Laserfiche WebLink
15010 - BASIC MECHANICAL REQUIREMENTS <br />A. CODES & REFERENCES <br />1. FLORIDA STATE BUILDING CODE 2007 (WITH 2O09 AMENDMENTS). <br />2.SMACNA <br />3. NFPA 101 (2006) <br />4. NFPA 90A (2002) <br />5. NFPA 99 (2005) <br />6.2006 GUIDELINES FOR DESIGN & CONSTRUCTION OF HEALTHCARE FACILITIES. <br />B. SCOPE OF WORK <br />1. PROVIDE ALL REQUIRED PERMITS, LABOR, MATERIAL AND EQUIPMENT REQUIRED TO <br />COMPLETE THE SCOPE OF THE PROJECT SHOWN ON THE DRAWINGS COMPLETE AND <br />READY FOR OCCUPANCY AND USE BY OWNER. THE WORK SHALL INCLUDE BUT IS NOT <br />LIMITED TO: <br />a. REMOVAL, RELOCATION AND RE -INSTALLATION OF EXISTING EQUIPMENT AND <br />SYSTEM. <br />b. CONNECTIONS TO EXISTING OR NEW EQUIPMENT AND SYSTEMS. <br />c. MODIFICATION OF EXISTING CHILLED OR HOT WATER SYSTEMS, STEAM SYSTEMS, <br />CONDENSATE DRAINAGE, DUCTWORK, TEMPERATURE CONTROLS AND LIFE -SAFETY <br />SYSTEMS. <br />d. CUTTING AND PATCHING TO REMOVE EXISTING OR INSTALL NEW WORK. <br />e• CLEANING AND TESTING. <br />f. INSTRUCTION TO OWNER'S PERSONNEL. <br />2. PROVIDE ALL BUILDING PENETRATIONS REQUIRED TO COMPLETE PROJECT. ALL <br />PENETRATIONS SHALL BE PATCHED AND SEALED WATERTIGHT. MAINTAIN FIRE <br />RATINGS OF EXISTING STRUCTURE. <br />3. PROVIDE ALL NECESSARY DUCT, EQUIPMENT, PIPE SUPPORTS AND MATERIALS <br />REQUIRED FOR INSTALLATION PER THE REQUIREMENTS OF LOCAL, STATE OR FEDERAL <br />CODES. <br />C. REQUIRED SHOP DRAWINGS <br />1. INSULATION. <br />2. AIR DEVICES. <br />3. VALVES. <br />4. DUCTWORK COORDINATION DRAWINGS. <br />5. CONTROLS. <br />6. AIR HANDLING EQUIPMENT. <br />7. HEATING COILS <br />8. FANS. <br />D. MAINTENANCE MANUALS <br />1. PROVIDE MAINTENANCE MANUALS FOR ALL NEW EQUIPMENT CONTAINING ALL <br />OPERATING AND MAINTENANCE DATA, SUBMITTALS, WARRANTEES, DIAGRAMS, <br />INSPECTION REPORTS AND VALVE LISTS IN A 3 RING BINDER WITH POCKETS FOR <br />DRAWINGS. PROVIDE OWNER WITH MINIMUM OF 2 COPIES. <br />E. RECORD DRAWINGS <br />1. THE CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES MADE <br />TO THE CONTRACT DOCUMENTS. <br />2.THE CONTRACTOR SHALL PROVIDE THE ENGINEER 2 SETS OF COMPLETED RECORD <br />DRAWINGS. <br />3.THE PROJECT WILL NOT BE CONSIDERED COMPLETE UNTIL ACCURATE RECORD <br />DRAWINGS ARE DELIVERED. <br />F. SUBSTITUTIONS <br />1. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN DRAWINGS AND <br />WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED AS 'SPECIFIED STANDARD' <br />OF QUALITY. NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL <br />OF THE ENGINEER 10 DAYS PRIOR TO BID DATE. <br />2.ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECTS THE ELECTRICAL <br />REQUIREMENTS SHALL BE COORDINATED BY THE MECHANICAL CONTRACTOR AND <br />EQUIPMENT VENDOR WITH THE ELECTRICAL CONTRACTOR PRIOR TO SUBMITTING <br />BIDS. <br />G. WIND LOADS <br />1. ALL EQUIPMENT MOUNTED OUTSIDE SHALL BE FURNISHED WITH A NOA (NOTICE <br />OF ACCEPTANCE) FOR WINDSTORM OR BE FURNISHED WITH AN ENGINEERED DETAIL <br />DESIGNED FOR THE LOCAL WIND RATE. <br />15050 - BASIC MATERIALS AND METHODS <br />A. ACCESS PANELS - FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED BY GENERAL <br />CONTRACTOR. <br />1. PROVIDE ACCESS TO ALL SERVICEABLE EQUIPMENT IN WALLS AND CEILINGS. <br />2. MICOR STYLE M FOR DRYWALL. <br />3. MICOR STYLE K FOR PLASTER. <br />4. MINIMUM SIZE 16'xl6' . <br />5. NYSTROM, KARP, J.L. INDUSTRIES OR WILLIAMS PAINT. <br />B. LABELING <br />1. PROVIDE RIGID PLASTIC EMBOSSED EQUIPMENT NAME TAGS FOR ALL NEW EQUIPMENT <br />AND DISCONNECTS. SETON NAMEPLATE CORPORATION. <br />2. PAINT ALL MECHANICAL PIPING IN EQUIPMENT ROOMS, BOILER ROOMS AND WHERE <br />EXPOSED OR OUTDOORS. MATCH EXISTING COLOR CODES USED ON SIMILAR SYSTEMS. <br />3. PROVIDE VALVE TAGS ON ALL NEW AND RELOCATED VALVES. VALVE TAGS SHALL <br />MATCH TAGS USED AT THE EXISTING FACILITY. TAGS SHALL BE SECURED TO VALVES <br />WITH BRASS CHAINS. PROVIDE UPDATED INFORMATION ON ALL NEW VALVES TO THE <br />EXISTING VALVE CHART. <br />4• PROVIDE SETON SNAP ON PIPE LABELS ON ALL NEW PIPING. PIPE LABELS TO MATCH SIZE <br />AND TYPE USED AT THE EXISTING FACILITY AND COMPLY WITH ANSI Al 3.1. LABELS SHALL <br />BE APPLIED CLOSE TO VALVES, CHANGES IN PIPE DIRECTIONS, BRANCHES, PIPES <br />PASSING THROUGH WALLS OR FLOORS AND EVERY 20 FEET IN STRAIGHT RUNS OF PIPING <br />AND AT LEAST ONE TIME PER ROOM. <br />C. FLASHINGS AND COUNTER FLASHINGS <br />1. FURNISH MATERIALS AND COORDINATE INSTALLATION FOR ALL PENETRATIONS OF ROOF <br />BY ALL DUCT AND PIPE. <br />2. SHEET METAL - 24ga. ASTM A525 . <br />3. SHEET LEAD 6 Ibs PER SO. FT. (WHERE ALLOWED) <br />4. STAINLESS STEEL 20 ga. <br />5. SHEET COPPER 24 oz PER SQ. FT. <br />D. MECHANICAL SYSTEMS CLEANING <br />1. CLEAN AND TOUCH UP ALL FACTORY FINISHES. <br />2.FLUSH ALL HVAC SYSTEMS BEFORE CONNECTION TO EQUIPMENT. <br />3.CLEAN ALL CLOSED HVAC SYSTEMS WITH ALKALINE CLEANER CIRCULATED FOR 72 <br />HOURS. <br />4. PRESSURE TEST ALL MECHANICAL PIPING SYSTEMS. <br />a• WATER SYSTEMS 150 psi FOR SIX HOURS. <br />E. CLEANING TESTING AND ADJUSTING <br />1. THE MECHANICAL CONTRACTOR, AT HIS EXPENSE, SHALL CLEAN, REPAIR, ADJUST, <br />CHECK, BALANCE AND PLACE IN SERVICE THE VARIOUS SYSTEMS HEREIN SPECIFIED <br />WITH THEIR RESPECTIVE EQUIPMENT, ACCESSORIES AND PIPING. HE/SHE SHALL <br />FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND TOOLS REQUIRED TO PERFORM <br />TESTS REQUIRED BY THESE SPECIFICATIONS AND BY THE GOVERNING AUTHORITIES. <br />2.NO WORK SHALL BE COVERED OR CONCEALED UNTIL PROPERLY INSPECTED AND <br />TESTED. <br />F. HANGERS AND SUPPORTS <br />1. PROVIDE ALL NECESSARY DUCTWORK, PIPE SUPPORTS, HANGERS, RODS, CLAMPS <br />AND ATTACHMENTS TO PROPERLY INSTALL AND SUPPORT