLE TRUSS <br />COMMON TRUSS <br />° SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE �� <br />SCALE:NTS <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL @ ENTRY FRONT WALL <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD -TOENAIL <br />EACH TRUSS TO NAILER <br />W/ (3)1 Od <br />SCALE:NTS <br />ROOF AND EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />SIMPSON LUS26 w/ (8)10d NAILS -� <br />OR IF 2 PLY TRUSS SIMPSON <br />LUS26-2 w/ (8) 16d NAILS TO SEE FLOOR FRAMING PLAN <br />LEDGER AND J/S6 FOR MORE INFO. <br />2X10 #2 SYP CONT. LEDGER w/ (3) VERIFY WITH PLAN FOR <br />1i2" X 4 1/2" LAG SCREWS ATTACH LOCATION AND DIRECTION <br />LAG SCREWS INTO END OF EACH (IF PARALLEL SEE 2/D2 FOR <br />FLOOR TRUSS, 24" O.C. MAX. (AT BLOCKING INFO) <br />EACH SIDE OF G.T. INSTALL (4) LAG MASONRY WALL <br />SCREWS EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF 9 <br />SCALE: NTS <br />LOW ROOF/WALL <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />w/ SIMPSON SP1 w/ (10) 1 Od <br />NAILS AT BASE & SIMPSON <br />SP2 w/ (12) 1 Od NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END ( BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS12 w/ (14) 10d x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W/--/ <br />Z- (2) 2x6 BLOCKING UNDER~ FLOOR G.T. <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ <br />BUMP OUT 39 <br />SCALE:NTS <br />DETAILS &SECTIONS <br />N <br />0 <br />N <br />CO <br />cli <br />�4���i <br />1-E W K0lo <br />� <br />p; 76{�'�• •� w <br />W • {� 11• <br />s 3v t 4! <br />4. <br />ol _ t r <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />10 <br />aE <br />t• O� m°-, <br />�° xk <br />�; <br />it W <br />- w a <br />H N O LL fl <br />0 iA J O <br />Z Fc:°' Zo <br />O <br />= 29 Lu <br />5 .@ (Nco m O <br />W r°2o,rn <br />00 a K <br />_ N rNrJ Z x rn p <br />C9 ¢ v ai <br />Z °" <br />W DD❑ <br />z <br />Qo <br />aaN <br />O Q <br />� <br />J <br />N <br />M <br />GV)0 <br />X <br />w <br />Q,�o <br />c y <br />_a) v)Cn <br />v1 <br />4AJ J <br />ca 10 i <br />I <br />_ 4 <br />z� <br />UN <br />0 <br />c Y <br />®10 <br />- <br />w <br />M <br />�a <br />o <br />Z <br />c6E <br />wipo- <br />0 <br />E U <br />w� <br />a'. <br />Za <br />o, <br />E— <br />'x0 <br />a¢ <br />U0 <br />0 <br />°a <br />ww <br />CV <br />wo <br />o <br />� <br />or <br />° <br />Z <br />47 <br />J <br />1 <br />F <br />z <br />z 2Z. <br />oa� <br />° <br />a° <br />U 3 <br /><p <br />�w <br />1� <br />o <br />�_ <br />;a <br />mia <br />7 <br />zI¢ <br />O° 3 <br />O <br />N <br />> Lo <br />Otm <br />CO <br />� <br />0 <br />O� <br />n\ <br />W o <br />• > <br />N <br />.-. <br />; <br />Y <br />''L_ <br />O V <br />/O� <br />C m o <br />� <br />Q� <br />E <br />T <br />T— <br />= N <br />r <br />.- o <br />T <br />Lo <br />T <br />M 0 <br />w <br />M <br />N N <br />o <br />z <br />M <br />Z <br />N <br />E O <br />cc <br />a cc <br />E ai <br />U q p <br />JOB <br />NO: 21-2030 <br />SCALE : AS NOTED <br />SHEET NO. <br />D 1 <br />