I / �/\\ /\\
<br />r----- - - - - -- - - - - I _ -- - u-
<br />3/L— 1,2u 1 j* 4--
<br />\ ��� CLERK �� 1 ry j <
<br />REGCJf�D`J / i l l / / v v y 4R'
<br />P� _�_�_7.1' I-- �_� _^jEXXTi �/ 2" �` XAM \�/ `� /EXAMa�d I 2° \\EX4r-1 1 �� \v/EXAML.�� 1 2" m
<br />I12 `
<br />I J / I
<br />WE 1
<br />l _ � - -
<br />4�� - 4�� � ' � � 411
<br />- - - - - ------- ---- -------------_---------�
<br />-- 3/41I
<br />14" ---
<br />I 1
<br />OFFICE
<br />MANAGE
<br />! ��
<br />imh
<br />I
<br />I
<br />P-2
<br />P-1
<br />TOILET
<br />TOILET
<br />_
<br />4,
<br />P-2
<br />(0
<br />'12 ; NONE
<br />72 I � ++
<br />-- T ----- _------ _ 3/411 ---_ — — —
<br />T_ I P73 °
<br />I
<br />I�1
<br />F_JLJI-
<br />F- 7
<br />-
<br />-
<br />(0
<br />1
<br />3/411
<br />1
<br />1
<br />pppp
<br />I
<br />� _
<br />+II`� 1
<br />_ S' t3
<br />I
<br />III
<br />I IIIT I
<br />I 1 TI
<br />I i �j
<br />WAITING
<br />101
<br />(0� If
<br />_ -��
<br />- -�jjllI � _ 1
<br />� -F 1 f1
<br />L__ J L-___J
<br />---�js,TTi� ! - -�f,Ii � (O\
<br />L_J
<br />1 jI/�" 113 114 I,."1 115 I/ 111 116 I/2°1
<br />1 Y
<br />- ----------
<br />I I I —
<br />/z I I1 3 I 1 311
<br />,4
<br />`-- 3u y— 3/4� 3/4u --3/411
<br />--
<br />-------------------------------- ----------- ----
<br />411
<br />GORRI GOR �.�
<br />I 109 31113/4"
<br />-- --- -- ---- - 1 lie" EA. 1
<br />I
<br />3/411
<br />rl--� �/ EXAi I ! .� 3/411 _... 1
<br />� _I _ _ � 1�— 3
<br />I I l l z
<br />1/2" HW 4 CW TO 1/2" HW 4 CW TO I, � 3/4
<br />u
<br />�^ EACH P-5, TYP. I EACH P-5, TYP. 11 -- z_ 1/z" TO
<br />I
<br />5-1 sH. VALVE.7
<br />—1- I q 1 1 IP-i
<br />1 r
<br />W i
<br />P-5 P-5 - 3,4u
<br />I q
<br />3/4 CW TO E
<br />-
<br />m P-5 - - - E'-5 3/4" HW TO SY TEM.
<br />1 U11 — - -
<br />I/ "
<br />I
<br />ERECIRC. PUMP
<br />XAI" 3�� I
<br />I t� 145 j i 3,4 1 EXAI"
<br />u
<br />\ r — — � \\ --1 — I1/2 u l 3 -
<br />3�� �--� I II
<br />3 34u I �— 4'1
<br />1 125
<br />I—
<br />F\'
<br />311 311 I
<br />IP-1 «l P-2
<br />TOILET
<br />I
<br />13/4 a 38
<br />3°
<br />EXAM 1 EXAM EX4I" j I E X 411 �3,4n :34,, -1
<br />3,4" I 12 7L 1
<br />131---, I I /
<br />51 - 3/4" - - - I - - 3/4" - - i -- / \
<br />1.
<br />5 /4" -_
<br />P-5 P_v'/4_/ 3i4�� P-5
<br />��----- --- - P-5
<br />3/4" HW 4 CW DOWN. SPLIT
<br />®� ® 1/2" HW 4 CW TO EACH P-5,
<br />01 PLU" 5INCH PLAN
<br />SCALE: 3/1&" = V-0"
<br />(Di PLUMBING FIXTURE SCHEDULE
<br />LABEL
<br />FIXTURE:
<br />W v CW HW
<br />DESCRIPTIONS
<br />P-I
<br />WATER CL05ET
<br />3" 2" 1/2" -
<br />BRIGGS 4234-130 WHITE ELONGATED
<br />HANDICAPPED
<br />HANDICAPPED It, GALLON FLUSH WATER CLOSET
<br />OL50NITE IS WHITE SEAT, CP STOP AND SUPPLY.
<br />P-2
<br />HANDICAPPED
<br />I11/2" 2" 11/2" 1/2"
<br />BRIGGS "WHITMAN" 6615 WALL HUNS LAV WITH
<br />LAVATORY
<br />DELTA 523LF-HDF SINGLE LEVER FAUCET,
<br />20 GAUGE GP P-TRAP LE55 CLEANOUT,
<br />CRI912-A CP STOPS AND SUPPLIES,
<br />P-3
<br />ELECTRIC
<br />11/2" 2" 1/2" -
<br />ELKAY EZ5TL-8G COOLER, STANDARD COLOR,
<br />WATER COOLER
<br />1-1/4" 20 GAUGE CP P-TRAP LESS CO., STOP AND
<br />DUAL -LEVEL
<br />SUPPLY. MOUNT LOWER NOZZLE AT H.C. HEIGHT.
