Laserfiche WebLink
KEYED NOTES: 0 <br />®NEW PACKAGED AIR CONDITIONER. TRANSITION MAIN SUPPLY DUCT <br />FROM UNIT OPENING TO SIZE INDICATED ON PLANS. <br />®VERIFY EXISTING CURB DIMENSIONS AND PROVIDE CURB ADAPTOR <br />EQUAL TO PLENUMS, INC. <br />®EXTEND EXHAUST DUCTS TO RUSKIN 20x12 ELF6315DXD LOUVER FROM <br />SHELL CONSTRUCTION WITH PLENUM FOR DUCT ATTACHMENT. <br />®PROVIDE ISxl2 RUSKIN ELF-6315DXD LOUVER WITH PLENUM DUCT <br />FOR CONNECTION OF EXHAUST DUCTS. COORDINATE WITH THE <br />GENERAL CONTRACTOR PRIOR TO INSTALLATION. <br />® TRANSITION FROM DUCT OPENING TO 18xl4. TRANSITION TO 1414 AFTER <br />12x10 CONNECTION. <br />TRANSITION Sxl0 SUPPLY AIR # RETURN AIR DUCTS UP AND INTO <br />WEBBING OF STEEL JOIST TO ALLOW FOR LARGER SUPPLY AND RETURN <br />DUCT TO BE INSTALLED BELOW. <br />® TRANSITION 12xl0 RETURN AIR DUCT UP AND ABOVE, THROUGH CLEAR <br />SPACE OF STEEL JOIST, LEAVE RETURN AIR DUCT IN JOIST SPACING. <br />TRANSITION 10x12 SUPPLY AIR UP AND ABOVE, THROUGH CLEAR SPACE <br />OF STEEL JOIST. RETURN SUPPLY AIR DUCT TO BELOW JOIST. <br />TRANSITION 12x14 SUPPLY AIR UP AND ABOVE, THROUGH CLEAR SPACE <br />OF STEEL JOIST. TRANSITION SUPPLY AIR DUCT TO 12xl0 AND RETURN <br />SUPPLY AIR DUCT TO BELOW JOIST. <br />Oi MECHANICAL PLAN <br />SCALE: 3/32" = 1'-0" <br />OUTS 1 DE AIR CALCULATION: <br />(FER TABLE 6-I, 464RAE 62.1, 2001) <br />OFFICE OCCUPANCY: <br />NET OCCUPIABLE SPACE (N.O.S.) = 2S61 SQ. FT. <br />MAX. OCCUPANCY = 15 PERSONS <br />CALCULATION: <br />(N.O.S. X (duo) + (OCCUPANCY x 5 GFM/PERSON) = REQUIRED CF1 I. <br />(4381 X .00) + (4-1 x 5 CFM/PERSON) = 498.22 REQUIRED GFM. <br />OUTSIDE AIR PROVIDED: <br />RTU -1 - 100 GFM <br />RTU-2 - 200 GFM <br />RTU-3 - 200 GFM <br />RTU-4 - 100 GFM <br />TOTAL: 500 CFM - IN COMPLIANCE. <br />HVAC GENERAL NOTES <br />1. DUCT SIZES ARE CLEAR INSIDE DIMENSIONS. VERIFY ALL DIMENSIONS <br />AND LOCATIONS PRIOR TO FABRICATION OR INSTALLATION. ALL NEW <br />DUCTWORK SHALL BE TYPE 800 F15EGLASS EQUAL TO <br />OWENS-CORNING, 11/2" THICK WITH AN 'R'-VALUE OF 6.0. SHEET METAL <br />DUCT WITH 2" 3/4" LB. DENSITY R-(o FOIL FACED EXTERNAL INSULATION <br />MAY ALSO BE USED. COORDINATE DUCTS WITH STRUCTURE PRIOR TO <br />INSTALLATION. ALL DUCT SHALL BE CONSTRUCTED AND INSTALLED <br />PER SMACNA REQUIREMENTS. <br />2. ALL FLEXIBLE DUCT CONNECTIONS SHALL BE CLASS ONE TYPE. <br />PROVIDE TAB COLLARS AT MAIN DUCT WITH MANUAL VOLUME <br />DAMPER WITH LOCKING QUADRANT. <br />3. AN IONIZATION PRINCIPLE SMOKE DETECTOR SHALL BE <br />INSTALLED IN THE SUPPLY AND RETURN DUCTWORK WHERE <br />INDICATED. THE DETECTOR SHALL BE WIRED TO APPLICABLE <br />FIRE ALARM SYSTEM BY THE FIRE ALARM CONTRACTOR <br />PROVIDE L.E.D. AND HORN ALARM STATIONS (DUCT SMOKE <br />DETECTOR'S REMOTE TEST SWITCH) LOCATED IN NORMALLY <br />OCCUPIED AREA MOUNTED AT 48" A.F.F. <br />4. ALL ROOF AND WALL PENETRATIONS SHALL BE PROVIDED <br />AND SEALED BY THE GENERAL CONTRACTOR. <br />5. CONTRACTOR SHALL SURVEY SITE PRIOR TO BID SUBMISSION TO <br />TO VERIFY EXISTING CONDITIONS, DOWN DUCTS AND EQUIPMENT. <br />ro, DEVIATION FROM MATERIALS, METHODS, OR PROCEDURES SET FORTH <br />HEREIN MUST BE APPROVED, IN WRITING, BY ENGINEER PRIOR TO <br />SUBMISSION OF BID, ORDER, FABRICATION OR INSTALLATION. <br />1. ANY AND ALL QUESTIONS AS TO THE INTENT OF OR PROCEDURES SET <br />FORTH IN THESE DRAWINGS MUST BE BROUGHT TO THE ATTENTION OF <br />THE ENGINEER PRIOR TO SUBMISSION OF A BID. LACK OF KNOWLEDGE <br />OR UNDERSTANDING OF THE PLANS SHALL NOT JUSTIFY ANY CLAINS <br />OR ADDITIONAL COMPENSATION. <br />8. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES <br />AND ORDINANCES. <br />S. THE HVAC CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCT, <br />PIPING, LOUVERS, DIFFUSERS, ETC. INCLUDING LOCATIONS AND <br />CLEARANCES, WITH ALL OTHER TRADES ON PROJECT IN <br />PRE -CONSTRUCTION MEETING, PRIOR TO ANY ORDER, FABRICATION <br />OR INSTALLATION. <br />10. THERMOSTATS SHALL BE AS PROVIDED AND INSTALLED BY THE <br />CONTROLS CONTRACTOR AS DIRECTED BY THE BUILDING ENGINEER <br />THERMOSTATS SHALL BE INSTALLED AT 5'-6" ABOVE FINISHED <br />FLOOR, TYPICAL. <br />11. SUPPLY DUCTWORK SHALL BE CONSTRICTED, FABRICATED AND <br />INSTALLED IN ACCORDANCE WITH SMACNA REQUIREMENTS FOR A I" <br />POSITIVE PRESSURE CLASSIFICATION. <br />12. RETURN AND EXHAUST DUCTWORK SHALL BE CONSTRUCTED, FABRICATED <br />AND INSTALLED IN ACCORDANCE WITH SMACNA REQUIREMENTS FOR A I" <br />NEGATIVE STATIC PRESSURE. <br />13. ALL EXHAUST FAN DISCHARGES AND PLUMBING VENTS SHALL BE A <br />MINIMUM OF 10'-0" FROM FRESH -AIR INTAKES. COORDINATE WITH <br />PLUMBING PLANS PRIOR TO INSTALLATION. <br />14, THE MECHANICAL CONTRACTOR SHALL BALANCE ALL SYSTEMS TO <br />WITHIN TEN PERCENT OF DESIGN VALUES SPECIFIED HEREIN. <br />15. EXTEND 3/4" SCHEDULE 40 PVC CONDENSATE DRAIN LINES FROM <br />AIR HANDLERS TO EXTERIOR WALLS THEN DOWN WITHIN WALL <br />CAVITY FURRED OUT AREA TO 6" ABOVE GRADE THEN OUT TO <br />GRASS/LANDSCAPING AREA. EXTEND MIN. 12" FROM BUILDING. <br />5UILDING AIR 5ALANCE SCHEIDULE <br />POSITIVE SOURCES: <br />RTU - I <br />100 CFM <br />RTU-2 <br />200 CFM <br />RTU-3 <br />200 CFM <br />RTU-4 <br />100 GFM <br />TOTAL: 600 CFM <br />NEGATIVE SOURCES: <br />EF-I <br />50 GFM <br />EF-2 <br />50 CFM <br />EF-3 <br />50 GFM <br />EF-4 <br />50 GFM <br />EF-5 <br />50 CFM <br />EF-6 <br />100 CFM <br />EXFILTRATION: <br />200 GFM <br />TOTAL: 550 CFM <br />RESULTING TOTAL AIR BALANCE: 50 CFM (POS.) <br />-VAC: LEGEND <br />CEILING SUPPLY DIFFUSER <br />CEILING RETURN 19 <br />CEILING EXHAUST FAN <br />PROGRAMMABLE 7HER-105747 <br />SMOKE DETECTOR <br />0 <br />VOLUME DAMPER <br />NEW RIGID DUCT <br />EXISTING RIGID DUCT <br />CLASS I FLEXIBLE DUCT <br />SQUARE TO ROUND TRANSITION 13 <br />REVISIONS <br />BY <br />00 <br />� cry <br />E� <br />N <br />o � <br />� v� m <br />ti <br />E <br />o <br />co 3 <br />3 ~ 3 <br />�-- o x . <br />ti <br />0 <br />CO <br />x^ <br />La <br />��-- <br />w <br />°ppp paaoo <br />°°° 0 ° EN <br />° 1 0 <br />° <br />° <br />xio o� <br />0 —2-1 <br />°o STATE a. o0 <br />° <br />®�o*°°r<ORI® <br />G`°oo <br />00000 <br />o00���00000ppp°°° <br />N <br />Lr) LO <br />N O <br />Um ��� <br />Z �� ON °^' z <br />�a r <br />T n0) <br />r V <br />Q O:5,0zI- <br />\ o o m o a <br />�� c LL <br />O Z` N .-- <br />J a�i�mrno <br />D LL Na pON <br />L <br />U NN.0 <br />(� T <br />0 0NW� o <br />C � U <br />L FLO <br />U_ <br />Z W m <br />�UZw��04 <br />0 U c u') <br />'J C mM <br />t <br />vU�mo� <br />C, !m� <br />mW m v- <br />L Q U 0 :E <br />•0 Z (L j► <br />m M r <br />c p W tOC)N <br />� Z a <br />0 N <br />J <br />Date: 05. 12. 14 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: BMD <br />Job: 14-20 <br />Sheet <br />m 1 <br />