Laserfiche WebLink
NVA-Mr-03 <br />MTNV I.E. = 3,671 <br />h-11 C.W. FROMR.P.E.S.F. <br />I <br />UNDERGROUND PLUMBING PLAN - DEMOLITION <br />0' 2' 48' 16' 2 4' <br />DEMOLITION KEY NOTES: <br />O1 REMOVE VERTICAL PORTION OF WASTE PIPING AND <br />CAP FLUSH WITH FLOOR. <br />�2 REMOVE UNDERGROUND WASTE PIPING BACK TO <br />THIS POINT AND CAP. <br />DEMOLITION LEGEND <br />SYMBOL <br />DESCRIPTION <br />EXISTING TO REMAIN <br />EXISTING TO BE REMOVED <br />�•- <br />DEMO TO THIS POINT <br />Project No. 09002.00 <br />P20 1 <br />$DATE$ $TIME$ $FILEU <br />© 2009BH/PKArchitects, <br />