DUCTWORK, PIPING AND <br />EQUIPMENT FROM THE BUILDING STRUCTURE. <br />2. PROVIDE ANY ANGLE IRON OR UNISTRUT AND SUSPENSION RODS REQUIRED TO INSTALL <br />EQUIPMENT, PIPING AND DUCTWORK. <br />3. ALL SUPPORTS EXPOSED TO OUTDOORS SHALL BE CLEANED, PRIMED AND PAINTED TO <br />PREVENT RUSTING. FINISH COLOR AS SELECTED BY OWNER. <br />4. THE USE OF BAILING WIRE OR PERFORATED METAL STRAPPING IS NOT PERMITTED FOR <br />SUPPORTS. <br />G. WARRANTY/GUARANTEE <br />1. THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE STABILITY OF <br />WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION OF THE <br />PERIOD OF ONE YEAR. <br />2. DEFECTS OF ANY KIND DUE TO THE FAULTY WORK OR MATERIALS APPEARING <br />DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD BY <br />THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE <br />OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE <br />DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE <br />ORIGINAL DEFECT OR REPAIR THERETO. <br />15060 - PIPING <br />A. DO NOT USE MECHANICALLY COUPLED JOINTS OR T-DRILLED TEES ON HVAC <br />SYSTEMS. <br />B. SCHEDULE 40 ASTM A53 GRADE B SEAMLESS BLACK STEEL PIPE WITH CLASS 150 LONG <br />RADIUS STEEL FITTINGS USED FOR: <br />1. HEATING HOT WATER 2' BELOW, THREADED JOINTS, ABOVE 21/1 WELDED JOINTS. <br />C. TYPE L HARD COPPER PIPE WITH WROUGHT COPPER FITTINGS AND SOLDERED <br />JOINTS USED FOR: <br />1. HVAC HEATING HOT WATER UP TO 11/2 OPTION UP TO 21/1. <br />D. PVC PIPE IS NOT TO BE USED ON MECHANICAL SYSTEMS. <br />15065 - REFRIGERATION PIPING SYSTEM <br />1.01 WORK INCLUDED <br />A. PIPING, VALVES AND FITTINGS FOR REFRIGERANT PIPING SYSTEMS <br />SHOWN ON DRAWINGS. <br />1.02 SAFETY CODE <br />A. COMPLY WI TH THE REQUIREMENTS OF ANSI B 9. 1, CODE FOR REFRIGERANT <br />SYSTEMS. <br />1. 03 SUBMITTALS <br />A. SUBMI T FOR REVI EW MANUFACTURER' S PRODUCT DATA FOR REFRI GERANT <br />PI PI NG SYSTEM COMPONENTS. <br />2.01 MATERIALS <br />A. PI PI NG: TYPE is L' ACR HARD COPPER, ASTM B88. <br />B. FITTINGS: WROUGHT COPPER. <br />C. SOLDER: SILVER SOLDER 15% HAVING A MELTING POINT <br />OF 1125' F OR HIGHER. ALL BRAZING SHALL BE UNDER A NITROGEN PURGE. <br />D. SERVICE VALVES: HENRY VALVES OR EQUAL. PROVIDE PACKED TYPE RECEIVER, <br />PURGE, AND GAUGE VALVES WITH VALVE STEM SEAL CAP PARTS. <br />1. VALVES UP T05,6' OD: HENRY FIGURE 516 OR EQUAL, DIAPHRAGM TYPE. <br />2. VALVES LARGER THAN5,5' OD: HENRY FIGURE 203 OR EQUAL. <br />E. REFRIGERANT FILTER DEHYDRATOR AND MOISTURE INDICATOR <br />1. DEHYDRATOR: SPORLON CO. CATCH-ALL, OR EQUAL, WITH REPLACEABLE CORE, TYPE, <br />OF SIZE RECOMMENDED BY MANUFACTURER FOR MAXIMUM DESIGN TONNAGE. <br />2. MOISTURE INDICATOR: SPORLAN CO. SEE -ALL, TYPE SA-125, OR EQUAL. <br />F. ESCUTCHEONS: CHROME PLATED ESCUTCHEONS SIZED FOR PIPE. <br />1. PIPING SHALL BE RACKED AND SUPPORTED WITH UNI STRUT. REFER