Laserfiche WebLink
N <br />N <br />Go <br />N <br />Go <br />te <br />HVAC 1ST FLOOR RCP PLAN - DEMOLITION RL <br />SCALE: 1/4"=1'-O" <br />GENERAL DEMOLITION NOTES <br />1. INFORMATION SHOWN HERE REFLECTS EXISTING RECORDS AND RECENT ON -SITE OBSERVATIONS. THE DEMOLITION WORK SHOWN IS INTENDED TO <br />CONVEY THE GENERAL NATURE AND SCOPE OF THE WORK REQUIRED. THE CONTRACTOR SHALL PERFORM ALL DEMOLITION WORK NECESSARY TO <br />PROPERLY COMPLETE THE NEW WORK SHOWN ELSEWHERE. <br />2. PROVIDE TEMPORARY MECHANICAL, ELECTRICAL AND LIGHTING EQUIPMENT AS NECESSARY TO MAINTAIN PROPER OPERATION OF ALL SYSTEMS AND <br />PROVIDE FOR WORKER SAFETY. <br />3. REMOVE ALL EXISTING PIPING, DUCTWORK, AND WIRING ETC. THAT IS NOT REQUIRED TO SUPPORT THE PROPER OPERATION OF THE NEW SYSTEMS AND <br />EXISTING SYSTEMS TO REMAIN. DISPOSE OF ALL DEMOLISHED MATERIALS OFFSITE. <br />4. PATCH AND REPAIR EXISTING SURFACES TO REMAIN THAT MAY BE DAMAGED BY THE PERFORMANCE OF THE DEMOLITION WORK. <br />5. PROTECT REMAINING PIPING, DUCTWORK, CONDUIT ECT. FROM THE ENTRANCE OF FOREIGN MATERIALS. <br />6. PROVIDE PLASTIC SHEETING AND SEALING AROUND DOORS AND OPENINGS TO PROTECT ADJACENT SPACES FROM THE SPREAD OF DUST AND <br />DEMOLITION DEBRIS TO OCCUPIED AREAS OF THE BUILDING. KEEP ALL ADJOINING AREAS ADJACENT TO THE WORK AREA CLEAN AND FREE OF DEBRIS. <br />7. COORDINATE REMOVAL OF CEILING MOUNTED ITEMS SUCH AS DIFFUSERS WITH THE GENERAL CONTRACTOR REMOVING THE CEILING AND PARTITIONS AS <br />NECESSARY. <br />8. REFER TO AND COORDINATE WITH ARCHITECTURAL DEMOLITION PLANS. <br />HVAC DEMOLITION NOTES <br />O1 LIEBERT COMPUTER ROOM AIR CONDITIONER TO REMAIN. <br />O2 MECHANICAL/DEMOLITION CONTRACTOR REMOVE CHILLER, PIPING, AND HOSES. CONTRACTOR SHALL RECOVER ALL REFRIGERANT FROM MEDICAL <br />CHILLERS PRIOR TO DISPOSAL. RETURN REFRIGERANT TO APPROVED RECLAIM FACILITY. <br />O3 MECHANICAL CONTRACTOR REMOVE FLOOR AIR GRILLE. Al <br />® MECHANICAL CONTRACTOR REMOVE EXISTING THERMOSTAT FROM WALL TO ALLOW INSTALLATION OF NEW PRIVACY PARTITION WALL. THERMOS T 0 E <br />RELOCATED A IN HES TO TH LE EE SH ET 4.0 FOR MORE INSTRUCTIONS. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />g I <br />I <br />MRI DISCONNECT <br />L- <br />MRI DISCONNECT <br />r � <br />II <br />L J - EXISTING GE MRI ELECTRONICS <br />I <br />I I <br />I <br />I <br />TRANSFORMER <br />ELECTRICAL PANEL <br />- MRI WATER CHILLER <br />COLD HEAD HELIUM <br />COMPRESSOR <br />HVAC 1ST FLOOR PLAN - DEMOLITION <br />SCALE: 1 /4"=1'-0" <br />5 TON LIEBERT COMPUTER ROOM <br />MRI FLUID CHILLER <br />Project No. 15017.00 <br />M300 <br />02015 BH/PK Architects, Inc. <br />$DATE$ $TIME$ $FILEA$ <br />