Laserfiche WebLink
DEMOLITION NOTES: O6 CONTRACTOR SHALL VERIFY LOCATIONS OF ALL EXISTING O9 AHU-2 ORIGINAL DESIGN SCHEDULE <br />AHU-1SUPPLY AND RETURN SMOKE DETECTORS, FOR 30,000 CFM <br />D EXISTING AIR HANDLING SYSTEM *AHU-1: SERVING THE RENOVATED AREAS. ALL EXISTING DUCT <br />9,350 SUPPLY CFM MOUNTED SMOKE DETECTORS SHALL BE CLEANED AND <br />TESTED IN PLACE IN ACCORDANCE WITH THE SMOKE <br />2,054 OUTSIDE AIR CFM <br />84.10 ENTERING DRY BULB DETECTOR MANUFACTURERS INSTRUCTIONS. PROVIDE NEW CONSTRUCTION KEY NOTES: <br />70° ENTERING WET BULB SAMPLING TUBE EXTENDING THE FULL WIDTH OF THE � <br />70.99° LEAVING DRY BULB DUCT. PROVIDE A PRESSURE DIFFERENTIAL TEST AT A <br />52.82° LEAVING WET BULB MINIMUM AIR VELOCITY OF 500 FPM AND A PRESSURE RANGE O AIA REQUIRES 15 ACH OF TOTAL AIR DESIGN HAS 15.8 ACH; <br />PRE -FILTER 30% EFF. OF 0.016 MIN TO 0.99 MAX SENSITIVITY SHALL ALSO BE AIA REQUIRES 3 ACH OF OUTSIDE AIR DESIGN HAS 3.2 ACH. <br />HIGH EFF. FILTER, 90% EFF. DETERMINED FOR EACH SMOKE DETECTOR IN ACCORDANCE <br />WITH NFPA-72E. A CERTIFICATION REPORT, SIGNED BY THE <br />• PRETEST DATA FROM PROFESSIONAL AIR INSTALLING CONTRACTOR, SHALL BE SUBMITTED AT O2 INSTALL NEW 1.5 TON CRAC UNIT SUSPENDED ABOVE CEILING p <br />BALANCING, INC REPORT DATED 07-08-08 THE FINAL INSPECTION LISTING EACH SMOKE DETECTOR IN EQUIPMENT ROOM WITH CONDENSATE PUMP. <br />AND THE TEST METHOD USED TO OBTAIN THE MANUFACTURER'S <br />CALIBRATED SENSITIVITY AND PRESSURE DIFFERENTIAL. O3 CRAC UNIT SHALL SHUT DOWN UPON ATIVATION OF SMOKE DETECTOR IN °° <br />2� CONTRACTOR SHALL FIELD VERIFY THAT THE EXHAUST FAN & CONTRACTOR SHALL PROVIDE BAKELITE NAMEPLATE ON EQUIPMENT ROOM ONLY. ACTIVATION OF EQUIPMENT ROOM DETECTOR <br />RETURN SERVING AHU-1 INTERLOCKED WITH AIR HANDLING SYSTEM CEILING T-BAR NAMING ANY SMOKE DETECTOR LOCATED SHALL ACTIVATE FACILITY ALARM SYSTEM. vX w <br />AHU-1, AND THAT AHU-1 IS INTERLOCKED WITH THE FIRE ABOVE. TAGS SHALL BE WHITE WITH BLACKS LETTERS. o -. <br />ALARM SYSTEM. IF THE SYSTEMS ARE NOT INTERCONNECTED. 4 REBALANCE TEST POINTS 1 4 5 6 7 AND 8 TO PRETEST VALUES <br />THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING. 7 CONTRACTOR SHALL VERIFY LOCATIONS OF ALL EXISTING 0 o r a'n <br />O AHU-1 DIFFERENTIAL PRESSURE GAUGES FOR ALL FILTER a m .�, t- <br />�5 REBALANCE EXISTING TO REMAIN CEILING DEVICES TO INDICATED w -• .: <br />SECTIONS CONTRACTOR SHALL VERIFY THAT ALL GAUGES AIRFLOW. ° x o <br />30 CONTRACTOR SHALL VERIFY EXISTING FIRE/SMOKE ARE IN WORKING ORDER AND LABELLED AS PER A.H.C.A. <br />AND/OR SMOKE DAMPERS ARE INTERLOCKED WITH AIR :a <br />HANDLING SYSTEM / FIRE ALARM SYSTEM. STANDARDS. O REBALANCE TEST POINT 2 TO PRETEST VALUE PLUS 480 CFM. ;'•� ! y <br />� w.ewFv� <br />40 FLEXABLE DUCTWORK SHALL BE REMOVED AND RELACED O <br />WITH METAL LINED FLEXABLE DUCTWORK. <br />0 <br />FLEXABLE DUCTWORK AND GRILLE SHALL BE REMOVED.CAP <br />AND SEAL REMAINING DUCT OPENING. <br />XT UP <br />AHU- <br />61 x 21— <br />UP TO <br />AHU-1 <br />AHU-2 <br />(3RD FLOOR) <br />A PRE -TEST REPORT OF THE EXISTING SHALL BE COMPLETED <br />AND DELIVERED TO THE ENGINEER FOR REVIEW PRIOR <br />TO STARTING DEMOLITION. THE CONTRACTOR SHALL RECORD <br />THE EXISTING AIR QUANTITIES OF ALL PRE -TEST POINTS, PLUS <br />THE FOLLOWING: <br />1 _ TEST POINTS LABELLED l B I <br />MECHANICAL PARTIAL <br />SECOND FLOOR PLAN - DEMOLTION <br />1111111 I 0 <br />0' 2' 4' 8' 16, 24' <br />61 <br />OF <br />Af <br />MECHANICAL PARTIAL <br />SECOND FLOOR PLAN - NEW CONSTRUCTION <br />1111I 1 I <br />0' 2' 4' 8' 16, 2 4' <br />DEMOLITION LEGEND <br />SYMBOL <br />DESCRIPTION <br />EXISTING TO REMAIN <br />EXISTING TO BE REMOVED <br />DEMO TO THIS POINT <br />NEW CONSTRUCTION LEGEND <br />SYMBOL <br />DESCRIPTION <br />EXISTING TO REMAIN <br />NEW CONSTRUCTION <br />CONNECT TO EXIST. AT THIS POINT <br />FIRE WALL LEGEND <br />SYMBOL <br />DESCRIPTION pLprt(s <br />- — — — — <br />SMOKE BARRIER BY <br />— - — - — - <br />1 HR. RATED FIRE PAFWMW'- <br />— — • — — <br />1 HR. RATED FIRE/SMOKE PARTITION <br />- • - — - — <br />2 HR. RATED FIRE PARTITION <br />— — — - <br />2 HR. RATED FIRE/SMOKE PARTITION <br />BUIL.OING SHALL ` ?V.fl!.Y WTrh <br />ALL APPLICABLE BUILDING, <br />ELECTRICAL. PLUMB?NG AND <br />-Al C007-s <br />o� <br />A <br />to <br />Cq <br />O <br />��w <br />aca <br />N <br />U <br />`N <br />��oo�c�yy <br />o 6'iN <br />e <br />3 <br />° <br />s <br />P <br />A <br />O <br />O <br />W <br />O <br />O <br />A <br />� <br />-�i <br />O <br />O <br />N <br />pv <br />�v <br />w <br />•� <br />�711 I I mil. -I �l t �44; V% <br />Project No. 08009.00 <br />M36 1 <br />102008BH/P%Architecb, Im. I <br />