Laserfiche WebLink
N <br />O <br />8 <br />00 <br />N — <br />t0 <br />MECHANICAL NOTES <br />O1 MECHANICAL CONTRACTOR PROVIDE NEW ALUMINUM SUPPLY AND RETURN DUCTING. WRAP BOTH SUPPLY <br />AND RETURN WITH INSULATED DUCT WRAP. <br />Q2 MECHANICAL CONTRACTOR PROVIDE NEW AIR DIFFUSER/GRILLE PER AIR DEVICE SCHEDULE. <br />O3 REBALANCE EXISTING AIR DEVICES TO SPECIFIED AIR FLOWS. <br />® PROVIDE NEW RETURN GALVANIZED STEEL, RETURN DUCTING BETWEEN NEW RETURN GRILLES AND LIEBERT <br />COMPUTER ROOM UNIT. <br />O MRI INSTALLATION CONTRACTOR PROVIDE RF WAVEGUIDE SIZED FOR DUCTING. <br />© PROVIDE NEW GALVANIZED STEEL DUCTING WITH INSULATED DUCT WRAP TO DIFFUSER AND RETURN GRILLE. <br />m-f <br />� - <br />14x24 <br />36x10 _ <br />-T-====� <br />I <br />22x10 <br />30x24 <br />-----� <br />} ..._ r.. <br />/ <br />I I <br />10"o <26x1,2 <br />� <br />�I <br />20x14 <br />-- - - -- <br />- - - - - <br />- - - <br />FD <br />� I <br />#$'F D <br />CAU21 1 i 1-� <br />���� <br />Mop t <br />/I <br />I1_ LI <br />; <br />225 <br />(EXETNC) <br />If <br />, <br />t ,,0 <br />6x 16 <br />X <br />y <br />x 21 oA <br />€ <br />I <br />5 `� <br />J <br />JJ <br />1000 <br />- - - - - - - - - <br />1 4x 10 <br />-> T <br />JJ <br />175 B---- <br />E <br />€ - ---------I------�- <br />24X12 1 <br />1000 <br />24x24 <br />1' <br />E: <br />II <br />2 <br />175 <br />2 53 <br />x <br />`' <br />310.0 <br />X901 <br />1 s <br />, ,I <br />I <br />2,000 C D <br />'' <br />I <br />-®-- --- <br />2 <br />18x1 EXH' <br />1 <br />I <br />' <br />12x1' <br />12X12Q <br />10 0 <br />`. <br />11 <br />- <br />-_ <br />EF-4 QN_ROOF <br />1000 100 <br />115FM.. <br />© EXH <br />2 <br />(EXISTING) <br />;24x24 24x24 <br />3 <br />{ <br />X <br />I' <br />i <br />€ <br />E <br />, 40 A <br />u <br />I , <br />1 <br />X <br />, <br />- <br />` <br />250�A <br />502 <br />12x120 <br />+ <br />€ -- <br />� <br />28 On I \ix2x12 <br />+ <br />I <br />_ <br />\ <br />', <br />3 2 <br />32 <br />x <br />t <br />x <br />i <br />HVAC 1ST FLOOR RCP PLAN — NEW CONSTRUCTION <br />SCALE: 1/4"=1'-0" <br />MA=` C H A I"v I (M*0*04 A L NOTES <br />O MECHANICAL CONTRACTOR PROVIDE CHILLED WATER PIPING. ROUTE FROM SECOND FLOOR CHASE ACROSS <br />CEILING SPACE AND DOWN TO QUICK CONNECT CONTROLLER UNIT. SEE SHEETS M4.1 AND M4.2 FOR <br />CONTINUATION. <br />O2 MECHANICAL CONTRACTOR PROVIDE CHILLED WATER PIPING. ROUTE FROM QUICK CONNECT CONTROLLER <br />UNIT TO RF FILTER PLATE CONNECTION. <br />O3 MECHANICAL CONTRACTOR PROVIDE NEW AIR FLOW PANEL PER AIR DEVICE SCHEDULE. <br />® MECHANICAL CONTRACTOR RELOCATE THERMOSTAT TO THIS LOCATION TO AVOID PLACEMENT OF NEW <br />2"0 <br />400 <br />24x24© <br />400 <br />24x24© <br />4 d +, <br />x <br />HVAC 1st FLOC..."n PLAN — NEW CONSTRUCTM s <br />SCALE: 1/4 =1 -0 1 <br />9 <br />PROFESSIONAL ENGINEERS <br />* 3203 QUEEN PALM DRIVE <br />TAMPA, FLORIDA 33619 <br />PHONE (813) 241-6488 <br />FAX 813) 241-6498 <br />of F,*mn - Uoonoo 0 27336 <br />Project No. 15017.00 <br />M400 <br />02015 BH/PK Architects, Inc. <br />;pumIr4 ;PIImr-, pr!LrMp <br />