Laserfiche WebLink
N <br />a.w <br />El <br />■ <br />o m <br />" CV <br />0 <br />te <br />0 <br />�o <br />ABBREVIATIONS <br />AFF <br />ABOVE FINISHED <br />FLOOR MAX <br />MAXIMUM <br />CLG <br />CEILING <br />MIN <br />MINIMUM <br />DN <br />DOWN <br />SPK. <br />SPRINKLER <br />EL <br />ELEVATION <br />TYP <br />TYPICAL <br />EXIST <br />EXISTING <br />UON <br />UNLESS OTHERWISE NOTED <br />FL <br />FLOOR <br />VIF <br />VERIFY IN FIELD <br />F <br />FIRE MAIN <br />FIRE PROTECTION SPECIFICATIONS <br />1.0 PIPE FITTINGS AND VALVES <br />A. STEEL PIPE ASTM A 135, PIPE SIZE 2" AND SMALLER SHALL BE SCHEDULE 40 BLACK STEEL <br />WITH THREADED CAST IRON BLACK FITTINGS. <br />1.1 CAST IRON THREADED FITTINGS <br />ASME B16.4, CLASS 125, STANDARD PATTERN, WITH THREADS ACCORDING TO ASME B1.20.1, 175 <br />PSI RATED. <br />1.2 MALLEABLE IRON THREADED FITTINGS <br />ASME B16.3, CLASS 150, STANDARD PATTERN, WITH THREADS ACCORDING TO ASME B1.20.1. <br />1.3 STEEL FITTINGS <br />ASTM A 234/ A 234M, SEAMLESS OR WELDED; ASME B16.9, BUTTWELDING; OR ASME 816.11, <br />SOCKET WELDING TYPE FOR WELDED JOINTS <br />1.4 GENERAL <br />UL LISTED AND/OR FM APPROVED SERVICE VALVES WITH 175 PSIG NON -SHOCK MINIMUM <br />WORKING PRESSURE RATING. GATE VALVES: UL 262, CAST BRONZE, THREADED ENDS, SOLID <br />WEDGE, OUTSIDE SCREW AND YOKE, RISING STEM. PROVIDE INDICATING (BUTTERFLY OR BALL) <br />VALVES TYPE, BRONZE BODY WITH THREADED ENDS, AND INTEGRAL INDICATING DEVICE, INDICATOR <br />SHALL BE VISUAL AND ELECTRICAL 115 VOLTS A.C., PRE -WIRED 2 CIRCUIT, SUPERVISORY SWITCH. <br />2.0 SPRINKLERS <br />PROVIDE AUTOMATIC HEAT -RESPONSIVE GLASS BULB SPRINKLER HEADS, WITH 1 /2" NOMINAL <br />ORIFICE, 5.50 "K" FACTOR 155'F TEMPERATURE RATING, INSTALL SPRINKLERS IN A UNIFORM, <br />CONSISTENT MANNER IN ORDER TO LINE UP EACH AREA, IN THE "CENTER" OF THE CEILING TILE <br />AS DETAILED. <br />3.0 PIPING INSTALLATIONS <br />DEVIATIONS FROM APPROVED "WORKING PLANS" FOR SPRINKLER PIPING REQUIRE WRITTEN <br />APPROVAL FROM AUTHORITY WITH JURISDICTION. FILE WRITTEN APPROVAL WITH THE ENGINEER <br />PRIOR TO DEVIATING FROM APPROVED "WORKING PLANS". INSTALL UNION OR FLANGE ADJACENT <br />TO EACH VALVE. INSTALL HANGER AND SUPPORT SPACING AND LOCATIONS FOR STEEL PIPING <br />JOINED WITH GROOVED MECHANICAL COUPLINGS ACCORDING TO MANUFACTURER'S WRITTEN <br />INSTRUCTIONS FOR RIGID SYSTEMS PER NFPA 13. <br />4.0 FIELD QUALITY CONTROL <br />FLUSH, TEST AND INSPECT SPRINKLER PIPING SYSTEMS ACCORDING TO NFPA 13 CHAPTER <br />"SYSTEM ACCEPTANCE". REPORT