DIVISION S DOORS AND WINDOWS (CONT.)
<br />DIVISION s DOORS AND WINDOWS (CONT.)
<br />DIVISION S FINISHES (CONT.)
<br />DIVISIONS FINISHES (CONT.)
<br />206 FINISHES AND COLORS
<br />103 SUBMITALS
<br />SECTION OW90 STUCCO FINISH
<br />SECTION I®M.&DO VINYL COMPOSITION TILE
<br />A ANODIZED FINISH: YKK AP AM RJ A ANODIZED PLUS@ FINISH:
<br />A PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL DATA FOR EACH GLAZWs MATERIAL, FABRICATED
<br />PART 1 GENERAL
<br />PART I C*-TERAI-
<br />L CLEAR YKK AP YSN WITH CLEAR PROTECTIVE COMPOSITE COATING.
<br />GLASS PRODUCT REQUIRED AND SEALANT INCLUDED INSTALLATION AND MANTENANCE INSTRUCTIONS,
<br />1.01 SUMMARY
<br />2. MEDIUM BRONZE: YKK AP YBN WITH CO CLEAR PROTECTIVE MPOSITE COATING.
<br />3. DARK BRONZE: YKK AP Y85N WITH CLEAR PROTECTIVE COMPOSITE COATING,
<br />PERFORMANCE CRITERIA, ETC_
<br />B. SAMPLES: SUBMIT FOR VERIFICATION PURPOSES 12 NCH SQUARE SAMPLE OF EACH TYPE OF GLASS
<br />101 SUMMARY
<br />A MATERIALS AND INSTALLATION OF CEMENT STUCCO ON HOLLOW MASONRY, EXTERIOR
<br />A PROVIDE TYPE AND STYLE AS SCHEDULED N TFE FINISH MATERIAL SCHEDIJL E
<br />4. BLAdG YKK AP YKN WITH CLEAR PROTECTIVE COMPOSITE COATING
<br />5. CHAMPAGNE: YKK AP YH3N WITH CLEAR PROTECTIVE COMPOSITE COATING.
<br />INDICATED, INCLUDING MIRRORS, MOUNTING HARDWARE AND MATERIALS.
<br />GRADE PLYWOOD AND FETAL LATH ALSO FURNISH AND INSTALL METAL, LATH, STUCCO WRAP
<br />B. ADHESIVES.
<br />I. PROVIDE WHITE LATEX CARPET ADHESIVE SUCH AS WUD. HENRY COMPANY NO 356, ROBERTS
<br />6. WHITE: YKK AP YU13N WITH PROTECTIVE COMPOSITE COATING.
<br />C. CERTIFICATE: SUBMIT CERTIFICATES FROM RESPECTIVE MANUFACTURERS, ATTESTING THAT GLASS AND
<br />AND ACCESSORIES.
<br />COMPANY NO.41-0504, OR AN EQUAL APPROVED BY THE ARCHITECT AND RECOMMENDED
<br />B. ANODIZED FINISHING: PREPARE ALUMINUM SURFACES FOR SPECIFIED FNISHt APPLY SHOP FNIS14 IN
<br />GLAZING MATERIALS F;URNJS ED FOR PROJECT COMPANY WITH REQUIREMENTS, INCLUDE ALL REQUIRED
<br />1.02 DELIVERY, STORAGE AND HANDLING
<br />FOR THE PURPOSE BY THE MANFACTURER OF THE SELECTED CARPET.
<br />ACCORDANCE WITH THE FOLLOWING:
<br />WARRANTIES.
<br />A DELIVER ALL CEMENT MATERIALS N ORIGINAL CONTAINERS BEARNG MANUFACTURERS NAME AND
<br />2. PROVIDE SEAM ADHESIVE SUCH AS WA HENRY COMPANY NO.246, R05ERTS COMPANY NO.
<br />L ANODIC COATNG: ELECTROLYTIC COLOR COATING FOLLOWED BY AN ORGANIC SEAL APPLIED
<br />I. GLASS MANUFACTURER SHALL SUBMIT A CERTIFIED LETTER STATING THAT ALL GLASS SIZE AND THICKNESS
<br />IDENTIFICATION.
<br />41-05M, OR AN EQUAL APPROVED BY THE ARCHITECT AND RECOMMENDED FOR THE PURPOSE
<br />N ACCORDANCE WITH THE REQUIREMENTS OF AAMA 612-02. ALUMINUM EXTRUSIONS SHALL BE
<br />FOR ALL GLAZNG OPENINGS MEET OR EXCEED THE WIND LOAD REQUIREMENTS AS SPECIFIED N SECTION
<br />S. DELIVER NEW, FLAT STRUCTURAL METAL LATH N ORGNAA PACKAGING. PROTECT PRODUCTS FROM
<br />BY THE MANUFACTURER OF THE SELECTED CARPET.
<br />PRODUCED FROM QUALITY CONTROLLED BILLETS MEETING AA-6063-115.
<br />08410, ALUMINUM ENTRANCES AND STOREFRONT$, AND SECTION 08521, ALUMINUM WINDOWS.
<br />_
<br />MOISTURE AND HUMIDITY. STORE UNDER COVER OFF GROUN N A DRY LOCATION,
<br />C. AT INTERSECTION OF CARPET AND FLOOR TILE, PROVIDE ROPPE COMPANY, INC. VINYL TILE CARPET JOINER
<br />A EXPOSED SURFACES SHALL BE FREE OF SCRATCHES AND OTHER SERIOUS BLEMISHES.
<br />PISS OR EQUIVALENT.
<br />B. EXTRUSIONS SHALL BE GIVEN A CAUSTIC ETCH FOLLOWED BY AN ANODIC OXIDE
<br />TREATMENT AND THEN SEALED WITH AN ORGANIC COATING APPLIED WITH AN
<br />104 DELIVERY, STORAGE AND HANDLING
<br />103 SUBMITTALS
<br />A MANUFACTURERS SPECIFICATION AND PRODUCT DATA FOR STUCCO APPLICATIONS.
<br />D. PROVIDE OTHER MATERIALS, NOT SPECIFICALLY DESCRIBED BUT REQUIRED FOR A COMPLETE AND PROPER
<br />ELECTRODEPOSITION PROCESS.
<br />A PROTECT GLASS AND GLAZING MATERIALS DURNG DELIVERY, STORAGE AND W40LNGG TO COMPLY WITH
<br />INSTALLATION, AS SELECTED BY THE CONTRACTORR, SUBJECT TO THE APPROVAL OF THE ARCHITECT.
<br />C. THE ANODIZED COATING SHALL COMPLY WITH ALL OF THE REQUIREMENTS OF AAMA 612-02:
<br />MANUFACTURER'S DIRECTIONS AND AS REQUIRED TO PREVENT EDGE DAMAGE TO GLASS AND GLAZING
<br />B. STUCCO WRAP STRUCTURAL METAL LATH AND ACCESSORIES, SUCH AS CORNER BEAD, CONTROL JOINTS, ETC.