TO DETAILS. <br />3.01 INSTALLATION <br />A. MAKE SOLDER JOINTS WITH NITROGEN PASSING THROUGH <br />JOINTS BEING SOLDERED. INSURE A CLEAN, TIGHT SYSTEM. PULL A CLEAN RAG <br />THROUGH EACH PIECE OF TUBING AFTER CUTTING OR REAMING. <br />3.02 LEAK TESTING <br />A. TEST FOR LEAKS BY USE OF NI TROGEN AND A LI QUI D <br />SOAPSUDS SOLUTION. CORRECT LEAKS FOUND. <br />B. EVACUATE SYSTEM TO 20' VACUUM AND CHARGE WI TH REFRI GERANT UNTI L <br />A PRESSURE OF 15 PSI G IS REACHED. THEN TEST FOR LEAKS USING A HALIDE <br />LEAK DETECTOR. CORRECT LEAKS FOUND. <br />C. PRESSURIZE SYSTEM, WITH REFRIGERANT AND NITROGEN, TO 300 PSI G ON <br />THE HI GH SI DE, AND 150 PSI G ON THE LOW SI DE, AND TEST FOR LEAKS. <br />CORRECT LEAKS FOUND. <br />3. 03 SYSTEM DEHYDRATION <br />A. DEHYDRATE SYSTEM BY 'DOUBLE DEHYDRATION' METHOD. <br />B. USE A SUITABLE VACUUM PUMP. EVACUATE SYSTEM TO A VACUUM OF <br />0.2' HG ABSOLUTE AND OPERATE PUMP FOR EIGHT HOURS WHEN THAT PRESSURE <br />IS REACHED. <br />EVACUATE SYSTEM TO A VACUUM OF 0.2' HG ABSOLUTE AND OPERATE PUMP <br />FOR FOUR HOURS. <br />3. 04 CHARGING SYSTEM <br />A. WHEN SYSTEM DEHYDRATION IS COMPLETE AND ALL LEAKS ARE CORRECTED, <br />CHARGE SYSTEM WITH REFRIGERANT. <br />3.05 SAFETY CODE <br />A. SYSTEM SHALL BE I N ACCORDANCE WI TH ANSI B9. 1 CODE FOR REFRI GERATI ON <br />SYSTEMS. <br />15100 - VALVES <br />A. NIBCO, STOCKHAM, CRANE, MILWAUKEE, APPOLLO OR KITZ. <br />B. HVAC WATER VALVES (NIBCO NUMBERS INDICATED BELOW). <br />1. SHUT OFF BELOW 3' FIGURE T585-70 OR S585-70, 2 PIECE, FULLY PORTED <br />600 psi, BALL VALVE. PROVIDE RAISED STEM HANDLE FOR INSULATION. <br />2. SHUT OFF 3' AND ABOVE FIGURE LD-2000, LUG STYLE, 200 psl. CLASS 125, <br />EPDM LINER, ALUMINUM BRONZE DISC. BUTTERFLY VALVE. PROVIDE WORM GEAR <br />OPERATOR OVER 51. PROVIDE RAISED STEM HANDLE FOR INSULATION. <br />C. HVAC STEAM VALVES (NIBCO NUMBERS INDICATED BELOW). <br />15103 - SLEEVES <br />A. SLEEVES TO BE 18 GAUGE SHEET METAL OR SCHEDULE 40 PIPE. SLEEVE THE <br />FOLLOWING: <br />1. MASONRY WALLS SLEEVE ALL PIPE PENETRATIONS. <br />2. FLOORS SLEEVE ALL HVAC PIPING. EXTEND SLEEVES 1/¢ ABOVE FINISHED FLOOR <br />(20 ABOVE FINISHED FLOOR IN MECHANICAL ROOMS). <br />3. FIRE RATED DRY WALL PARTITIONS SLEEVE STEAM SUPPLY AND RETURN AND HEATING <br />WATER. <br />4. NON -FIRE RATED PARTITIONS NO SLEEVES REQUIRED. SEAL WALL TO INSULATION. <br />5. USE U.L. LISTED ASSEMBLY FOR ALL PENETRATIONS THROUGH RATED CONSTRUCTION. <br />15242 - VIBRATION ISOLATION <br />A. ACCEPTABLE MANUFACTURERS: <br />1. MASON INDUSTRIES. <br />2. KINETICS NOISE CONTROL. <br />3. KORFUND. <br />4. AMBER BOOTH. <br />B. MASON TYPE SLF CONTROL FOR AIR COMPRESSOR, AHU'S (UNLESS INTERNAL). <br />CENTRIFUGAL FANS. <br />C. MASON SUPER W RUBBER PAD FOR HVAC PUMPS, CHILLERS, AHU'S (IF INTERNAL). <br />D. MASON TYPE HS CEILING FOR SUSPENDED FANS