Laserfiche WebLink
I / �/\\ /\\ <br />r----- - - - - -- - - - - I _ -- - u- <br />3/L— 1,2u 1 j* 4-- <br />\ ��� CLERK �� 1 ry j < <br />REGCJf�D`J / i l l / / v v y 4R' <br />P� _�_�_7.1' I-- �_� _^jEXXTi �/ 2" �` XAM \�/ `� /EXAMa�d I 2° \\EX4r-1 1 �� \v/EXAML.�� 1 2" m <br />I12 ` <br />I J / I <br />WE 1 <br />l _ � - - <br />4�� - 4�� � ' � � 411 <br />- - - - - ------- ---- -------------_---------� <br />-- 3/41I <br />14" --- <br />I 1 <br />OFFICE <br />MANAGE <br />! �� <br />imh <br />I <br />I <br />P-2 <br />P-1 <br />TOILET <br />TOILET <br />_ <br />4, <br />P-2 <br />(0 <br />'12 ; NONE <br />72 I � ++ <br />-- T ----- _------ _ 3/411 ---_ — — — <br />T_ I P73 ° <br />I <br />I�1 <br />F_JLJI- <br />F- 7 <br />- <br />- <br />(0 <br />1 <br />3/411 <br />1 <br />1 <br />pppp <br />I <br />� _ <br />+II`� 1 <br />_ S' t3 <br />I <br />III <br />I IIIT I <br />I 1 TI <br />I i �j <br />WAITING <br />101 <br />(0� If <br />_ -�� <br />- -�jjllI � _ 1 <br />� -F 1 f1 <br />L__ J L-___J <br />---�js,TTi� ! - -�f,Ii � (O\ <br />L_J <br />1 jI/�" 113 114 I,."1 115 I/ 111 116 I/2°1 <br />1 Y <br />- ---------- <br />I I I — <br />/z I I1 3 I 1 311 <br />,4 <br />`-- 3u y— 3/4� 3/4u --3/411 <br />-- <br />-------------------------------- ----------- ---- <br />411 <br />GORRI GOR �.� <br />I 109 31113/4" <br />-- --- -- ---- - 1 lie" EA. 1 <br />I <br />3/411 <br />rl--� �/ EXAi I ! .� 3/411 _... 1 <br />� _I _ _ � 1�— 3 <br />I I l l z <br />1/2" HW 4 CW TO 1/2" HW 4 CW TO I, � 3/4 <br />u <br />�^ EACH P-5, TYP. I EACH P-5, TYP. 11 -- z_ 1/z" TO <br />I <br />5-1 sH. VALVE.7 <br />—1- I q 1 1 IP-i <br />1 r <br />W i <br />P-5 P-5 - 3,4u <br />I q <br />3/4 CW TO E <br />- <br />m P-5 - - - E'-5 3/4" HW TO SY TEM. <br />1 U11 — - - <br />I/ " <br />I <br />ERECIRC. PUMP <br />XAI" 3�� I <br />I t� 145 j i 3,4 1 EXAI" <br />u <br />\ r — — � \\ --1 — I1/2 u l 3 - <br />3�� �--� I II <br />3 34u I �— 4'1 <br />1 125 <br />I— <br />F\' <br />311 311 I <br />IP-1 «l P-2 <br />TOILET <br />I <br />13/4 a 38 <br />3° <br />EXAM 1 EXAM EX4I" j I E X 411 �3,4n :34,, -1 <br />3,4" I 12 7L 1 <br />131---, I I / <br />51 - 3/4" - - - I - - 3/4" - - i -- / \ <br />1. <br />5 /4" -_ <br />P-5 P_v'/4_/ 3i4�� P-5 <br />��----- --- - P-5 <br />3/4" HW 4 CW DOWN. SPLIT <br />®� ® 1/2" HW 4 CW TO EACH P-5, <br />01 PLU" 5INCH PLAN <br />SCALE: 3/1&" = V-0" <br />(Di PLUMBING FIXTURE SCHEDULE <br />LABEL <br />FIXTURE: <br />W v CW HW <br />DESCRIPTIONS <br />P-I <br />WATER CL05ET <br />3" 2" 1/2" - <br />BRIGGS 4234-130 WHITE ELONGATED <br />HANDICAPPED <br />HANDICAPPED It, GALLON FLUSH WATER CLOSET <br />OL50NITE IS WHITE SEAT, CP STOP AND SUPPLY. <br />P-2 <br />HANDICAPPED <br />I11/2" 2" 11/2" 1/2" <br />BRIGGS "WHITMAN" 6615 WALL HUNS LAV WITH <br />LAVATORY <br />DELTA 523LF-HDF SINGLE LEVER FAUCET, <br />20 GAUGE GP P-TRAP LE55 CLEANOUT, <br />CRI912-A CP STOPS AND SUPPLIES, <br />P-3 <br />ELECTRIC <br />11/2" 2" 1/2" - <br />ELKAY