TEST RESULTS PROMPTLY AND IN WRITING TO ARCHITECT AND <br />TO THE AUTHORITY HAVING JURISDICTION. CLEANING: CLEAN DIRT AND DEBRIS FROM <br />SPRINKLERS. REPLACE SPRINKLERS HAVING PAINT OTHER THAN FACTORY FINISH WITH NEW <br />SPRINKLERS. CLEAN AND REUSE OF PAINTED SPRINKLERS IS PROHIBITED. <br />5.0 SPRINKLER SYSTEM BASIS OF DESIGN <br />ITEM DESIGN <br />CLASSIFICATION COORDINATE WITH ARCHITECTURAL DRAWING AND CLASSIFY <br />AREAS PER NFPA <br />TYPE WET PIPE SPRINKLER SYSTEM <br />SPRINKLER HEAD (SEE SCHEDULE) <br />MANUFACTURER/MODEL <br />TEMPERATURE RATING (SEE SCHEDULE) <br />NOTES <br />1. COORDINATE CEILING MOUNTED SPRINKLER HEADS WITH OTHER DEVICES (LIGHTS, DIFFUSERS, <br />ACCESS PANELS, ETC.) SEE ARCHITECTURAL CEILING PLANS FOR LOCATIONS OF ALL DEVICES. <br />2. ALL MATERIALS AND EQUIPMENT SHALL UL AND/OR FACTORY MUTUAL APPROVED WHERE <br />APPLICABLE. <br />2----- <br />� <br />rt <br />� <br />LEGEND <br />EXISTING FIRE SPRINKLER PIPING SHALL REMAIN (VIF) <br />EXISTING FIRE SPRINKLER HEAD SHALL BE REMOVED (VIF) <br />EXISTING SPRINKLER HEAD SHALL REMAIN (VIF) <br />NEW ARMOVER FIRE SPRINKLER PIPING <br />CONCEALED MOUNTED SPRINKLER HEAD - (SEE SCHEDULE) <br />SIDE CONNECTION <br />NEW CONNECTION <br />FIRE PROTECTION GENERAL NOTES <br />1. FIRE PROTECTION WORK SHALL BE DESIGNED, INSTALLED, AND TESTED IN ACCORDANCE WITH <br />NFPA 13 LATEST EDITION OR AS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. <br />2. INCLUDE ANY INCIDENTAL APPARATUS, APPLIANCES, MATERIAL LABOR AND SERVICES NECESSARY <br />TO MAKE NEW WORK COMPLETE IN ALL RESPECTS AND FULLY READY FOR OPERATION. <br />3. MAKE SUCH OFFSETS AND DEVIATIONS FROM WORK SHOWN ON THE DRAWINGS, AS MAY BE <br />NECESSARY TO FIT THE ACTUAL SPACE CONDITIONS. <br />4. THE INSTALLER SHALL VISIT THE JOB SITE, INSPECT ALL EXISTING CONDITIONS AFFECTING THE <br />WORK. SUBMISSION OF HIS PROPOSAL SHALL BE CONSTRUED AS INDICATING SUCH KNOWLEDGE. <br />NO ADDITIONAL PAYMENT WILL BE MADE ON CLAIMS THAT ARISE FROM THE CONTRACTOR'S <br />FAILURE TO COMPLY WITH THIS REQUIREMENT. <br />5. THE PLANS AND DIAGRAMS OF FIRE PROTECTION PIPING ARE SCHEMATIC ONLY AND SHOULD NOT <br />BE SCALED. INSTALLER SHALL COORDINATE AT SITE WITH ALL EXISTING PLUMBING, HVAC AND <br />ELECTRICAL WORK SO AS NOT TO CONFLICT IN LOCATION WITH OTHER WORK UNDER THIS <br />CONTRACT OR THAT MAY BE EXISTING. CONTRACTOR SHALL ADJUST PIPE ROUTING AS NECESSARY <br />TO AVOID CONFLICTS WITH DUCTWORK, EQUIPMENT, LIGHTING, ETC. <br />6. INSTALLER SHALL NOT CUT ANY EXISTING