<br />E ALLOW THE OWNER TO INSPECT AND SELECT FROM SCRAP CARPET REMAINING AFTER THE INSTALLATION.
<br />VOLUNTARY SPECIFICATIONS, PERFORMANCE REQUIRE W8 AND TEST PROCEDURES FOR
<br />MATERIALS FROM EFFECTS CP MOISTURE INCLUDING CONDENSATION, OF TEMPERATURE CHANGES, OF
<br />PART 2 PRODUCTS
<br />BWDLE, WRAP N BURLAP, AND DELIVER TO THE OWNER THE CARPET SCRAPS SO SELECTED.
<br />COMBhED COATINGS OF ANODIC OXIDE AND TRNJSPAFENT ORGANIC COATINGS, ON
<br />DIRECT EXPOSURE TO SW, AND FROM OTHER CAUSES.
<br />END OF SECTION OWSO
<br />ARCHITECTURAL ALUMINUM. TESTING SHALL DEMONSTRATE THE ABILITY OF THE FNIS14 TO
<br />B. STORE IN LOCATION TO PREVENT ANY DAMAGE. REPLACE GLASS OR GLAZING MATERIALS AT ANY PONT
<br />201 JOB MIXED INGREDIENTS
<br />RESIST MASIFROM T IIAND A MONLY FOUND ON
<br />MIRING THE CONTRACT PERIOD AT NO COST TO OINER
<br />A PORTLAND CEMENT, ASTMC 150 TYPE I, MIXED N ACCORD WITH MANUFACTURERS NSTRUCTIONS.
<br />SECTION �W Cs�IRPETII�s
<br />CONSTRUCTION ANp MOIST THE LOSS OF COLOR
<br />B. WATER CLEAN AND POTABLE
<br />D. OVERALL COATING THICKNESS FOR FINISHES SHALL BE A MNIMUM OF 0.1 MILS.
<br />105 GUARANTEE
<br />C. METAL LATH
<br />PART 1 CsENERAL
<br />2) CASS CORROSION RESISTANCE TEST, CASS 240/ASTM 83" TEST METHOD.
<br />A PROVIDE MINIMUM TEN (10) YEAR GUARANTEE FOR ALL GLASS PRODUCTS, INCLUDING GUARANTEE AGAINST
<br />L STRUCTURAL METAL LATH SHALL BE 34 POUND EXPANDED METAL SHEET WITH SOLID PARALLEL RIBS.
<br />3) OTHER AAMA 2605 PERFORMANCE TESTS SPECIFIED N THESE SPECIFICATIONS, SUCH AS:13 DRY
<br />SILVER SPOILAGE OF ALL MIRE, PERFORMANCE OF GLAZING SEALANTS, TEC.
<br />2. METAL LATH SHALL BE 3.4 POUND DIAMOND MESH METAL LATH.
<br />1.01 SUMMARY
<br />FILM HARpNESSt 1B2 SALT SPRAY RESISTANCEt 1.512 COLOR RETENTION, SOUTH FLORIDAt 1.514
<br />ACTURER FOR STUCCO APPLICATION
<br />3. ACCESSORIES FURBISHED BY SAME MANUFACTURER.
<br />A PROVIDE TYPE AND STYLE AS SCHEDULED N THE FINISH MATERIAL SCHEDULE
<br />GLOSS RETENTION, SOUTH FLORIDA
<br />C. HIGH PERFORMANCE ORGANIC COATING FINISH
<br />PART 2 PRODUCT$
<br />D. MECHANICAL FASTENERS
<br />L NAILS, 8d RING SHANK HOT DIP GALVANIZED OF SUI�ICIENT LENCsHTH TO PENETRATE PLYWOOD BACKING
<br />B. ADHESIVES.
<br />I. PROVIDE WHITEEX LATEX CARPET ADHESIVE SUCH AS W.W. HENRY COMPANY NO 356, ROBERTS
<br />L TYPE FACTORY APPLIED TWO -COAT 10% KYNAR RESIN BY ARKBMA OR 10% HYLAR RESIN BY
<br />201 GLASS
<br />I NOW
<br />COMPANY 4, AN EQUAL APPROVED BY THE ARCHITECT AND REC.OMF ENDED
<br />SOLVAY SOLEXIS, FLUOROPOLYMER BASED COATING SYSTEM, POLYVNYLIDENE FLUORIDE
<br />(PVF-2), APPLIED N ACCORDANCE WITH YKK AP PROCEDURES AND MEETING A4MA 2605
<br />A PROVIDE GLASS TYPES AND THICKNESS AS PER DRAWINGS AND WNDOW SHHEDULE:
<br />2. WHERE LIGHT METAL FRAMING OCCURS: MNIMLM NOA SELF DRILLING CORROSION RESISTANT SCREWS OF
<br />UR. OSE41-OB
<br />FOR THE PURPOSE THE MANUFACTURER THE SELECTED CARPET.
<br />HE
<br />SPECIFICATIONS.
<br />FLOAT (OR 'PLATE"} COMPLY WITH FEDERAL SPECIFICATION DD-G-45L C .EAR WIRE GLASS: COMPLY
<br />WICIENT LENGTH TO PENTRATE METAL. 3/8 INCH,
<br />2. PROVIDE SEAM ADHESIVE SUCH AS W.UL HENRY COMPANY
<br />WE , ROBERTS COMPANY
<br />2. COLORS: SELECTED BY ARCHITECT FROM THE FOLLOWING:
<br />WITH FEDERAL SPECIFICATION OD-G-45L FIGURED AND PATTERN GLASS: COMIPLY WITH FEDERAL
<br />E. STUCCO WRAP
<br />41-0502, OR AN EQUAL APPROVED THE ARCHITECT AND RECOMMENDED FOR THE PURPOSE
<br />D REC UR
<br />A STANDARD COATING COLOR CHARTS.
<br />SPECIFICATION DD-G-451.
<br />L BY TYVER FOR USE OVER PLYWOOD FACINGS.
<br />BY THE C
<br />OF THE SELECTED CARPET.
<br />B. CUSTOM COATING COLOR CHARTS.
<br />B. SUBJECT TO COMPLIANCE WITH ALL REQUIREMENTS, THE FOLLOWING MANUFACTURERS 01#R PRODUCT
<br />TION OF CARPURER
<br />C AT INTERSECTION OF CARPET AND FLOOR TILE, PROVIDE ROPPE C0IPANY, INC VINYL TILE CARPET JOINER
<br />C. COLOR NAME AND NUMBER:
<br />WHICH MAY BE MCORAOATED N THE WORK:
<br />PART 3 DMG1'TIX7'PL
<br />+18S OR EQUIVALENT.