AND AHU'S. <br />E. MASON PC30N CLOSEST 2 HANGERS TO AHU'S AND PIPING WITHIN 20 PIPE DIAMETERS <br />OF PUMPS. <br />F. INERTIA BASES WHERE SCHEDULED OR SHOWN. <br />15250 - INSULATION <br />A. INSULATION, ADHESIVES, COATINGS, SEALERS, TAPES, ETC. SHALL HAVE A FLAME <br />SPREAD OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS IN ACCORDANCE <br />WITH ASTM E-84, NFPA 225. UL 723 AND MEET THE REQUIREMENTS OF NFPA 90A. <br />ALL INSULATING R-VALUES TO MEET THE REQUIREMENTS OF THE FLORIDA ENERGY <br />CODE. <br />B. FIBERGLASS PIPE INSULATION, JOHNS MANVILLE MICRO-LOK 850, CERTIANTEED, <br />KNAUF, OWENS CORNING. JACKET: ASJ KRAFT PAPER WITH ALUMINUM FOIL. <br />1. HEATING HOT WATER 2' AND UNDER - 1' THICK. <br />2. HEATING HOT WATER 21/1 AND OVER 11/1 THICK. <br />C. FLEXIBLE ELASTOMERIC INSULATION, ARMSTRONG 'AP ARMAFLEX', MITCHEL, <br />RUBATEX (NOT EXPOSED TO WEATHER): <br />1. CONDENSATE DRAINS - 3/4 THICK. <br />2. REFRIGERATION HOT GAS LINES: 3/4 THICK <br />D. BLANKET TYPE DUCT INSULATION, JOHNS MANVILLE, CERTAINTEED, KNAUF, OWENS <br />CORNING, MINIMUM R=6.0, FOIL FACED KRAFT VAPOR BARRIER : GLASS FABRIC & <br />MASTIC ALL JOINTS. <br />1. ALL SUPPLY, OUTSIDE AIR AND RETURN WHERE CONCEALED FROM VIEW, R-6 . <br />E. SEMIRIGID BOARD TYPE DUCT INSULATION 1.51b DENSITY, CERTAINTEED 1B-300, <br />JOHNS MANVILLE, KNAUF, OWENS CORNING: GLASS FAB & MASTIC ALL JOINTS. <br />I. ALL SUPPLY, RETURN AND OUTSIDE AIR WHERE EXPOSED AND IN MECHANICAL ROOMS. <br />2. MINIMUM DUCT INSULATION THICKNESS AND R VALUES ARE AS FOLLOWS: <br />a. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACE: 2' (R-6 MINA.) <br />b. SUPPLY AND RETURN AIR IN CONDITIONED INTERIOR SPACE: 1.5' (R-4.2 MINA.) <br />c. OUTSIDE AIR: 2' (R-6 MINA.) <br />F. OUTSIDE INSTALLATION: <br />1. PIPE INSULATION COVER WITH 18 ga. STAINLESS STEEL COVER. SUBSTITUTE <br />CELLULAR GLASS OF EQUIVALENT R VALUE FOR FIBERGLASS. <br />2. DUCT INSULATION CLOSED FOAM POLYISOCYANURATE 2' OR FOAM GLASS 3' THICK <br />(R-8 MIN) COVER WITH GLASS CLOTH AND SEALER AND COVERED WITH LAMINATED <br />ALUMINUM POLYESTER FIRM OR ALUMINUM METAL JACKET. <br />15515 - HYDRONIC SPECIALTIES <br />A. MANUFACTURERS: BELL & GOSSET ITT, PETERSON ENGINEERING CO., TRERICE CO., <br />TACO, THRUSH, ARMSTRONG, WHEATLY. <br />B. PROVIDE PETE'S PLUGS AT ALL REHEAT COILS AND EQUIPMENT CONNECTIONS. <br />C• PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS AND MANUAL DRAIN VALVES <br />AT ALL LOW POINTS. <br />D. BALANCING VALVES - ARMSTRONG CBV OR TOUR & ANDERSON, INC., STA-D AND <br />STA-F CIRCUIT BALANCING VALVES, WITH PROVISION FOR CONNECTING PORTABLE <br />DIFFERENTIAL PRESSURE METER. <br />15910 - SHEET METAL ACCESSORIES <br />A. AIR INLETS AND OUTLET. <br />1. REFER TO SCHEDULE. <br />2. ALL ALUMINUM CONSTRUCTION. <br />3. ACCEPTABLE MANUFACTURERS: TITUS, PRICE, METAL-AIRE, CARNES, ANEMOSTAT, <br />NAILOR, PQTTORFF. <br />B. FIRE DAMPERS <br />1. FIRE DAMPERS SHALL BE TYPE 'B' CURTAIN TYPE, SUITABLE FOR EITHER VERTICAL <br />OR HORIZONTAL INSTALLATION, WITH 20 GAUGE STEEL CHANNEL FRAMES, <br />24 GAUGE STEEL BLADES AND 18 GAUGE STEEL ENCLOSURE WITH DUCT COLLARS. <br />ALL PARTS GALVANIZED MILL FINISH. <br />2. FIRE DAMPERS SHALL BE EQUAL TO RUSKIN TYPE IBD2 FOR WALLS UP TO 2 HOURS. <br />3.INSTALL IN ACCORDANCE WITH NFPA-90A, TESTED IN ACCORDANCE WITH UL SAFETY <br />STANDARD 555. <br />4. FURNISH FIRE DAMPERS AND ACCESS DOORS IN ALL DUCTS PENETRATING <br />ANY RATED CONSTRUCTION AND WHERE INDICATED ON DRAWINGS. <br />5. USE FOLDING BLADE TYPE 'Cl IN HIGH VELOCITY ROUND DUCTS. USE FOLDING BLADE <br />TYPE FOR SQUARE AND RECTANGULAR DUCTS, AS DETAILED. <br />6.FIRE DAMPERS SHALL BEAR THE 1 HOUR UNDERWRITER'S LABORATORY UL SAFETY <br />STANDARD 555, RATED PROTECTION REQUIRED, 1650 F FUSIBLE LINK. <br />7. ACCEPTABLE MANUFACTURERS SHALL BE RUSKIN, AIR BALANCE, GREENHECK, NAILOR. <br />COMBINATION FIRE/SMOKE DAMPERS <br />1. TYPE 'B' FOR ALL LOCATIONS, WITH ACCESS DOORS. ALL DAMPERS SHALL BE <br />INSTALLED IN ACCORDANCE WITH NFPA-90A AND TESTED IN ACCORDANCE WITH UL <br />SAFETY STANDARDS 555S. <br />2. ALL DAMPERS SHALL BEAR THE UL SAFETY STANDARD 555S LABEL FOR THE <br />COMPLETE ASSEMBLY. DAMPERS SHALL BE RATED FOR 11/2 HOUR PROTECTION WITH <br />1650F FUSIBLE LINK, LEAKAGE CLASS 3 EQUAL TO RUSKIN FSD-36. MOTOR OPERATOR <br />PNEUMATIC TO MATCH EXISTING OR ELECTRIC VOLTAGE SHALL BE 24 VOLT <br />UNLESS INDICATED ON PLANS. COORDINATE WITH FIRE ALARM CONTROL AND <br />ELECTRICAL CONTRACTORS. <br />3. UNLESS OTHERWISE REQUIRED BY THE AUTHORITY HAVING JURISDICTION, SLEEVES FOR <br />FIRE DAMPERS AND FIRE SMOKE COMBINATION DAMPERS SHALL BE THE RIGID TYPE OF <br />CONSTRUCTION RECOMMENDED IN SCHEDULE 2 OF SMACNA PUBLICATION FOR 'FIRE <br />DAMPER AND HEAT STOP GUIDE FOR AIR HANDLING SYSTEMS'. USE 16 GAUGE FOR <br />DUCTS 24' OR LESS IN DIAMETER OR EITHER RECTANGULAR DIMENSION AND 14 FOR <br />DUCTS OVER 241. PROVIDE MINIMUM 18' LONG SLEEVES. <br />C. FLEXIBLE DUCTWORK <br />1. TO BE FLEXMASTER 8MM OR THERMAFLEX M-KE. <br />2. FLEXIBLE DUCTWORK SHALL BE ACOUSTICAL LOW PRESSURE TYPE FIBERGLASS <br />INSULATION WITH AN R VALUE OF 6.0 OR GREATER AND COPOLYMER SEAMLESS <br />OUTSIDE SLEEVE. THE ENTIRE FLEXIBLE DUCT ASSEMBLY SHALL BE LISTED IN <br />ACCORDANCE WITH UL-181 CLASS 1 AIR DUCT MATERIAL. THE LENGTH OF ANY FLEX <br />DUCT SHALL BE MAXIMUM 8'-0', MINIMUM 4'-0'. FLEXIBLE DUCTWORK SHALL MEET <br />THE FLORIDA MODEL ENERGY EFFICIENCY CODE. ALL JOINTS AT CONNECTIONS TO <br />DIFFUSERS AND DUCTWORK SHALL BE SEALED WITH GLASS, FABRIC AND MASTIC. <br />D. BALANCING DAMPERS (RUSKIN MD-35 SERIES) <br />1. GENERAL -IN ALL DUCTWORK SYSTEMS, PROVIDE DAMPERS FOR PROPER CONTROL <br />AND BALANCING OF AIR