Laserfiche WebLink
w Office: (813) 241-6488 <br />Prafes.vicrrral Engineers Fax: (813) 241-6498 <br />January 14, 2016 <br />Mr. Lyndon T. Pollock, AIA <br />8250 College Parkway, #203 <br />Fort Myers, Florida 33919 <br />RE: Facility Name: Florida Hospital (Zephyrhills) <br />7050 Gall Boulevard <br />Zephyrhills, Florida 33541 <br />Project Name: MRI Replacement <br />Client Code/File-Project Sub. Number: 23/100046-1-5 <br />Dear Lyn: <br />We have reviewed the AHCA comments generated their plan review of the revised drawings dated <br />October 12, 2015 and offer the following response: <br />Electrical <br />Comment E-7: Sheet E5.0: Provide in the one -line diagram where is connected the existing disconnect <br />(panel or switchboard), also provide panel schedule and coordination studies. <br />Response: Please see revised drawing E-5.0. �,�1111 <br />PAD <br />If you have any questions, please call. ���, <br />Respectfully, •, ct��' 4019 �`�� <br />KPI Engineering, Inc. <br />< s <br />CORI l b <br />Shawn M. Jeffrey, Sr. — LEED AP `e>j/0NA1, e� ` <br />Design Group Manager / Partner <br />cc: Trey Morgan, PE (KPI) <br />Scott Nelson (KPI) <br />Richie Ramsauer (KPI <br />3203 Queen Palm Drive - Tampa, FL 33619 <br />