<br />FLORIDA HOSPITAL ZEPHYRHILLS
<br />MRI REPLACEMENT
<br />]Florida Hospital Zephyrhills
<br />7050 Gall Boulevard
<br />Zephyrhills, IF 33541
<br />Client Code ]File -Project Submission Number: 23 / 100046-1-5
<br />PROJECT TEAM DIRECTORY
<br />OWNER
<br />Florida Hospital Zephyrhills
<br />7050 Gall Boulevard
<br />Zephyrhills, Florida 33541
<br />Phone: (813) 788-0411
<br />ARCHITECT
<br />Burt Hill / Pollock Krieg Architects, Inc.
<br />8250 College Parkway Suite 203
<br />Fort Myers, Florida 33919
<br />Phone: (239) 482-4761
<br />Fax: (239) 482-0265
<br />MECHANICAL/ELECTRICAL ENGINEERS
<br />KPI Engineering Inc.
<br />3203 Queen Palm Drive
<br />Tampa, Florida 33619
<br />Phone: (813) 241-6488
<br />Fax: (813) 241-6498
<br />STRUCTURAL ENGINEERS
<br />TLC Engineering for Architecture
<br />500 North Westshore Blvd #435
<br />Tampa Florida 33609
<br />Phone: 813-637-0110
<br />Fax: 813-637-0013
<br />KEY PLAN
<br />oil
<br />NINEloss
<br />l'
<br />PROJECT LOCATION
<br />SYMBOLS AND MATERIALS
<br />AO
<br />WINDOW TYPE
<br />ELEVATION BENCHMARK
<br />REVISION AND NUMBER
<br />C.J.D
<br />CONTROL JOINT
<br />DOOR AND FRAME
<br />WITH DOOR NUMBER
<br />00
<br />EXISTING DOOR
<br />METAL STUD WALL
<br />MASONRY WALL
<br />EVALUATION
<br />208
<br />ROOM NAME AND NUMBER
<br />WALL TYPE
<br />BUILDING SECTION
<br />\l1�
<br />SECTION OR DETAIL
<br />ELEVATION
<br />®
<br />INTERIOR ELEVATION
<br />NORTH ARROW
<br />EARTH
<br />GRANULAR FILL
<br />® METAL
<br />® FINISH WOOD
<br />STUCCO OR GYPSUM BOARD
<br />CONCRETE OR GRAVEL
<br />CONCRETE MASONRY UNIT (CMU)
<br />®
<br />PLYWOOD
<br />®
<br />ACOUSTIC CEILING TILE
<br />®
<br />BATT OR SEMIRIGID INSULATION
<br />RIGID INSULATION
<br />ROUGH WOOD FRAMING OR BLOCKING
<br />0
<br />0
<br />#MTN
<br />VICINITY MAP
<br />G►�
<br />ware
<br />n
<br />a:
<br />t3td take
<br />-
<br />fl**i W 10104 ftd
<br />:
<br />Htr£rcl _eke :;I
<br />'nu.r��Fam
<br />:
<br />Estaies
<br />.;
<br />,
<br />Site
<br />Fo erg
<br />g
<br />s
<br />F walla ..xol•
<br />& Cour*ry Cl-at
<br />Fr�uatr. C nt�e
<br />�`Y
<br />a
<br />._.
<br />o
<br />u� S 1Jts
<br />L n s c.t a e s
<br />..............
<br />- 8 n3rs tt _•
<br />"
<br />- :JaksdeL4k
<br />' '
<br />Zeonyl
<br />hills
<br />r
<br />;PA
<br />nkp
<br />GENERAL NOTES
<br />Industry standards (I.e. ASTM, ANSI, etc.) shall have the some force and effect.
<br />on performance of work as If copies were directly Inserted into the Contract Documents or bound and
<br />published therewith. Comply with standards In effect as of the date of the Contract Documents,
<br />unless otherwise note or required by authorities having jurisdiction.
<br />CODES - All work shall conform to the following codes and ordinances:
<br />2014 Florida Building Code
<br />2014 Florida Plumbing Code
<br />2014 Florida Fuel Gas Code
<br />2014 Florida Mechanical Code
<br />2014 Florida Accessibility Code
<br />2014 Florida Energy Conservation Code
<br />2014 Florida Existing Building Code
<br />Florida Fire Prevention Code Fifth Edition - Effective December 31, 2014
<br />Local Codes and Ordinances and flood damage prevention ordinances where applicable
<br />2012 NFPA 101 - Life Safety Code
<br />2012 NFPA 99 - Health Care Facilities
<br />2010 Guidelines for Design and Construction of Health Care Facilities
<br />t
<br />7o5o bA llkw)
<br />6MU
<br />BUILDING CODE INFORMATION
<br />OCCUPANCY GROUP : GROUP 1-2
<br />TYPE OF CONSTRUCTION : TYPE I-B
<br />TYPE 1(3,30 FULLY SPRINKLERED (NFPA)
<br />SQUARE FOOTAGE OF REMODELING: 1,106sgf t
<br />I. Contractor to oversee cleaning and Insure that the premises are maintained free of rubbish during construction. Final cleanup Is the
<br />responsibility of the Contractor. Contractor to provide PermIffIng Authority with Debris Affidavit of time of submittal.
<br />2. At the termination of work, submit to Building Agent/Tenant maintenance manuals presenting full details for care and maintenance of all
<br />surfaces and equipment of every nature. Contents shall include manufacturer's and Installer's names, addresses, and phone numbers, and
<br />Instructions for installation, start-up, operation, maintenance parts list, and data sheets.