<br />D. FINISHES TESTING
<br />I. TINTED GLASS:
<br />301 INSTALLATION
<br />D. PROVIDE OTHER MATERIALS, NOT SPECIFICALLY DESCRIBED BUT REQUIRED FOR A COMPLETE AND
<br />L APPLY 017E SOLUTION NAOH, SODIUM HYDROXIDE, TO SMALL AREA OF FINISHED SAMPLE
<br />AREAL LEAVE N PLACE FOR SIXTY MINU1TESt L04TLY WIPE OFF NAOHt DO NOT CLEAN AREA
<br />a. PPG-NDUSTIES, NO. SOLARGRAY COMMERCIAL NSULATING GLASS I -NCH WITS WITH V1-NCH
<br />A NSTALL MECHANICAL- FASTENERS ON 6 NCH CENTERS ALONG SEAMS AND 12 INCH CENTERS ALONG INTERIORS.
<br />PROPER INSTALLATION, AS SELECTED BY THE CONTRACTOR SUBJECT TO THE APPROVAL OF THE
<br />ARCHITECT.
<br />FAR
<br />AIRSPACE AND 1/4-NCH LUTES, INTERIOR LUTE CLEAR
<br />2. WIRE GLASS:
<br />B. STUCCO INSTALLATION SHALL BE TWO COAT APPLICATION. APPLY BASE COAT WITH FIRM PRESSURE TO FORM
<br />E. ALLOW THE OWNER TO NSPECT AND SELECT FROM SCRAP CARPET REMAINING AFTER THE INSTALLATION.
<br />2. SUBMIT SAMPLES WITH TEST AREA NOTED ON EACH SAMPLE
<br />GOOD BOND THEN DOUBLE 13ACKK TO PROVIDE THICKNESS. LEAVE RWGH ENOUGH TO PROVIDE BOND FOR
<br />BUNDLE, WRAP IN BURLAP, AND DELIVER TO THE OWNER THE CARPET SCRAPS SO SELECTED.
<br />a. FIRELITE.
<br />FNISH COAT. FINISH COAT SHALL BE OF TEXTURE AS CALLED FOR ON THE BUILDING ELEVATION DRAWINGS.
<br />PART 3 EXECUTION
<br />3. CLEAR FLOAT GLASS
<br />C. CURING: CURE STUCCO BY USE OF POLYETHYLENE FILM, OR BY USE OF FIFE SPRAY.
<br />END OF SECTION 09680
<br />301 MANUFACTURERS INSTRUCTIONS / RECOMMENDATIONS
<br />a. PPG INDUSTRIES, INC
<br />b. FORD GLASS DMSION.
<br />302 PROTECTION
<br />SECTION OSWO PAINING
<br />A COMPLIANCE: COMPLY WITH MANUFACTURER'S PRODUCT DATA, INCLUDING PRODUCT TECHNICAL
<br />BIU_LETINS, INSTALLATION INSTRUCTIONS, AND PRODUCT CARTON NSTRUCTIONS. LATEST INSTALLATION
<br />a LIBBEY-OIENS-FORD CO.
<br />A PROTECT STUCCO DIMING AND UPON COMPLETION FROM WATER INFILTRATION, DUST, DIRT, PRECIPITATION,
<br />PART I GENERAL
<br />INSTRUCTIONS CAN BE FOUND AT WWWI1CKAPCOM.
<br />C. OTHER MANUFACTURERS WHO PROVIDE SIMILAR PRODUCTS, SUBJECT TO COMPLIANCE WITH ALL
<br />EXCESSIVE DRYING UNTIL STUCCO HAS SET.
<br />I01 GENERAL
<br />REQUIREMENTS, MAY BE APPROVED WITH COMPLETE DATA SUBMITTAL AND ARCHITECT APPROVAL PRIOR
<br />A IT IS THE NMNIT OF THIS SPECIFICATION TO PRODUCE A PREMIUM JOB, WHICH WILL PROVIDE THE MAXIMUM
<br />302 EXAMINATION
<br />TO BIDDING IN ACCORDANCE WITH DIVISION I.
<br />SECT( 0�� GYP '
<br />DURABILITY, WHICH CAN REASONABLY BE EXPECTED FRAM A PANTED SURFACE
<br />A SITE VERIFICATION OF CONDITIONS: VERIFY CONDITIONS UNHITCH HAVE BEEN PREVIOUSLY
<br />D. INSULATNG GLASS: COMPLY WITH A51M E-113, ASTM E-114. SEALED INSULATNG WITS FABRICATED FROM
<br />B. 'PANT" INCLUDES COATING SYSTEMS MATERIALS, PRIMERS, EMULSIONS, ENAMELS, STAINS, SEALERS, AND
<br />INSTALLED UNDER OTHER SECTIONS) ARE ACCEPTABLE FOR PRODUCT NSTALLATICN N
<br />TWO PANES OF GLASS WITH AIR SPACE BETWEEN. GLASS THICKNESS AND HEAT STRENGTHENING TO BE
<br />PART I deeRAL
<br />FILLERS, AND OTHER APPLIED MATERIALS WHETHER USED AS PRUNE, INTERMEDIATE, OR FNISH COAT.
<br />ACCORDANCE WITH MOVACTIRER'S INSTRUCTIONS.
<br />DETERMINED BY MANUFACTURER FOR WIND LOADING CONDITION. INSULATING GLASS WARRANTY: 10 YEARS.
<br />101 GENERAL
<br />C. SPECIFIED PRODUCTS BELOW ARE MANUFACTURED BY SHERWN WILLIAMS, EXCEPT WERE OTHER
<br />A GYPSUM WALLBOARD WORK SHALL CONFORM To TO THE GYPSUM ASSOCIATION 'R
<br />'RECOMMENDED
<br />MANUFACTURERS ARE INDICATED, AND ESTABLISH A STANDARD OF QUALITY. EQUIVALENT PRODUCTS OF
<br />3.03
<br />A3APREPARATION
<br />JACENT SURFACES PROTEGTIONk PROTECT ADJACENT WORK AREAS AND FINISH SURFACES FROM
<br />202 MANUFACTURERS / PRODUCTS
<br />SPECIFICATIONS FOR THE APPLICATION AND FNIS14NG OF GYPSUM WALLBOARD.'
<br />OTHER ACCEPTABLE MANIFACTl�ERS MAY NOT BE USED UNLESS APPROVED BY ARCHITECT.
<br />DAMAGE DURING PRODUCT INSTALLATION.
<br />A FLOAT GLASS (TYPE FG-Ak CLEAR V4 NCH THICK MINIMUM.
<br />S. EXAMINE SUBSTRATES TO WHICH DRYWALL CONSTRUCTION ATTACHES OR ABUTTS, PRESET HOLLOW METAL FRAMES,
<br />D. PROVIDE BEST GRADE AND MALITY MATERIALS AND PRODUCTS MANUFACTURED BY %ERWIN WILLIAMS.