STRUCTURAL MEMBERS WITHOUT FIRST SECURING WRITTEN <br />APPROVAL FROM THE ARCHITECT. <br />7. PIPE SIZED, GENERAL ROUTING, AND CONFIGURATION IN SYSTEMS REQUIRED TO BE HYDRAULICALLY <br />CALCULATED SHALL BE INSTALLED PER THIS ENGINEER'S CONSTRUCTION DOCUMENTS. ANY <br />DEVIATION SUBMITTED BY THE CONTRACTOR SHALL BE RE -DESIGNED BY THIS ENGINEER WITH <br />RELATED RE -DESIGN FEES BORN BY THE CONTRACTOR. <br />8. CONTRACTOR SHALL ARRANGE FOR, OBTAIN AND BEAR THE COST OF NECESSARY PERMITS, BONDS, <br />AND FEES. <br />9. ALL MATERIALS SHALL BE U.L. LISTED AND BEAR THE U.L. LABEL. <br />10. PENETRATIONS THROUGH FIRE RATED ASSEMBLIES, PENETRATIONS FOR PIPES, CONDUITS, OR OTHER <br />PURPOSES THROUGH ASSEMBLIES (FLOORS, WALLS, PARTITIONS, ETC.) WITH A REQUIRED <br />FIRE RESISTANCE RATING FIRE STOP MATERIAL SHALL BE UL LISTED AND INSTALLED IN STRICT <br />ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS TO MEET OR EXCEED THE FIRE RATING OF <br />THE PENETRATED ASSEMBLY. <br />11. BEFORE SHUTTING OFF ANY SECTION OF THE FIRE PROTECTION SYSTEM TO MAKE ADJUSTMENTS <br />OR ADDITIONAL CONNECTIONS, COORDINATE WITH THE OWNER AND NOTIFY THE AUTHORITY <br />HAVING JURISDICTION. PLAN THE WORK CAREFULLY AND ASSEMBLE ALL MATERIALS TO ENABLE <br />COMPLETION IN THE SHORTEST POSSIBLE TIME. WORK SHALL BE USED TO COMPLETION WITHOUT <br />INTERRUPTION, AND PROTECTION SHALL BE RESTORED AS PROMPTLY AS POSSIBLE. <br />12. PROVIDE FLUSHING CONNECTION AT END OF SPRINKLER SYSTEM WHERE LAY -IN CEILING OCCURS. <br />ALL SPRINKLER PIPING THAT REQUIRES CHANGE IN ELEVATION DUE TO COORDINATION ROUTING OF <br />PIPING SHALL HAVE FLUSH CONNECTION AT ALL LOWER ELEVATION. THE SPRINKLER SYSTEM SHALL <br />BE INSTALLED WITH COMPLETE DRAINABLE SYSTEM. <br />13. ALL SPRINKLER HEADS SHALL BE U.L. LISTED AND INSTALLED IN ACCORDANCE WITH THEIR <br />LISTING REQUIREMENTS. ALL ESCUTCHEONS AND ACCESSORIES SHALL BE METAL. <br />14. YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED <br />WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE <br />OWNER AT NO ADDITIONAL COST TO THE OWNER. <br />15. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE CONTRACTOR SHALL REMOVE ALL <br />TOOLS, APPLIANCES, SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO <br />BE REMOVED SHALL BE TURNED OVER TO THE OWNER. <br />16. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) <br />WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER, THE ITEMS <br />OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. <br />17. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. <br />18. COORDINATE EXACT LOCATION OF SPRINKLERS AND PIPING WITH CEILING, ELECTRICAL, <br />MECHANICAL, AND STRUCTURAL ELEMENTS OF BUILDING. MAKE MODIFICATIONS WITHOUT <br />ADDITIONAL COST TO THE OWNER. <br />19. PROVIDE ALL HANGERS AS REQUIRED TO COMPLY WITH NFPA 13. <br />20. PROVIDE ALL DRAINS AS REQUIRED BY NFPA 13. <br />21. ALL SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE. <br />22. PENDENT MOUNTED SPRINKLER HEADS SHALL BE ALIGNED WITHIN NORMAL FABRICATION AND <br />INSTALLATION TOLERANCES AND WILL BE CENTERED IN CEILING TILES. <br />23. THE EXISTING FIRE PROTECTION SYSTEM IN BUILDING WAS HYDRAULICALLY CALCAULATED EXISTING <br />EXISTING SPRINKLERS INDICATED HAVE BEEN REMOVED AND NO SPRINKLER HEADS HAVE BEEN <br />ADDED WHICH DOES NOT EFFECT THE REMOTE ZONE. THE CHANGES MADE ON THIS PROJECT <br />DO NOT EFFECT THE HYDRAULIC CHARACTERISTICS OF THE EXISTING SYSTEM. THEREFORE HYDRAULIC <br />CALCULATIONS ARE NOT REQUIRED FOR THIS PROJECT. <br />FIRE PROTECTION <br />FP1.0 ABBREVIATIONS, LEGENDS, GENERAL NOTES AND DETAILS <br />FP2.0 FIRE PROTECTION DEMOLITION AND NEW CONSTRUCTION PARTIAL PLANS <br />FIRE SPRWLER HEAD SCHEDULE <br />SYMBOL <br />NAME <br />METAL FINISH <br />TEMPERATURE <br />K-FACTOR <br />SIN <br />N.P.T. <br />ESCHUTCHEON <br />MANUFACTURER <br />MODEL <br />0 <br />CONCEA <br />ELED <br />WHITE <br />155' F <br />5.6 <br />VK462 <br />1/2" <br />FLUSH <br />VIKING <br />M QR <br />INTERIOR SIDE OF <br />WALL <br />GYPSUM WALL <br />MIN. 5/8" THICKNESS OF FILL METAL STUDS <br />MATERIAL APPLIED WITHIN <br />ANNULUS FLUSH BOTH SURFACES <br />OF WALL <br />r <br />PIPE CENTERED <br />IN SLEEVE <br />NOTES: v <br />1. UL SYSTEM NO. W-L-1054, F RATING 1 OR 2 HR <br />1 OR 2 HOUR P_P_ESLEEVE <br />WALL PENETRATION DETAIL <br />EXISTING BRANCH PIPING <br />1XISTING SECOND ELOOB <br />Z i <br />J <br />EXISTING CEILING TO BE <br />REMOVED REFER TO ARCH. <br />DRAWINGS <br />1 ARMOVER <br />) CONNECT <br />IU LX1511N6 BRANCH <br />PIPING (VIF) <br />EXISTING PENDANT SPRINKLER HEAD <br />AND NIPPLE SHALL BE REMOVED <br />(TYPICAL) <br />NOT TO SCALE <br />CONTINUOUS ALL THREADED ROD <br />ADJUSTABLE HANGER <br />(FM/UL APPROVED) <br />1" SCH. 40 NIPPLE <br />REDUCER <br />12" MAX. <br />NEW CONCEALED <br />MOUNTED SPRINKLER <br />NEW CEILING HEAD <br />NEW CONCEALED MOUNTED SPRINKLER HEAD <br />WITH NEW ARMOVER DETAIL NOT TO ICU <br />Project No. 15017.00 <br />FRI 4, 0 <br />02015 BH/PK Architects, Inc., <br />$DATE$ $TIME$ $FILEA$ <br />