My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (127)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (127)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 3:25:11 PM
Creation date
2/25/2025 9:48:07 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Wehr Construction Inc
Building Plans - Permit #
Unknown
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"�i�� <br />A�� <br />N <br />EE <br />P <br />6 <br />u <br />0 <br />vd- <br />M_ O <br />E <br />I t0 <br />te <br />W <br />INFECTION CONTROL NOTES: <br />O1 CONTRACTOR SHALL PROVIDE PORTABLE HEPA (99.97% OF 0.3um AND LARGER PARTICLES <br />TRAPPED) AIR SCRUBBER EXHAUSTING AIR FROM CONSTRUCTION AREA TO CORRIDOR OR <br />OUTDOORS AS SHOWN. ARRANGEMENT OF SCRUBBER AND DUCT ARRANGEMENT TYPICAL FOR <br />CORRIDOR AREAS. AREAS ARE ANTICIPATED TO CHANGE IN SIZE AND LOCATION AS WORK <br />PROGRESSES. <br />0 CONTRACTOR SHALL PROVIDE TEMPORARY, FLEXIBLE EXHAUST DUCTWORK FROM THE AIR <br />SCRUBBER LOCATED IN THE CONSTRUCTION AREA TO THE CLEAN NON —CONSTRUCTION SIDE OF <br />THE CORRIDOR AS PER DRAWINGS. CONTRACTOR TO PROVIDE OPENING IN THE TEMPORARY <br />SMOKE —TIGHT BARRIER WALL FOR THE EXHAUST DUCTWORK AND EXHAUST DIFFUSER. PROVIDE <br />SUFFICIENT DUCTWORK TO ALLOW THE MOVEMENT OF THE TEMPORARY EXHAUST FAN. ATTACH <br />DUCT TIGHT TO CEILING AND RUN EXPOSED. <br />O3 CONTRACTOR SHALL PROVIDE HEPA CONSTRUCTION FILTERS ON EXHAUST AND RETURN AIR <br />GRILLES. <br />® CONTRACTOR SHALL ENSURE THAT CONSTRUCTION AREA REMAINS UNDER A 0.03 IN WG MINIMUM <br />NEGATIVE PRESSURE DURING THE CONSTRUCTION PERIOD. PROVIDE A DIGITAL DIFFERENTIAL <br />PRESSURE METER (MANOMETER) TO MONITOR AND ALLOWING DAILY LOGGING OF DIFFERENTIAL <br />PRESSURE BETWEEN CONSTRUCTION AREA AND HOSPITAL <br />O5 CONTRACTOR PROVIDE TEMPORARY AIR ISOLATION WALL WITH ACCESS DOOR AT THIS LOCATION. <br />SEE ARCHITECTURAL ICRA PLAN FOR DOOR SIZE AND ADDITIONAL REQUIREMENTS. AIR BARRIERS <br />SHALL BE MOVED AS NEEDED TO ACCOMMODATE CONSTRUCTION SCHEDULING AND HOSPITAL <br />CORRIDOR REQUIREMENTS. PATCH AND SEAL ANY WALL DAMAGE AS NEEDED TO MATCH EXISTING <br />WHEN TEMPORARY WALLS ARE REMOVED. <br />INFECTION CONTROL MEASURES: <br />1. The contractor shall obtain from the owner a copy of the infection control risk assessment (ICRA) prepared for this <br />project. The contractor shall review the requirements in this report and perform all work in accordance with those <br />requirements. The contractor shall strictly adhere to the limits of the construction area, and where phasing applies <br />shall adhere to the phasing plan. Any work outside the construction area shall be coordinated with the facility and <br />performed in accordance with the ICRA report. <br />2. To the extent that it is required by the ICRA the contractor shall endeavor to maintain existing levels of indoor air <br />quality in areas surrounding and adjacent to the construction work zone, and elsewhere in the facility. It should be <br />anticipated that the ICRA report will require measure to this effect including erection of construction zone barriers <br />and provisions for negative air pressure in the construction zone relative to other areas of the facility. Failure to <br />comply with construction and maintenance of construction barriers will result in the cessation of work until the <br />barriers are brought into compliance. <br />3. Contractor shall monitor the room areas under construction to assure the area has negative pressure in relation to <br />the non construction areas. <br />4. Any requirement for interruption or shutdown of