My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (129)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (129)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 3:36:20 PM
Creation date
2/25/2025 9:48:41 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Rodda Construction
Building Plans - Permit #
12953
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPORTANT POWER NOTES WIRING NOTES INCOMING WIRE SIZE NOTES <br />( CONTRACTOR FURNISHED -CONTRACTOR INSTALLED) <br />( CONTRACTOR FURNISHED -CONTRACTOR INSTALLED) <br />1. POWER LINES FOR EQUIPMENT LISTED SHALL BE DEDICATED LINES RUN DIRECTLY FROM NEAREST FACILITY <br />POWER SOURCE. UNDER NO CIRCUMSTANCES SHALL ANY OTHER ELECTRICAL EQUIPMENT BE CONNECTED <br />TO THESE POWER LINES NOW OR IN THE FUTURE. <br />LINE REQUIREMENTS <br />A. NO TRANSIENTS (IMPULSES FROM 0.5 TO 800 MICROSECONDS) THAT EXCEED 30F NOMINAL PEAK LINE <br />VOLTAGE, AS MEASURED BY A POWER LINE ANALYZER, WITH THE SYSTEM IN STANDBY SHALL OCCUR. <br />B. TRANSIENTS EQUAL TO OR GREATER THAN 30F NOMINAL PEAK LINE VOLTAGE. <br />- SHALL NOT OCCUR MORE THAN ONCE PER HOUR. <br />- SHALL NOT EXCEED MORE THAN 12 IMPULSES PER 24-HOUR PERIOD. <br />2. IF ANY OF THE ABOVE POWER SPECIFICATIONS REGARDING LINE TRANSIENTS OR NOMINAL LINE VOLTAGE, <br />CANNOT BE MET, THE FOLLOWING CORRECTIVE ACTION MUST BE TAKEN: <br />CONTACT TOM FISHLER, P.E. 262-827-9101 TEAL MEDICAL CORP. TO ORDER AN EQUIPMENT SPECIFIC TEAL UNIT. <br />WHEN PLACING ORDERS: REFERENCE FILE NAME LOCATED IN BOTTOM RIGHT OF SHEET A-1. <br />VOLTAGE REGULATION WITH OPTIONAL TEAL UNIT <br />A. 112.5KVA, THREE PHASE, 480VAC INCOMING LINE TO MAIN DISCONNECT WITH 5% VOLTAGE REGULATION <br />UNDER INTERMITTENT NO LOAD TO FULL LOAD CONDITIONS REQUIRED. 60HZ ±0.5%. <br />3. IF ANY OF THE ABOVE POWER SPECIFICATIONS REGARDING VOLTAGE REGULATION, CANNOT BE MET, <br />THE FOLLOWING CORRECTIVE ACTION MUST BE TAKEN: <br />A REGULATION TRANSFORMER OR LINE CONDITIONER DEPENDING ON THE SEVERITY OF THE PROBLEM SHALL BE <br />EMPLOYED TO MAINTAIN LINE VOLTAGE WITHIN 5F NOMINAL UNDER INTERMITTENT, NO LOAD TO FULL LOAD <br />CONDITIONS. <br />TEAL POWER CONDITIONER NOTE <br />NOTE: IF A LINE MATCHING TRANSFORMER IS REQUIRED, OR IF THE FACILITY IS <br />EXPERIENCING GROUNDING OR POWER CONDITION PROBLEMS, OMEGA MEDICAL <br />RECOMMENDS THE PURCHASE OF A TEAL UNIT INSTEAD OF A LINE MATCHING <br />TRANSFORMER. THE TEAL UNIT REPLACES THE 1) LINE MATCHING TRANSFORMER; <br />2) MAIN DISCONNECT (A); 3) LOAD CENTER (Al); AND 4) TRANSIENT CONTROL <br />WHICH WILL PROTECT THE EQUIPMENT FROM VOLTAGE SPIKES, ETC. <br />A TEAL UNIT WILL SAVE CONSTRUCTION TIME AND REDUCE CONSTRUCTION COST. <br />CONTACT TOM FISHLER 