<br />L ALUMINUM SURFACE PROTECTION PROTECT ALUMINUM SURFACES FROM CONTACT WITH LIME,
<br />SAFTEY GLASS (TYPE FG-Bk CLEAR UM. FULLY TEMPERED 114 INCH THICK MINIM
<br />CAST-N-ANCORS, AND STRUCTURAL FRAMING FOR COMPLIANCE WITH REQUIREMENTS FOR NSTALLATION TOLERANCE
<br />MATCH COLORS AS INDICATED ON THE DRAWINGS. USE PREMIXED PANTS INSOFAR AS POSSIBLE THIN ONLY
<br />MORTAR CEMENT, ACIDS, AND OTHER
<br />LOW E GLASS (TYPE FG-R FLOAT TYPE, TEMPERED, CLEAR COATING ON INNER SURFACE
<br />AND OTHER CONDITIONS AFFECTING PERFORMANCE OF DRY WALL CONSTRUCTION. DO NOT PROCEED WITH
<br />AS PERMITTED ANY MANFACTURER'S LABEL INSTRUCTIONS, AND AVOID UNNECESSARY T14 M M
<br />HARMFUL COBTAMNANTS.
<br />MIRROR GLASS (TYPE FG-WA CLEAR TEMPERED SAFTEY TYPE WITH COPPER AND SILVER COATING, SQUAB
<br />INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED,
<br />E. PROTECT FINISHED SURFACES, WOW OF OTHER TRADES, AND PROPERTY OF THE OWNER PROM DAMAGE AND
<br />EDGES.
<br />C. DO NOT TAPE AND FNIS14 GYPSUM BOARD WHEN THE TEMPERATURE IS BELOW 60 DEGREES FAHRENHEIT.
<br />DEFACEMENT. COVER FLOORS AND FIXED EQUIPMENT WITH DROP CLOTHS.
<br />304 INSTALLATION
<br />THE TEMPERATURE OF THE ROOMS SHALL BE HELD AT 60 DEGREES FAHRENHEIT FOR 48 HOURS BEFORE
<br />F. PREPARE SURFACES ACCORDING TO PAINT MANUFACTURER'S INSTRUCTIONS. EXAMNE FACTORY FINISHED
<br />A GENERAL: INSTALL MANUFACTURER'S SYSTEM N ACCORDANCE UTH 8140P DRAWINGS, AND WITHIN
<br />PART 3 E><E0 TION
<br />TAPING AND FNIS14M IS TO BEGIN. MANTAN 60 DEGREES FAWWNIWEIT DIMING AND AFTER INSTALLATION.
<br />AND PRIMED SURFACES TO BE PANTED, AND VERIFY COMPATIBILITY OF EXISTING MATERIAL WITH PANT TO
<br />SPECIFIED TOLERANNCE&
<br />VENTILATES AS REQUIRED TO REMOVE EXCESS HIUMIDITY.
<br />BE APPLIED. APPLY PANT IN STRICT ACCORDANCE WITH THE MAKFACTLMR'S PRINTED INSTRUCTIONS
<br />L PROTECT ALUMINUM MEMIBERS N CONTACT WITH MASONRY, STEEL, CONCRETE, OR
<br />301 PRECONSTRUCTION
<br />ONLY TO SURFACES U14IC14 ARE THOROUGHLY DRY, SMOOTH, EVEN, CLEAN, FREE OF DUST AND PROPERLY
<br />DISSIMILAR MATERIALS USING NYLON PADS OR BITUMINOUS COATIN65%
<br />A EXAMINE JOB CONDITIONS AND VERIFY THAT ALL ARE SATISFACTORY FOR SPEEDY AND ACCEPTABLE
<br />102 GYPSUM WALLBOARD
<br />PREPARED TO RECEIVE THE INTENDED FNISH.
<br />2. SHIM AND BRACE ALUMINUM SYSTEM BEFORE ANCHORING TO STRUCTURE
<br />WORK
<br />A GYPSUM WALLBOARD SHALL BE MANUFACTURED BY U. GYPSUM. WALLBOARD IS TO MEET. ASTM C36-84A
<br />3. PROVIDE SILL FLASHING AT EXTERIOR STOREFRONT SYSTEMS. EXTEND EXTRUDED FLASHING
<br />B. CLEAN AND PREPARE GLAZING SUPPORT MATERIALS ACCORDING TO MANUFACTURER'S INSTRUCTIONS AND
<br />AND G-L-30d IR NC14ES THICK, 48 INCHES WIDE WITH TAPERED EDGES.
<br />102 PAINTING
<br />CONTINUOUS WITH SPLICE JONTSt SET N CONTINUOUS BEADS OF SEALANT.
<br />STANDARDS OF THE GLASS ASSOCIATION OF NORTH AMERICA GLAZING MANUAL
<br />IB, AT FIRE RATED PARTITIONS INSTALL WALLBOARD TO MEET SEPARATE REQUIREMENTS, USE TYPE III, GRADE
<br />A ACCEPTABLE MATERIALS
<br />4. VERIFY STOREFRONT SYSTEM ALLOWS WATER ENTERING SYSTEM TO BE COLLECTED N
<br />C, INSPECTION AND CLEANNG SHALL NCLUDE BUT IS NOT LIMITED TO THE FOLLOWING: CLEAN DIRT OR
<br />X CLASS 1, 5/8 INCHES THICK FIRE RETARDANT WALLBOARD.
<br />L ALL PANTING TO BE SCHEDULED N THE FNISH SCHEDULE
<br />GUTTERS AND WEPT TO EXTERIOR VERIFY METAL JOINTS ARE SEALED IN ACCORDANCE
<br />WITH MANUFACTURERS INSTALLATION INSTRUCTIONS.
<br />FOREIGN MATERIALS FROM CHANNELS, STOPS, RABBETS, SETTING BLOCKS, SPACERS, ECT_ REMOVE NON-
<br />C. INSTALL GYPSUM BOARD WITH TRUE, EVEN SURFACES AND STRAIGHT, SHARP CORNERS. USE FULL LENGTH
<br />2. EQUIVALENT PRODUCTS OF THE FOLLOWING ARE ALSO ACCEPTABLE:
<br />5. LOCATE EXPANSION WHERE INDICATED REVIEWED SHOP DRAWINGS.
<br />MULLIONS
<br />PERMANENT PROTECTIVE COATINGS. WIFE SURFACES CLEAN IMMEDIATELY PRIOR TO ADDING PRIMER
<br />BOARDS WERE P08618LE. END JOINTS ON THE SAME SIDE OF A WALL SHALL BE STAGGERED AND JOINTS
<br />BEHR (P D)
<br />6. SEAL METAL TO METAL. STOREFRONT SYSTEM JOINTS USING SEALANT RECOMMENDED BY SYSTEM
<br />TAPES OR GLAZING COMPOUNDS. APPLY PRIMER TO SURFACES AS REQUIRED TO RECEIVE GLAZING
<br />TAPES
<br />ON OPPOSITE SIDE SHALL NOT OCCUR OVER THE SAME SUPPORT. DO NOT LOCATE NORMAL END JOINTS AT
<br />PRATT t LANBERTT
<br />MANUFACTURER
<br />COMPOLNDS.
