Laserfiche WebLink
FOP <br />FROM BELOW -- <br />FIRST FLOOR PLUMBING PLAN - DEMOLITION <br />0' 2' 4' 8' 16' 2 4' <br />DEMOLITION KEY NOTES: <br />OREMOVE EXISTING PLUMBING FIXTURE & RELATED <br />PIPING, CAP OR PLUG EXISTING SERVICES ABOVE <br />CEILING & BELOW FLOOR AS REQUIRED. PLUG WASTE <br />PIPING AS CLOSE TO MAIN AS POSSIBLE TO AVOID <br />DEAD ENDS. TURN FIXTURE OVER TO OWNER. <br />OREMOVE AND RELOCATE EXISTING PLUMBING FIXTURE, <br />AND ASSOCIATED TRIM TO LOCATION SHOWN ON NEW <br />CONSTRUCTION PLANS. CAP OR PLUG EXISTING <br />SERVICES ABOVE CEILING & BELOW FLOOR AS SHOWN. <br />PLUG WASTE PIPING AS CLOSE TO MAIN AS POSSIBLE TO <br />AVOID DEAD ENDS. <br />O REMOVE AND RELOCATE EXISTING PLUMBING FIXTURE, <br />AND ASSOCIATED TRIM TO LOCATION SHOWN ON NEW <br />CONSTRUCTION PLANS. REMOVE EXISTING WASTE BACK <br />TO POINT INDICATED ON SH. P2.1, CAP EXISTING WATER <br />PIPING FLUSH WITH WALL. <br />REMOVE AND RELOCATE EXISTING PLUMBING FIXTURE, <br />AND ASSOCIATED TRIM TO LOCATION SHOWN ON NEW <br />CONSTRUCTION PLANS. PLUG EXISTING WASTE FLUSH <br />WITH WALL AND REMOVE EXISTING WATER PIPING BACK <br />TO POINT INDICATED. <br />OREMOVE EXISTING FLOOR DRAIN & RELATED PIPING, <br />PLUG EXISTING WASTE PIPING AS CLOSE TO MAIN <br />AS POSSIBLE TO AVOID DEAD ENDS. <br />�6 REMOVE AND DISPOSE OF EXISTING WATER HEATER <br />AND RELATED PIPING. <br />OREMOVE AND RELOCATE EXISTING HOT WATER RECIRC. <br />PUMP TO LOCATION SHOWN ON NEW CONSTRUCTION PLANS. <br />OEXISTING PLUMBING FIXTURE TO REMAIN. <br />OCAP EXISTING PIPING ABOVE CEILING. <br />10 REMOVE AND RELOCATE EXISTING PLUMBING FIXTURE, <br />AND ASSOCIATED TRIM TO LOCATION SHOWN ON NEW <br />CONSTRUCTION PLANS. REMOVE EXISTING WASTE BACK <br />TO POINT INDICATED ON SH. P2.1, REMOVE EXISTING C..W. <br />PIPING BACK TO POINT INDICATED AND CAP ABOVE CEILING. <br />CAP EXISTING H.W. FLUSH WITH WALL FOR FUTURE <br />RECONNECTION. <br />DEMOLITION LEGEND <br />SYMBOL <br />DESCRIPTION <br />EXISTING TO REMAIN <br />EXISTING TO BE REMOVED <br />DEMO TO THIS POINT <br />Project No. 09002.00 <br />P2*2 <br />$DATE$ $TIME$ tFILEA$ <br />2009 BH/PK Architects, <br />