<br />P- 4
<br />MOP BA51N
<br />3" 211I/2 " 1/2 "
<br />FIAT M55-2424 MOP BASIN WITH 830-AA SERVICE
<br />FAUCET W/ BRACKET 4 H4NGER,14535B STAINLESS
<br />STEEL STRAINER, VAC. 5FfAK;:R 4 HOSE TffAM SPOUT,
<br />P-5
<br />EXAM RM,
<br />I11/2" 2" I/2" 'I/2
<br />ELKAY BLR-150-C STAINLESS STEEL SINK
<br />SINK
<br />COMPLETE WITH FAUCET AND BASKET STRAINER
<br />1-I/2" 20 GAUGE CP P-TRAP LESS C.O.,
<br />STOPS AND SUPPLIES. 15" X 15" X 6"
<br />5-1
<br />5INK-51NGLE
<br />11/2" 2" I/2" 1/2"
<br />ELKAY P51R-1918 19"xl8"x11/2" DEEP, 20
<br />COMPARTMENT
<br />GAUGE -TYPE 302 55 SELF -RIMMING SINK WITH
<br />DELTA 101-HDF-D5T SINGLE HANDLE FAUCET.
<br />18 GA P-TRAP, CHROME 5TOP5 AND SUPPLIES,
<br />1/2 HP GARBAGE DISPOSAL EQUAL TO
<br />IN61NKERATOR AT BREAK ROOM ONLY.
<br />EWI4
<br />ELECTRIC
<br />- - 3/4" 3/4"
<br />A.O. SMITH DEL-40, 40 GALLON WATER
<br />WATER HEATER
<br />HEATER 32 KW. 6208 VOLT, I PHASE.
<br />UL. LISTED AND ASHRAE W-A APPROVED.
<br />P-io
<br />SHOWER
<br />2" 2" 1/2" 1/2"
<br />TILE SHOWER STALL BY OTHERS. ZURN
<br />VALVE
<br />TEMP-GARD SHOWER VALVE Z-1120-HW-VB,
<br />PRESSURE BALANCIWG WITH HAND HELD SHOUTER,
<br />60" FLEX HOSE WITH INTEGRAL VACUUM BREAKER
<br />JAY R. SMITH 2OI0-A NIGKEL BRONZE DRAIN.
<br />VB
<br />VALVE BOX
<br />- - 1/z " -
<br />RECESSED VALVE BOX WITH FRAME AND COVER
<br />EQUAL TO WATER TITE MODEL W9000.
<br />O PLU` 51NG LEGEND
<br />SANITARY
<br />VENT -------------------
<br />COLD WATER -- - - - - --
<br />HOT WATER EX15TING SANITARY SANITARY - — — — — — --------
<br />EXISTING
<br />EXISTING COLD WATER -- -- - ---
<br />EXISTING HOT WATER
<br />01FLUM51NG GENERAL NOTES:
<br />I. THE PLUMBING CONTRACOR SHALL SURVEY SITE PRIOR TO BID
<br />SUBMISSION TO VERIFY ALL EXISTING LOCATIONS, SLOPES AND
<br />INVERTS OF EXISTING SANITARY PIPING INCLUDING CONNECTION
<br />POINTS FOR NEW PIPING TO EXISTING. ALSO, VERIFY LOCATIONS
<br />AND CONNECTION POINT TO THE EXISTING HOT AND COLD WATER
<br />LINES,
<br />2. WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON
<br />WITH NO -HUB FITTINGS.
<br />3. DOMESTIC WATER PIPING SHALL BE 'L' COPPER WITH 95/5
<br />SOLDERED FITTINGS. PROVIDE WATER HAMMER ARRESTORS
<br />EQUAL TO JAY R SMITH AT EACH FIXTURE GROUP, IN
<br />ACCORDANCE WITH THE FBC - PLUMBING. PVC AND CPVC PIPING
<br />15 NOT ALLOWED DUE TO RETURN AIR PLENUM,
<br />4. SLOPE WASTE LINES 3" AND LARGER AT YS"PER FOOT. LINES
<br />SMALLER THAN 3" SHALL BE SLOPED AT i/4" PER FOOT,
<br />5, INSULATE ALL DOMESTIC HOT WATER PIPING WITH 1/2" WALL
<br />ARMAFLEX OR EQUIVALENT INSULATION.
<br />6. PROVIDE NEW ISOLATION VALVES AT ALL FIXTURES. NEW ISOLATION
<br />VALVES SHALL BE CHROME FINISH EQUAL TO BRASSCRAFT.