<br />EDGE OF OPENINGS. FORM JOINTS, NEATLY. BUTT BOARDS TOGETHER BUT DO NOT FORCE INTO PLACE DO
<br />GLIDDEN
<br />NOT BUTT EDGES AGANST TAPERED EDGES. NO JOINT SHALL HAVE A GAP GREATER THAN V4 INCH.
<br />PORTER
<br />305 FEW QUALITY CONTROL
<br />3.02 INSTALLATION
<br />D. N GENERAL, INSTALL GYPSUM BOARD ON CEILING BEFORE WALLS. CONSTRUCT CEILINGS WITH LONG
<br />5ENJAMNE MOORE
<br />A M,MAFACTURERt FELD SERVICES- LPOB REQUEST, PROVIDE MANUFACTURERS FIELD
<br />A INSPECT FRAMNG BEFORR INSTALLATION AND PROVIDE WRITTEN REPORT OF ANY CONDITIONS THAT MIGHT
<br />DIMENSION OF GYPSUM BOARD APPLIED AT R04 ANGLES TO SUPPORT.
<br />B. UNDERCOATS AND T14NEM
<br />SERVICE CONSISTING OF SITE VISIT FOR INSPECTION OF PRODUCT INSTALLATION N
<br />INTERFERE WITH SATISFACTORY INSTALLATION.
<br />E. SCREW GYPSUM BOARD TO FRAuMNG WITH SCREWS NOT OVER 8 NCHES ON CENTER FASTEN GYPSUM
<br />L PROVIDE LNDERCOAT PAINT PRODUCED BY THE SAME MANUFACTURER
<br />ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />B. INSPECT ALL GLASS IMMEDIATELY BEFORR INSTALLATION. DEJECT ANY UNLABELED, EDGE -DAMAGED,
<br />BOARD BEGINNING AT THE CENTER AND WORK TOWARDS OUTER EDGES. HOLD BOARD FIRMLY AGAINST
<br />OF FINISH COAT.
<br />CONDUCT
<br />B. FIELD TEST: FIELD TEST TO DETERMINE WATERTIGHTNESS CF STOREFRONT
<br />SCRATCHED, OR MIS -SIZED PIECES. LEAVE MANUFACTURER'S LABELS ATTACHED UNTIL THE ARCWIMC
<br />WOOD FRAMING WHILE FASTENNG. FASTENERS AT EDGES OF BOARDS SHALL BE V2 INCH FROM THE EDGE
<br />2. USE ONLY TWIN ERS RECOMMENDED BY THE PANT MANUFACTURER AND USE ONLY
<br />SYSTEM. CONDUCT TEST N ACCORDANCE WITH AAMA 5012-03.
<br />DIRECTS THAT THEY CAN BE REMOVED.
<br />F. OPENING FOR ELECTRICAL DEVICES, PIPING, GRILLS, AND REGISTERS SHALL BE ACCURATELY LOCATED AND
<br />THE RECOMMENDED LIMITS.
<br />306 ADJUSTING AND CLEANNG
<br />C. INSTALL AS PER MAUNFACTURER'S NSTRIUCTIONS AND THE STANDARDS OF THE FLAT GLASS MARKETING
<br />NEATLY MADE TO CLOSELY FIT THE DEVICES AND BE COMPLETELY COVERED BY PLATES AND ESCUTCHEONS.
<br />C. COLOR SCHEDULES
<br />A ADJUSTING: ADJUST SUNG DOORS FOR OPERATION N ACCORDANCE WITH MANFACTUREER'S
<br />ASSOCIATION.
<br />103 TRIM PIECES
<br />L PROVIDE PAINTING AS SCHEDULED N THE FINISHE. MATERIALS SCHEDULE
<br />a. GYPSUM DRYWALL, USE:
<br />RECOMIIENDATICNS.
<br />D. MAINTAIN THE HIGHEST STANDARDS OF INSTALLATION AND CONSISTENCY IN APPLICATION AND
<br />A PROVIDE TRIM ACCESSORIES OF THE SIZES REQUIRED FOR THE WALLBOARD APPLICATION AS
<br />L
<br />L FIRST COAT - PIGMENTED PRIf'ER/SEALER
<br />B. CLEANNG: THE GENERAL CONTRACTOR SHALL CLEAN IN PRODUCTS N ACCORDANCE
<br />APPEARANCE. INSTALL SETTING BLOCKS AND SPACERS, GASKETS, AND FELTS EXACTLY AS DIRECTED BY
<br />MANUFACTURED BY U.S. GYPSLM PROVIDE DUR-A-BEAD CORNER BEAD AT EXTERNAL CORNERS AND NO.
<br />2. SECOND COAT - ACRYLIC LATEX ENAMEL
<br />WITH MANUFACTURER'S INSTRUCTIONS PRIOR TO
<br />OWNER'S ACCEPTANCE, AND REMOVE CONSTRUCTION DEBRIS FROM PROJECT SITE LEGALLY
<br />MANUFACTURER SUPPORT GLASS FIRMLY AND EVENLY WITH SETTING BLOCKS. KEEP GLASS COMPLETELY
<br />SEPARATED FROM ANY MATERIAL OTHER THAN CUSHIONING STOPS, SPACERS, GASKETS, ETC. INSTALL.
<br />200-A METAL CASING BEAD WHERE WALLBOARD ABUTTS OTHER MATERIALS.
<br />3. THIRD COAT - ACRYLIC LATEX ENAMEL
<br />DISPOSE OF DEBRIS.
<br />GLASS TO MAINTAIN UNIFORM APPEARANCE N SIIRFACES. DO NOT VARY GLAZING MATERIALS EXCEPT AS
<br />104 FASTENERS
<br />b. ON FERROUS METAL, USE:
<br />C. PROTECTION: THE GENERAL CONTRACTOR SHALL PROTECT THE INSTALLED PRODUCT'S FINISH
<br />APPROVED OR DIRECTED BY THE ARCHITECT.
<br />A PROVIDE SCREWS, NAILS, CLIPS, TIES, AND OTHER FASTENERS AS MCOMMENDED BY THE GYPSUM MANUFACTURER,
<br />L FIRST COAT - RUST INHIBITIVE ALKYD METAL PRIMER
<br />SURFACES FROM DAMAGE DURING CONSTRUCTION.
<br />E. INSTALL SEALANTS TO PROVIDE COMPLETE BOND AND TO ASSURE WATER WILL WAS14 AWAY FROM GLASS.