utilities made necessary by this construction shall be coordinated <br />with the facility at least one week prior to interruption. <br />5. Contractor shall endeavor to minimize any disruption of surrounding areas of the facility. <br />6. All debris will be removed in covered carts. Wheels shall be cleaned prior to entering the building from outside or <br />from the construction area. <br />7. If fire alarm and/or sprinkler system are shut down for four (4) hours or more contractor shall provide a "fire <br />watch". <br />8. Traffic between barricaded areas and open areas shall be kept to a minimum. Keep door to such areas closed at <br />all times. Transport materials and refuse into area from an external site without violating other areas. <br />9. Provide negative pressure in construction area by blocking supply ventilation in a dust tight manner and HEPA—filter <br />existing return ducts, or with use of negative air machine. Do not re —circulate air from construction area to <br />remainder of the facility with out HEPA filtration. <br />ICRA Precautions During Construction <br />Provide active means to prevent airborne dust from dispensing into atmosphere <br />Execute work by methods to minimize raising dust <br />Immediately replace any ceiling the if displaced <br />Water mist work surfaces to control dust while cutting <br />Seal unused doors with low tack <br />Block off and seal air vents <br />Place dust mat at the entrance and exit of work area <br />Remove or isolate HVAC system in areas where work is being performed <br />ICRA Precautions upon Construction Completion <br />Wipe work surfaces with disinfectant <br />Contain construction waste before transport in tightly covered containers <br />Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area <br />Remove isolation of HVAC system in areas where work was performed. <br />General Suspended Ceiling Rules <br />Contractor shall notify the owner's representative of areas to be accessed prior to start of work <br />Spray top of ceiling panels to be removed, and surrounding affected panels with fine water mist to settle dust prior to <br />removal <br />Clean top of adjacent ceiling panels after work is complete <br />Clean floor below work areas when work is completed <br />Reroute traffic with barriers as required so that no patients or staff travel immediately below the work area. <br />Owner should be contacted for all ceiling problems <br />T)pical Above Ceiling Work <br />Contractor to provide a pre —manufactured portable collapsible and temporary dust barrier system, Portable airborne <br />40 <br />Environmental Containment Unit ECU as manufactured by Mintie Technologies or equal, and al necessary accessories <br />b t not limited to, 350-425 CFM <br />Negative Air a a <br />INFECTION CONTROL PRECAUTIONS <br />SCALE: 1 /4"4-0" <br />''^^n <br />VI <br />U <br />U <br />U <br />bA <br />U <br />o <br />N <br />00 <br />U � <br />M <br />O N <br />M <br />� New rn <br />c�M�N <br />�o <br />J0 <br />U <br />c Z <br />o <br />F+i 0000 fw ii �l <br />in <br />.-1 <br />0 <br />cU <br />I <br />co <br />0 <br />I <br />0 <br />o V) <br />CIO <br />w <br />f <br />f <br />0 <br />U <br />a <br />U <br />Q <br />a <br />-b <br />,cn C� CV <br />Q, A 00 <br />C T <br />A A z <br />Q <br />N <br />N <br />03 <br />0 <br />03 <br />h-�-1 <br />4� <br />03 <br />V � <br />W � <br />Z w <br />Project No. 15017.00 <br />M2,00 <br />©2015 BH/PK Architects, Inc. i <br />JUA I t) :t 1IMLJ :tr ILtA:t <br />
The URL can be used to link to this page
Your browser does not support the video tag.