<br />J. Contractor is responsible for compliance with all Codes, Ordinances and Regulations applicable at project location. Contractor is responsible
<br />for filing and securing all necessary permits, approvals, etc. for all trades.
<br />4. When 'or equal'. 'alternate', or other qualifying terms are used, those items shall be approved by Building Agent/Tenant and/or Architect.
<br />5. Existing materials or Items scheduled to remain that are damaged by construction shall be repaired, patched, and refinished to the nearest
<br />intersection, restoring surface to it's original condition.
<br />6. Contractor shall protect all existing walls, doors, frames, surfaces, fixtures, finishes, etc. from damage during demolition and construction. Existing
<br />materials to be removed shall be coordinated with Owner to verify if Owner wishes to salvage some. Relocation of salvaged materials, once
<br />removed, to be by the Building Agent/Tenant's forces
<br />7. Contractor shall verify and be responsible for all dimensions and job site conditions related to this work. Any discrepancy in dimensions or
<br />special modifications required due to field conditions shall be reported to the Architect for clarificotlon
<br />8. The Architect does not have control or charge of, and shall not be held responsible fc; construction means, methods, techniques, sequence or for
<br />safety precautions and programs in connection with work, for the acts or omissions of the contractor, sub contractors or any other persons
<br />performing any of the work, or for the failure of any of them to carry out the work in accordance with the Documents.
<br />9. All pipes, ducts, conduit, etc., which penetrate the final slab or walls shall be Installed so as to maintain the fire resistive and structural Integrity
<br />of the building construction.
<br />10. Demolition of existing construction necessary to Install new construction and equipment Is to be performed by the contractor who Is to
<br />supply and Install the new construction and equipment. Install lintels where required with prior written approval.
<br />ll. Contractor to repair floor slobs, fill gaps, cracks and voids. Grind smooth any high spots or ridges. Floors to be prepared as required to
<br />receive floor finishes so that previous substrate defects cannot be detected.
<br />12. GENERAL CONDITIONS OF THE CONTRACT, AIA Document A201, latest edition, shall apply.
<br />13. Fire extinguisher cabinets mounting height to be 2'-6' from floor to bottom of receptacle. Top of extinguisher to be 4'-0' AFF, max.
<br />14. Not all listed GENERAL NOTES may apply, nor are they all -Inclusive for every work situation. Excellence, through -out the job, does apply.
<br />15. Each new FIRE WALL, FIRE BARRIER, FIRE PARTITION, SMOKE BARRIER, SMOKE PARTITION, or any other new wall
<br />required to hove protected openings shall be permanently identified with signs or stenciling above any
<br />decorative ceiling and In concealed spaces with the words, 'FIRE AND SMOKE BARRIER PROTECTED ALL OPENINGS',
<br />or similar language. Sign or stenciling to include UL Design number of partition. Such signs or stenciling shall be in 4 inch
<br />high letters, %Z-inch stroke, and not more than 15-feet on center. Per Florida Fire Protection Code 101:8.3.2.4.
<br />16. Contractor to repair any damaged spray flreproffIng. Patch shall be completed to maintain the require fire resistant rating.
<br />INDEX OF DRAWINGS
<br />400 Cover Sheet
<br />ARCHITECTURAL
<br />A1,0 First Floor Life Safety Plan
<br />ALL First Floor ICRA Plan
<br />A2.0 Demolition Plan and Floor Plan
<br />A2.1 Ceiling Plan and Details
<br />A2.2 Second Floor and Roof Plan
<br />A5.1 Specifications
<br />STRUCTURAL
<br />S i .0 Structural Notes and Abbreviations
<br />S2.0 Structural Roof Plan and Details
<br />S2.1 Structural First Floor Plan and Details
<br />PLUMBING
<br />PLO Plumbing Legend, General Notes, Fixture
<br />Schedules and Details and Plumbing Partial Floor Plan
<br />MECHANICAL
<br />M1.0
<br />Abbreviations, Legend and General Notes
<br />M2.0
<br />Infection Control Plan
<br />M3.0
<br />HVAC 1st Floor Plan - Demolition
<br />M4.0
<br />HVAC 1 st Floor Plan -New Construction
<br />M4.0
<br />HVAC 2nd Floor Plan - New Construction
<br />M4.0
<br />HVAC 3rd Floor Plan - New Construction
<br />M5.0
<br />Mechanical Schedule & Details
<br />FIRE PROTECTION
<br />FP1.0 Abbreviations, Legends, General Notes and Details
<br />FP2.0 Fire Protection Demolition and New Construction Partial Plans
<br />ELECTRICAL
<br />E-1.0 Legend, Abbreviations and General Notes
<br />E-2.0 Demolition and New Feeder Plan
<br />E-3.0 New Construction
<br />E4.0 Riser Diagram and Schedules
<br />ALL WORK SHALL COMPLY WITH ALL
<br />PREVAILING CODES, FLORIDA BUILDING
<br />CODE, NATIONAL ELECTRIC CODE AND
<br />CITY OF ZEPHYRHILLS ORDINANCES
<br />REVIEW DATE _L�_I0
<br />CITY OF ZEPHYRHILLS
<br />PLANS EXAMINER
<br />Refer also to Siemens Medical Drawing
<br />Florida Hospital Zephyrhills Project #140420
<br />dated 7/10/15
<br />Lyndon T. Pollock
<br />Registered Architect AR0006747
<br />\0 mr- �M&
<br />Project No. 15017.00
<br />A0.0
<br />I�-.-. ©2015 BHIPK Architects, Inc.
<br />812512015 4:06:44 PM _Acd\A0-0 Cover Sheet.dgn