QUANTITIES. CONCEALED DAMPERS SHALL HAVE CONCEALED <br />DAMPER REGULATOR. ALL COMPONENTS FOR PROPER OPERATION; (I.e. GEARS, <br />LINKAGES, CABLE, ETC.) SHALL BE INCLUDED. <br />2. TYPE: FACTORY MANUFACTURED ONLY, OPPOSED BLADE FOR 12' AND LARGER AND <br />SINGLE BLADE UP TO 1l' IN HEIGHT. <br />3. MATERIAL: STEEL, 3V TYPE BLADES MOUNTED IN STEEL CHANNEL FRAME. <br />4. SHAFT: 3/8 SQUARE ROD OPERATOR WITH END BEARINGS AND GASKET SEAL AT DUCT <br />PENETRATIONS. TERMINATE SHAFT IN DAMPER FRAME WITH BUSHINGS. <br />5. OPERATOR: LOCKING QUADRANT HANDLE WITH DAMPER POSITION INDICATOR AND <br />INSULATION STAND OFF MOUNTING BRACKET FOR EXTERNALLY INSULATED DUCTWORK. <br />6. MANUFACTURER: RUSKIN MODEL MD-35 SERIES OR EQUAL BY AIR BALANCE, INC. OR <br />GREENHECK. <br />E. ACCESS DOORS <br />1.ACCEPTABLE MANUFACTURERS: <br />a. RUSKIN MODEL ADH22. <br />b. VENCO CAD-10. <br />c. GREENHECK HAD-10. <br />2. SIZE ACCESS DOOR AS FOLLOWS: <br />a. DUCT SIZES UNDER 12% DOOR SIZED SUFFICIENT TO EQUIPMENT OR REPLACE <br />FUSIBLE LINK. <br />ba DUCT SIZES 12' TO 20% 12'xl2' DOOR. <br />c. DUCT SIZES 20' TO 36% 18'xl8' DOOR. <br />d. DUCT SIZES 36' AND ABOVE: 24'x24' DOOR. <br />3. USE DOUBLE PANEL CONSTRUCTION, TWO SHEETS OF AT LEAST 24 GAUGE <br />GALVANIZED STEEL WITH 1' THICK INSULATION BETWEEN PANELS. <br />4. MOUNT DOORS IN A RIGID FRAME OF AT LEAST 22 GAUGE FORMED GALVANIZED <br />STEEL OR ALUMINUM. <br />5. PROVIDE LATCHES THAT PERMIT EASY REMOVAL OF ACCESS DOOR WHILE MAINTAINING <br />POSITIVE CLOSING AND MINIMUM LEAKAGE. <br />6. PROVIDE SPONGE RUBBER GASKETS FOR ALL DOORS. <br />7. IN ACCORDANCE WITH NFPA 90A, IDENTIFY EACH ACCESS DOOR WITH 1/1 HIGH <br />STENCILED LETTERS AS 'FIRE DAMPER', 'SMOKE DAMPER', OR 'COMBINATION <br />FIRE/SMOKE DAMPER'. <br />F. BRANCH CONNECTIONS -CLINCH LOCK TYPE NOT PERMITTED. <br />15970 - TEMPERATURE CONTROLS <br />A. EXTEND EXISTING CONTROL SYSTEM TO NEW EQUIPMENT AND PROVIDE ALL <br />MODIFICATIONS NECESSARY FOR A FULLY FUNCTIONING SYSTEM. <br />B. AIR HANDLING UNIT AND CONSTANT VOLUME REHEAT BOXES <br />1. THE EXISTING CONTROL SYSTEM IS TO BE MODIFIED BY THE OWNERS EXISTING <br />CONTROL VENDOR. <br />2. AUTOMATIC CONTROL VALVES SHALL BE FULLY PROPORTIONING WITH MODULATING <br />PLUG OR V-PORT INNER GUIDES OR LINEAR CHARACTERISTIC BALL TYPE. THE VALVE <br />SHALL BE QUIET IN OPERATION AND FAIL-SAFE IN THE NORMALLY 'COOLING' POSITION <br />IN THE CONTROL EVENT OF CONTROL FAILURE. CONTROL VALVES SHALL BE SIZED <br />BY THE CONTROL MANUFACTURER AND SHALL BE WARRANTED TO MEET THE HEATING <br />AND COOLING LOADS AS SPECIFIED. CONTROL VALVES SHALL BE SUITABLE FOR THE <br />PRESSURE CONDITIONS AND SHALL CLOSE AGAINST THE DIFFERENTIAL PRESSURE <br />INVOLVED. VALVE OPERATORS SHALL BE OF THE PNEUMATIC OR ELECTRIC 24 VOLT <br />TYPE. BODY PRESSURE RATING AND CONNECTION TYPE (SCREWED FLANGED OR <br />FLANGED) SHALL CONFORM TO PIPE SCHEDULE ELSEWHERE IN THIS SPECIFICATION. <br />3.CONTROL CONTRACTOR SHALL PROVIDE ALL WIRING REQUIRED FOR THE CONTROL <br />SYSTEM TO OPERATE. IF THE JOB CONTAINS SMOKE DAMPERS THEY SHALL ALSO <br />BE WIRED BY T.C.C. <br />4. MOUNT THERMOSTATS 48' A.F.F. ALIGN WITH LIGHT SWITCHES, DOOR SWINGS AND <br />OTHER WALL MOUNTED DEVICES. <br />5. COORDINATE FINAL LOCATION OF THERMOSTATS WITH THE OWNER PRIOR TO <br />INSTALLATION. <br />15990 - TEST AND BALANCE <br />A. PROVIDE COMPLETE TEST AND BALANCE OF ALL WATER AND AIR SYSTEMS IN <br />ACCORDANCE WITH NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) OR AABC <br />(ASSOCIATED AIR BALANCE COUNCIL) STANDARDS. <br />B. CONTRACTOR SHALL: <br />1. VISIT SITE AT START OF PROJECT AND COORDINATE REQUIRED BALANCING EQUIPMENT <br />AND DAMPERS WITH MECHANICAL CONTRACTOR. <br />2. AIR SYSTEMS: <br />a. MAKE CHANGES TO BELTS, PULLEYS, DAMPERS, VOLUME BOXES, ETC. TO OBTAIN <br />DESIGN CONDITIONS AS REQUIRED BY TAB PROCEDURES. <br />b. BALANCE SUPPLY, RETURN AND EXHAUST AIR OUTLETS WITHIN 10% OF DESIGN <br />WHILE MAINTAINING REQUIRED PRESSURE RELATIONSHIPS. RECORD DESIGN AND <br />ACTUAL TOTALS. <br />c. MEASURE AND REPORT FAN RPM, FAN SUCTION PRESSURE, FAN DISCHARGE <br />PRESSURE, FAN TOTAL PRESSURE AND PRESSURE DROP ACROSS COMPONENTS. <br />DESIGN AND ACTUAL SUPPLY, RETURN, OUTSIDE AND EXHAUST AIR. <br />d. ACTUAL AND DESIGN NAMEPLATE AMPERAGE ON FAN MOTORS. <br />e. PRESSURE DIFFERENTIAL ACROSS DUCT SMOKE DETECTORS. <br />f. ADJUST FANS FOR LOWEST STATIC PRESSURE REQUIRED TO DELIVER TO OUTLETS <br />AS NOTED IN NEBB OR AABC PROCEDURES. <br />3. WATER SYSTEMS: <br />a. ADJUST AND RECORD ACTUAL GPM AND SYSTEM SUCTION AND DISCHARGE <br />PRESSURES (STATIC AND OPERATING). <br />B. DESIGN AND ACTUAL GPM AND TEMPERATURE DIFFERENCE ACROSS COILS. <br />4. CONFIRM OPERATION OF ALL CONTROLS, MANOMETERS AND SENSING DEVICES. <br />5. ON AHCA REVIEWABLE PROJECTS PROVIDE WRITTEN REPORT AT LEAST ONE WEEK <br />BEFORE FINAL INSPECTION AND PROVIDE A TECHNICIAN DURING FINAL INSPECTION <br />OF PROJECT. <br />6. CONTRACTOR SHALL PROVIDE FINAL SHEAVE CHANGE OUT AND ADJUSTMENT FOR <br />MAXIMUM AMPRAGE TO INCLUDE DIRTY FILTER ALLOWANCE LOADING ALLOWING THE <br />VFD TO RAMP UP IN RESPONSE TO FILTER LOADING. <br />c> <br />421 <br />N <br />0 <br />o CI; <br />v� <br />�CID <br />aq <br />ti <br />�w <br />d �� o <br />0waa <br />Smith <br />Wk Seckman <br />Reid, Inc. <br />600 West Hillsboro, Suite 300 <br />Deerfield Beach, FL 33441 <br />(954)421-1260 <br />FAX:(954) 421-1466 <br />www.ssr-inc.com <br />Firm Certification - EB-0000857 <br />Dennis Davie PE . 58N8 <br />John E. Moulder PE - 33200 <br />SSR JOB # 1137003.0 <br />K <br />A <br />O <br />O <br />Q4 <br />O <br />to <br />Project No. 00000.00 <br />M03 <br />D 2011 BHI PK Architects, Inc. <br />