EZ5TL-8G COOLER, STANDARD COLOR, <br />WATER COOLER <br />1-1/4" 20 GAUGE CP P-TRAP LESS CO., STOP AND <br />DUAL -LEVEL <br />SUPPLY. MOUNT LOWER NOZZLE AT H.C. HEIGHT. <br />P- 4 <br />MOP BA51N <br />3" 211I/2 " 1/2 " <br />FIAT M55-2424 MOP BASIN WITH 830-AA SERVICE <br />FAUCET W/ BRACKET 4 H4NGER,14535B STAINLESS <br />STEEL STRAINER, VAC. 5FfAK;:R 4 HOSE TffAM SPOUT, <br />P-5 <br />EXAM RM, <br />I11/2" 2" I/2" 'I/2 <br />ELKAY BLR-150-C STAINLESS STEEL SINK <br />SINK <br />COMPLETE WITH FAUCET AND BASKET STRAINER <br />1-I/2" 20 GAUGE CP P-TRAP LESS C.O., <br />STOPS AND SUPPLIES. 15" X 15" X 6" <br />5-1 <br />5INK-51NGLE <br />11/2" 2" I/2" 1/2" <br />ELKAY P51R-1918 19"xl8"x11/2" DEEP, 20 <br />COMPARTMENT <br />GAUGE -TYPE 302 55 SELF -RIMMING SINK WITH <br />DELTA 101-HDF-D5T SINGLE HANDLE FAUCET. <br />18 GA P-TRAP, CHROME 5TOP5 AND SUPPLIES, <br />1/2 HP GARBAGE DISPOSAL EQUAL TO <br />IN61NKERATOR AT BREAK ROOM ONLY. <br />EWI4 <br />ELECTRIC <br />- - 3/4" 3/4" <br />A.O. SMITH DEL-40, 40 GALLON WATER <br />WATER HEATER <br />HEATER 32 KW. 6208 VOLT, I PHASE. <br />UL. LISTED AND ASHRAE W-A APPROVED. <br />P-io <br />SHOWER <br />2" 2" 1/2" 1/2" <br />TILE SHOWER STALL BY OTHERS. ZURN <br />VALVE <br />TEMP-GARD SHOWER VALVE Z-1120-HW-VB, <br />PRESSURE BALANCIWG WITH HAND HELD SHOUTER, <br />60" FLEX HOSE WITH INTEGRAL VACUUM BREAKER <br />JAY R. SMITH 2OI0-A NIGKEL BRONZE DRAIN. <br />VB <br />VALVE BOX <br />- - 1/z " - <br />RECESSED VALVE BOX WITH FRAME AND COVER <br />EQUAL TO WATER TITE MODEL W9000. <br />O PLU` 51NG LEGEND <br />SANITARY <br />VENT ------------------- <br />COLD WATER -- - - - - -- <br />HOT WATER EX15TING SANITARY SANITARY - — — — — — -------- <br />EXISTING <br />EXISTING COLD WATER -- -- - --- <br />EXISTING HOT WATER <br />01FLUM51NG GENERAL NOTES: <br />I. THE PLUMBING CONTRACOR SHALL SURVEY SITE PRIOR TO BID <br />SUBMISSION TO VERIFY ALL EXISTING LOCATIONS, SLOPES AND <br />INVERTS OF EXISTING SANITARY PIPING INCLUDING CONNECTION <br />POINTS FOR NEW PIPING TO EXISTING. ALSO, VERIFY LOCATIONS <br />AND CONNECTION POINT TO THE EXISTING HOT AND COLD WATER <br />LINES, <br />2. WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON <br />WITH NO -HUB FITTINGS. <br />3. DOMESTIC WATER PIPING SHALL BE 'L' COPPER WITH 95/5 <br />SOLDERED FITTINGS. PROVIDE WATER HAMMER ARRESTORS <br />EQUAL TO JAY R SMITH AT EACH FIXTURE GROUP, IN <br />ACCORDANCE WITH THE FBC - PLUMBING. PVC AND CPVC PIPING <br />15 NOT ALLOWED DUE TO RETURN AIR PLENUM, <br />4. SLOPE WASTE LINES 3" AND LARGER AT YS"PER FOOT. LINES <br />SMALLER THAN 3" SHALL BE SLOPED AT i/4" PER FOOT, <br />5, INSULATE ALL DOMESTIC HOT WATER PIPING WITH 1/2" WALL <br />ARMAFLEX OR EQUIVALENT INSULATION. <br />6. PROVIDE NEW ISOLATION VALVES AT ALL FIXTURES. NEW ISOLATION <br />VALVES SHALL BE CHROME FINISH EQUAL TO BRASSCRAFT. <br />1. INSTALLATION OF ALL PLUMBING FIXTURES, PIPING, COMPONENTS <br />AND PERIPHERALS SHALL COMPLY WITH THE