<br />1. INSTALLATION OF ALL PLUMBING FIXTURES, PIPING, COMPONENTS
<br />AND PERIPHERALS SHALL COMPLY WITH THE FLORIDA BUILDING
<br />CODE - PLUMBING AND ALL OTHER APPLICABLE CODES, LAWS,
<br />STANDARDS AND ORDINANCES.
<br />a, PLUMBING CONTRACTOR SHALL COORDINATE ALL ROUTING AND
<br />PIPING CONNECTIONS PRIOR TO COMMENCEMENT OF WORK.
<br />'3. ALTERNATE FIXTURE MANUFACTURERS ARE ACCEPTABLE
<br />PROVIDED THEY ARE EQUIVALENT AND MEET THE KIND AND
<br />QUALITY OF THE FIXTURES SPECIFIED,
<br />10. PIPE HANGERS SHALL BE SPLIT RING TYPE, GALVANIZED, WITH
<br />THREADED ROD SUPPORT FROM STRUCTURE ABOVE EQUAL TO
<br />GRINNELL, DISTANCE BETWEEN SUPPORTS SHALL BE PER FBC -
<br />PLUMBING TABLE 308.5.
<br />11. TESTING OF THE PLUMBING SYSTEMS SHALL BE PERFORMED BY
<br />THE PLUMBING SUBCONTRACTOR AND WITNESSED BY THE
<br />BUILDING DEPARTMENT INSPECTOR POTABLE HOT AND COLD
<br />WATER PIPING SHALL BE HYDROSTATICALLY TESTED AT 125 PSIG
<br />FOR 24 HOURS. SOIL, WASTE AND VENT PIPING SHALL BE FILLED
<br />WITH WATER TO THE TOP OF THE SYSTEM FOR A PERIOD OF 24
<br />HOURS.
<br />12, CLEANOUTS SHALL BE PROVIDED PER PLAN AND/OR AS
<br />REQUIRED TO PROVIDE A COMPLETE SERVICEABLE SYSTEM.
<br />CLEANOUTS SHALL BE SAME SIZE AS PIPE. FLOOR CLEANOUTS
<br />SHALL BE EQUAL TO ZURN Z-1400-KC WITH BRONZE TOP. WALL
<br />CLEANOUTS SHALL BE EQUAL TO ZURN Z-1411-KC WITH STAINLESS
<br />STEEL COVER.
<br />KEYED NOTES: C
<br />EXISTING 51TE SANITARY LINE, FIELD VERIFY EXACT LOCATION
<br />AND COORDINATE INVERT PRIOR TO BID AND START OF
<br />CONSTRUCTION. CAP AND SEAL ANY EXISTING STUB -UPS FROM
<br />SHELL CONSTRUCTION NOT BEING UTILIZED.
<br />® EXTEND 1/2" HW AND CW MOP BASIN.
<br />® EXTEND 3/4" DOWN AND SPLIT 1/2" TO 5-1AND P-1.
<br />EXISTING 3/4" WATER METER TO BE REUSED. FIELD VERIFY EXACT
<br />LOCATION PRIOR TO BID AND ADJUST WATER LAYOUT
<br />ACCORDINGLY. EXTEND 3/4" RISER UP WITHIN WALL SPACE TO
<br />ABOVE CEILING AND CONTINUE AS INDICATED.
<br />®EXISTING 3/4" WATER METER TO BE ABANDONED IN PLACE. VERIFY
<br />REQUIREMENTS WITH LOCAL UTILITY PRIOR TO START OF WORK.
<br />REVISIONS
<br />BY
<br />�i
<br />u
<br />U C\1
<br />► Y � N
<br />¢ 00
<br />` E
<br />ti o
<br />ti -
<br />10 ate.
<br />N
<br />o
<br />o m Lp ro
<br />N "
<br />it ¢ E I-
<br />4
<br />¢ rn -
<br />- °° 3
<br />o =
<br />:a�
<br />c
<br />Qo
<br />) 6
<br />N
<br />m
<br />x
<br />U
<br />w
<br />as
<br />ppppp aa000
<br />op �
<br />EN
<br />° 1
<br />'
<br />a
<br />�o c�
<br />°
<br />° 5- 2-1 °
<br />STATE0.
<br />NAAO
<br />��
<br />ppo°
<br />C14 CD
<br />Um
<br />0 - (0 N (7)
<br />�� 0)r-
<br />^ NiM r U
<br />Q z°� o.�
<br />U-u o
<br />0 N 00 d
<br />J��mo
<br />LL N
<br />Cd
<br />Dq L
<br />0
<br />Q Ln o ° o
<br />opt cn w
<br />v
<br />a_
<br />U_
<br />Z
<br />W m
<br />J z w
<br />U N
<br />o to
<br />�JOmM
<br />Q •>75
<br />w
<br />m
<br />0 �
<br />mW
<br />L m Q vas
<br />v
<br />Z ,.
<br />tQ���a
<br />c 0 �
<br />�Z a
<br />O — N
<br />J
<br />Date: 05. 12. 14
<br />Scale: AS NOTED
<br />Project Mgr: AAY
<br />Drawn: BMD
<br />Job: 14-20
<br />Sheet
<br />p 1
<br />
|