<br />105 JONI TREATMENT SYSTEMS
<br />2. SECOND COAT - SEMI -GLOSS ALKYD ENAMEL
<br />END OF SECTION
<br />PROVIDE PRECISE MITER CUTS OR OTHER DIRECT JONTS WERE DETAILED. SEAL MITER JOINTS AND
<br />A SYSTEM SHALL BE PERFORATEAN D TAPE D CEMENT RECOMMENDED THE GYPSUM MANFACTURER
<br />3. THIRDAME COAT - SEMI -GLOSS ALKYD ENL
<br />OTHER JOINTS SO THEY ARE COMPLETELY AIRAND WATER TIGHT.
<br />B. APPLY MATERIALS N STRICT ACCORDANCE TO MANUFACTURER'S RECOMMENDATIONS. FILL JOINTS UTH JONI
<br />c. ON WOOD DOORS' USE:
<br />COMPOUND, EMBED PERFORATED TAPE AND APPLY A SKIM COAT OF JOINT COMPOUND OVER TAPE. APPLY TWO
<br />L FIRST COAT - STAN (SEE FINISH SCHEDULE)
<br />SECTION MILD FINISH 14RE
<br />3.03 PROTECTION AFTER NSTALLATION
<br />ADDITIONAL COATS OF JONI COMPOUND ALLOWING AT LEAST 24 HOURS BETWEEN EACH COAT. SAND EACH COAT.
<br />2. SECOND COAT - STAN IEEE FNIS14 SCHEDULE)
<br />PART I CAD ERAL
<br />A PROTECT GLASS AFTER NSTALLATION WITH SAFTEY STRIPS AND WARNING MARKERS. KEEP SAFTEY STRIPS
<br />FNISH SURFACES SHALL BE WFORMLY SMOOTH, TRUE AND N SATISFACTORY CONDITION TO RECEIVE PANT.
<br />3. THIRD COAT - VARNISH LOW SHEEN "RUBBED EFFECT"
<br />AND WARNING MARKERS OFF THE GLASS SURFACE TO AVOID STAINING OR MARRING THE SURFACE
<br />END OF SECTION MSS
<br />I01
<br />PROTECT METAL PARTS FROM DAMAGE AFTER INSTALLATION.
<br />END OF SECTION OWE70
<br />A OBTAIN EACH TYPE OF AS SPECIFIED IN THE DOOR/HARDWARE SCHEDULE P 40WAF E FROM A SINGLE
<br />SECTION CUM CERAMIC TILE
<br />MLNFACTURER ALTI-IOUGsH SEVERAL MAY BE INDICATED AS OFFERING PRODUCTS COMPL.YMG WITH THE
<br />REQUIREMENTS.
<br />3�4 CLEANING
<br />PART 1 CsENERAL
<br />DIVISION
<br />`'
<br />Q
<br />I�7IVi�
<br />�y � /� �p�/� /� �
<br />�fi/
<br />A CLEAN ALL GLASS AT THE CONCLUSION OF THE NTEMOR WORK OR W-EN DIRECTED BY THE ARCHITECT.
<br />�71-GvIl�1�TI�s
<br />B. FURNISH ALL HARDWARE, N THEIR ORIGINAL PACKAGING, COMPLETE WITH ACCESORIES OF PROPER SIZE AND
<br />CLEAN ALL GLASS WITH CLEANER CLEANING MATERIALS, AND METHODS RECO'METED BY THE
<br />I01 GENERAL
<br />SECTION IM22 FIRE " iC rWAUISMERS
<br />DESIGN REQUIRED FOR THE PURPOSE FOR WINCH THEY ARE TO BE USED AND WITH ALL SCREWS, SHIELDS, AND
<br />MANUFACTURER CLEAN ALL GLASS COMPLETIY CLEAR OF STREAKS OR SPOT
<br />A CERAMIC AND TYPES ARE INDICATED ON THE DRAWINGS AND ARE FROM A SINGLE MANIFA CTURER OTHER
<br />OTHER ANCHORAGE DEVICES NECESSARY FOR A COMPLETE NSTAaLL-ATICK HARDWARE SCHEDULE SHOW
<br />B. ANY GLASS THAT IS SCRATCHED OR DAMAGED DURING CLEANING WILL BE REPLACED AT THE
<br />MANFACTURERS WILL NOT BE CONSIDERED.
<br />PAR"(' I ORAL
<br />ON THE pRAWING61•
<br />CONTRACTOR'S EXPENSE
<br />B. DELIVER MATERIALS N ORIGINAL CONTANERS WITH SEALS UNBROKEN AND LABELS NTACT UNTIL TIME OF
<br />C. INSTALL EACH HARDWARE ITEM N COMPLIANCE WITH THE NATIONAL BUILDERS HARDWARE ASSOCIATION AND
<br />C, PROVIDE OWNER WITH MANUFACTURER'S INSTRUCTIONS FOR CLEANING.
<br />USES. ENGAGE AN EXPERIENCED INSTALLER WI0 HAS SUCCESSFULLY COMPLETED TILE INSTALLATIONS
<br />101 SUBMITTALS
<br />THE MANUFACTURERS NSTRUCTIONS AND RECOMMENDATIONS. WHEREVER CUTTNG AND FITTING IS REQUIRED TO
<br />SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO THAT INDICATED FOR THE PROJECT.
<br />A PRODUCT DATA: REQUIREP
<br />INSTALL HARDWARE ONTO OR INTO SURFACES WHICH ARE LATER TO BE PANTED OR FINISHED N ANOTHER
<br />305 REPAIR AND REPLACEMENT
<br />C. COMPLY WITH PARTS OF ANSI 106 SERIES OF FINE INSTALLATION STANDARDS INCLUDED WDER 'AMERICAN
<br />B. SHOP DRAWINGS: NOT REQUIRED
<br />WAY, COORDINATED REMOVAL, STORAGE, AND REINSTALLATION OR APPLICATION OF SURFACE PROTECTIONS
<br />A REMOVE ,AND REPLACE ANY DAMAGE GLASS AND GLAZING. INSTALL, PROTECT, AND CLEAN
<br />NATIONAL STANDARD SPECIFICATIONS FOR THE INSTALLER OF CERAMIC TILE' THAT APPLY TO TYPE OF
<br />C. SAMPLES: NOT REQUIRED
<br />UT14 FNIS14 NO WORK
<br />REPLACEMENT GLASS AS SPECIFIED ABOVE.
<br />SETTING AND GROUT MATERIALS AND METHODS INDICATED. TILE MAY BE THIN -SET.
<br />PART 2 PRODUCTS
<br />D. SET UNITS LEVEL, PLUMB AND TRUE TO LINE AND LOCATION. ADJUST AND REINFORCE THE ATTACHMENT
<br />102 MORTAR AND GROUT
<br />SUBSTRATE AS NECESSARY FOR PROPER INSTALLATION AND OPERATION. DRILL AND COUNTERSUUK UNITS NOT
<br />FACTORY PREPARED FOR ANCHORAGE FASTENERS. SPACE FASTENERS AND ANCHORS IN ACCORDANCE WITH
<br />END OF SECTION 08800
<br />A MORTAR SHALL BE PORTLAND CEMENT ASTM C150, TYPE L GROUT SHALL BE ACID RESISTANT UPCO
<br />201 MANUFACTURERS/PRODUCTS
<br />A COORDINATE WITH LOCAL MUNICIPALITIES AND PROVIDE FIRE EXTINGUISHERS.