262-827-9101. ORDER MODEL #PCDU-ORF PER GENERATOR. <br />YOU MUST SPECIFY PRIMARY VOLTAGE: 208 OR 480VAC THREE PHASE INPUT. <br />ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUITS, WIRE, <br />WIREWAYS, DISTRIBUTION TRANSFORMERS, JUNCTION BOXES, ENCLOSURES, CIRCUIT <br />BREAKERS, ETC. <br />ALL WIRES TO BE THHN TYPE, STRANDED COPPER UNLESS OTHERWISE SPECIFIED. THE <br />ELECTRICAL CONTRACTOR SHALL SUPPLY LUG PAIRS OF #8 OR GREATER FOR ALL <br />CABLES LISTED WITHIN THE SCOPE OF THIS WORK. <br />CONDUIT AND DUCT RUNS ARE SHOWN SCHEMATICALLY. ACTUAL BUILDING CONDITIONS <br />WILL DETERMINE CONDUIT AND DUCT ROUTES. CONDUIT TURNS TO HAVE LARGE <br />SWEEPING BENDS WITH MINIMUM RADIUS AS SPECIFIED IN NEC ART. 346-10. IF LARGE <br />BENDS IN CONDUIT ARE NOT POSSIBLE, USE SERVICE ENTRANCE ELBOW CONNECTORS <br />TO AVOID DAMAGE TO CABLE. <br />ELECTRICAL CONTRACTOR TO PROVIDE 10'-0" TAILS FOR ALL WIRES UNLESS OTHERWISE <br />SPECIFIED AND IDENTIFY BOTH ENDS OF ALL WIRES. ELECTRICAL CONTRACTOR SHALL <br />MAKE EVERY EFFORT TO ENSURE THAT POINT TO POINT CONDUIT RUNS ARE AS SHORT <br />AS FIELD CONDITIONS ALLOW. <br />LEAVE PULL WIRE IN EMPTY CONDUITS. <br />WORK SHALL COMPLY WITH REGULATORY AGENCIES OF JURISDICTION. ALL SUCH <br />AGENCIES SUPERSEDE THESE DRAWINGS AND MUST BE ADHERED TO. THE ELECTRICAL <br />CONTRACTOR SHALL BE RESPONSIBLE FOR SCRUTINIZING THESE DRAWINGS AND <br />SHALL MAKE CORRECTIONS ACCORDING TO PREVAILING CODES. <br />NOTE: CONDUITS MAY BE INCREASED IN SIZE BUT NEVER DECREASED WITHOUT <br />CONSENT FROM THE EQUIPMENT REPRESENTATIVES. ELECTRICAL CONTRACTOR SHALL <br />BE RESPONSIBLE FOR 11,.STALLING THE PATIENT GROUNDING NETWORK PER NATIONAL <br />ELECTRIC CODE ARTICLE 517 AND NFPA 70. <br />ALL CONDUIT SHALL BE RIGID TYPE UNLESS SPECIFIED OTHERWISE IN THIS DRAWING <br />SET. ALL CONDUIT RUNS EXPOSED TO WET ENVIRONMENTS SHALL BE MADE LIQUID <br />TIGHT. (e.g. UNDERGROUND, ETC.) <br />ALL FLUSH MOUNTED ELECTRICAL BOXES AND WIRE TROUGHS SHALL HAVE OVERSIZED <br />COVER PLATES. ALL FLUSH MOUNTED ELECTRICAL BOXES AND WIRE TROUGHS EXPOSED <br />TO A WET ENVIRONMENT SHALL BE MADE LIQUID TIGHT. (e.g. IN FLOOR, ETC.) <br />THE ELECTRICAL CONTRACTOR SHALL INSTALL, PROVIDE POWER TO AND CONNECT THE <br />FOLLOWING IF REQUIRED: <br />THE "X-RAY IN USE" WARNING SIGN; THE 120VAC, 15AMP RECEPTACLE AND BNC <br />CONNECTORS; THE DOOR INTERLOCK SWITCH; THE EMERGENCY OFF SWITCH; AND THE <br />120VAC, DUPLEX OUTLETS FOR SERVICE AND HOUSEKEEPING DESCRIBED IN THE <br />GENERAL NOTES ITEM #6. <br />SPECIAL NOTE TO ALL ANCILLARY <br />EQUIPMENT SUPPLIERS: <br />THE ELECTRICAL SPECIFICATIONS IN THESE PLANS ARE DEDICATED TO THE <br />EQUIPMENT PROVIDED BY OMEGA MEDICAL IMAGING. <br />ALL ADDITIONAL EQUIPMENT SUPPLIERS SHALL NOT USE ANY ELECTRICAL <br />DEVICES CALLED OUT IN THESE PLANS AS A PART OF THEIR ELECTRICAL <br />REQUIREMENTS OR SCHEMATIC. <br />ALL ADDITIONAL EQUIPMENT SUPPLIERS SHALL ISSUE A SEPARATE DETAILED <br />SPECIFICATIONS PACKAGE TO THE ARCHITECT OR TO THE CUSTOMER. THE <br />ARCHITECT SHALL EXTRAPOLATE THIS INFORMATION AND INCORPORATE IT <br />INTO THEIR WORKING DRAWINGS. <br />OMEGA MEDICAL IMAGING IS NOT RESPONSIBLE FOR FURNISHING INFORMATION <br />ON EQUIPMENT THEY DO NOT PROVIDE. <br />ADDITIONAL EQUIPMENT, OTHER THAN O.M.I., DEPICTED IN THESE PLANS <br />HAVE BEEN SHOWN AS A COURTESY TO OUR CUSTOMERS. <br />LISTED BELOW IS THE RELATIONSHIP BETWEEN THE LENGTH AND SIZE OF EACH INCOMING WIRE, <br />WITH THE ASSUMPTION THAT THE POWER SOURCE HAS THE REQUIRED CAPACITY. <br />THE VOLTAGE REGULATION UNDER LOAD VARIATION IS CALCULATED TO BE WITHIN ±5%. <br />BE SURE TO USE WIRE SIZES INDICATED. <br />RECOMMENDED POWER TO THE MAIN DISCONNECT: <br />MAIN CIRCUIT BREAKER: <br />X-RAY GENERATOR: <br />MAXIMUM MOMENTARY: <br />Long Term: <br />MAXIMUM LINE IMPEDANCE: <br />480VAC, THREE PHASE, 75KVA, 60Hz, <br />WYE-5WIRE <br />60AMP, 3-POLE, THERMOMAGNETIC <br />EMD TECHNOLOGIES EPSILON 65KW - EPS 65 R/F <br />105 AMPS / 67KVA <br />7AMPS/ 4.1 KVA <br />0.16 OHMS <br />* PROVIDE THE APPROPRIATE WIRE SIZE FROM POWER SOURCE TO MAIN DISCONNECT: <br />WIRE LENGTH LESS THAN 50' 100, 200' ** GREATER THAN 200' <br />FEEDER SIZE <br />LINE: #3AWG #3AWG #1/OAWG #2/OAWG <br />NEUTRAL: #3AWG #3AWG #1/0AWG #2/OAWG <br />GROUND: #8AWG #8AWG #6AWG #4AWG <br />* VOLTAGE DROP CALCULATED FOR LESS THAN 1 %. <br />** WIRE SIZE CALCULATED AT 300 FEET. IF RUN IS LONGER THAN 300', EC SHALL NOTIFY EQUIPMENT INSTALLER. <br />PATIENT SAFETY GROUNDING CONSIDERATIONS: <br />A SPECIAL GROUNDING SYSTEM IS REQUIRED IN ALL DIAGNOSTIC ROOMS BY SOME STATE AND LOCAL CODES. <br />THIS GROUNDING SYSTEM IS STRONGLY RECOMMENDED IN AREAS WHERE ELECTRICALLY SUSCEPTIBLE PATIENTS <br />MIGHT BE EXAMINED OR TREATED UNDER PRESENT, FUTURE OR EMERGENCY CONDITIONS. CONSULT WITH THE <br />GOVERNING ELECTRICAL CODES AND CONFER WITH APPROPRIATE HOSPITAL ADMINISTRATIVE PERSONNEL AND <br />CONSULTING ENGINEERS TO DETERMINE THE AREAS REQUIRING THIS GROUNDING SYSTEM. IF SUCH A GROUNDING <br />SYSTEM IS REQUIRED, THE RESPONSIBLE CONSTRUCTION PARTICIPANTS SHALL DESIGN AND INSTALL GROUNDING <br />SYSTEM TO INCLUDE ALL METAL OBJECTS AND FIXTURES. <br />FACILITY: <br />Florida Hospital <br />Zephyrhills, FL <br />DRAWN BY: <br />Dave Moser <br />DATE: <br />01.30.2012 <br />FILE NAME: <br />FHZ122011 <br />SCALE: <br />NONE <br />SHEET: <br />E=3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.