FLORIDA BUILDING <br />CODE - PLUMBING AND ALL OTHER APPLICABLE CODES, LAWS, <br />STANDARDS AND ORDINANCES. <br />a, PLUMBING CONTRACTOR SHALL COORDINATE ALL ROUTING AND <br />PIPING CONNECTIONS PRIOR TO COMMENCEMENT OF WORK. <br />'3. ALTERNATE FIXTURE MANUFACTURERS ARE ACCEPTABLE <br />PROVIDED THEY ARE EQUIVALENT AND MEET THE KIND AND <br />QUALITY OF THE FIXTURES SPECIFIED, <br />10. PIPE HANGERS SHALL BE SPLIT RING TYPE, GALVANIZED, WITH <br />THREADED ROD SUPPORT FROM STRUCTURE ABOVE EQUAL TO <br />GRINNELL, DISTANCE BETWEEN SUPPORTS SHALL BE PER FBC - <br />PLUMBING TABLE 308.5. <br />11. TESTING OF THE PLUMBING SYSTEMS SHALL BE PERFORMED BY <br />THE PLUMBING SUBCONTRACTOR AND WITNESSED BY THE <br />BUILDING DEPARTMENT INSPECTOR POTABLE HOT AND COLD <br />WATER PIPING SHALL BE HYDROSTATICALLY TESTED AT 125 PSIG <br />FOR 24 HOURS. SOIL, WASTE AND VENT PIPING SHALL BE FILLED <br />WITH WATER TO THE TOP OF THE SYSTEM FOR A PERIOD OF 24 <br />HOURS. <br />12, CLEANOUTS SHALL BE PROVIDED PER PLAN AND/OR AS <br />REQUIRED TO PROVIDE A COMPLETE SERVICEABLE SYSTEM. <br />CLEANOUTS SHALL BE SAME SIZE AS PIPE. FLOOR CLEANOUTS <br />SHALL BE EQUAL TO ZURN Z-1400-KC WITH BRONZE TOP. WALL <br />CLEANOUTS SHALL BE EQUAL TO ZURN Z-1411-KC WITH STAINLESS <br />STEEL COVER. <br />KEYED NOTES: C <br />EXISTING 51TE SANITARY LINE, FIELD VERIFY EXACT LOCATION <br />AND COORDINATE INVERT PRIOR TO BID AND START OF <br />CONSTRUCTION. CAP AND SEAL ANY EXISTING STUB -UPS FROM <br />SHELL CONSTRUCTION NOT BEING UTILIZED. <br />® EXTEND 1/2" HW AND CW MOP BASIN. <br />® EXTEND 3/4" DOWN AND SPLIT 1/2" TO 5-1AND P-1. <br />EXISTING 3/4" WATER METER TO BE REUSED. FIELD VERIFY EXACT <br />LOCATION PRIOR TO BID AND ADJUST WATER LAYOUT <br />ACCORDINGLY. EXTEND 3/4" RISER UP WITHIN WALL SPACE TO <br />ABOVE CEILING AND CONTINUE AS INDICATED. <br />®EXISTING 3/4" WATER METER TO BE ABANDONED IN PLACE. VERIFY <br />REQUIREMENTS WITH LOCAL UTILITY PRIOR TO START OF WORK. <br />REVISIONS <br />BY <br />�i <br />u <br />U C\1 <br />► Y � N <br />¢ 00 <br />` E <br />ti o <br />ti - <br />10 ate. <br />N <br />o <br />o m Lp ro <br />N " <br />it ¢ E I- <br />4 <br />¢ rn - <br />- °° 3 <br />o = <br />:a� <br />c <br />Qo <br />) 6 <br />N <br />m <br />x <br />U <br />w <br />as <br />ppppp aa000 <br />op � <br />EN <br />° 1 <br />' <br />a <br />�o c� <br />° <br />° 5- 2-1 ° <br />STATE0. <br />NAAO <br />�� <br />ppo° <br />C14 CD <br />Um <br />0 - (0 N (7) <br />�� 0)r- <br />^ NiM r U <br />Q z°� o.� <br />U-u o <br />0 N 00 d <br />J��mo <br />LL N <br />Cd <br />Dq L <br />0 <br />Q Ln o ° o <br />opt cn w <br />v <br />a_ <br />U_ <br />Z <br />W m <br />J z w <br />U N <br />o to <br />�JOmM <br />Q •>75 <br />w <br />m <br />0 � <br />mW <br />L m Q vas <br />v <br />Z ,. <br />tQ���a <br />c 0 � <br />�Z a <br />O — N <br />J <br />Date: 05. 12. 14 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: BMD <br />Job: 14-20 <br />Sheet <br />p 1 <br />