<br />INDUSTRY STANDARDS. SET THRESHOLAS FOR EXTERIOR DOORS IN FULL BED OF BUTYL -RUBBER OF
<br />HYDROMENT, TYPE AS RECOMMENDED BY THE MANUFACTURER FOR THE SPECIFIC TYPE OF TILE AND
<br />METHOD OF INSTALLATION. COLR FOR FLOOR TILE IS SPECIFIED ON THE DRAWINGS.
<br />B. FIRE EXTINGUISHERS: SEE DRAWINGS FOR SPECIFICATIONS.
<br />POLYIOSBUTYLENE MASTIC SEALANT.
<br />E. ADJUST AND CHECK EACH OPERATING ITEM OF HARDWARE AND EACH DOOR TO ENSURE PROPER OPERATION.
<br />B. DO NOT GROUT TILE UNTIL TILE IS FIRMLY SET. SOAK OR DAMPEN JOINTS OF THE TILE TO BE GROUTED UM
<br />PART 3 EXECt1TION
<br />DIVISION ISION( S F1NI�E6
<br />REPLACE UNITS THAT CANNOT BE ADJUSTED 70 OPERATE FREELY AND SMOOTHLY AS INTENDED FOR THE
<br />APPLICATION MADE. INSTRUCT OWNERS IN ADJUSTMENT AND MAINTENANCE OF HARDWARE
<br />PORTLAND CEMENT GROUT. SOAK OR DAMPEN OTHER JOINTS AS RECOMMENDED BY THE GROUT
<br />MR FORCE GROUT INTO JOINT LINES COMPLETELY IDILING JOINTS WITH COMPACTED GROUT AND
<br />301 SCHEDULES
<br />A INSTALL AS REQUIRE.
<br />PROPER DAM
<br />COOVERINVERIN G MORTAR FINISH JOINTS OF SQIUARE EDGED TILE FLUSH WITH SURFACE. STRIKE OFF TOOT JOINTS
<br />FINAL ADJUSTMENT.
<br />OF CUSHION EDGED TILE TO DEPTH OF CUSHION. FILL GAPS AND SKIPS, AND RETOOL
<br />END OF SECTION 10522
<br />1O KEYING
<br />SECTION Mike METAL SYSTEMS
<br />103 CLEANING
<br />A KEYING SHALL BE PER THE OWNERS REQUIREMENTS. TAG KEYS AND PROVIDE TO OWNER AT SUBSTANTIAL
<br />METAL STUDS
<br />A UPON COMPLETION OF THE PLACEMENT AND GROUTING, CLEAN TILE SLIR=ACE SO THAT THEY ARE FREE OF
<br />COMPLETION.
<br />FOREIGN MATTER REMOVE LATEX-PORTLANP CEMENT GROUT RESIDUE FROM TILE AS SOON AS POSSIBLE
<br />A AT INTERIOR METAL STUD PARTITIONS, UNLESS OTHERWISE SHOW ON THE DRAWINGS, PROVIDE
<br />UNGLAZED TILE MAY BE CLEANED WITH ACID SOLUTIONS ONLY WHEN PERMITTED BY TILE AND GROUT
<br />tO3 GUARANTEE
<br />STANDARD PUNCH STEEL STUDS OF THE SIZES SHOWN 04 THE DRAWINGS, EITHER HOT -DIP
<br />MANUFACTURER'S PRINTED INSTRUCTIONS, BUT SOONER THAN 14 DAYS AFTER INSTALLATION. FLUSH SURFACE
<br />A PROVIDE ONE-YEAR GUARANTEE FOR ALL HARDWARE PERIOD OF GUARANTEE SHALL BEGIN FROM DATE OF
<br />GALVANIZED OR FACTORY PRE -PAINT: 25 GA (UNLESS SHOW OTHERWISE ON THE DRAWING. 20
<br />WITH CLEAN WATER BEFORE AND AFTER CLEANING,DIVISION
<br />ISION( �� ��IT
<br />OWNER'S ACCEPTANCE.
<br />GA AT ALL DOOR OPENINGS.
<br />B. ACCESSORIES- PROVIDE ALL ACCESSORIES INCLUDING, BUT NOT NECESSARILY LIMITED TO,
<br />END OF SECTION 09300
<br />END OF SECTION 08110
<br />TRACKS, CLIPS, ANCHORS, FASTENING DEVICES, SOUND ATTENUATION PENCIL RODS AND
<br />NOW SPECIFIED
<br />RESILIENT CLIPS, AND OTHER ACCESSORIES REQUIRED FOR A COMPLETE AND PROPER
<br />SECTION IOW1I ACOUSTIC PAML CEILINGS
<br />DIVISION 12 F URN I:31-II1�I�S
<br />SECTION WO GLASS 4 CA.AZING
<br />OF T14E8
<br />AND AS RECOMMENDED BY T14E C.
<br />MEET
<br />PART I IQAL
<br />L'AO
<br />OR EXCEED MIN WM MCUIFS1ENTS FEDERAL SPESTALLATION,
<br />C QQ-S-69AND FEDERAL SPEC
<br />QQ-S-TTSD, CLASS D.
<br />101 GENERAL
<br />NOW SPECIFIED
<br />PART I GENERAL
<br />A COORDINATE LAYOUT AND INSTALLATION OF ACOUSTICAL CEILNG WITS AND SUSPENSION SYSTEM
<br />METAL TRIM
<br />GOMPPONENTS WITH OTHER CONSTRUCTION THAT PENETRATES CEILING OR IS SUPPORTED BY THEM,
<br />101 SISIMARY
<br />A POF41 FROM GALVANIZED STEEL NOT LIGHTER THAN 26 GAUGE, COMPLYING WITH FEDERAL SPEC
<br />INCLUDING LIGHT FIXTURES AND HVAC EQUIPMENT.
<br />A PROVIDE AND INSTALL GLAZING AND ACCESSORIES WHERE SHOWN ON THE DRAWINGS AND AS SPEICIFIED
<br />QQ-S-TiS, CLASS D.
<br />Q
<br />DIVISION 13 �CIIL CONSTRUCTION
<br />HEREIN. GLAZING TYPES AND SITES SHALL BE AS PER THE DRAWINGS AND WINDOW SCHEDULE
<br />B. CASING BEADS: U.Sfs. 4200-5.
<br />102 MINERAL -FIBER ACOUSTICAL PANELS
<br />A PROVIDE ACOUSTICAL PANELS AS MANFACTURED BY USG RADAR CLIMAPLUS
<br />102 QUALITY STANDARDS
<br />E:NP OF SECTION OS110
<br />24 INCHES BY 24 NC14ES 3/4 INCHES THICK WHITE. REFER TO DRAWINGS FOR LIMITS OF TILE INSTALLATION.
<br />NOW SPECIFIED
<br />A GLAZING STANDARDS: COMPLY WITH RECOMMENDATIONS OF FLAT GLASS MARKETING ASSOCIATION
<br />B. INSTALL N STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS. ARRANGE
<br />Q
<br />SYSTEMS
<br />DIVISION �� CONVEYING
<br />IFGMA) "GLAZNG MANUAL' AND "SEALANT MANUAL' EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE
<br />ACOUSTICAL WITS AND ORIENT DIRECTIONAL PATTERN OF TILES FOR A UNIFORM APPEARANCE. REST
<br />INDICATED. REFER TO THPUBLICATIONS FOR DEFINITIONS OF GLASS AND GLAZING TERMS NOT
<br />OSE
<br />PANELS ON FLANGES OR INVERTED TEES WITH TILE UNITS WING NEATLY AGAINST BUTTING SURFACE
<br />�7Y�7 �7
<br />OTHERWISE DEFINED N THIS SECTION OR OHITER REFERENCED STANDARDS.
<br />AND SUPPORT BY WALL ANGLES.
<br />B. SAFTEY GLAZING PRODUCT: WERE SAFTEY GLASS IS INDICATED OR REQUIRED BY AUTHORITIES HAVING
<br />L03 METAL SUSPENSION SYSTEM
<br />NOW SPECIFIED
<br />JURISDICTION, PROVIDE TYPE OF PRODUCTS INDICATED WHICH COMPLY WITH ANSI Z91.1 AND TESTING
<br />REQUIREMENTS OF CPSC 16 CPR PART 1201 FOR CATEGORY 11 MATERIALS.
<br />A PROVIDE SYSTEM AS MAN.FACIURED BY USG SUSPENSION SYSTEM SHALL BE EXPOSED TEE -GRID,
<br />C. FIRE -RESISTANCE -RATED WIRE GLASS: PROVIDE WIRE GLASS PRODUCTS THAT ARE IDENTICAL TO THOSE
<br />DOUBLE -WEB, NTERMEDIATE DUTY (ASTM C635), ELECTROGALVANIZED, COLD -ROLLED STEEL,
<br />, 1 /�'
<br />DIVISION ISION ��CTTICti1...
<br />TESTED PER ASTM E 163 (UL 9) AND ARE LABELED AND LISTED BY UL OR OTHER TESTING AND
<br />NSS CHES WIDE, CAPPED BOTTOM FLANGE. UNITE IN COLOR SYSTEM TO INCLUDE ALL CROW TEES,
<br />NSPECTNG AGENCY ACCEPTABLE TO AUTHORITIES HAVING JUURISDICATION.
<br />BRIDGING TREES, INTERSECTION CLIPS, SPLICES, COMPLETE EXPOSED GRID SYSTEM.
<br />D. SINGLE SOLFCE RESPONSIBILTY : PROVIDE MATERIALS OBTANED FROM ONE SOURCE FOR EACH TYPE
<br />B. LAY OUT PATTERN IN ACCORDANCE WITH THE DRAWINGS, LEVEL, TRUE TO PLANE, AND AT THE REQUIRED
<br />SEE ME04 ICAL
<br />OF GLAZING PRODUCT IDICATED.
<br />ELEVATION. FRAME AROUND ALL OPENINGS N CEILING LIGHTS AND GRILLES WITH MAN RMNERS. HANGERS
<br />/�'
<br />�� ELECTRICAL
<br />E. PROVIDE GLASS AND GLAZING THAT HAS BEEN PRODUCED, FABRICATED AND INSTALLED TO WITHSTAND
<br />ARE TO BE SPACED AT 4'-0' ON CENTER MAXIMI<UM. PROVIDE ADDITIONAL HANGERS AS REQUIRED TO
<br />TEMPERATURE CHANGES, WND LOADNG , IMPACT LOADING, WITHOUT FAILURE NCLUDING LOSS OR
<br />SUPPORT LIGHT FIXTI RE.S AM HVAC REGISTERS AND GRILLES AND INTERFERENCES CF DUCT WORK.
<br />DIVISION
<br />BREAKAGE OF GLASS, FAILURE OF SF -AILMENTS OR GASKETS TO REMAIN WATERTIGHT AND AIRTIGHT,
<br />G. SECURES WIRES BY LOOPING AND WIRE -TYING, EITHER DIRECTLY TO STRUCTURES OR TO INSERTS, EYE
<br />SEE ELECTRICAL
<br />DETERIORATION OF GLASS AND GLAZING MATERIALS, AND OTHER DEFECTS N THE WORK
<br />SCREWS, OR OTHER DEVICES APPROPRIATE FOR SUBSTRATE. SCREW ATTACH EDGE MOLDING TO
<br />F. FIELD MEASURE ALL OPENIG OR AREAS TO RECEIVE GLASS AND GLAZING TO ASCERTAN CORRECT FIT.
<br />SUBSTRATE AT INTERVALS NOT OVER 16 INCHES ON CENTER AND NOT MORE THAN 3 INCHES FROM ENDS.
<br />IMPROPERLY SIZED GLASS OR GLAZING SHALL BE REPLACED AT NO ADDITIONAL- COST t0 OU R
<br />LEVEL GRID To A TOLERANCE OF VS' IN 12 FEET.
<br />A
<br />OF ECIFICATIONS
<br />� SiP
<br />END OF SECTION OeVi
<br />REVISIONS
<br />BY
<br />410
<br />U � �
<br />•
<br />o .$ 00
<br />Y I,
<br />a
<br />t-, • � �
<br />< M 3
<br />� c
<br />0.
<br />N
<br />M
<br />a
<br />Q
<br />Q
<br />N
<br />o
<br />> o 0
<br />CQ
<br />tZ
<br />a�
<br />to
<br />O
<br />ti
<br />U_
<br />Z
<br />JWm
<br />Z
<br />U N
<br />`0 C.) LO
<br />_0 V m OLL.
<br />m
<br />05 Q I
<br />mW J
<br />O
<br />L Z �.
<br />}Q�
<br />c Lea
<br />� Lat �p N
<br />Z
<br />Q IV
<br />J
<br />Date: 05. 12. 14
<br />Scale: AS NOTED
<br />Project Mgr. MY
<br />Drawn: JDS
<br />Job: 14-20
<br />Sheet
<br />N2
<br />HAProjects\Projects 2014\14020 - FMC Gall Blvd. Int. Medicine\04.CD\01-CD.A\04.Architectural\N12-SPECS.dwg, 5/12/2014 2:43:25 PM,ISimon, Xerox 6604 PS.pc3
<br />
|